Loading...
HomeMy WebLinkAboutNC0020559_Historical_2000 (2)NCDENR JAMES B. HUNT JR. GOVERNOR . ` 'BILL HOLMAI „ SECRETARY " - KERB T. STEV ENB/ DIRECTOR' 'I NORTn L AROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY September 26, 2,000 rl� Honorable Robert G. Young, Jr., Mayor City Of Henderson f 1 8 Post Office Box 1434� Nn Henderson, North Carolina 27536-1434 — SUBJECT: City of Henderson Red Bud Creek Pump Station Improvements Eligibility Determination Project No. E-SEL-T-00-0031 Dear Mayor Young: The subject plans and specifications have been reviewed for eligibility by the Construction Grants & Loans Section of the North Carolina Division of Water Quality. Eligibility for State Emergency Loan funding is determined as follows: Modifications to the existing Red Bud Creek Pump Station to allow connection of a portable engine driven emergency pump with discharge into the existing force main, and procurement of an 1800 GPM portable engine driven emergency pump. Funding for this project is limited to the proposed loan amount of $112,780 established and approved by the Environmental Management Commission. In the event that received bids exceed this established amount and local funds are not adequate to award contract(s), it will be necessary to consider all alternatives including redesign, re - advertising, and rebidding. Neither the State or Federal Government, nor any of its departments, agencies or employees is or will be a party to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. In accordance with the Federal Regulations, the Recipient is required to assure compliance with the OSHA safety regulations on the subject project. It is the responsibility of the Recipient and the Consultant Engineer to insure that the project plan documents are in compliance with CONSTRUCTION GRANTS 9 LOANS SECTION 1633 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1633 PHONE 919-T33-6900 FA% 919-715-6229 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 30% RECYCLED/10% POST -CONSUMER PAPER d .. Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these plans and specifications, and any subsequent addenda or change order, does not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. It is mandatory for project facilities to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors' responsibilities shall be in complying with these Acts. Attached is one (1) copy of the Part B (Approval to Award) which is to be completed and submitted to the State for review. It must be accompanied by documents -including a detailed cost breakdown showing units, unit cost, and value of the eligible work. Upon review and approval of this information, the State will authorize the Recipient to make the proposed award. Two (2) copies of any change order must be promptly submitted by the Recipient to the State. If additional information is requested by the State, a response is required within two (2) weeks, or the change order will be returned without further or final action. One (1) set of the final approved plans and specifications will be forwarded to you. One (1) set of plans and specifications identical to the approved set must be available at the project site at all times. Upon completion of the project construction, the Recipient shall submit a letter confirming that the project has been constructed in accordance with the plans and specifications approved by the State. "As -built" plans will need to be submitted with any changes color -coded on the plans if the above confirmation cannot be made. If there are any questions concerning this matter, please do not hesitate to contact Mr. Cecil G. Madden, Jr., P. E. at (919) 715-6203. lowle L� Chief -tion Grants & Loans Section Attachment CGM:pe cc: McKim & Creed Raleigh Regional Office, WQ Amy Simes, P.E. Daniel Blaisdell, P.E. Don Evans Valerie Lancaster DMU, SEL City of Henderson Red Bud Pump Station Emergency Loan Application 011 Subject: City of Henderson Red Bud Pump Station Emergency Loan Application Date: Tue, 01 Feb 2000 12:44:34 -0500 �Giw t From: Judy Garrett <judy.garrett@ncmail.net> To: bobby.blowe@ncmail.net CC: ken.schuster@ncmail.net The Raleigh Regional Office has reviewed the information submitted for the subject project. Due to the environmental impact which occurs from the overflows from this station, we recommend that this project be approved for emergency funding. If you have questions, please call me at 571-4700. 1 of 1 02/01/2000 1:10 PM v 1, CK M&CR�ED v January 12, 2000 Mr. Kenneth Schuster, P.E. NCDENR Division of Water Quality 1628 Mail Service Center Raleigh, North Carolina 27699-1628 Re: City of Henderson Red Bud Pump Station Emergency Loan Application Dear Mr. Schuster: M&C 01406-0002 (10) AN 13 ?jq) The City has experienced continuing overflow and bypass conditions at the Red Bud Pump Station. As you are aware, they are proceeding with implementation of a pump station, interceptor, and force main expansion project. However, given the continuing nature of the problems and the length of time required to complete the comprehensive project, the City wishes to pursue the immediate installation of a semi -temporary portable pump at this location which would run during these rainfall events. The pump would be capable of an output of up to 2,000 GPM (compared to the current pump design capacity of 965 GPM and actual output of approximately 800 GPM). Due to the magnitude of the expenditure and the timing relative to the fiscal year, the City wishes to apply for funding from the Emergency Loan Fund of the Clean Water Revolving Loan and Grant Program. Mr. Blowe informed us that the Raleigh Regional Office is responsible for a determination of eligibility to apply for those funds. Mr. Blowe indicated there is approximately $1.0 million available in that fund at present. We understand that it may appear unusual to ask for loan eligibility for a "temporary' or .'portable" piece of equipment. We would point out that this unit will be used extremely frequently (especially during wet weather) at this installation for up to two years while the comprehensive project is implemented. Thereafter, there will be occasions for its use at many locations in the system. Chief among these would be at the Sandy Creek Pump Station, a 3.8 MGD station that has occasional capacity deficiencies at this time. We can foresee the utilization of this pump at the wastewater treatment plant and other significant pump stations as well. The unit is provided with means of control and modulation of the pumping rate to suit the particular situation in terms of influent flow and capacity of downstream receiving facilities. 5625 DILLARD DR., SUITE 117, CARY, NORTH CAROLINA 27511 TEL919.233.8091 FAx919.233.8031 www.mckimcreed.com Mr. Kenneth Schuster, P.E. January 12, 2000 Page 2 A copy of the funding application is attached. We would appreciate a favorable decision on this matter at your earliest opportunity. In the interim, the City will be pursuing the installation of requisite connections at the station site and preparation of plans/specifications and bid solicitations for the pump equipment and installation. Please don't hesitate to contact me if you have any questions or comments, or require additional information. Sincerely, McKKIIM & CREED, P.A. / jcz. J L , Timothy J. Baldwin, P.E. Vice President /der Enclosure 0..,1406\00021 DOI120Shuster dw � M M1 1 1 & CREED APPLICATION To be submitted in Triplicate (To be filled in by the DATE RECEIVED See INSTRUCTIONS before completing application I ACCOUNT 1) LEGAL NAME & ADDRESS OF APPLICANT Name City of Henderson PO Box 1434 City Henderson Zip Code 27536 County Vance Telephone Number 252-431-6006 Federal ID Number 566001241 3) PROJECT DESCRIPTION Red Bud Pump Station 5) CERTIFICATION FOR STATE 2) TYPE OF PROJECT (Check One) Wastewater Treatment Works X Wastewater Collection System Water Supply System Water Supply Project Planning 4) AMOUNT REQUESTED FOR THIS PROJECT Loan $ Emergency Loan $ 231,850 Grant $ The attached statements and exhibits are hereby made part of this application and the undersigned representative of the Applicant certifies that the information in the application and the attached statements and exhibits is true, correct, and complete to the best of his knowledge and belief. He further certifies that: He has been authorized to file this application by formal action of the governing body of the Applicant as is evidenced by the ATTACHED CERTIFIED COPY OF AUTHORIZATION MADE BY THE APPLICANT'S GOVERNING BODY; the governing body of the applicant agrees that if a loan or grant for the Project is made pursuant to the Clean Water Revolving Loan and Grant Act of 1987 and the Federally Funded State Revolving Fund Program (SRF), the Applicant will provide proper and efficient operation and maintenance of the approved Project after completion of construction thereof, and the Applicant has substantially compiled or will substantially comply with all Federal, State, and local laws, rules, regulations, and ordinances applicable to the Project. Applicant will adopt and place into effect on or before completion of the project a schedule of fees and charges which will provide adequate funds for proper operation, maintenance, administration of the system, and repayment of all principal of and interest on loans. 6) AUTHORIZED REPRESENTATIVE 17) SIGNATURE OF REPRESENTATIVE 18) DATE Name: Robert G. Young, Jr. Title: p:tl40610 Z4MP-Gmnt doc SECTION II - FINANCIAL INFORMATION AS OF DATE OF APPLICATION I) Financing construction of project: Source a) Funds to be made available by the Applicant Cash.............................................................................. General Obligation Bonds .............................................. Revenue Bonds.............................................................. b) Other (specify: ) ................................. c) Federal (Including SRF) Loan Requested ............. Grant Requested............ d) State Loan Requested ............... Grant Requested .............. Sub-total .................................................... .................................................... Sub -total ............................. Sub -total Total Amount Date Available $ 231,850 $ 231,850 2) Name sources and amounts of other federal or state grants and loans requested, and indicate status of each request. N/A 3) Outstanding bonded indebtedness not including bonds for this project: $ 4) Indicate total appraised property valuation: $ 5) The applicant has followed proper accounting and fiscal reporting procedures, as evidenced by the applicant's most recent report of audit, and the applicant is in substantial compliance with provisions of the general fiscal control laws of the State. YesX No_ oA1406maozwrnnac.Maa SECTION III - ENGINEERING INFORMATION 1) Project cost estimate summary: Indicate under Item la major items of work for which separate contracts are proposed and estimated cost. a) Construction: Specify for each contract b) c) d) e) f) 9) Estimated Total Estimated Eligible Proiect Cost Project Cost (1) Contract 1— Pump Equipment and Materials $ 143,000 $ 143,000 (2) Contract 2: Bypass Installation ................................ $ 55,000 $ 55,000 (3) Contract $ $ (4) $ $ Subtotal $ 198,000 $ 198,000 Technical Services........................................................... Administrative................................................................ Contingency (10% of cons[. cost) (5% after bid) $ Other (specify: ).............................. Site and Other Real Property Interests ............................. Total Closing cost (2°/a) (For Federal Only) .............................. Total 2) Time schedule proposed for construction of project: $ 9,500 $ 19,800 $ 227,300 $ 4,550 $ 231,850 a) Estimated date of submission of final plans and specifications December 1999 If approved, give date and permit number b) Estimated date contract can be awarded January 1999 $ 9,500 $ 19,800 $ $ 227,300 $ 4,550 $ 231,850 c) Estimated construction time (calendar days) 60 3) Please indicate if project is under a mandated time schedule by the SOC, JOC, AOC, of if the project is under moratorium. Yes x No (If yes, attach copy.) 4) Indicate whether this is a regional project and list the local units involved. (Please provide a copy of the executed intergovernmental agreement.) 5) Project Engineer (name, firm name, address (postal and entail), and telephone and facsimile number). Timothy J. Baldwin, P.E. Phone: (919) 233-8091 McKim & Creed, P.A. Fax: (910) 233-8031 5625 Dillard Drive Email tbaldwin@mckimcreed.com Suite 117 Cary, NC 27511 0a140e000n4M".ntdw SECTION IV - SUPPORTING DOCUMENTS AND NARRATIVE STATEMENTS x 1) Resolution or resolutions of governing body providing required assurances and agreements and designating an authorized representative x a) Certification by recording officer x 2a) Preliminary Engineering Report (PER) and Environmental Assessment (See instructions for requirements and number of copies) or 2b) Facilities Plan (required for federal wastewater funds) x 3) Financial feasibility analysis - Forms LGC 108A and 108C 4) Agreements with other units of government (if applicable) x 5) Engineering and other professional services agreements and contracts x 6) Water or sewer user ordinance including user charge structure x 7) Certification of MBE percentage goal as adopted by the applicant in accordance with GS 143-128 8) Site certificates by applicant and title counsel [clear or limited] (see attached forms) THESE DOCUMENTS MAY BE SUBMITTED FOR ADDITIONAL PRIORITY POINTS UNDER THE STATE LOAN AND GRANT PROGRAM: 9) Final plans and specifications (note: final plans and specs for wastewater projects are required for higher priority consideration under the State loan and grant program) 10) Resolution establishing capital reserve fund (if applicable) 11) Resolution or supporting data for meeting criteria for water conservation and land use planning (see applicable section in the rules) I. Water Conservation a) Continuing infiltration/inflow program b) Water loss reduction program c) Water conservation education program d) Water conservation incentives or water reclamation or reuse II. Water Conservation a) Adopted land use plan b) Plan exceeds state standards c) Implementation of the plan FOR HIGH -UNIT COST GRANT APPLICATION AND PRIORITY POINTS UNDER DRINKING WATER SRF, THE ADDITIONAL DOCUMENTS MUST BE PROVIDED: 12) Official copy of applicants existing water rate structure and sewer rate structure with documentation of an average monthly residential user charge 13) Copy of projected project revenues for water and wastewater must be completed (use attached form) (note: All drinking water SRF applicants see note in instructions) QX OBWOOz Mp-GnnLa v 1✓ICIQM&CREED v November 30, 1999 Mr. Don Evans, P.E. NCDENR — Design Management Unit Construction Grants and Loans Section 2728 Capital Boulevard Raleigh, NC 27604 RE: City of Henderson High -Unit Cost Grant Application Dear Mr. Evans: M&C 01406-0001(10) Please find enclosed the revised grant application and amendment to the preliminary engineering report for the Nutbush Interceptor and Red Bud Pump Station project. The bulk of the application package and documentation from the March 31, 1999 submittal remains in effect, but the project scope has been amended somewhat. The major amendment consists of the inclusion of the Red Bud Pump Station parallel force main in this project rather than in a future phase. Also, the budget estimate for the pump station upgrade has been modified somewhat based on more current estimates received during the design process. These modifications are discussed in the attached PER amendment, and are reflected in the revised project budget sheets in the grant application. Of course, the full maximum S3 million grant had been requested previously, and this remains the request. Please don't hesitate to contact me if you have any questions or require additional information. Sincerely, McKIM & CREED, P.A. Timothy J. Baldwin, P.E. Sr. Project Manager Enclosures cc: Mark Warren, Assistant City Manager 031406MNe111RB6 . aoc a- 5625 DILLARD DR.. SUITE 117, CARY. Nc%TH CAROLINA 275; r _:_ 919 233.8091 FAX 919 233.8031 --w mckimcreed co— APPLICATION To be submitted in Triplicate SECTION I - 1) LEGAL NAME & ADDRESS OF APPLICANT Name City of Henderson PO Box 1434 City Henderson Zip Code 27536 " County Vance Telephone Number 252-431-6006 Federal ID Number 566001241 3) PROJECT DESCRIPTION Pump station, Interceptor and Collection System ]ll Reduction Improvements 5) CERTIFICATION (To be tilled in by the State) DATE RECEIVED ACCOUNT FOR STATE LOAN OR GRANT 2) TYPE OF PROJECT (Check One) Wastewater Treatment Works X Wastewater Collection System Water Supply System Water Supply Project Planning 4) AMOLWT REQUESTED FOR THIS PROJECT Loan S Emergency- Loan S Grant S 3,000,000 The attached statements and exhibits are hereby made part of this application and the undersigned representative of the Applicant certifies that the information in the application and the attached statements and exhibits is true, correct. and complete to the best of his knowledge and belief. He further certifies that: He has been authorized to file this application by formal action of the governing body of the Applicant as is evidenced by the ATTACHED CERTIFIED COPY OF AUTHORIZATION MADE BY THE APPLICA-NT'S GOVERNING BODY; the governing body of the applicant agrees that if a loan or grant for the Project is [Wade pursuant to the Clean Water Revolving Loan and Grant Act of 1987 and the Federallv Funded State Revolving Fund Program (SRF), the Applicant will provide proper and efficient operation and maintenance of the approved Project after completion of construction thereof; and the Applicant has substantially compiled or will substantially comply with all Federal, State, and local laws, rules, regulations, and ordinances applicable to the Project. Applicant %ill adopt and place into effect on or before completion of the project a schedule of fees and charges ultich trill provide adequate funds for proper operation, maintenance, administration of the system and repayment of all principal of and interest on loans. 6) AUTHORIZED REPRESENTATIVE Name: Robert G. Young, Jr. Title: 7) SIGNATURE OF REPRESEN—TATIVE 1 8) DATE _furv.aC4.1g99 6:+V• '-X)" &TEN- 8.;r yape .x SECTION II - FINANCIAL INFORMATION AS OF DATE ur APPLICATION 1) Financing construction of project: Source Amount Date Available a) Funds to be made available by the Applicant Cash.............................................................................. $ 830,126 General Obligation Bonds .............................................. $ Revenue Bonds... ................................................... ....... $ b) Other (specify: 1................................. $ Sub -total $ 830,126 c) Federal (Including SRF) LoanRequested......................................................................... $ ( ) GrantRequested........................................................................ $ ( ) Sub -total $ d) State LoanRequested......................................................................... $ ( ) Grant Requested........................................................................ $ 3,000,000 ( ) Sub -total $ 3,000.000 Total $ 3.830,126 2) Name sources and amounts of other federal or state grants and loans requested, and indicate status of each request. N/A 3) Outstanding bonded indebtedness not including bonds for this project: $6,434.047 4) Indicate total appraised property valuation: S 639 024,120 5) The applicant has followed proper accounting and fiscal reporting procedures. as eNldenced by the applicant's most recent report of audit, and the applicant is in substantial compliance with pro%isions of the general fiscal control laws of the State. YesX No , a0@A00J DP ,, a . ,. d d. SECTION III - ENGINEERING INFORMATiviN l) Project cost estimate summary: Indicate under Item la major items of work for which separate contracts are proposed and estimated cost. a) Construction: Specify for each contract (1) Contract Interceptor and Force Main (2) Contract Pump Station ......................................... (3) Contract 1/I.............................................................. (4) Subtotal b) Technical Ser%ices............................................................. c) Administrative.................................................................. d) Contingency (10% of const cost) (5% after bid) $ e) Other (specify: 1................................ f) Site and Other Real Property Interests ............._.......... Total g) Closing cost (2%) (For Federal Only) ............................ Total 2) Time schedule proposed for construction of project: Estimated Total Proiect Cost S 1,904,010 $ 620,000 S 620,650 S S 3,144,660 S 332,000 S 39,000 S 314,466 S S S 3,830,126 Estimated Eligible Project Cost $ 1,904.010 $ 620,000 $ 620,650 S $ 3.144,660 $ 332,000 $ 39,000 $ 314,466 S S S 3,830,126 S S 3,830,126 $ 3,830.126 a) Estimated date of submission of final plans and specifications December 1999 If approved, give date and permit number b) Estimated date contract can be awarded June 1 2000 c) Estimated construction time (calendar days) 270 3) Please indicate if project is under a mandated time schedule by the SOC. JOC, AOC, of if the project is under moratorium. Yes X No (If yes, attach copy.) 4) Indicate whether this is a regional project and list the local units involN ed. (Please provide a copy of the executed intergovernmental agreement.) 5) Project Engineer (name, firm name, address (postal and email), and telephone and facsimile number). Timothy J. Baldwin, P.E. Phone: (919) 233-8091 McKim & Creed, P.A. Fax: (910) 233-8031 5625 Dillard Drive Email tbaldwin@mckimcreed.com Suite 117 Cary, NC 27511 SECTION IV - SUPPORTING DOCUMENTS AND NARRATIVE STATEMENTS All documents submitted with previous (3131199) application X 1) Resolution or resolutions of governing body providing required assurances and agreements and designating an authorized representative X a) Certification by recording officer X 2a) Preliminary Engineering Report (PER) and Environmental Assessment (See instructions for requirements and number of copies) or N/A 2b) Facilities Plan (required for federal wastewater funds) N/A 3) Financial feasibility analysis - Forms LGC 108A and 108C N/A 4) Agreements with other units of government (if applicable) 5) Engineering and other professional services agreements and contracts 6) Water or sewer user ordinance including user charge structure X 7) Certification of MBE percentage goal as adopted by the applicant in accordance with GS 143-128 8) Site certificates by applicant and title counsel [clear or limited] (see attached forms) THESE DOCUMENTS MAY BE SUBMITTED FOR ADDITIONAL PRIORITY POINTS UNDER THE STATE LOAN AND GRANT PROGRAM: N/A 9) Final plans and specifications (note: final plans and specs for wastewater projects are required for higher priority consideration under the State loan and grant program) 10) Resolution establishing capital reserve fund (if applicable) 11) Resolution or supporting data for meeting criteria for water conservation and land use planning (see applicable section in the rules) 1. Water Conservation a) Continuing infiltration/inflow program b) Water loss reduction program c) Water conservation education program d) Water conservation incentives or water reclamation or reuse 11. Water Conservation a) Adopted land use plan b) Plan exceeds state standards c) Implementation of the plan FOR HIGH -UNIT COST GRANT APPLICATION AND PRIORITY POINTS UNDER DRINKING WATER SRF._ THE ADDITIONAL DOCUMENTS MUST BE PROVIDED: X 12) Official copy of applicants existing water rate structure and sewer rate structure with documentation of an average monthly residential user charge 13) Copy of projected project revenues for water and wastewater must be completed (use attached form) (note: All drinking water SRF applicants see note in instructions) 011405"I0 V ,Granl-A rc.+se0.a AMENDMENT TO PRELIMINARY ENGINEERING REPORT I. Introduction Since the original grant application and preliminary engineering report were submitted in March, 1999, there have been continued problems with overflows and bypasses at the Red Bud Pump Station. Base flows, as well as infiltration inflows, have resulted in chronic overflow bypass conditions even during something less then extreme rainfall events. Faced with this situation, the City has elected to pursue the relatively complete pump station installation and concurrent parallel force main installation in the initial project, rather then the previously discussed phase implementation. Therefore, the pump station phasing contained on page 12 of 15 of the PER has been amended and the proposed station upgrade described on the attached revised pages 12 through 15, with revised Figure 1 and Tables 9-11. Project budgets have been revised accordingly. 0 ff'AOBNOW UOUT ET ER Ame menttl City of Hendersof. Pump Station, Interceptor, and Collection System 1/1 Reduction Improvements V. Pump Station Upgrade The Red Bud pump station has received considerably more detailed investigations than several other stations since it has been subject to chronic overflow/bypass conditions, is mentioned specifically under the City's SOC. The existing pump station at Red Bud is having difficulty in keeping up with the extraneous flows due to the level of 1/1 in the Red Bud system. Even once some of the 1/1 flows have been removed through the previously referenced repairs, the station will still need an upgrade to convey current and projected flows. See Table 9 for pump station calculations. The initial post-1/1-repair flow to the pump station is expected to be approximately 1,410 gpm. Of the three major drainage basins in the City's system, Red Bud has exhibited the fastest growth, owing largely to the proximity to interchange areas of 1-85 and the new servicing of Vance -Granville Community College. The method for assigning projected future flows is described previously and the results are shown in Table 10 with system and pump curves on Figure 1. Therefore, the expected flow at the end of the 20-year planning period is 4,100 gpm. The pump station is currently designed for 965 gpm, but has had difficulty maintaining this output. The older magnetic drives themselves account for a 5-8% loss from synchronous speed, dramatically reducing output, and the force main (given the low design velocity of only 2.0 fps) seems to have a tendency toward deposition of grit and grease build-up. Given the extremely flat pump curve, this can have a dramatic effect on the pump output, which has been as low as 800 gpm. The pump station will be upgraded by installation of new pumps and construction of an 18" parallel force main from the station to the existing discharge point on Coble Boulevard. Phase The existing building and structures are generally in good condition. The pumps and motors, however, are undersized for the high flow conditions. In order to convey the required 4,1000 gpm and maintain a reasonably wide operating range, the station will be converted from duplex to triplex configuration. Pumps will be designed to operate in lead -lag -standby mode. Since one pump will be sufficient for the immediate future, and the generator is virtually new, the existing generator will be retained and planned to be replaced at such time as two -pump operation is routinely required. In order to provide sufficient room for the VFD's in a three - pump installation it is planned to utilize dry -pit submersible pumps. For cooling purposes, these are oversized frames and motors, resulting in 200 HP sizes. Table 9 and Figure 1 have been revised to show the pump conditions and systems curves for the proposed improvements. The outdated magnetic drives will be replaced with modem variable frequency drives (VFDs). The remainder of the station, including the existing generator. is adequate and will remain in place for Phase I. A telemetry/SCADA system must also be installed to monitor the station from a remote location. Finally, new monitoring and controls for the wet well, equalization basin, chemical feed system, bar screen, and other mechanical systems will be installed. 011406000120VPERWER_AJ 4e,;u d« Page 12 of 15 Im I 1 -- 0 I I 7 ---- & & lV I oil S. 888.8.8. tilg OMN 9 G: r A! u 9 0 WWI 11S MENIDn m ci 0 C; N in m -f 6 0, 6 a 6 C4 8 §18 8 8 8 A O aq OWj 000000000 d c; 6 d o o .;,q: od ui vi M, M, mmg M, c1d N i 14 'rgln NO PR 6 6 o ci 0 coon 6 ci 0 0 Cq W 7 ,cq q OCSd0--:-:--NN 000 - - - - - - T11 o o10 Table 10: Growth Rates and Flow Patterns Based on an Overall Growth Rate of: 3.0% Over a Period of 20 yr Nutbush Treatment Facility Current Flow: 4 MGD Growth: 3.00 MGD Future Flow: 7.00 MGD Growth Patterns Within City 10% 1-85 Area Remainder 70% 30% Red Bud Nutbush Red Bud Nutbush Sandy Creek 750 25% 33% 33% 33% Overall Percent Overall Percent 5.25% 1.75% 1.00% 1.00% 1.00% Flow Flow Flow Flow Flow 0.158 0.053 0.030 0.030 0.030 Outside City Limits 90% In Red Bud In Sandy Creek In Nutbush Creek 50% 40% 10% Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 Zone 4 NC01 (RB01/RBO6) (RB01) (RB02) Northern Vance (SC00/SCO2) Marlin Creek Ind. Park 45% 45% 10% 35% 5% 25% 35% 100% Overall Percent Overall Percent Overall Percent 20.25% 20.25% 4.50% 12.60% 1.80% 9.00% 12.60% 9.00% Flow Flow Flow Flow Flow Flow Flow Flow 0.608 0.608 0.135 0.378 0.054 0.270 0.378 0.270 400 350 300 - ---- 290 ------ 200 - 150 100 50 0 0 300 600 Figure 1: Red Bud Pump Station System and Pump Curves I 900 1200 1500 18M 2100 2400 2700 3000 3300 3600 39M 4200 Flow (gpm) M of Hendersoi. Pump Station, Interceptor, and Collection System 1/1 Reduction Improvements The expected cost of each item mentioned in the pump station upgrade is as follows: Description Cost Install 3 new dry -pit submersible pumps $270,000 Replace magnetic drives with variable frequency drives for all three pumps in station $210,000 Structural/Building Modifications $60,000 Install teleme /SCADA RTU $15,000 Install automated monitoring and control functions $65,000 Total Pump Station Construction $620,000 VI. Interceptor Design As the flows are pumped from the Red Bud pump station, they are conveyed to the 18 and 24" gravity sewers at on Coble Boulevard in Nutbush basin 11 and on to the treatment plant. Currently many, if not all segment surcharge, and some portions of the gravity sewer overflow during peak events. With the addition of flow due to the Red Bud pump station upgrade, the existing sewers will not be able to properly handle flows. Therefore, an upgrade to the existing sewers will be performed. The current post -repair required peak flow from the Red Bud pump station is 1,410 gpm. Therefore, this sewer must be capable of conveying this flow, whether through upgrade of the existing sewer or installation of a parallel sewer of larger size. When designing this sewers upgrade and installation, the overall capacity of the treatment system must be considered. This interceptor carries flows from not only the Red Bud pump station, but from the Nutbush and Sandy Creek basins as well. Therefore, the downstream portion of the sewer (that carries flows after the Nutbush and Sandy Creek connections) must be designed to carry the current and anticipated future flows at the treatment plant. The anticipated flow at the treatment plant is 7.0 MGD average day, or slightly over 12,000 gpm peak flow, in twenty years. The anticipated flow at the Red Bud pump'station (with the expected I/I reduction) is 4,100 gpm in twenty years. Each flow is assigned a peak factor of 2.5 to allow for the diurnal variation in flow. This new interceptor, along with the existing sewer, must be capable of conveying this future flow, beginning at 4,100 gpm on Coble Boulevard and ending at 12,000 gpm at the treatment plant. There are a few minor tributaries to this interceptor between these points which had relatively insignificant amounts of flow. The major tributary which results in the flow increase from 4,000 to 12,000 gpm is the Sandy Creek interceptor and basin. Although presently this flow enters the interceptor on the north side of 1-85, a future project will extend and relocate the Sandy Creek force main to Radio Lane will it will combine with the Red Bud flow. From this point to the plant the interceptor sewer must be capable of conveying 12,000 gpm. Based on the topography of the interceptor route, these flows will require a 30 inch interceptor from Coble Blvd. to Radio Lane and a 42 inch interceptor from Radio Lane to the treatment plant. With these pipe sizes and attendant slopes the 20 year design flows are conveyed at a percent of depth ranging from approximately 40% to approximately 70% depending upon the specific 0 k1a06'A001Q2 _R%POi_n Re.+ _2.d« Page 13 of 15 of Hendersoi. Pump Station, Interceptor, and Collection System 1/1 Reduction Improvements reach and attendant slopes required to avoid conflicts. Table 11 illustrates the reach by reach size slope and conveyance capacity for the entire interceptor route. The estimated costs for the installation of the new interceptor are as follows: Description Cost MOBILIZATION Qess than 2% of bid) 1 LS $15,000 $15,000 42' SS PIPE ABOVE GRADE 750 LF $90 $67,500 42" SS PIPE 0-8' DEPTH 3,432 LF $100 $343,200 42" SS PIPE 8-12' DEPTH 778 LF $110 $85,580 30" SS PIPE ABOVE GRADE 8 LF $70 $560 30' SS PIPE 0-8' DEPTH 299 LF $80 $23,920 30' SS PIPE 8-12' DEPTH 496 LF $90 $44,640 30" SS PIPE 12-16' DEPTH 155 LF $100 $15,500 30' SS PIPE 16-20' DEPTH 61 LF $110 $6,710 18" FORCEMAIN 15,000 LF $55 $825,000 MANHOLE - 6' DIAMETER 0-8' DEPTH 1 EA $4.500 $4,500 MANHOLE - 6' DIAMETER 8-12' DEPTH 1 EA $4,500 $4,500 MANHOLE - 6' DIAMETER 12-16' DEPTH 1 EA $5,000 $5,000 MANHOLE - 6' DIAMETER 16-20' DEPTH 2 EA $5,000 $10,000 MANHOLE - T DIAMETER 0-8' DEPTH 2 EA $5,500 $11,000 MANHOLE - T DIAMETER 8-12' DEPTH 8 EA $5,500 $44,000 MANHOLE - T DIAMETER 12-16' DEPTH 2 EA $6,000 $12,000 MANHOLE - V DIAMETER 0-8' DEPTH 1 EA $6,500 $6,500 MANHOLE - 8' DIAMETER 8-12' DEPTH 4 EA $6,500 $26,000 AIR RELEASE VALVES 5 EA $3,000 $15,000 EXISTING UTILITY CONFLICT 1 LS $5,000 $5,000 60" CASING BORE & JACK CROSSING 70 LF $400 $ 28,000 60" CASING BORE & JACK CROSSING 150 LF $400 $ 60,000 INTERFERENCE STRUCTURES 2 EA $10,000 $20,000 30" BORE AND JACK CROSSING 150 LF $200 $30,000 GRAVEL BEDDING 664 TON $25 $16,600 GRAVEL DRIVEWAY REPLACEMENT 1 EA $300 $300 UNDERCUT EXCAVATION 1.550 SY $15 $23,250 SELECT FILL 1,500 CY $15 $22,500 CONNECTION TO EXISTING MANHOLE 1 EA - $10,000 $10,000 FORCEMAIN INTERCONNECTIONS TO EXISTING SYSTEM 2 EA 10,000 $20,000 CONNECTION/BYPASS AT PUMP STATION 1 LS $30,000 $30,000 CONCRETE COLLARS 9 EA $750 $6,750 CONCRETE PIERS 35 EA $1,500 $52,500 6' X 6' X 5' CONCRETE VAULT 1 EA $2,500 $5,000 INSTALLATION OF NEW MANHOLE INTO EXISTING SEWER 1 EA $3,000 $3,000 LINE SOILS COMPACTION TESTING ALLOWANCE 1 LS $5,000 $5,000 Total Interceptor Construction $1,904,010 011�l ERWER_A_Re.,:.e@A Page 14 of 15 dv a N N N N N N N N N N N N N N N N N y O y1 O y1 O S YW O O m � C 3 u =o N W N N+ N N O m d ++ J d U a ++ W N+ O 1p J d U a W N+ 30 W JWN W V4V1 W Vad W VaW W VUJ W VU W VUUI W VVd W VdN W Jdd W VfN0 WO?P?d1N0 (VJ [J WVA O W dV W O W O IJ tD U iDNS�m V � p N W N N N N O 10 ++ d V d d +++ A W N+ O d V d U a W N 3 1 � W W WV W W W WVV 41 W A W Yo W N W 0 W OJi vvW W W W N V W 0�m� W S W O W WTI + mW a m N W OI W 41 O� V W V o V �NdridNfA+mU+v� yVy {Vd{�� (Vd(mm m �Sp V yVp V d W L'N �,' yr (m N�pp N a a WD pppp tyJ 4p1 N N d+ a N Np 5 V+ NN+OUOSSNOSOIOOdUaS O d y V N+ W OULI O V d) O O O O O O O O O O O O O O O O O O O O O O O O N S S S S S S p O p O S S S S S p O S88{1111 S S S S S+ O S d d d d d d d d d d d d d d d U O O O O V 0aR g T de ie iR 7R a'•1R ae M?RMK2R 7R 2R tR ae 7R >R aR zR a"• O tJ N N IJ N IJ IJ iJ N {J {J N N N Wm d to d d a1 D F N A d dp d d dp dp dp dpp d d do d d d Wqq U++++ W s p fWOWW p fJS o WW p p fJ p IJ (J IOiISYYS8YNfUD p f�0 fU0NU C m A d d d d d d d d d d d d d d A U W W W W a O s y 0 W m 0. +O 0NNNN A 0 0 0 0 P 0 0 P 0 0 00000000000 0 9 0 P 0 0 +l i0 Pp (p �p �p 10 N i0 i0 i0 ID N ONE {NJ� N Ul N m [J f3 .Ol (II+ +N dO fJW W W + y m N a a a a a A a a a a + a + a + a + a a a A + N d N d N N d N- V mU pdppp CC aSS? W�nn W W W W Qa �W�nn �W�nn �W�nn �W�mn yW�n�{Wy(��iWi��yu�n� ��Wnn yWy�� yu�P INII tNII U UNim 7 y O J V V V V V V V V V V V V V V V V V fp m U U 1yJ A Sd$$$8$$QPQPP$F$Fo$��N�a D N jy NNNN aa jj jy N j N j N j G N j N j G N y G N i G N j N y N j L N W N N a V a V A IQ a V y d A 3 W W W W L C G G G L N d W Y W W O +TOE ANmf0 f01010 Ia0 fO lObmmfO fADm V W UUUUOO M R y+ a s y a a A P A a a a A A A A a a V a U U Up U ro Gl A w N d N b N ta0 Ia0 b ta0 b b b b d S m P � b P of Hendersof. Interceptor, and Collection System 1/1 Reduction Improvements Al. Total Project Cost Summary Description Cost III Reduction Repairs $620,650 Pump Station Upgrade $620,000 Forcemain and Interceptor Installation 1 904 010 Total Construction $3,144,660 Contingency 10% $314,466 Technical Services $332,000 Administrative and l_e al Services $39.000 Project Total $3,830,126 Vill. Conclusions There exists in Henderson an amount of Infiltration and Inflow (1/1) that causes excessive flow and/or overflows in the sewer system during wet weather events. These excessive flows are caused by defects in the sewer system due to the system's age and condition. Given the observations made during site visits and from the reports generated during smoke testing, it is believed that the a large percentage of the inflow portion of the 1/1 can be removed from the system by repairing system defects and resealing joints. It was assumed that 70% of the inflow can be reduced by making repairs to the sewer system defects identified in the smoke tests. The project will result in a reduction of 1/1 throughout the system, with special focus on the Red Bud pump station. The expected "average peak day' flow reduction throughout the system will be 1.10 MGD. This 1/1 reduction is the anticipated decrease in the average daily flow on the peak day of each month. The expected flow reduction at the Red Bud pump station will be 251 gpm. This reduction is the anticipated decrease in the peak instantaneous flow to the pump station. The expected cost of the project will be approximately $3,830,000. This cost will include upgrade of the existing Red Bud pump station, installation of a new 18" force main to operate in parallel with the existing 14" force main from the pump station to the discharge point on Coble Blvd., installation of a new 30/42" interceptor to parallel the existing sewer from the vicinity of Beckford Drive to the treatment plant, and repair of selected defective portions of the sewer system. Q�140MOWInIJPERIPER_A RM 2do Page 15 of 15