September 26, 2,000
rl�
Honorable Robert G. Young, Jr., Mayor
City Of Henderson f 1 8
Post Office Box 1434� Nn
Henderson, North Carolina 27536-1434 —
SUBJECT: City of Henderson
Red Bud Creek
Pump Station Improvements
Eligibility Determination
Project No. E-SEL-T-00-0031
Dear Mayor Young:
The subject plans and specifications have been reviewed for eligibility by the
Construction Grants & Loans Section of the North Carolina Division of Water Quality.
Eligibility for State Emergency Loan funding is determined as follows:
Modifications to the existing Red Bud Creek Pump Station to allow connection of a
portable engine driven emergency pump with discharge into the existing force main, and
procurement of an 1800 GPM portable engine driven emergency pump.
Funding for this project is limited to the proposed loan amount of $112,780
established and approved by the Environmental Management Commission. In the event
that received bids exceed this established amount and local funds are not adequate to
award contract(s), it will be necessary to consider all alternatives including redesign, re -
advertising, and rebidding.
Neither the State or Federal Government, nor any of its departments, agencies or
employees is or will be a party to the invitation to bids, addenda, any resulting contracts
or contract negotiations/changes.
In accordance with the Federal Regulations, the Recipient is required to assure
compliance with the OSHA safety regulations on the subject project.
It is the responsibility of the Recipient and the Consultant Engineer
to insure that the project plan documents are in compliance with
CONSTRUCTION GRANTS 9 LOANS SECTION
1633 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1633
PHONE 919-T33-6900 FA% 919-715-6229
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 30% RECYCLED/10% POST -CONSUMER PAPER
d ..
Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these
plans and specifications, and any subsequent addenda or change order, does not imply approval of a
restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement
actions.
It is mandatory for project facilities to be constructed in accordance with the North Carolina
Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In
addition, the specifications must clearly state what the contractors' responsibilities shall be in
complying with these Acts.
Attached is one (1) copy of the Part B (Approval to Award) which is to be completed and
submitted to the State for review. It must be accompanied by documents -including a detailed cost
breakdown showing units, unit cost, and value of the eligible work. Upon review and approval of this
information, the State will authorize the Recipient to make the proposed award.
Two (2) copies of any change order must be promptly submitted by the Recipient to the State. If
additional information is requested by the State, a response is required within two (2) weeks, or the
change order will be returned without further or final action.
One (1) set of the final approved plans and specifications will be forwarded to you. One (1) set
of plans and specifications identical to the approved set must be available at the project site at all times.
Upon completion of the project construction, the Recipient shall submit a letter confirming that
the project has been constructed in accordance with the plans and specifications approved by the State.
"As -built" plans will need to be submitted with any changes color -coded on the plans if the above
confirmation cannot be made.
If there are any questions concerning this matter, please do not hesitate to contact
Mr. Cecil G. Madden, Jr., P. E. at (919) 715-6203.
lowle L� Chief
-tion Grants & Loans Section
Attachment
CGM:pe
cc: McKim & Creed
Raleigh Regional Office, WQ
Amy Simes, P.E.
Daniel Blaisdell, P.E.
Don Evans
Valerie Lancaster
DMU, SEL
City of Henderson Red Bud Pump Station Emergency Loan Application
011
Subject: City of Henderson Red Bud Pump Station Emergency Loan Application
Date: Tue, 01 Feb 2000 12:44:34 -0500 �Giw t
From: Judy Garrett <judy.garrett@ncmail.net>
To: bobby.blowe@ncmail.net
CC: ken.schuster@ncmail.net
The Raleigh Regional Office has reviewed the information submitted for
the subject project. Due to the environmental impact which occurs from
the overflows from this station, we recommend that this project be
approved for emergency funding. If you have questions, please call me
at 571-4700.
1 of 1 02/01/2000 1:10 PM
v 1, CK M&CR�ED
v
January 12, 2000
Mr. Kenneth Schuster, P.E.
NCDENR
Division of Water Quality
1628 Mail Service Center
Raleigh, North Carolina 27699-1628
Re: City of Henderson
Red Bud Pump Station Emergency Loan Application
Dear Mr. Schuster:
M&C 01406-0002 (10)
AN 13 ?jq)
The City has experienced continuing overflow and bypass conditions at the Red Bud Pump
Station. As you are aware, they are proceeding with implementation of a pump station,
interceptor, and force main expansion project.
However, given the continuing nature of the problems and the length of time required to
complete the comprehensive project, the City wishes to pursue the immediate installation of a
semi -temporary portable pump at this location which would run during these rainfall events. The
pump would be capable of an output of up to 2,000 GPM (compared to the current pump design
capacity of 965 GPM and actual output of approximately 800 GPM).
Due to the magnitude of the expenditure and the timing relative to the fiscal year, the City
wishes to apply for funding from the Emergency Loan Fund of the Clean Water Revolving Loan
and Grant Program. Mr. Blowe informed us that the Raleigh Regional Office is responsible for a
determination of eligibility to apply for those funds. Mr. Blowe indicated there is approximately
$1.0 million available in that fund at present.
We understand that it may appear unusual to ask for loan eligibility for a "temporary' or
.'portable" piece of equipment. We would point out that this unit will be used extremely
frequently (especially during wet weather) at this installation for up to two years while the
comprehensive project is implemented. Thereafter, there will be occasions for its use at many
locations in the system. Chief among these would be at the Sandy Creek Pump Station, a 3.8
MGD station that has occasional capacity deficiencies at this time. We can foresee the
utilization of this pump at the wastewater treatment plant and other significant pump stations as
well. The unit is provided with means of control and modulation of the pumping rate to suit the
particular situation in terms of influent flow and capacity of downstream receiving facilities.
5625 DILLARD DR., SUITE 117, CARY, NORTH CAROLINA 27511
TEL919.233.8091 FAx919.233.8031 www.mckimcreed.com
Mr. Kenneth Schuster, P.E.
January 12, 2000
Page 2
A copy of the funding application is attached. We would appreciate a favorable decision on this
matter at your earliest opportunity. In the interim, the City will be pursuing the installation of
requisite connections at the station site and preparation of plans/specifications and bid
solicitations for the pump equipment and installation.
Please don't hesitate to contact me if you have any questions or comments, or require
additional information.
Sincerely,
McKKIIM & CREED, P.A.
/ jcz. J L ,
Timothy J. Baldwin, P.E.
Vice President
/der
Enclosure
0..,1406\00021 DOI120Shuster dw � M M1 1 1 & CREED
APPLICATION
To be submitted in Triplicate
(To be filled in by the
DATE RECEIVED
See INSTRUCTIONS before completing application I ACCOUNT
1) LEGAL NAME & ADDRESS OF APPLICANT
Name City of Henderson
PO Box 1434
City Henderson
Zip Code 27536 County Vance
Telephone Number 252-431-6006
Federal ID Number 566001241
3) PROJECT DESCRIPTION
Red Bud Pump Station
5) CERTIFICATION
FOR STATE
2) TYPE OF PROJECT (Check One)
Wastewater Treatment Works
X Wastewater Collection System
Water Supply System
Water Supply Project Planning
4) AMOUNT REQUESTED FOR THIS PROJECT
Loan $
Emergency Loan $ 231,850
Grant $
The attached statements and exhibits are hereby made part of this application and the undersigned representative of the
Applicant certifies that the information in the application and the attached statements and exhibits is true, correct, and
complete to the best of his knowledge and belief. He further certifies that: He has been authorized to file this application by
formal action of the governing body of the Applicant as is evidenced by the ATTACHED CERTIFIED COPY OF
AUTHORIZATION MADE BY THE APPLICANT'S GOVERNING BODY; the governing body of the applicant agrees
that if a loan or grant for the Project is made pursuant to the Clean Water Revolving Loan and Grant Act of 1987 and the
Federally Funded State Revolving Fund Program (SRF), the Applicant will provide proper and efficient operation and
maintenance of the approved Project after completion of construction thereof, and the Applicant has substantially compiled
or will substantially comply with all Federal, State, and local laws, rules, regulations, and ordinances applicable to the
Project. Applicant will adopt and place into effect on or before completion of the project a schedule of fees and charges
which will provide adequate funds for proper operation, maintenance, administration of the system, and repayment of all
principal of and interest on loans.
6) AUTHORIZED REPRESENTATIVE 17) SIGNATURE OF REPRESENTATIVE 18) DATE
Name: Robert G. Young, Jr.
Title:
p:tl40610 Z4MP-Gmnt doc
SECTION II - FINANCIAL INFORMATION AS OF DATE OF APPLICATION
I) Financing construction of project:
Source
a) Funds to be made available by the Applicant
Cash..............................................................................
General Obligation Bonds ..............................................
Revenue Bonds..............................................................
b) Other (specify: ) .................................
c) Federal (Including SRF)
Loan Requested .............
Grant Requested............
d) State
Loan Requested ...............
Grant Requested ..............
Sub-total
....................................................
....................................................
Sub -total
.............................
Sub -total
Total
Amount Date Available
$ 231,850
$ 231,850
2) Name sources and amounts of other federal or state grants and loans requested, and indicate status of each request.
N/A
3) Outstanding bonded indebtedness not including bonds for this project: $
4) Indicate total appraised property valuation: $
5) The applicant has followed proper accounting and fiscal reporting procedures, as evidenced by the applicant's most
recent report of audit, and the applicant is in substantial compliance with provisions of the general fiscal control
laws of the State. YesX No_
oA1406maozwrnnac.Maa
SECTION III - ENGINEERING INFORMATION
1) Project cost estimate summary:
Indicate under Item la major items of work for which separate contracts are proposed and estimated cost.
a) Construction: Specify for each contract
b)
c)
d)
e)
f)
9)
Estimated Total Estimated Eligible
Proiect Cost Project Cost
(1) Contract 1— Pump Equipment and Materials $ 143,000 $ 143,000
(2) Contract 2: Bypass Installation ................................ $ 55,000 $ 55,000
(3) Contract $ $
(4) $ $
Subtotal $ 198,000 $ 198,000
Technical Services...........................................................
Administrative................................................................
Contingency (10% of cons[. cost) (5% after bid) $
Other (specify: )..............................
Site and Other Real Property Interests .............................
Total
Closing cost (2°/a) (For Federal Only) ..............................
Total
2) Time schedule proposed for construction of project:
$ 9,500
$ 19,800
$ 227,300
$ 4,550
$ 231,850
a) Estimated date of submission of final plans and specifications December 1999
If approved, give date and permit number
b) Estimated date contract can be awarded January 1999
$ 9,500
$ 19,800
$
$ 227,300
$ 4,550
$ 231,850
c) Estimated construction time (calendar days) 60
3) Please indicate if project is under a mandated time schedule by the SOC, JOC, AOC, of if the project is under
moratorium. Yes x No (If yes, attach copy.)
4) Indicate whether this is a regional project and list the local units involved. (Please provide a copy of the executed
intergovernmental agreement.)
5) Project Engineer (name, firm name, address (postal and entail), and telephone and facsimile number).
Timothy J. Baldwin, P.E.
Phone: (919) 233-8091
McKim & Creed, P.A.
Fax: (910) 233-8031
5625 Dillard Drive
Email tbaldwin@mckimcreed.com
Suite 117
Cary, NC 27511
0a140e000n4M".ntdw
SECTION IV - SUPPORTING DOCUMENTS AND NARRATIVE STATEMENTS
x 1) Resolution or resolutions of governing body providing required assurances and agreements and designating an
authorized representative
x a) Certification by recording officer
x 2a) Preliminary Engineering Report (PER) and Environmental Assessment (See instructions for requirements and
number of copies)
or
2b) Facilities Plan (required for federal wastewater funds)
x 3) Financial feasibility analysis - Forms LGC 108A and 108C
4) Agreements with other units of government (if applicable)
x 5) Engineering and other professional services agreements and contracts
x 6) Water or sewer user ordinance including user charge structure
x 7) Certification of MBE percentage goal as adopted by the applicant in accordance with GS 143-128
8) Site certificates by applicant and title counsel [clear or limited] (see attached forms)
THESE DOCUMENTS MAY BE SUBMITTED FOR ADDITIONAL PRIORITY POINTS UNDER THE STATE
LOAN AND GRANT PROGRAM:
9) Final plans and specifications (note: final plans and specs for wastewater projects are required for higher
priority consideration under the State loan and grant program)
10) Resolution establishing capital reserve fund (if applicable)
11) Resolution or supporting data for meeting criteria for water conservation and land use planning (see applicable
section in the rules)
I. Water Conservation
a) Continuing infiltration/inflow program
b) Water loss reduction program
c) Water conservation education program
d) Water conservation incentives or water reclamation or reuse
II. Water Conservation
a) Adopted land use plan
b) Plan exceeds state standards
c) Implementation of the plan
FOR HIGH -UNIT COST GRANT APPLICATION AND PRIORITY POINTS UNDER DRINKING WATER SRF,
THE ADDITIONAL DOCUMENTS MUST BE PROVIDED:
12) Official copy of applicants existing water rate structure and sewer rate structure with documentation of an
average monthly residential user charge
13) Copy of projected project revenues for water and wastewater must be completed (use attached form)
(note: All drinking water SRF applicants see note in instructions)
QX OBWOOz Mp-GnnLa
v 1✓ICIQM&CREED
v
November 30, 1999
Mr. Don Evans, P.E.
NCDENR — Design Management Unit
Construction Grants and Loans Section
2728 Capital Boulevard
Raleigh, NC 27604
RE: City of Henderson
High -Unit Cost Grant Application
Dear Mr. Evans:
M&C 01406-0001(10)
Please find enclosed the revised grant application and amendment to the preliminary
engineering report for the Nutbush Interceptor and Red Bud Pump Station project. The bulk of
the application package and documentation from the March 31, 1999 submittal remains in
effect, but the project scope has been amended somewhat. The major amendment consists of
the inclusion of the Red Bud Pump Station parallel force main in this project rather than in a
future phase. Also, the budget estimate for the pump station upgrade has been modified
somewhat based on more current estimates received during the design process. These
modifications are discussed in the attached PER amendment, and are reflected in the revised
project budget sheets in the grant application. Of course, the full maximum S3 million grant
had been requested previously, and this remains the request.
Please don't hesitate to contact me if you have any questions or require additional information.
Sincerely,
McKIM & CREED, P.A.
Timothy J. Baldwin, P.E.
Sr. Project Manager
Enclosures
cc: Mark Warren, Assistant City Manager
031406MNe111RB6 . aoc a-
5625 DILLARD DR.. SUITE 117, CARY. Nc%TH CAROLINA 275; r
_:_ 919 233.8091 FAX 919 233.8031 --w mckimcreed co—
APPLICATION
To be submitted in Triplicate
SECTION I -
1) LEGAL NAME & ADDRESS OF APPLICANT
Name City of Henderson
PO Box 1434
City Henderson
Zip Code 27536 " County Vance
Telephone Number 252-431-6006
Federal ID Number 566001241
3) PROJECT DESCRIPTION
Pump station, Interceptor and Collection System ]ll
Reduction Improvements
5) CERTIFICATION
(To be tilled in by the State)
DATE RECEIVED
ACCOUNT
FOR STATE LOAN OR GRANT
2) TYPE OF PROJECT (Check One)
Wastewater Treatment Works
X Wastewater Collection System
Water Supply System
Water Supply Project Planning
4) AMOLWT REQUESTED FOR THIS PROJECT
Loan S
Emergency- Loan S
Grant S 3,000,000
The attached statements and exhibits are hereby made part of this application and the undersigned representative of the
Applicant certifies that the information in the application and the attached statements and exhibits is true, correct. and
complete to the best of his knowledge and belief. He further certifies that: He has been authorized to file this application by
formal action of the governing body of the Applicant as is evidenced by the ATTACHED CERTIFIED COPY OF
AUTHORIZATION MADE BY THE APPLICA-NT'S GOVERNING BODY; the governing body of the applicant agrees that
if a loan or grant for the Project is [Wade pursuant to the Clean Water Revolving Loan and Grant Act of 1987 and the
Federallv Funded State Revolving Fund Program (SRF), the Applicant will provide proper and efficient operation and
maintenance of the approved Project after completion of construction thereof; and the Applicant has substantially compiled or
will substantially comply with all Federal, State, and local laws, rules, regulations, and ordinances applicable to the Project.
Applicant %ill adopt and place into effect on or before completion of the project a schedule of fees and charges ultich trill
provide adequate funds for proper operation, maintenance, administration of the system and repayment of all principal of and
interest on loans.
6) AUTHORIZED REPRESENTATIVE
Name: Robert G. Young, Jr.
Title:
7) SIGNATURE OF REPRESEN—TATIVE 1 8) DATE
_furv.aC4.1g99
6:+V• '-X)" &TEN- 8.;r yape .x
SECTION II - FINANCIAL INFORMATION AS OF DATE ur APPLICATION
1) Financing construction of project:
Source Amount Date Available
a) Funds to be made available by the Applicant
Cash.............................................................................. $ 830,126
General Obligation Bonds .............................................. $
Revenue Bonds... ................................................... ....... $
b) Other (specify: 1................................. $
Sub -total $ 830,126
c) Federal (Including SRF)
LoanRequested......................................................................... $ ( )
GrantRequested........................................................................ $ ( )
Sub -total $
d) State
LoanRequested......................................................................... $ ( )
Grant Requested........................................................................ $ 3,000,000 ( )
Sub -total $ 3,000.000
Total $ 3.830,126
2) Name sources and amounts of other federal or state grants and loans requested, and indicate status of each request.
N/A
3) Outstanding bonded indebtedness not including bonds for this project: $6,434.047
4) Indicate total appraised property valuation: S 639 024,120
5) The applicant has followed proper accounting and fiscal reporting procedures. as eNldenced by the applicant's most
recent report of audit, and the applicant is in substantial compliance with pro%isions of the general fiscal control
laws of the State. YesX No
, a0@A00J DP ,, a . ,. d d.
SECTION III - ENGINEERING INFORMATiviN
l) Project cost estimate summary:
Indicate under Item la major items of work for which separate contracts are proposed and estimated cost.
a) Construction: Specify for each contract
(1) Contract Interceptor and Force Main
(2) Contract Pump Station .........................................
(3) Contract 1/I..............................................................
(4)
Subtotal
b) Technical Ser%ices.............................................................
c) Administrative..................................................................
d) Contingency (10% of const cost) (5% after bid) $
e) Other (specify: 1................................
f) Site and Other Real Property Interests ............._..........
Total
g) Closing cost (2%) (For Federal Only) ............................
Total
2) Time schedule proposed for construction of project:
Estimated Total
Proiect Cost
S 1,904,010
$ 620,000
S 620,650
S
S 3,144,660
S 332,000
S 39,000
S 314,466
S
S
S 3,830,126
Estimated Eligible
Project Cost
$ 1,904.010
$ 620,000
$ 620,650
S
$
3.144,660
$
332,000
$
39,000
$
314,466
S
S
S
3,830,126
S
S 3,830,126 $ 3,830.126
a) Estimated date of submission of final plans and specifications December 1999
If approved, give date and permit number
b) Estimated date contract can be awarded June 1 2000
c) Estimated construction time (calendar days) 270
3) Please indicate if project is under a mandated time schedule by the SOC. JOC, AOC, of if the project is under
moratorium. Yes X No (If yes, attach copy.)
4) Indicate whether this is a regional project and list the local units involN ed. (Please provide a copy of the executed
intergovernmental agreement.)
5) Project Engineer (name, firm name, address (postal and email), and telephone and facsimile number).
Timothy J. Baldwin, P.E. Phone: (919) 233-8091
McKim & Creed, P.A. Fax: (910) 233-8031
5625 Dillard Drive Email tbaldwin@mckimcreed.com
Suite 117
Cary, NC 27511
SECTION IV - SUPPORTING DOCUMENTS AND NARRATIVE STATEMENTS
All documents submitted with previous (3131199) application
X 1) Resolution or resolutions of governing body providing required assurances and agreements and designating an
authorized representative
X a) Certification by recording officer
X 2a) Preliminary Engineering Report (PER) and Environmental Assessment (See instructions for requirements and
number of copies)
or
N/A 2b) Facilities Plan (required for federal wastewater funds)
N/A 3) Financial feasibility analysis - Forms LGC 108A and 108C
N/A 4) Agreements with other units of government (if applicable)
5) Engineering and other professional services agreements and contracts
6) Water or sewer user ordinance including user charge structure
X 7) Certification of MBE percentage goal as adopted by the applicant in accordance with GS 143-128
8) Site certificates by applicant and title counsel [clear or limited] (see attached forms)
THESE DOCUMENTS MAY BE SUBMITTED FOR ADDITIONAL PRIORITY POINTS UNDER THE STATE
LOAN AND GRANT PROGRAM:
N/A 9) Final plans and specifications (note: final plans and specs for wastewater projects are required for higher
priority consideration under the State loan and grant program)
10) Resolution establishing capital reserve fund (if applicable)
11) Resolution or supporting data for meeting criteria for water conservation and land use planning (see applicable
section in the rules)
1. Water Conservation
a) Continuing infiltration/inflow program
b) Water loss reduction program
c) Water conservation education program
d) Water conservation incentives or water reclamation or reuse
11. Water Conservation
a) Adopted land use plan
b) Plan exceeds state standards
c) Implementation of the plan
FOR HIGH -UNIT COST GRANT APPLICATION AND PRIORITY POINTS UNDER DRINKING WATER SRF._
THE ADDITIONAL DOCUMENTS MUST BE PROVIDED:
X 12) Official copy of applicants existing water rate structure and sewer rate structure with documentation of an
average monthly residential user charge
13) Copy of projected project revenues for water and wastewater must be completed (use attached form)
(note: All drinking water SRF applicants see note in instructions)
011405"I0 V ,Granl-A rc.+se0.a
AMENDMENT TO
PRELIMINARY ENGINEERING REPORT
I. Introduction
Since the original grant application and preliminary engineering report were submitted in
March, 1999, there have been continued problems with overflows and bypasses at the Red
Bud Pump Station. Base flows, as well as infiltration inflows, have resulted in chronic overflow
bypass conditions even during something less then extreme rainfall events. Faced with this
situation, the City has elected to pursue the relatively complete pump station installation and
concurrent parallel force main installation in the initial project, rather then the previously
discussed phase implementation.
Therefore, the pump station phasing contained on page 12 of 15 of the PER has been
amended and the proposed station upgrade described on the attached revised pages 12
through 15, with revised Figure 1 and Tables 9-11.
Project budgets have been revised accordingly.
0 ff'AOBNOW UOUT ET ER Ame menttl
City of Hendersof.
Pump Station, Interceptor, and Collection System 1/1 Reduction Improvements
V. Pump Station Upgrade
The Red Bud pump station has received considerably more detailed investigations than
several other stations since it has been subject to chronic overflow/bypass conditions, is
mentioned specifically under the City's SOC. The existing pump station at Red Bud is having
difficulty in keeping up with the extraneous flows due to the level of 1/1 in the Red Bud system.
Even once some of the 1/1 flows have been removed through the previously referenced repairs,
the station will still need an upgrade to convey current and projected flows. See Table 9 for
pump station calculations.
The initial post-1/1-repair flow to the pump station is expected to be approximately 1,410 gpm.
Of the three major drainage basins in the City's system, Red Bud has exhibited the fastest
growth, owing largely to the proximity to interchange areas of 1-85 and the new servicing of
Vance -Granville Community College. The method for assigning projected future flows is
described previously and the results are shown in Table 10 with system and pump curves on
Figure 1. Therefore, the expected flow at the end of the 20-year planning period is 4,100 gpm.
The pump station is currently designed for 965 gpm, but has had difficulty maintaining this
output. The older magnetic drives themselves account for a 5-8% loss from synchronous
speed, dramatically reducing output, and the force main (given the low design velocity of only
2.0 fps) seems to have a tendency toward deposition of grit and grease build-up. Given the
extremely flat pump curve, this can have a dramatic effect on the pump output, which has
been as low as 800 gpm.
The pump station will be upgraded by installation of new pumps and construction of an 18"
parallel force main from the station to the existing discharge point on Coble Boulevard.
Phase
The existing building and structures are generally in good condition. The pumps and motors,
however, are undersized for the high flow conditions. In order to convey the required 4,1000
gpm and maintain a reasonably wide operating range, the station will be converted from duplex
to triplex configuration. Pumps will be designed to operate in lead -lag -standby mode. Since
one pump will be sufficient for the immediate future, and the generator is virtually new, the
existing generator will be retained and planned to be replaced at such time as two -pump
operation is routinely required. In order to provide sufficient room for the VFD's in a three -
pump installation it is planned to utilize dry -pit submersible pumps. For cooling purposes,
these are oversized frames and motors, resulting in 200 HP sizes. Table 9 and Figure 1 have
been revised to show the pump conditions and systems curves for the proposed
improvements. The outdated magnetic drives will be replaced with modem variable frequency
drives (VFDs). The remainder of the station, including the existing generator. is adequate and
will remain in place for Phase I.
A telemetry/SCADA system must also be installed to monitor the station from a remote
location. Finally, new monitoring and controls for the wet well, equalization basin, chemical
feed system, bar screen, and other mechanical systems will be installed.
011406000120VPERWER_AJ 4e,;u d« Page 12 of 15
Im
I
1
--
0
I
I
7
----
&
&
lV
I
oil
S.
888.8.8.
tilg
OMN
9
G:
r
A!
u
9
0
WWI
11S
MENIDn
m
ci
0
C;
N
in
m
-f
6
0,
6
a
6
C4
8
§18
8
8 8
A
O
aq
OWj
000000000
d
c;
6
d
o
o
.;,q:
od
ui
vi
M,
M,
mmg
M,
c1d
N
i
14
'rgln
NO
PR
6
6
o
ci
0
coon
6
ci
0
0
Cq
W
7
,cq
q
OCSd0--:-:--NN
000
-
-
-
-
-
-
T11
o
o10
Table 10: Growth Rates and Flow Patterns
Based on an Overall Growth Rate of: 3.0%
Over a Period of 20 yr
Nutbush Treatment Facility
Current Flow: 4 MGD
Growth: 3.00 MGD
Future Flow: 7.00 MGD
Growth Patterns
Within City
10%
1-85 Area
Remainder
70%
30%
Red Bud Nutbush
Red Bud Nutbush
Sandy Creek
750
25%
33%
33%
33%
Overall Percent
Overall Percent
5.25% 1.75%
1.00% 1.00%
1.00%
Flow
Flow
Flow
Flow
Flow
0.158
0.053
0.030
0.030
0.030
Outside City Limits
90%
In Red Bud
In Sandy Creek
In Nutbush Creek
50%
40%
10%
Zone 1 Zone 2 Zone 3
Zone 1 Zone 2 Zone 3 Zone 4
NC01
(RB01/RBO6)
(RB01)
(RB02)
Northern Vance
(SC00/SCO2) Marlin Creek
Ind. Park
45%
45%
10%
35%
5%
25%
35%
100%
Overall Percent
Overall Percent
Overall Percent
20.25% 20.25% 4.50%
12.60% 1.80% 9.00% 12.60%
9.00%
Flow
Flow
Flow
Flow
Flow
Flow
Flow
Flow
0.608
0.608
0.135
0.378
0.054
0.270
0.378
0.270
400
350
300 - ----
290 ------
200 -
150
100
50
0
0 300 600
Figure 1: Red Bud Pump Station System and Pump Curves
I
900 1200 1500 18M 2100 2400 2700 3000 3300 3600 39M 4200
Flow (gpm)
M
of Hendersoi.
Pump Station, Interceptor, and Collection System 1/1 Reduction Improvements
The expected cost of each item mentioned in the pump station upgrade is as follows:
Description
Cost
Install 3 new dry -pit submersible pumps
$270,000
Replace magnetic drives with variable frequency
drives for all three pumps in station
$210,000
Structural/Building Modifications
$60,000
Install teleme /SCADA RTU
$15,000
Install automated monitoring and control functions
$65,000
Total Pump Station Construction
$620,000
VI. Interceptor Design
As the flows are pumped from the Red Bud pump station, they are conveyed to the 18 and 24"
gravity sewers at on Coble Boulevard in Nutbush basin 11 and on to the treatment plant.
Currently many, if not all segment surcharge, and some portions of the gravity sewer overflow
during peak events. With the addition of flow due to the Red Bud pump station upgrade, the
existing sewers will not be able to properly handle flows. Therefore, an upgrade to the existing
sewers will be performed.
The current post -repair required peak flow from the Red Bud pump station is 1,410 gpm.
Therefore, this sewer must be capable of conveying this flow, whether through upgrade of the
existing sewer or installation of a parallel sewer of larger size.
When designing this sewers upgrade and installation, the overall capacity of the treatment
system must be considered. This interceptor carries flows from not only the Red Bud pump
station, but from the Nutbush and Sandy Creek basins as well. Therefore, the downstream
portion of the sewer (that carries flows after the Nutbush and Sandy Creek connections) must
be designed to carry the current and anticipated future flows at the treatment plant. The
anticipated flow at the treatment plant is 7.0 MGD average day, or slightly over 12,000 gpm
peak flow, in twenty years. The anticipated flow at the Red Bud pump'station (with the
expected I/I reduction) is 4,100 gpm in twenty years. Each flow is assigned a peak factor of
2.5 to allow for the diurnal variation in flow. This new interceptor, along with the existing
sewer, must be capable of conveying this future flow, beginning at 4,100 gpm on Coble
Boulevard and ending at 12,000 gpm at the treatment plant.
There are a few minor tributaries to this interceptor between these points which had relatively
insignificant amounts of flow. The major tributary which results in the flow increase from 4,000
to 12,000 gpm is the Sandy Creek interceptor and basin. Although presently this flow enters
the interceptor on the north side of 1-85, a future project will extend and relocate the Sandy
Creek force main to Radio Lane will it will combine with the Red Bud flow. From this point to
the plant the interceptor sewer must be capable of conveying 12,000 gpm. Based on the
topography of the interceptor route, these flows will require a 30 inch interceptor from Coble
Blvd. to Radio Lane and a 42 inch interceptor from Radio Lane to the treatment plant. With
these pipe sizes and attendant slopes the 20 year design flows are conveyed at a percent of
depth ranging from approximately 40% to approximately 70% depending upon the specific
0 k1a06'A001Q2 _R%POi_n Re.+ _2.d« Page 13 of 15
of Hendersoi.
Pump Station, Interceptor, and Collection System 1/1 Reduction Improvements
reach and attendant slopes required to avoid conflicts. Table 11 illustrates the reach by reach
size slope and conveyance capacity for the entire interceptor route.
The estimated costs for the installation of the new interceptor are as follows:
Description
Cost
MOBILIZATION Qess than 2% of bid)
1 LS
$15,000
$15,000
42' SS PIPE ABOVE GRADE
750 LF
$90
$67,500
42" SS PIPE 0-8' DEPTH
3,432 LF
$100
$343,200
42" SS PIPE 8-12' DEPTH
778 LF
$110
$85,580
30" SS PIPE ABOVE GRADE
8 LF
$70
$560
30' SS PIPE 0-8' DEPTH
299 LF
$80
$23,920
30' SS PIPE 8-12' DEPTH
496 LF
$90
$44,640
30" SS PIPE 12-16' DEPTH
155 LF
$100
$15,500
30' SS PIPE 16-20' DEPTH
61 LF
$110
$6,710
18" FORCEMAIN
15,000 LF
$55
$825,000
MANHOLE - 6' DIAMETER 0-8' DEPTH
1 EA
$4.500
$4,500
MANHOLE - 6' DIAMETER 8-12' DEPTH
1 EA
$4,500
$4,500
MANHOLE - 6' DIAMETER 12-16' DEPTH
1 EA
$5,000
$5,000
MANHOLE - 6' DIAMETER 16-20' DEPTH
2 EA
$5,000
$10,000
MANHOLE - T DIAMETER 0-8' DEPTH
2 EA
$5,500
$11,000
MANHOLE - T DIAMETER 8-12' DEPTH
8 EA
$5,500
$44,000
MANHOLE - T DIAMETER 12-16' DEPTH
2 EA
$6,000
$12,000
MANHOLE - V DIAMETER 0-8' DEPTH
1 EA
$6,500
$6,500
MANHOLE - 8' DIAMETER 8-12' DEPTH
4 EA
$6,500
$26,000
AIR RELEASE VALVES
5 EA
$3,000
$15,000
EXISTING UTILITY CONFLICT
1 LS
$5,000
$5,000
60" CASING BORE & JACK CROSSING
70 LF
$400
$ 28,000
60" CASING BORE & JACK CROSSING
150 LF
$400
$ 60,000
INTERFERENCE STRUCTURES
2 EA
$10,000
$20,000
30" BORE AND JACK CROSSING
150 LF
$200
$30,000
GRAVEL BEDDING
664 TON
$25
$16,600
GRAVEL DRIVEWAY REPLACEMENT
1 EA
$300
$300
UNDERCUT EXCAVATION
1.550 SY
$15
$23,250
SELECT FILL
1,500 CY
$15
$22,500
CONNECTION TO EXISTING MANHOLE
1 EA -
$10,000
$10,000
FORCEMAIN INTERCONNECTIONS TO EXISTING SYSTEM
2 EA
10,000
$20,000
CONNECTION/BYPASS AT PUMP STATION
1 LS
$30,000
$30,000
CONCRETE COLLARS
9 EA
$750
$6,750
CONCRETE PIERS
35 EA
$1,500
$52,500
6' X 6' X 5' CONCRETE VAULT
1 EA
$2,500
$5,000
INSTALLATION OF NEW MANHOLE INTO EXISTING SEWER
1 EA
$3,000
$3,000
LINE
SOILS COMPACTION TESTING ALLOWANCE
1 LS
$5,000
$5,000
Total Interceptor Construction
$1,904,010
011�l ERWER_A_Re.,:.e@A Page 14 of 15
dv
a
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
y
O
y1
O
y1
O
S
YW
O O
m
�
C
3 u
=o
N
W
N
N+
N
N
O
m
d
++
J
d
U
a
++
W
N+
O
1p
J
d
U
a
W
N+
30
W
JWN
W
V4V1
W
Vad
W
VaW
W
VUJ
W
VU
W
VUUI
W
VVd
W
VdN
W
Jdd
W
VfN0
WO?P?d1N0
(VJ
[J
WVA
O
W
dV
W
O
W
O
IJ
tD
U
iDNS�m
V
�
p
N
W
N
N
N
N
O
10
++
d
V
d
d
+++
A
W
N+
O
d
V
d
U
a
W
N
3
1
�
W
W
WV
W
W
W
WVV
41
W
A
W
Yo
W
N
W
0
W
OJi
vvW
W
W
W
N
V W
0�m�
W
S
W
O
W
WTI
+
mW
a
m
N
W
OI
W
41
O�
V
W
V
o
V
�NdridNfA+mU+v�
yVy
{Vd{��
(Vd(mm
m
�Sp
V
yVp
V
d
W
L'N
�,'
yr
(m
N�pp
N
a
a
WD
pppp
tyJ
4p1
N
N
d+
a
N
Np
5
V+
NN+OUOSSNOSOIOOdUaS
O
d
y
V
N+
W
OULI
O
V
d)
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N
S
S
S
S
S
S
p
O
p
O
S
S
S
S
S
p
O
S88{1111
S
S
S
S
S+
O
S
d
d
d
d
d
d
d
d
d
d
d
d
d
d
d
U
O
O
O
O
V
0aR
g
T
de
ie
iR
7R
a'•1R
ae
M?RMK2R
7R
2R
tR
ae
7R
>R
aR
zR
a"•
O
tJ
N
N
IJ
N
IJ
IJ
iJ
N
{J
{J
N
N
N
Wm
d
to
d
d
a1
D F
N
A
d
dp
d
d
dp
dp
dp
dpp
d
d
do
d
d
d
Wqq
U++++
W
s p
fWOWW
p
fJS
o
WW
p
p
fJ
p
IJ
(J
IOiISYYS8YNfUD
p
f�0
fU0NU
C
m
A
d
d
d
d
d
d
d
d
d
d
d
d
d
d
A
U
W
W
W
W
a
O
s y
0
W
m 0.
+O
0NNNN
A
0
0
0
0
P
0
0
P
0
0
00000000000
0
9
0
P
0
0
+l
i0
Pp
(p
�p
�p
10
N
i0
i0
i0
ID
N
ONE
{NJ�
N
Ul
N
m
[J
f3
.Ol
(II+
+N
dO
fJW
W
W
+
y
m
N
a
a
a
a
a
A
a
a
a
a
+
a
+
a
+
a
+
a
a
a
A
+
N
d
N
d
N
N
d
N-
V
mU
pdppp
CC
aSS?
W�nn
W
W
W
W
Qa
�W�nn
�W�nn
�W�nn
�W�mn
yW�n�{Wy(��iWi��yu�n�
��Wnn
yWy��
yu�P
INII
tNII
U
UNim
7 y
O
J
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
fp
m
U
U
1yJ
A
Sd$$$8$$QPQPP$F$Fo$��N�a
D
N
jy
NNNN
aa
jj
jy
N
j
N
j
N
j
G
N
j
N
j
G
N
y
G
N
i
G
N
j
N
y
N
j
L
N
W
N
N
a
V
a
V
A
IQ
a
V
y d
A
3
W
W
W
W
L
C
G
G
G
L
N
d
W
Y
W
W
O
+TOE
ANmf0
f01010
Ia0
fO
lObmmfO
fADm
V
W
UUUUOO
M R
y+
a
s
y a
a
A
P
A
a
a
a
A
A
A
A
a
a
V
a
U
U
Up
U
ro
Gl
A
w
N
d
N
b
N
ta0
Ia0
b
ta0
b
b
b
b
d
S
m
P
�
b
P
of Hendersof.
Interceptor, and Collection System 1/1 Reduction Improvements
Al. Total Project Cost Summary
Description
Cost
III Reduction Repairs
$620,650
Pump Station Upgrade
$620,000
Forcemain and Interceptor Installation
1 904 010
Total Construction
$3,144,660
Contingency 10%
$314,466
Technical Services
$332,000
Administrative and l_e al Services
$39.000
Project Total
$3,830,126
Vill. Conclusions
There exists in Henderson an amount of Infiltration and Inflow (1/1) that causes excessive flow
and/or overflows in the sewer system during wet weather events. These excessive flows are
caused by defects in the sewer system due to the system's age and condition.
Given the observations made during site visits and from the reports generated during smoke
testing, it is believed that the a large percentage of the inflow portion of the 1/1 can be removed
from the system by repairing system defects and resealing joints. It was assumed that 70% of
the inflow can be reduced by making repairs to the sewer system defects identified in the
smoke tests.
The project will result in a reduction of 1/1 throughout the system, with special focus on the Red
Bud pump station. The expected "average peak day' flow reduction throughout the system will
be 1.10 MGD. This 1/1 reduction is the anticipated decrease in the average daily flow on the
peak day of each month. The expected flow reduction at the Red Bud pump station will be
251 gpm. This reduction is the anticipated decrease in the peak instantaneous flow to the
pump station.
The expected cost of the project will be approximately $3,830,000. This cost will include
upgrade of the existing Red Bud pump station, installation of a new 18" force main to operate
in parallel with the existing 14" force main from the pump station to the discharge point on
Coble Blvd., installation of a new 30/42" interceptor to parallel the existing sewer from the
vicinity of Beckford Drive to the treatment plant, and repair of selected defective portions of the
sewer system.
Q�140MOWInIJPERIPER_A RM 2do Page 15 of 15