Loading...
HomeMy WebLinkAbout20140333 Ver 1_Emails_20151102Baker, Virginia From: Hughes, Andrea W SAW <Andrea.W.Hughes @usace.army.mil> Sent: Monday, November 02, 2015 3:52 PM To: Baker, Virginia; bowers.todd @epa.gov Subject: FW: Holman Mill - Updated PCN stream impacts (UNCLASSIFIED) Attachments: Holman PCN - Page 5 (Updated Stream Impacts).pdf Classification: UNCLASSIFIED Caveats: NONE Just wanted to let you know we were not satisfied with their response to your comments regarding Red Maple in the planting list. I talked to Wildlands and they provided the e -mail below stating they would remove this species from the planting plan. - - - -- Original Message---- - From: Ian Eckardt [ mailto :ieckardt @wildlandseng.com] Sent: Monday, November 02, 2015 2:01 PM To: Hughes, Andrea W SAW Cc: Jeff Keaton; Angela Allen Subject: [EXTERNAL] Holman Mill - Updated PCN stream impacts Andrea, Attached is the updated Page 5 of the Holman Mill PCN application with the revised stream impacts. Reaches that only involve Enhancement II activities were removed. Impact types were updated to UT1 Reaches 3 and 4 to include both Enhancement I and II activities. These reaches will involve minor bank stabilization and habitat improvement through instream structures in addition to fencing out cattle and buffer planting. Per our phone conservation, red maple will not be part of the buffer planting. Please let me know if you need anything else to process the 404. Thanks, Ian Eckardt I Environmental Scientist 0:704.332.7754 x108 M: 704.517.4988 Wildlands Engineering, Inc. <http: / /www.wildlandseng.com /> 1430 S. Mint St, Suite 104 Charlotte, NC 28203 Classification: UNCLASSIFIED Caveats: NONE