Loading...
HomeMy WebLinkAbout20140333 Ver 1_PCN - Page 5 (Updated Stream Impacts)_20151102 Page 5 of 12 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 2f. Area of impact (acres) W1 – Wetland N P T Stream enhancement – minor bank grading Seep Yes No Corps DWQ 0.002 W2 – Wetland P P T Fill – Installation of rock outlet Headwater forest Yes No Corps DWQ 0.0005 2g. Total wetland impacts 0.0025 2h. Comments: Impacts to wetlands areas were avoided to the extent possible during the design phase. Minor bank grading to the left bank of UT1 at Station 107+47 would result in temporary impacts to the portion of Wetland N that directly abuts the channel. Less than 6 inches of grading is proposed in that impact area. A rock outlet structure is proposed where Wetland P drains into UT1 near Station 101+57. The rock outlet structure would stabilize the grade where Wetland P would reconnect to the new stream alignment and result in a permanent impact of 0.0005 acres. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P T Restoration UT1 – Reach 1 PER INT Corps DWQ 4-6 215 S2 P T Enhancement I/II UT1 – Reach 2 PER INT Corps DWQ 6-10 435 S3 P T Restoration UT1 – Reach 3 PER INT Corps DWQ 6-10 331 S4 P T Enhancement I/II UT1 – Reach 4 PER INT Corps DWQ 6-10 1,687 S5 P T Enhancement I UT2 - Reach 2 PER INT Corps DWQ 10-15 298 S7 P T Restoration UT2 – Reach 3 PER INT Corps DWQ 10-15 396 S8 P T Restoration UT2 – Reach 4 PER INT Corps DWQ 10-15 242 S9 P T Restoration UT2A PER INT Corps DWQ 10-15 468 3h. Total stream and tributary impacts 4,072 3i. Comments: Impacts are temporary enhancement and restoration activities and will result in a net gain of 313 linear feet of perennial and/or intermittent stream channel. UT1 Reaches 2 & 4 involve Enhancement I (EI) and II (EII) techniques. EI includes minor bank stabilization and habitat improvement through instream structures. EII involves fencing out cattle and buffer planting.