Loading...
HomeMy WebLinkAbout20151067 Ver 1_More Info Letter_20151029North Carolina Department of Environmental Quality Pat McCrory Governor October 29, 2015 Certified Mail Return Receipt Requested 70141200 0000 8628 8337 City of Raleigh Attn: Edward Stempien One Exchange Plaza, Ste. 620 Raleigh, NC 27601 Subject: REQUEST FOR ADDITIONAL INFORMATION Beaverdam Creek Interceptor Dear Mr. Stempien: Donald R. van der Vaart Secretary DWR #15 -1067 Wake County On October 13, 2015, the Division of Water Resources (Division) received your application dated October 12, 2015 requesting a 401 Water Quality Certification and Riparian Buffer Authorization from the Division for your project. The Division has determined that your. application is incomplete and cannot be processed. The application is on -hold until the following information is received: 1. The application indicates that all of the impacts to riparian buffers are temporary, but it appears that some of the impacts will result in the permanent conversion from forest to maintained herbaceous easement. According to the Neuse Riparian Buffer Rules, conversion from forest to herbaceous vegetation constitutes a permanent impact. Please differentiate between the buffer impact areas that are temporary (grass to grass) and permanent (trees to grass). [15A NCAC 02H .0502(f)] 2. It appears that a portion of the riparian buffer impacts in Zone 1 within Impact Areas P and Q are parallel and, therefore, mitigation will be required. The only instance where this would not be the case is when the sewer line is being installed within an existing non- electric utility line corridor. Proof of how the mitigation requirement will be Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http : / /portal.ncdenr.org /web /wq /aps 1628 Mail Service Center, Raleigh, NC 27699 -1628 Phone: (919) 791 -4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788 -7159 An Equal Opportunity 1 Affirmative Action Employer — Made in part by recycled paper Beaverdam Creek Interceptor DWR #15 -1067 On -Hold satisfied must be submitted before the authorization can move forward. [15A NCAC 02B.0233(10)1 Pursuant to Title 15A NCAC 02H .0502(c) and Title 15A NCAC 0213 .0233 (8), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699 -1617. Please be aware that you have no authorization under the Water Quality Certification Rules or the Neuse Riparian Buffer Rules for this activity. Please contact Cherri Smith at 919 - 791 -4251 or cherri.smithp- ncdenr.gov if you have any questions or concerns. Si er y, Danny Smith Supervisor, Water Quality Regional Operations Section cc: DWR RRO 401 file DWR 401 & Buffer Permitting Unit Sean Hein; Green Engineering; 303 Goldsboro St. E.; Wilson, NC 27893 U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, Ste. 105; Wake Forest, NC 27597