HomeMy WebLinkAboutSW3230601_Supplement-EZ Form_20231127 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION t Project Name Denver Fitness Facility _ 2 Project Area ac 3.568 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this pLoject High or Low Density? High 6 I Does this project use an off-site SCM? No 'COMPLIANCE WITH 02H.1003(4)} "j 7 Width of vegetated setbacks provided(feet) 507 N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 ad? NIA 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 3 12 Bloretention Cell 13 Wet Pond i 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 1 17 Rainwater Harvestin RWHi 18 Green Roof 19 Level spreader-Filter Strip(LS-F5 20 Disconnected Impervious Surface DI5 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 'Name and Title: J.David Ledford,Registered Landscape Architect 28 O anization: J.David Ledford,RLA 29 Street address: 2730 Maiden Hi hwa _ 30 City,State,Zip: LHncointon,NC 28092 31 Phone numbers: 704-530-7880 32 Email: jdavidledford@yahoo.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided Here. Desiqner 9 Signat a of Designer �t �S2� + Date 1# ! DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so,number of drains a areaslSCMs 1 3 Does this promect have low density areas? No 4 If so,number of law density drainage areas 0 Is alllpart of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGI;AREA:INFORMATION Entire Site 1 4 T e of SCM Sand Filter 5 Total drainage areas ft 186,807 181,595 6 Onsite drains a area(sq ft 155,422 151,210 7 Offsite drainage areas ft 30,385 30,335 8 Total BUA in pLoject(sq ft 133596 sf 133596 sf New BUA on subdivided lots(subject to permitting) 9 ft sf sf New BUA not on subdivided lots(subject to 10permitting) s sf sf 11 Offsite BUA s ft 30385 sf 30385 sf 12 Breakdown of new BUA not on subdivided lots: Parking(sq ft 60095 sf 60095 sf Sidewalk(sq ft 6065 sf 6065 sf Roof(sq ft 26829 sf 26829 sf Roadway s ft sf sf Future(sq ft sf sf Other,please specify in the comment box below(sq ft 10222 sf 10222 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft sf sf New infiltrating permeable pavement not on 14 subdivided lots s ft sf sf Existing BUA that will remain(not subject to 15permitting) s ft I sf sf 16 Existinq BUA that is already ermitted s ft sf sf 17 Existin BUA that will be removed(sq ft sf sf 18 Percent BUA 72% 74% 19 Desi n storm inches 1.0 in 20 Design volume of SCM cu ft 8730 cf 21 Calculation method for design volume Simple Method DLJIY_ jONAL INFORMATION Please use this space to provide any additional information about the 22 1drainage area(s): #12-Other BUA SF is for Imperious Areas of Proposed Pickle Ball Courts. SAND FILTER 1 Draina a g area number 1 2 Minimum required treatment volume(cu ft) 7,607 cu ft ERAl.t�t�e�l;arw Dz�a.1ps0 3 Is the SCM sized to treat the SW from al}surfaces at build-out? Yes f54 Is the SCM located away from contaminated soils? Yes What are the side slopes of the SCM(H_V)? 3:1 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10- ear storm)? a Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump( referred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 noes the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with NIA General MDC 10? 14 Is the an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC 12? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the 5CM designed k an NO licensed rofessional? Yes MD FIMR get,FROM 08H. 18 SHWT elevation(fmsl) 791-00, 19 Type of sand filter(open or closed) Open 20 If closed,will the filter will be pre-cast or pour-in-place? _ 21 If closed,to of rate elevation fmsl 22 Is this sand filter designed to attenuate peak flows? No Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 4387 cf 24 Will there be a permanent pool in the sediment chamber? No 25 Bottom of the sediment chamber fmsl 796.50' 26 jArea of the sediment chamber(square feet) 2116 sf 27 Physical depth of the sediment chamber Qnches 42 in 28 Ponding depth in the sediment chamber,above any permanent pool N/A 291 Elevation of top of weir between chambers fmsl) 800.00' Sand Chamber 30 Volume that can be retained in the sand chamber cubic feet 4343 cf 31 Bottom of the sand chamber fmsl 796.50' 32 Area of the sand chamber(square feel 2019 sf 33 Physical depth of the sand chamber inches 42 in 34 Ponding depth in the sand chamber,above the sand surface finches) 42 in F evation of the bypass device(fmsl 800.00` T pe of b ass device Open Box Weir Mechanism for distributing flow over the sand surface Rip Rap Dissipator Sand s ecification for sand chamber i ASTM C33 De th above underdain pi inches) IT Will the media be maintained to drain at least two inches per hour at Yes the sand surface? 41 Is at least one clean-out pipe provided at the low point of each i Yes underdrain line? 42 Will clean out pipes be capped? Yes r..,._ - _ ADDITIONAL INFORMATION 43 Please use this space to provide any additional information about the sand filters. #25&032:Square Foot Area at Vt tap elevation. #36:In addition to the primary by-pass of the open box weir,an additional emergency spillway has been designed to pass the 10 yr.storm event as a backup or for additional flow from larger storm events. 2