Loading...
HomeMy WebLinkAbout20181033 Ver 1_Owen Farms_100064_MY3_2023_20240226 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report MY3 Monitoring Report Owen Farms Mitigation Site Transylvania County, NC French Broad River Basin Cataloging Unit 06010105 NCDMS Project No. 100064 NCDMS Contract No. 7532 NCDMS RFP No. 16-007334 (Issued 9/8/2017) USACE ID: SAW-2018-01165 DWR ID: 20181033 Data Collected: March and August 2023 Prepared for: NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 Prepared by: HDR Engineering, Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601-3034 DRG Contributing Staff: Ben Furr, Ryan Smith, Alex DiGeronimo, Yvette Mariotte, Kevin Williams, Michael Foster, William Bailey This Year 3 Monitoring Report has been written in conformance with the requirements of the following: •Federal rule for compensatory mitigation project sites as described in the Federal Register, Title 33 Navigation and Navigable Waters, Volume 3, Chapter 2, Section § 332.8, paragraphs (c)(2) through (c)(14). •NCDEQ Division of Mitigation Services IN-Lieu Fee instrument signed and dated July 28, 2010. February 16, 2024 Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services, Asheville Regional Office 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 Re: MY3 Monitoring Report Comments Owen Farms Stream and Wetland Mitigation Site French Broad River Basin; CU# 06010105 – Transylvania County DMS Project ID No. 100064 Contract No. 7532 SAW-2018-01165 Mr. Wiesner, As per your letter concerning the Owen Farms Stream and Wetland Mitigation Site MY3 Report, we have updated the report and addressed your comments as follows: Response to DMS Comments 1: General: Please review the DMS notes and confirm that all requests, IRT questions and full delivery provider commitments from the 2023 credit release meeting have been addressed and included in the final MY3 (2023) report. DMS/IRT questions have been reviewed and addressed. 2: Section 1.2 – Background: “Additionally, 1.396 acres of wetlands have been enhanced,…”. Please update the report text to 1.540 acres per the IRT approved mitigation plan and Table 1. Acreage in Section 1.2 has been updated accordingly. 3: Section 2.2.2 Vegetation & Section 3.0 Maintenance and Adaptive Management Plans: Section 2.2.2 reports replanting in February 2023 & Section 3.0 reports replanting in January 2023. Please review and update the discrepancy in the report. Discrepancy in Section 2.2.2 has been updated accordingly. The site was replanted in February 2022, following repair activities in January 2022. A small amount of replanting was also completed in January 2023 following repair activities in November 2022. Table 5 has also been updated to help add clarity. 4: Section 2.2.2 Vegetation: Is existing Fescue considered a project vegetation concern within the conservation easement? Are any ring sprays around planted vegetation proposed in future monitoring years? Please address in the comment responses and update the report text accordingly. Although fescue is present in the easement it is not jeopardizing survivability of planted or native vegetation. Ring sprays around planted vegetation are not necessary and not planned at this time. 5: Table 5. Project Activity and Reporting History: Morphological surveys and vegetation surveys were completed at separate times/ dates in MY3(2023); please update the table to identify the separate survey dates. Based on the report text, morphological surveys were completed in March 2023. Please consider collecting morphological data later in the growing season so it represents the full monitoring year. If collected earlier, data collection dates should be consistent each year to allow a full year between surveys. Please include all MY3(2023) maintenance activities in the table including beaver dam removal and project invasive treatments. Activities and corresponding dates have been updated in Table 5. We prefer to collect morphological data prior to leaf-out. Morphological surveys will be completed again in March 2025 during MY5 to maintain consistency. 6: Table 8. Visual Vegetation Assessment: The table reports 0% encroachment; however, minor livestock encroachment was identified and observed during a December 6, 2023, DMS site visit. Please review the table and update the report accordingly. Table 8 updated to reflect livestock encroachment within easement area. 7: Figure 7.4: Please update the “Daily Rainfall Totals” line in the graph legend. It currently reads “Series1”. Graph legend title has been updated. 8: Table 13: A bankfull event is reported for MY3(2023) on 12/15/2022. Please explain why this is not considered a MY2(2022) bankfull event. Please update the report accordingly. Table updated to accurately portray bankfull event as occurring in MY2. Section 2.2.3 was also updated to reflect this change. 9: Table 14. Wetland Hydrology Summary: In the Performance Standard line of the table, please report that the success criteria is 12% of the growing season and list the growing season dates from the IRT approved mitigation plan. Comments have been updated accordingly in the summary table. 10: Figures 8.1 – 8.6 Groundwater gauge data graphs: Please review and confirm that the data reported is accurate and the graph callouts are correct. As an example, the Gauge 1 (Figure 8.1) callout shows occurrences of the groundwater line well below the “12 inches below surface” line. Please also be consistent with the graph colors utilized. Figure 8.6 has a green “Wetlands 5, Gauge 5 line”. Please review and update the report and graphs accordingly. Graph data has been reviewed and updated for accuracy and callouts have been updated accordingly. 11: December 6, 2023: Property Boundary Inspection Observations& Required Action Items: • The easement corners were adequately monumented with stamped aluminum caps. The caps were typically flush with the ground surface making them easy to locate. • Three witness posts were missing/damaged. The U-channel post at platted corner 72 at the top of UT7 has been damaged by highway maintenance. The post at platted corner 31 on the west side of wetland 1 could not be located. The fencepost used to witness platted corner 35 at the southwest corner of the UT2A crossing corridor is located too far from the actual corner monument. • Several signs were absent, missing nails, rotated, bent or otherwise damaged. The signs were fastened to the wooden fence posts with galvanized roofing nails. Many of the damaged signs were on posts where the nails had backed out of the post. The locations of damaged or missing signs are shown on the .kmz provided to Davey. • Signs were incorrectly attached to trees with roofing nails driven flush to the tree. • In-line marking was not visible in portions of the wooded areas. • Signs were installed outside the easement along the fence line between platted corners 1 and 30 (between the top of UT1 and Wetland 1). • A yearling steer was observed inside the easement near platted corner 85. Cattle access to this area has created a visible trail along the fence between corners 83 and 86. No exit gate could be found during the inspection, so the cow remained inside the easement. Notification of the occurrence was provided by DMS at the time of the inspection. • There are multiple locations where relic fencing is located within the conservation easement. The fencing consists of multi-strand barbed wire or woven wire attached to wooden posts, T-posts and trees. The wire has been removed from some of the fence segments leaving only the metal T-posts as remnants. • Two sections of silt fence are located within the easement on the east side of the site along Highway 281. • A metal 55-gallon drum is located in the French Broad in the southeast section of the site. •Based on a review with Davey staff (Ben Furr) it was unclear if livestock currently have access to portions or all of UT1 due to uninstalled and/ or damaged fencing. 12: Required Action Items in MY4 (2024): • Repair/install witness posts at the three locations identified. • Repair/install all damaged or missing signs. DMS has consistently observed that roofing nails do not perform well as fasteners for attaching signs to wooden posts and recommends using screw type fasteners such as 2 ½ inch hex head sheet metal roofing screws rated for exterior treated lumber applications for the repair. • DMS recommends replacement of all tree sign fasteners with 16d aluminum nails such as the 3 ½ inch by 0.177 inch by 11/32-inch head aluminum nails from Kaiser Aluminum 800-633-3156. Please watch the DMS instructional video before correcting the signage https://youtu.be/7dE7edd3V5M . It is a five-minute video originally created during the NC Ecosystem Enhancement Program era and helps visualize the preferred method for attaching signs to trees. • In-line marking was not visible along many of the wooded boundary sections and visibility of the boundary needs to be improved. Due to the thick nature of the wooded areas, DMS recommends installing signs on prominent boundary trees visible from a distance and blazing the trees with yellow survey paint. A few signs should be made visible from Highway 281 and all other wooded areas where the signs are absent/not visible. • Remove signs installed outside the easement along the fence line between platted corners 1 and 30 (between the top of UT1 and Wetland 1). • Notify the landowner that cattle are accessing the easement. Identify all locations where cattle are gaining access and encroaching into the easement and repair the exclusion fencing. Remove any fallen trees or limbs from the fence and repair any damage. • Remove internal fencing wire and associated metal T-posts. • Remove silt fence sections along Highway 281. • Remove the metal 55-gallon drum located in the French Broad and properly dispose. • Review documents and walk all of UT1 to determine if livestock potentially have access to the conservation easement. Determine livestock access and add or repair fencing (as necessary) to exclude livestock from the project’s conservation easement. Additional signage may be warranted if additional fencing is installed. DRG notes the aforementioned observation comments and will complete the following maintenance actions requested by DMS. If you have any questions or need additional information, please do not hesitate to give me a call (919.588.9663). Sincerely, Davey Resource Group, Inc. Ben Furr Area Manager Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page i February 16, 2024 Contents 1.0 Project Summary ............................................................................................................................... 1 1.1 Location and Setting ..................................................................................................................... 1 1.2 Background ................................................................................................................................... 1 1.3 Preconstruction Conditions .......................................................................................................... 1 2.0 Annual Monitoring ............................................................................................................................ 2 2.1 Monitoring .......................................................................................................................................... 2 2.2 Results and Discussion ........................................................................................................................ 2 2.2.1 Stream Stability ................................................................................................................................ 3 2.2.2 Vegetation ........................................................................................................................................ 4 2.2.3 Stream Hydrology ............................................................................................................................ 5 2.2.4 Wetland Hydrology .......................................................................................................................... 5 3.0 Maintenance and Adaptive Management Plans ............................................................................... 5 4.0 References ........................................................................................................................................ 7 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page ii February 16, 2024 Figures Figure 1.0 Project Asset Map (Appendix A) Figures 2.1-2.9. Current Conditions Plan View (Appendix B) Figures 3.1-3.47 Vegetation Plot Photos and Site Photos (Appendix C) Figures 4.1 - 4.14 Cross Section Photos (Appendix D) Figures 5.1 – 5.14 Monitoring Cross Section Plots (Appendix D) Figures 6. Monthly Precipitation Data (Appendix E) Figures 7.1 – 7.4 Channel Flow Hydrographs (Appendix E) Figures 8.1 – 8.5 Wetland Groundwater Gauge Data (Appendix E) Tables Table 1. Project Mitigation Quantities and Credits (Appendix A) Table 2. Project Goals, Performance Criteria, and Functional Improvements (Appendix A) Table 3. Project Monitoring Components (Appendix A) Table 4. Project Attributes (Appendix A) Table 5. Project Activity and Reporting History (Appendix A) Table 6. Project Contacts Table (Appendix A) Tables 7.1 - 7.6 Visual Stream Stability Assessments (Appendix B) Table 8. Visual Vegetation Condition Assessment (Appendix B) Table 9. Vegetation Plot Data (Appendix C) Table 10. Vegetation Performance Standards Summary Table (Appendix C) Table 11. Baseline Stream Data Summary (Appendix D) Table 12. Cross Section Morphology Monitoring Summary (Appendix D) Table 13. Bankfull Events Summary (Appendix E) Table 14. Wetland Hydrology Summary (Appendix E) Appendices Appendix A – General Project Information Appendix B – Visual Assessment Data Appendix C – Vegetation Plot Data Appendix D – Stream Geomorphology Data Appendix E – Hydrologic Data Appendix F – 2023 IRT Credit Release Meeting Minutes Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 1 February 16, 2024 1.0 Project Summary 1.1 Location and Setting The Owen Farms Mitigation Site (Site) is located approximately 3 miles north of Lake Toxaway in Transylvania County, NC. Directions from Asheville, NC: From Asheville, NC: Travel on I-26 east to exit 40 (NC-280 W/Airport Road) and merge on to NC-280 W, continue for 15.9 miles; continue straight onto US-64 W (NC-280 W becomes US-64 W), go 3.9 miles; turn right to stay on US-64 W; continue on US-64 W for 14.9 miles; turn right on Blue Ridge Road, continue for 5.4 miles and the Site entrance will be on the left. The Site is located in the Blue Ridge Belt Physiographic Province of North Carolina. 1.2 Background In October 2020 HDR|ICA restored approximately 3,180 linear feet of stream, enhanced approximately 5,172 linear feet of stream (125 linear feet of Enhancement I; 5,047 linear feet of Enhancement II), and preserved 423 linear feet of stream at the Owen Farms Mitigation Site. Additionally, 1.540 acres of wetlands have been enhanced, 0.35 acres of wetlands have been re-established, and 0.97 acres of wetlands have been rehabilitated at the Site. The Site provides many ecological functional uplifts within the French Broad River Basin. Project goals were established based on the French Broad RBRP (NCEEP 2009), and on-Site data collected during the existing conditions survey. Site specific goals and objectives were developed to provide the highest practical potential for functional uplift based on NC SAM and NC WAM analyses of streams and wetlands on Site. 1.3 Preconstruction Conditions Streams The Site was cleared prior to 1951 and has been utilized for agricultural purposes including pasture and row crops. Prior to construction cattle had access to the majority of streams on Site. The streams on Site exhibited the following conditions prior to construction: •Portions of WFFBR had been straightened to maximize agricultural practices on the property. The channel exhibited actively eroding banks due to cattle hoof shear and many of the channel’s riffles and pools had experienced significant deposition of fine material from the eroded channel banks. The large majority of the channel displayed little to no deeply rooted bank or riparian vegetation. Where a woody buffer had been present, it was commonly only one tree wide, with vegetation typically sparse at best. Many of the trees within the one-tree buffer had been undercut because the channel had incised below the rooting depth. •UT 5 was dammed and ponded immediately downstream of a culvert passing under Silverstein Road. Downstream of the pond, UT 5 had been straightened and channelized to its confluence with the West Fork French Broad River (WFFBR). •With the exception of the upstream most 248 feet, UT 7 had an absent to minimal buffer. The downstream half of UT 7 appeared to have been modified for agricultural practices and ditched along the edge of the valley as evidenced by an incised channel and spoil piles adjacent to the banks. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 2 February 16, 2024 •UT 8 was fairly stable except for the downstream most 40 feet of the reach which experienced down cutting to match the invert elevation of WFFBR at the confluence. In the downstream portion of the reach there was little to no deeply rooted vegetation along the banks. The banks had been lined with old bricks by the landowner in an attempt to prevent further mass wasting as the channel continues to incise and undercut the banks. •UT 4a was significantly incised due to a headcut approximately 20 feet upstream of its confluence with UT 4. •UT 1, UT 2, UT 2a, UT 3, UT 2b, UT 4, UT 4b, UT 6, UT 6a, UT 7a, and UT 7b are all first or second order, spring fed, perennial tributaries which exhibited mild to moderate instability due to cattle hoof shear and limited buffer presence in some areas before construction and planting activities. Wetlands Prior to construction cattle had access to all of the wetlands on Site. The wetlands on Site exhibited the following conditions prior to construction: •Wetland W3 is the largest wetland within the Site (1.8 acres) and is divided into two distinct wetland types: Riverine Swamp Forest and Floodplain Pool. The Riverine Swamp Forest portion of W3 had a significantly altered vegetative community compared to reference condition. This portion of W3 consisted solely of herbaceous vegetation which was dominated by common rush and served as a cattle pasture. Fecal matter and cattle tracks were present throughout the wetland. The Floodplain Pool portion of W3 formed in a relic meander scroll of WFFBR. UT 5 flowed through the eastern portion of the Floodplain Pool prior to its confluence with WFFBR. Cattle had unrestricted access to the entirety of W3. •Wetland W5 was a relic Headwater Forest wetland area adjacent to UT 7. Prior to construction the channelization and placement of spoil along the floodplain made it so W5 no longer supported wetland hydrology. Cattle access also altered the vegetative structure and ground surface condition. •Wetland W1 is a Riverine Swamp Forest that is heavily influenced by beaver. Prior to construction activities, cattle had full access to W1. •Wetlands W2, W4, W6, W6A, W7, W8, and W9 are all headwater wetlands that had experienced alterations to the vegetative structure and significant fecal matter inputs due to cattle access. 2.0 Annual Monitoring 2.1 Monitoring Table 3 in Appendix A outlines all the monitoring components, methods, quantity, and frequency of data to be collected for the Site. A visual representation of all monitoring devices can be found in the MY3 Current Conditions Plan View (CCPV) (Figures 2.1 – 2.9). Monitoring and data collection occurred between March 30 and November 13, 2023. 2.2 Results and Discussion This section documents the conditions observed in Year 3 monitoring. Areas that were repaired in February and November of 2022 were assessed in 2023 for stability. Areas of minor to severe bank and toe erosion that occurred after repairs in February 2022 were repaired in November 2022. Photographs of select repaired areas can be found in Figures 3.31 – 3.50 and Appendix F. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 3 February 16, 2024 2.2.1 Stream Stability Cross section geometry along WFFBR has remained consistent with the As-Built condition. Repaired areas have remained stable over the course of MY3 monitoring period. Visual observation of stream banks indicates that WFFBR has stabilized after repairs in November 2022. Herbaceous and woody stream bank vegetation has significantly increased during the MY3 monitoring period. Evidence of stream stability can be seen in Figures 4.1-4.14 and Figures 5.1-5.14. UT 8 cross sections remain largely unchanged over the past monitoring year. Cross section surveys show changes in channel geomorphology between MY0 and MY1. However, geomorph surveys indicate that the channel has found equilibrium between MY1 and MY3 and has remained stable over the past two monitoring periods. A tree was discovered across the channel near cross section 7 in August 2023. The tree is not impeding channel flow nor impacting bank stability. Cross sections along UT 7 remain largely unchanged over the last monitoring year. The restored reach appears stable and functioning as intended. It is worth noting that three small beaver dams were discovered at STA 12+10, STA 12+85 and STA 13+45 on UT 7. Beaver dams were removed in August 2023. Visual observations do not indicate instability of stream banks due to the presence of the beaver dams. While the banks of UT 5 remain stable, the beaver dam that was discovered and removed at station 18+25 during MY2 monitoring period was rebuilt after geomorph surveys in March 2023. The beaver dam was removed in August 2023 after trapping events in July 2023. Beaver dams had not been rebuilt on UT 5 or UT 7 as of last site visit on December 5, 2023. Cross section surveys show changes in channel geomorphology between MY0 and MY1. However, geomorph surveys indicate that the channel has found equilibrium and has remained stable over the past three monitoring periods with no aggradation or degradation being observed. The table below summarizes previous repairs for clarity. Station Damage Type Repair Type Repair Date Repair Stability 10+00 – 10+40 Erosion (right bank) Sod matting Nov. 2022 Stable 10+70 – 11+25 Erosion (right bank) Sod matting Nov. 2022 Stable 13+90 – 14+50 Erosion (right bank) Sod matting, boulder toe Nov. 2022 Stable 15+35 – 15+65 Erosion (right toe) Boulder toe Nov. 2022 Stable 16+10 – 16+75 Erosion (left bank) Sod matting Nov. 2022 Stable 22+35 – 22+95 Erosion (right toe) Boulder toe Nov. 2022 Stable 25+15 – 25+50 Erosion (right toe) Boulder toe Nov. 2022 Stable 10+75 Scour On site material fill Dec. 2021 Stable 11+10 Scour (left floodplain) On site material fill Dec. 2021 Stable 13+00 Scour (right floodplain) On site material fill Dec. 2021 Stable 15+50 Scour (right floodplain) On site material fill Dec. 2021 Stable 16+25 – 18+50 Scour (left bank) On site material fill Dec. 2021 Stable 25+75 Scour (right bank) On site material fill Dec. 2021 Stable 28+50 Scour (left bank) On site material fill Dec. 2021 Stable 10+65 – 10+95 Erosion (right bank) Coir matting Dec. 2021 Stable 12+61 – 12+67 Erosion (left bank) Coir matting Dec. 2021 Stable 18+63 – 18+75 Bank failure (left bank) Coir matting Dec. 2021 Stable 18+55 – 18+90 Bank failure (right bank) Coir matting Dec. 2021 Stable Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 4 February 16, 2024 2.2.2 Vegetation Year 3 vegetation plot data can be found in Table 9 of Appendix C. The average density of planted stems across the site is 486 stems per acre, which exceeds Year 3 success criteria of 320 planted stems per acre. Plot 12 continues to fail to meet Year 3 criteria due to a dense herbaceous vegetative layer outcompeting the planted bare roots. It is worth noting that Plot 12 is located in the Swamp Bog Complex planting area, and it is not uncommon for this community to be dominated by shrubby and herbaceous species. Plot 12 exhibited 100 percent herbaceous coverage dominated by species such as common rush (Juncus effusus), various sedges (Carex spp.), knotweed (Polygonum spp.), wool grass (Scirpus cyperinus), ironweed (Vernonia fasciculata), and golden rod (Solidago sp.). It was anticipated in the Mitigation Plan that this community may exhibit a lower stem density than the rest of the Site. Plot 12 will be visually assessed during Year 4 monitoring to determine if any volunteer stems have established after an additional year of growth. Vegetation plot 11, one of the three random plots on Site, was located in the Swamp Bog Complex. It also failed to meet Year 3 criteria at 243 stems per acre and was comprised of 67% hazel alder. The herbaceous community in Plot 11 was similar to what was observed in Plot 12. Findings between plot 11 and 12 confirm expectations noted in the Mitigation Plan about the Swamp Bog vegetative community. It is also worth noting that visual stem densities in the swamp bog complex are low. This is not presented in the Current Conditions Plan View figures or in the Visual Vegetation Condition table as it was anticipated in the Mitigation Plan and discussed in prior monitoring reports. Volunteers stems of hazel alder in Plot 3 continue to dominate the plot, comprising 53% of species diversity in Plot 3, mostly in the areas affected by beaver dam flooding in MY2. Four new volunteer stems were observed in Plot 3 during the MY3 vegetation survey. Provided that the beaver dam on UT2 is not rebuilt in between MY3 and MY4, DRG anticipates stem composition to diversify over the subsequent monitoring periods. While Plot 10 is exceeding Year 3 success criteria in stem density, the mortality experienced by the plot as a result of dense herbaceous growth resulted in the plot being comprised of 60% white oak (Quercus alba). DRG anticipates volunteer stems to establish in the subsequent monitoring years, increasing species diversity within the plot. Plot 16, the second random plot on Site, was located within the wetland expansion area of W3. Results from the MY3 survey indicate that this area has a stem density of 486 stems per acre. DRG observed 4 different species within the plot. As a result of the repairs made to the floodplain along the left and right bank of West Fork French Broad River in January 2022, DRG replanted approximately 733 bareroot stems within the repaired and disturbed areas in February 2022. Vegetation plot 19, the third random vegetation plot on-site, was located within the replanted area along the right floodplain of WFFBR. Results of the MY3 survey indicate that this area has a stem density of 526 stems per acre. Approximately 0.49 acres of the WFFBR floodplain have sparse herbaceous vegetation and are represented as Areas of Vegetative Concern in Figures 2.1-2.9 in Appendix B. The majority of bare areas observed are confined to areas that were disturbed during repairs made in January 2022. As a result of poor soil quality in the disturbed areas herbaceous growth has been slow to establish. Woody vegetation in these areas is a growing season behind the rest of the Site since it was replanted in February 2022. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 5 February 16, 2024 Chinese privet (Ligustrum sinense) and Multiflora rose (Rosa multiflora) were observed within the easement boundary along the floodplain of West Fork French Broad, UT1, UT2, UT4, UT5, UT7, and W3. Multiflora rose was treated using Roundup Custom© in March and August 2023. Small areas of cattail were observed within the channel of UT5 and was treated with Roundup Custom© in August 2023. Invasive species will be monitored and treated as needed throughout the remainder of the monitoring period. 2.2.3 Stream Hydrology All monitored streams have experienced continuous flow within tributaries and has been documented for at least 30 consecutive days. To date, stream flow gauge data indicates that the site did not experience a bankfull event during Year 3; however, UT8 recorded a bankfull event December 15, 2022, which was not reported in the MY2 report. Hydrologic data for UT7 indicates a spike in water depth around June 14, 2023 that show water levels to at or above bankfull: this is indicative of the time when beaver dams were constructed and is a false representation of a bankfull event. Stream hydrologic data between November 10, 2022 and November 23, 2023 can be seen in Figures 7.1 - 7.4 (Appendix E). 2.2.4 Wetland Hydrology Wetland W3 re-establishment are exceeding success criteria, experiencing groundwater levels within 12 inches of the soil surface for at least 23% of the growing season, or 47 consecutive days over the Year 3 monitoring period (Figures 8.1-8.3, Appendix E). Gauge data indicate that ground water within the wetland rehabilitation area has remained within 12 inches of the soil surface for 49% of the growing season, or 102 consecutive days over the Year 3 monitoring period (Figure 8.4, Appendix E) in the wetland expansion areas depicted on the CCPV Figures in Appendix B. The new gauge that was installed provide hydrologic data for areas extending beyond the delineated boundaries of W3 has exceeded success criteria for Year 3, experiencing groundwater levels within 12 inches of the surface for 49% of the growing season, or 101 consecutive days. Gauge 4, located within the enhancement area of W5, shows water levels within 12 inches of the soil surface for 41% of the growing season, or 85 consecutive days during the Year 3 monitoring period (Figure 8.5, Appendix E). Data from Gauge 5, located in the re-establishment area of W5, shows groundwater levels within 12 inches of the soil surface for approximately 32% of the growing season, or 65 consecutive days over the Year 3 monitoring period (Figure 8.6, Appendix E). Hydrographs presented in Figures 8.1-8.6 represent gauge data collected between November 13, 2022 and November 13, 2023. 3.0 Maintenance and Adaptive Management Plans Areas that were repaired in November 2022 were replanted in January 2023. All repaired areas showed increased amounts of herbaceous and woody vegetation during the Year 3 monitoring period. DRG does not anticipate the need for any repairs on WFFBR in Year 4. A section of downed fence was discovered along the right bank of UT4 due to a fallen tree in March 2023. DRG removed the tree and repaired the fence at the time of discovery. Photos of the repaired fence can Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 6 February 16, 2024 be found in Appendix C, Figures 3.36-3.37. Calves were observed within the easement due to downed or damaged fencing and/or kissing gates. DRG addressed this issue with the property owner and repaired fencing. DRG also nailed wooden boards across the kissing gate entry points to prevent future cattle access through kissing gates. Chinese privet and multiflora rose were treated on the Site during the Year 3 monitoring period. Invasive species on the Site will be monitored and treated as needed throughout the monitoring period. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 7 February 16, 2024 4.0 References HDR Engineering, Inc. of the Carolinas 2020. Mitigation Plan Owen Farms Mitigation Site. Transylvania County, North Carolina. January 31, 2020. NCDENR. Division of Mitigation Services (DMS). 2013. Survey Requirements for Full Delivery Projects. https://ncdenr.s3.amazonaws.com/s3fspublic/Mitigation_Services/Document_Management_ Library/Guidance_and_Template_Documents/2013_08_13_FD_SurveySpecs.pdf NCDEQ. Division of Mitigation Services (DMS). 2020. Annual Monitoring Report Format, Data, and Content Requirements October 2020. https://files.nc.gov/ncdeq/Mitigation%20Services/Document%20Management%20Library/Guid ance%20and%20Template%20Documents/DMSMonitoringReportTemplateOct2020.pdf North Carolina Geological Survey (NCGS), 1985. Geologic Map of North Carolina. North Carolina Wetland Functional Assessment Team (WFAT). 2016. N.C. Wetland Assessment Method (NC WAM) User Manual, Version 5.0 (February 2016). 290 pp North Carolina Stream Functional Assessment Team (SFAT). 2015. N. C. Stream Assessment Method (NC SAM) User Manual, Version 2.1 (August 2015). 350 pp Rosgen, David. 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs Colorado. Schafale, Michael P., Weakley, Alan S. Classification of the Natural Communities of North Carolina. Third Approximation. 1990. North Carolina Natural Heritage Program, Raleigh, NC. The Applied Climate Information System (ACIS). 2022. WETS Station: Brevard, NC. http://agacis.rcc-acis.org/?fips=37175 US Army Corps of Engineers (USACE), North Carolina Interagency Review Team (NCIRT). 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update. United States Geological Survey (USGS), 1984. Lake Toxaway Quadrangle, North Carolina, 7.5 Minute Series (Topographic). Washington, D. C. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Appendix A – General Project Information Total Stream Credit 5,043.893 Total Wetland Credit 1.767 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Table 1. Owen Farms Mitigation Site (DMS Project No. 100064) Project Mitigation Quantities and Credits Transylvania County, NC February 16, 2023 Original Mitigation Original Original Original Plan As-Built Mitigation Restoration Mitigation Project Segment Ft/Ac Ft/Ac Category Level Ratio (X:1) Credits Comments Stream West Fork French Broad River (WFFBR)*1799.000 1799.000 Cold R 1.00000 1,799.000 Full channel Restoration, buffer planting, livestock exclusion, permanent easement West Fork French Broad River (WFFBR)705.000 705.000 Cold EII 2.50000 282.000 Bank stabilization along the left bank, buffer planting, livestock exclusion, and permanent easement UT 1*764.000 764.000 Cold EII 4.00000 191.000 Buffer planting, livestock exclusion, and permanent easement UT 2 923.000 923.000 Cold EII 3.50000 263.714 Buffer planting, livestock exclusion, and permanent easement UT 2A*546.000 546.000 Cold EII 2.50000 218.400 Buffer planting, livestock exclusion, and permanent easement UT 2B 75.000 75.000 Cold EII 2.50000 30.000 Buffer planting, livestock exclusion, and permanent easement UT 3 125.000 125.000 Cold EI 1.50000 83.333 Stabilization of channel dimension and profile, buffer planting, livestock exclusion, and permanent easement UT 4*809.000 809.000 Cold EII 2.50000 323.600 Buffer planting, livestock exclusion, and permanent easement UT 4A 472.000 472.000 Cold EII 2.30000 205.217 Stabilization of channel dimension and profile near confluence with UT 4, buffer planting, livestock exclusion, and permanent easement UT 4B 178.000 178.000 Cold EII 4.00000 44.500 Buffer planting, livestock exclusion, and permanent easement UT 5*827.000 827.000 Cold R 1.00000 827.000 Full channel Restoration, buffer planting, livestock exclusion, permanent easement UT 6 114.000 114.000 Cold P 10.00000 11.400 Preservation UT 6A 206.000 206.000 Cold P 10.00000 20.600 Preservation UT 7 417.000 417.000 Cold R 1.00000 417.000 Full channel Restoration, buffer planting, livestock exclusion, permanent easement UT 7 439.000 439.000 Cold EII 3.50000 125.429 Buffer planting, livestock exclusion, and permanent easement UT 7A 103.000 103.000 Cold P 10.00000 10.300 Preservation UT 7B 136.000 136.000 Cold EII 2.50000 54.400 Buffer planting, livestock exclusion, and permanent easement UT 8 137.000 137.000 Cold R 1.00000 137.000 Full channel Restoration near confluence with WFFBR, buffer planting, livestock exclusion, permanent easement Total: 5,043.893 Wetland Wetland Group 1 (W1-W9)1.540 1.396 R E 2.00000 0.770 Planting, livestock exclusion, permanent easement Wetland Group 2 (W3 and W5) 0.350 0.350 R REE 1.00000 0.350 Raising invert of adjacent tributaries and filling abandoned channels; livestock exclusion, planting, and removal of spoil Wetland Group 3 (W3)0.970 0.970 R RH 1.50000 0.647 Planting, livestock exclusion, permanent easement; restoring adjacent tributaries to increase frequency of floodwaters accessing wetland Total:1.767 *Length of streams flowing through utility easements or agricultural crossings has been deducted from As-Built and Original Mitigation Plan footage and credits Project Credits Riparian Non-Rip Coastal Warm Cool Cold Wetland Wetland Marsh Restoration N/A N/A 3,180.000 N/A N/A N/A Re-establishment 0.350 N/A N/A Rehabilitation 0.647 N/A N/A Enhancement 0.770 N/A N/A Enhancement I N/A N/A 83.333 Enhancement II N/A N/A 1,738.260 Creation N/A N/A N/A Preservation N/A N/A 42.300 N/A N/A Totals N/A N/A 5,043.893 1.767 N/A N/A Restoration Level Stream U T 2 A UT2 UT2B U T 4 BUT4A UT4 W e s t Fork Fre n chBro a d R i v e r UT6 U T 6 A U T8 UT 5 U T 7A U T 7 BUT7 West F o r k F r e n c h Broad U T 3 XS7 XS14 XS11 XS12 XS10 XS9 XS6 XS3 XS2 XS4 XS5 XS1 3 4 5 6 7 8 9 10 11 12 14 13 15 16 17 19 20 18 W1 W1 W1 W1 W1 W1 W1 W1 W1 W2 W6A W6 W4 W3 W3 W5B W7 W5 W5 W5 W3 W3 Source: Esri, Maxar, Earthstar Geographics, IGN, and the GIS User Community 0 1,400Feet O LEGEND Stream Restoration (1:1) (3,180 Credits) Stream Enhancement I (1.5:1) (83.3 Credits) Stream Enhancement II (2.3:1) (205.2 Credits) Stream Enhancement II (2.5:1) (1,360.9 Credits) Stream Enhancement II (3.5:1) (394.6 Credits) Stream Enhancement II (4:1) (235.5 Credits) Stream Preservation (10:1) (42.3 Credits) Non-Creditable Stream Easement Boundary Utility Easement #0 Groundwater Gauges1@Rain Gauge !.Flow Gauges Cross Sections Wetland Re-establishment (0.350 Credits) Wetland Rehabilitation (0.647 Credits) Wetland Enhancement (0.698 Credits) Permanent Vegetation Plot Random Vegetation Plot PROJECT ASSET MAP FIGURE 1.0 OWEN FARMS MITIGATION SITE OWEN FARMS MY3 CURRENT CONDTIONS PLAN VIEW !. #0 #0 #0 1@ W3 W3 12 16 W3 XS11 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC Page 2 February 16, 2024 Table 2. Project Goals, Performance Criteria, and Functional Improvements Goal Treatment Functional Uplift Performance Criteria Measurements Monitoring Results Restore/enhance streams within the Site so that they are neither aggrading nor degrading Restore a stable dimension, pattern, and profile. Install fencing to exclude cattle. Reduction of nutrients and sediment to downstream locations, reduction of shear stress, and improved hydraulic function. Entrenchment Ratios should be ≥ 2.2. BHR should not exceed 1.2. BHR should not change more than 10% in any given monitoring interval. Riffle section W/D ratios should remain within the range of the appropriate stream type. Cross-section monitoring and visual inspections. Stream dimensions have remained stable throughout the site over the past year. All cross sections BHR≤1. Provide/ enhance flood attenuation. Restore several existing streams as primarily a Priority I restoration where bankfull and larger flows can access the floodplain. Construct floodplain bench on WFFBR. Increase attenuation of floodwaters, increase biogeochemical cycling and recharge riparian wetlands. Four bankfull events in separate monitoring years. Flow gauges (Pressure transducers), and visual inspection. During the 2023 MY, only UT 8 experienced a bankfull event. Restore/enhance aquatic, semi- aquatic, and riparian habitat. Restore native vegetation to the stream channel banks, wetlands, and the adjacent riparian corridor. Treatment of nutrient enriched surface runoff from adjacent pastureland, increased bank stability and increased habitat. Minimum of 320 stems/ac present at MY-3. Minimum of 260 stems/ac present at MY-5. Minimum of 210 stems/ac present at MY-7. Trees should average 6 feet in height at MY-5 and 8 feet in height at MY-7. Bog Complex communities may exhibit lower stem density and height. Vegetation plots will be monitored annually between July 1st and leaf fall using the CVS protocol. Plots 11 and 12 fail to meet density requirements. Plots 3, 10, and 20 fail to meet diversity requirements. Restore/Enhance Wetlands within the Site to remove hydrologic impairments Reconstruct above bankfull stream channel flows to riparian wetlands and re- grade topography to remove spoil and overburden material. Restoration of riparian habitat, treatment of nutrient enriched runoff from adjacent pastureland, increased flood attenuation. Groundwater elevation within 12 inches of the ground surface for at least 12% of the growing season (April 7 - October 30). Groundwater monitoring gauges. All wetlands are meeting performance criteria Restore and connect riparian habitat with adjacent natural communities. Conservation easement establishment. Protect Site from encroachment in conservation easement. Prevent Easement Encroachment. Visual inspection. Damaged fencing resulted in short term cattle access to areas within the easement. Fencing has been repaired and cattle removed from easement area Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Table 3. Monitoring Plan Components Parameter Monitoring Method Quantity Frequency Notes Dimension Riffle Cross Sections UT5 (2) UT7 (1) UT8 (1) WFFBR (4) Years 1, 2, 3, 5 & 7 Pool Cross Sections UT5 (2) UT7 (1) UT 8 (1) WFFBR (2) Years 1, 2, 3, 5 & 7 Bank pins may be installed in areas of concern. Pattern Visual None twice per year Bank pins may be installed in areas of concern Profile Visual None twice per year Additional profile measurements may be required if problems are identified during the monitoring period Substrate Visual None Annual There should be an absence of any significant trend in the aggradational or depositional potential of the channel Surface Water Hydrology Flow Gage (Pressure Transducer) UT5 (1) UT7 (1) UT8 (1) WFFBR (1) twice per year Measuring devices will be inspected/downloaded at each site visit to document occurrence of bankfull events and ensure device function Groundwater Hydrology Groundwater Gages 5 Site gauges, 2 Reference Gauges Annual Data will be downloaded at each site visit. One reference gauge will be located in W3 Rehabilitation area and also serve to monitor flood events in this area of the site. The second reference gauge will be located in the enhancement portion of W5. Vegetation CVS Level 2 Vegetation plots will be placed on ~2% of the planted area (17 permanent, 10x10 meter plots; 3 random plots of equal size) Years 1, 2, 3, 5 & 7 Vegetation will be monitored using the Carolina Vegetation Survey (CVS) protocols. GPS coordinates and orientation of random plots will be provided in the annual monitoring reports and plot locations will be depicted on the Current Condition Plan View maps. Invasive and nuisance vegetation Visual twice per year Locations of exotic and nuisance vegetation and the occurrence of beaver dams and approximate inundation limits will be mapped Project Boundary Visual twice per year Fence damage, vegetation damage, boundary encroachments, etc. will be mapped Culverts and Crossings Visual Twice per year Blockages and/or erosion around culverts and crossings will be mapped and noted in monitoring reports. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Table 4. Project Attributes Project Attribute Table Project Name Owen Farms Mitigation Site County Transylvania Project Area (acres) 25 Project Coordinates (latitude and longitude [decimal degrees]) 35.183902, -82.937970 Project Watershed Summary Information Physiographic Province Blue Ridge Mountains River Basin French Broad USGS Hydrologic Unit 8 06010105 USGS Hydrologic Unit 14 06010105010020 DWR Sub-basin 0601010501 Project Drainage Area (acres) 3,795 Project Drainage Area Percentage of Impervious Area 2 Land Use Classification Agricultural/Pasture Reach Summary Information Parameters WFFB UT 4 UT 5 UT 6 Pre-project length (feet) 1,975 731 652 114 Post-project (feet) 1,799 809 827 114 Valley confinement (Confined, moderately confined, unconfined) Unconfined Confined Confined Confined Drainage area (acres) 3,795 30.6 45.2 21.7 Flow regime Perennial Perennial Perennial Perennial NC DWR Water Quality Classification B, TR B B B Dominant Stream Classification (existing) B4 B4 B4 B4 Dominant Stream Classification (proposed) C4 C4 C4 C4 Dominant Evolutionary Class (Simon) if applicable Thermal Regime Cold Cold Cold Cold Reach Summary Information Continued Parameters UT 7 UT 8 UT 1 UT 2 Pre-project length (feet) 372 49 764 Post-project (feet) 417 137 764 923 Valley confinement (Confined, moderately confined, unconfined) Confined Confined Confined Confined Drainage area (acres) 32.1 41 19.5 18.6 Flow regime Perennial Perennial Perennial Perennial NC DWR Water Quality Classification B B B B Dominant Stream Classification (existing) B4 B4 B4 B4 Dominant Stream Classification (proposed) C4 C4 B4 B4 Dominant Evolutionary Class (Simon) if applicable Thermal Regime Cold Cold Cold Cold Reach Summary Information Continued Parameters UT 3 Pre-project length (feet) 125 Post-project (feet) 125 Valley confinement (Confined, moderately confined) Confined Drainage area (acres) <1 Flow regime Intermittent NC DWR Water Quality Classification B Dominant Stream Classification (existing) E4 Dominant Stream Classification (proposed) E4 Dominant Evolutionary Class (Simon) if applicable Thermal Regime Cold Wetland Summary Information Parameters Applicable? Resolved? Supporting Docs? Water of the United States – Section 404 Yes Yes PCN Water of the United States – Section 401 Yes Yes PCN Endangered Species Act Yes Yes CE Historic Preservation Act Yes Yes CE Coastal Zone Management Act (CZMA or CAMA) No N/A N/A Essential Fisheries Habitat No N/A N/A Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Table 5. Project Activity and Reporting History Data Completion Collection or Delivery Complete Mitigation Plan Jan-20 Jan-20 Final Design – Planting and Construction Plans Jan-20 Feb-20 Construction ---7-Oct-20 Repair Activities Complete ---15-Jan-21 Bare Root and Livestake Plantings for Entire Project Area ---22-Jan-21 Mitigation Plan/As-built (Year 0 Monitoring-Baseline)25-Feb-21 31-Mar-21 Year 1 Monitoring (2021)29-Sep-21 24-Jan-22 Year 2 Monitoring (2022)19-Aug-22 21-Feb-23 Repair Grading Activities Complete Jan-22 Repair Planting Activities Complete Feb-22 Invasive Species Herbicide Treatment 15-Aug-22 Repair Grading Activities Complete Nov-22 Year 3 Monitoring (2023)15-Feb-24 Repair Planting Activities Complete 1-Jan-23 Morphological Survey 30-Mar-23 Mar-23 Vegetation Survey 23-Aug-23 Aug-23 Beaver Dam Removal Aug-23 Aug-23 Year 4 Monitoring Year 5 Monitoring Table 6. Project Contacts Table Designer Primary project design POC Construction Contractor Construction Contractor POC Planting Contractor Planting Contractor POC Land Mechanics Design, Inc. 126 Circle G Lane Willow Spring, NC 27592 Lloyd Glover (919) 639-6132 Davey Resource Group 3101 Poplarwood Court Raleigh, North Carolina 27604 Michael Foster (706) 982-0403 Davey Resource Group 3101 Poplarwood Court Raleigh, North Carolina 27604 Alex DiGeronimo (843) 830-1536 Activity or Report Monitoring Performers Stream Monitoring POC Vegetation Monitoring POC Davey Resource Group 3101 Poplarwood Court Raleigh, North Carolina 27604 HDR Engineering 555 Fayetteville Street, Suite 900 Raleigh, North Carolina 27601-3034 Vickie Miller (919) 232-6600 Land Mechanics Design, Inc. 126 Circle G Lane Willow Spring, NC 27592 Lloyd Glover (919) 639-6132 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Appendix B – Visual Assessment Data Figure 2.3 Figure 2.2 Figure 2.4 Figure 2.7 Figure 2.8 Figure 2.9 Figure 2.6 Figure 2.5 UT1 UT1 U T 2 A UT2 UT2 B U T 4 BUT4A UT4 UT6 U T 6 A UT8 UT 5 U T 7A U T 7 BUT7 West F o r k F r e n c h Broad U T 3 WESTFORKFRENCHBROADRIVER W9 W3 W3 1 2 3 4 5 6 7 8 9 10 11 12 14 13 15 16 17 19 20 18 0 1,700Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.1 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary Utility Easement Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) Wetland Enhancement (RR, Enh, 2:1) Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Constructed Top of Bank Culvert Cross Sections Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot Not Meeting, Random Vegetation Plot Beaverdams Ford Soil Lift Fence Line Soil Lift with Boulder Toe Soil lift with Toe Wood Rip-Rap Bedrock Floodplain Interceptor Wetland Expansion Area ÅB Monitoring Photo Direction ""!Rain Gauge !.Flow Gauges #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting Invasive Species Locations Vegetative Areas of Concern 7 8 9 Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB XS1XS8 XS7 XS2 UT8 WESTFORKFRENCH BROAD RIVER W3 W3 WA WC WC 8 9 0 375Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.2 OWEN FARMS MITIGATION SITE UT8 LEGEND Easement Boundary \Cattails Utility Easement Wetland Enhancement (RR, Enh, 2:1) ÅB Monitoring Photo Direction Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot Invasive Species Locations Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) Wetland Expansion Area Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Constructed Top of Bank Vegetative Areas of Concern Culvert Cross Sections Beaverdams Ford Soil Lift Fence Line Soil Lift with Boulder Toe Soil lift with Toe Wood Rip-Rap Bedrock Floodplain Interceptor #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting1@Rain Gauge !.Flow Gauges Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB \\ X S 3 XS4 UT3 UT 5 UT4 WEST FORK FRENCH BROAD RIVER XS12 XS11 W2 W6A W6 W3 W3 W3 W3 W3 G1 G6 WB WC WC 7 9 10 12 14 16 19 0 375Feet O LEGEND Easement Boundary \Cattails Utility Easement Wetland Enhancement (RR, Enh, 2:1) Wetland Re-establishment (RR, Re-est., 1:1) ÅB Monitoring Photo Direction Invasive Species Locations Wetland Rehabilitation (RR, Rehab, 1.5:1) Wetland Expansion Area Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting Constructed Top of Bank Culvert Vegetative_Areas_of_Concern Cross Sections Fence Line Beaverdams Ford Soil Lift Streams Approach Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Soil Lift with Boulder Toe Soil lift with Toe Wood Rip-Rap Bedrock Floodplain Interceptor1@Rain Gauge !.Flow Gauges FIGURE 2.3 OWEN FARMS MITIGATION SITE CURRENT CONDITIONS PLAN VIEW Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB XS 6 UT6 UT6A XS5 WEST FORK FRENCH BR O A D R I V E R W4 15 17 0 390Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.4 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary \Cattails Utility Easement Wetland Enhancement (RR, Enh, 2:1) Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) ÅB Monitoring Photo Direction Invasive Species Locations Wetland Expansion Area Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot Constructed Top of Bank Vegetative Areas of Concern Fence Line Culvert Cross Sections Beaverdams Ford Soil Lift Soil Lift with Boulder Toe Soil lift with Toe Wood Rip-Rap Bedrock Floodplain Interceptor #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting1@Rain Gauge !.Flow Gauges Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅB ÅB ÅB XS13 UT 7 WEST FORK FRENCH BROAD R I V E R XS 1 4 W5 W5 W5 W5 G5 20 18 0 310Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.5 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary \Cattails Utility Easement Wetland Enhancement (RR, Enh, 2:1) Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) ÅB Monitoring Photo Direction Invasive Species Locations Wetland Expansion Area Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting Constructed Top of Bank Fence Line Culvert Cross Sections Beaverdams Ford Soil Lift Soil Lift with Boulder Toe Soil lift with Toe Wood Wetland Expansion Area Rip-Rap Bedrock Floodplain Interceptor1@Rain Gauge !.Flow Gauges Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅBÅB ÅBÅB ÅB \ \ \ \ XS 9 UT5 XS 1 0 XS1 1 XS1 2XS4 W3 W3 W3 W3 G3 G1 G2 G6 WC WC 11 12 13 16 0 375Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.6 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary Utility Easement Fence Line Wetland Enhancement (RR, Enh, 2:1) Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) Wetland Expansion Area Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot Not Meeting, Random Vegetation Plot \Cattails Beaverdams Invasive Species Locations Culvert Ford Cross Sections Log Structure Soil Lift Soil Lift with Boulder Toe Soil lift with Toe Wood Rock Cross Vane Constructed Top of Bank Rip-Rap Bedrock Floodplain Interceptor #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting ÅB Monitoring Photo Direction1@Rain Gauge !.Flow Gauges Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB UT7 UT7B UT7 UT 7 A FENC E L I N E T I E S I N T O EXIS T I N G F E N C I N G W5B W5 W5 W5 W5 W5 W5 G4 20 0 375Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.7 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary Utility Easement Wetland Enhancement (RR, Enh, 2:1) ÅB Monitoring Photo Direction Invasive Species Locations Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) Wetland Expansion Area #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting Constructed Top of Bank Fence Line Culvert Cross Sections Beaverdams Ford Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot Not Meeting, Random Vegetation Plot Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Soil Lift Soil Lift with Boulder Toe Soil lift with Toe Wood Rip-Rap Bedrock Wetland Expansion Area Floodplain Interceptor1@Rain Gauge !.Flow Gauges Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB ÅB UT2 UT 1 UT 1 UT2A UT2A UT2 B UT 2 UT 2 UT1 W9 W1 W1 W1 W1 W1 W1 W1 W1 W11 2 3 4 5 0 630Feet O CURRENT CONDITIONS PLAN VIEW FIGURE 2.8 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary Utility Easement Wetland Enhancement (RR, Enh, 2:1) ÅB Monitoring Photo Direction Invasive Species Locations Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) Wetland Expansion Area Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting Constructed Top of Bank Fence Line Culvert Cross Sections Beaverdams Ford Soil Lift Soil Lift with Boulder Toe Streams Approach Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Soil lift with Toe Wood Rip-Rap Bedrock Wetland Expansion Area1@Rain Gauge !.Flow Gauges Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat ÅB ÅB ÅB ÅB ÅB ÅB ÅB UT 4 B UT 2 UT2A U T 4 UT4 W1 W1 W1 W1 W4 W7 WB 5 6 7 15 0 500Feet O FIGURE 2.9 OWEN FARMS MITIGATION SITE LEGEND Easement Boundary \Cattails Utility Easement Wetland Enhancement (RR, Enh, 2:1) Wetland Re-establishment (RR, Re-est., 1:1) Wetland Rehabilitation (RR, Rehab, 1.5:1) ÅB Monitoring Photo Direction Invasive Species Locations Wetland Expansion Area Meeting, Permanent Vegetation Plot Not Meeting, Permanent Vegetation Plot Meeting, Random Vegetation Plot #7 Groundwater Gauge - Not Meeting #7 Groundwater Gauge - Meeting Constructed Top of Bank Fence Line Culvert Cross Sections Beaverdams Ford Soil Lift Stream Restoration (1:1) Stream Enhancement I (1.5:1) Stream Enhancement II (2.3:1) Stream Enhancement II (2.5:1) Stream Enhancement II (3.5:1) Stream Enhancement II (4:1) Stream Preservation (10:1) Non-Creditable Stream Soil Lift with Boulder Toe Soil lift with Toe Wood Rip-Rap Bedrock Floodplain Interceptor Wetland Expansion Area1@Rain Gauge !.Flow Gauges CURRENT CONDITIONS PLAN VIEW Rock Cross Vane Rock Step Structures Log Structure Hellbender Habitat WFFB 1799 3598 Visual Stream Stability Assessment Reach Assessed Stream Length  Assessed Bank Length Date Assessed:8/23/2023 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth and/or  surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.  Does NOT  include undercuts that are modest, appear sustainable and are providing  habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 16 16 100% Bank Protection Bank erosion within the structures extent of influence does not exceed  15%. (See guidance for this table in DMS monitoring guidance  document)  16 16 100% Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended Table 7.1 Visual Stream Stability Assessment Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024  Visual Stream Stability Assessment Reach UT4 Assessed Stream Length 809 Assessed Bank Length 1618 Date Assessed 8/23/2023 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth  and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.  Does  NOT include undercuts that are modest, appear sustainable and are  providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the  sill. 14 14 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring  guidance document)  14 14 100% Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Table 7.2 Visual Stream Stability Assessment Transylvania County, NC February 16, 2024  Visual Stream Stability Assessment Reach UT5 Assessed Stream Length 827 Assessed Bank Length 1654 Date Assessed 8/23/2023 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth and/or  surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.  Does  NOT include undercuts that are modest, appear sustainable and are  providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 23 23 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring guidance  document)  23 23 100% Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended Transylvania County, NC February 16, 2024  Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Table 7.3 Visual Stream Stability Assessment Visual Stream Stability Assessment Reach UT6 Assessed Stream Length 114 Assessed Bank Length 228 Date Assessed 8/23/2023 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth and/or  surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.  Does  NOT include undercuts that are modest, appear sustainable and are  providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the  sill. 2 2 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring guidance  document)  2 2 100% Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended Transylvania County, NC February 16, 2024  Table 7.4 Visual Stream Stability Assessment Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Visual Stream Stability Assessment Reach UT7 Assessed Stream Length 417 Assessed Bank Length 834 Date Assessed 8/23/2023 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth and/or  surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.  Does  NOT include undercuts that are modest, appear sustainable and are  providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 10 10 100% Bank Protection Bank erosion within the structures extent of influence does not  exceed 15%. (See guidance for this table in DMS monitoring guidance  document)  10 10 100% Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended Transylvania County, NC February 16, 2024  Table 7.5 Visual Stream Stability Assessment Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Visual Stream Stability Assessment Reach UT8 Assessed Stream Length 137 Assessed Bank Length 274 Date Assessed 8/23/2023 Bank Surface Scour/Bare  Bank Bank lacking vegetative cover resulting simply from poor growth and/or  surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely.  Does  NOT include undercuts that are modest, appear sustainable and are  providing habitat. 0 100% Bank Failure Fluvial and geotechnical ‐ rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed  15%. (See guidance for this table in DMS monitoring guidance  document)  3 3 100% Totals   Major Channel Category Metric Number  Stable,  Performing as  Intended Total Number  in As‐built Amount of  Unstable  Footage % Stable,  Performing as  Intended Transylvania County, NC February 16, 2024  Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Table 7.6 Visual Stream Stability Assessment Visual Vegetation Assessment Planted acreage 14.26 Data Assessed 8/23/2023 Bare Areas Very limited cover of both woody and herbaceous material.0.10 acres 0..49 3.4% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria.0.10 acres 0.00 0.0% 0.49 3.4% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard.0.10 acres 0.00 0.0% 0.49 3.4% Easement Acreage 25.0 Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated  against the total easement acreage . Include species with the potential to directly outcompete native,  young, woody stems in the short‐term or community structure for existing communities.  Species  included in summation above should be identified in report summary.   0.10 acres 0.70 2.8% Easement Encroachment Areas Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area.  0 15' of loose fencing near ford crossing allowed cattle access inside of easement.       Total Cumulative Total Vegetation Category Definitions Mapping  Threshold Combined  Acreage % of Easement  Acreage Vegetation Category Definitions Mapping  Threshold Combined  Acreage % of Planted  Acreage Transylvania County, NC February 16, 2024  Table 8. Visual Vegetation Condition Assessment *Low stem densities observed only in Swamp Bog complex. See section 2.2.2 for details Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Appendix C – Vegetation Plot Data Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Table 9. Vegetation Plot Data 14.26 2021-01-22 NA 8/23/2023 0.0247Plot size (ACRES) Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date of Current Survey Veg Plot 11 R Veg Plot 16 R Veg Plot 19 R Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Total Total Total Alnus serrulata hazel alder Tree OBL 9 1 4 4 5 Aronia arbutifolia red chokeberry Shrub FACW 1 1 1 Betula alleghaniensis yellow birch Tree FAC 1 2 2 2 1 2 1 1 Betula lenta sweet birch Tree FACU 1 1 Betula nigra river birch Tree FACW 1 1 1 1 3 3 3 5 5 1 1 2 2 1 1 1 1 Carya cordiformis bitternut hickory Tree FACU 1 1 3 4 2 2 Carya ovata shagbark hickory Tree FACU 1 1 1 1 1 1 1 1 1 1 Cephalanthus occidentalis common buttonbush Shrub OBL 1 1 1 1 Cornus florida flowering dogwood Tree FACU 2 2 1 1 1 3 3 1 1 Hamamelis virginiana American witchhazel Tree FACU 3 3 2 2 1 1 1 1 2 2 1 Lindera benzoin northern spicebush Tree FAC 2 2 2 1 Liriodendron tulipifera tuliptree Tree FACU 2 3 2 6 1 2 2 2 3 3 1 1 1 1 1 2 1 3 2 2 4 5 1 2 1 1 4 5 2 Platanus occidentalis American sycamore Tree FACW 3 3 1 1 1 1 1 1 6 7 5 5 3 4 4 4 3 3 2 2 1 1 5 5 2 2 4 4 5 5 6 5 Quercus alba white oak Tree FACU 1 1 1 2 3 4 4 6 6 2 2 6 6 5 5 5 5 Sambucus canadensis American black elderberry Tree 1 Ulmus americana American elm Tree FACW 2 2 1 1 2 2 1 1 Sum Performance Standard 6 9 9 13 4 17 7 8 14 15 13 13 7 8 12 13 4 11 10 10 4 5 15 17 12 15 11 13 9 9 11 12 11 11 6 12 13 Sassafras albidum sassafras Tree FACU 4 Sum Proposed Standard 6 9 9 13 4 17 7 8 14 15 13 13 7 8 12 13 4 11 10 10 4 5 15 17 12 15 11 13 9 9 11 12 11 11 6 12 13 9 13 17 8 15 13 8 13 11 10 5 17 15 13 9 12 11 6 12 13 364 526 648 324 607 526 324 526 445 364 202 688 607 526 364 486 445 243 486 526 5 5 6 4 4 4 4 6 5 3 4 7 7 6 5 5 3 3 4 4 33 35 53 38 47 46 50 31 27 60 40 29 33 38 33 42 45 67 50 38 3 2 3 4 7 5 7 4 4 3 2 2 4 4 3 4 5 5 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 13 17 8 15 13 8 13 11 10 5 17 15 13 9 12 11 6 12 13 364 526 648 324 607 526 324 526 445 364 202 688 607 526 364 486 445 243 486 526 5 5 6 4 4 4 4 6 5 3 4 7 7 6 5 5 3 3 4 4 33 35 53 38 47 46 50 31 27 60 40 29 33 38 33 42 45 67 50 38 3 2 3 4 7 5 7 4 4 3 2 2 4 4 3 4 5 5 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Post Mitigation Plan Species Mitigation Plan Performance Standard Post Mitigation Plan Performance Standard Current Year Stem Count Current Year Stem Count Stems/Acre Stems/Acre Species Count Species Count Dominant Species Composition (%) Dominant Species Composition (%) Average Plot Height (ft.) Average Plot Height (ft.) % Invasives % Invasives Veg Plot 17 F Veg Plot 18 F Veg Plot 20 F Species Included in Approved Mitigation Plan Veg Plot 10 F Veg Plot 12 F Veg Plot 13 F Veg Plot 14 F Veg Plot 15 FVeg Plot 5 F Veg Plot 6 F Veg Plot 7 F Veg Plot 8 F Veg Plot 9 FIndicator Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 FScientific Name Common Name Tree/Shrub Meeting Success Criteria Not Meeting Success Criteria Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 364 5 0 526 5 0 648 6 0 364 5 0 486 6 0 486 6 0 364 6 0 486 6 8 931 7 0 486 6 0 526 6 0 405 5 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 324 4 0 607 4 0 526 4 0 405 4 0 567 4 0 648 4 0 445 5 0 607 4 0 648 4 0 445 5 0 567 4 0 648 4 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 324 4 0 526 6 0 445 5 0 405 5 0 445 5 0 405 5 0 445 6 0 607 6 0 445 6 0 445 6 0 648 6 0 607 6 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 364 3 0 202 4 0 688 7 0 607 5 0 243 4 0 769 7 0 567 5 0 243 4 0 567 4 0 607 5 0 243 4 0 729 5 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 607 7 0 526 6 0 364 5 0 567 7 0 688 6 0 364 5 0 486 6 0 648 5 0 405 5 0 810 8 0 769 5 0 526 5 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 486 5 0 445 3 0 243 3 0 486 5 0 405 3 0 324 4 0 283 3 0 648 5 0 648 4 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 486 4 0 526 4 0 *Each monitoring year represents a different plot for the random vegetation plot "groups". Random plots are denoted with an R, and fixed plots with an F. Vegetation Performance Standards Summary Table Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Veg Plot 2 F Veg Plot 3 F Veg Plot 5 F Veg Plot 6 F Veg Plot 8 F Veg Plot 9 F Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Monitoring Year 7 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 0 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Veg Plot 1 F Veg Plot 4 F Veg Plot 7 F Veg Plot 10 F Veg Plot 18 F Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Monitoring Year 7 Monitoring Year 5 Monitoring Year 1 Monitoring Year 0 Veg Plot 20 F Veg Plot Group 1 R Veg Plot Group 2 R Veg Plot Group 3 R Veg Plot 12 F Veg Plot 13 F Veg Plot 14 F Veg Plot 15 F Veg Plot 17 F Owen Farms Mitigation Site | DMS Project No. 100034 MY3 Monitoring Report Table 10 Vegetation Performance Standards Summary Table Transylvania County, NC February 16, 2024 Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Figures 3.1 – 3.47: Vegetation Plot Photographs  and Site Aerial Photographs  3.1 Vegetation Plot 1 : 8/23/2023  3.3  Vegetation Plot 3 : 8/23/2023  3.5 Vegetation Plot 5 : 8/23/2023 3.2  Vegetation Plot 2 : 8/23/2023  3.4  Vegetation Plot 4 : 8/23/2023  3.6 Vegetation Plot 6 : 8/23/2023  Transylvania County, NC February 16, 2024  Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Transylvania County, NC February 16, 2024  Figures 3.1 – 3.47: Vegetation Plot Photographs and Site Aerial Photographs  3.7 Vegetation Plot 7 : 8/23/2023  3.9 Vegetation Plot 9: 8/23/2023  3.11 Vegetation Plot 11 : 8/23/2023  3.8 Vegetation Plot 8 : 8/23/2023  3.10 Vegetation Plot 10 : 8/23/2023  3.12 Vegetation Plot 12 : 8/23/2023  Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Transylvania County, NC February 16, 2024  Figures 3.1 – 3.47: Vegetation Plot Photographs and Site Aerial Photographs  3.13 Vegetation Plot 13 : 8/23/2023  3.15 Vegetation Plot 15 : 8/23/2023  3.17 Vegetation Plot 17 : 8/23/2023  3.14 Vegetation Plot 14 : 3/16/2022  3.16 Vegetation Plot 16 : 8/23/2023  3.18 Vegetation Plot 18 : 8/23/2023  Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Transylvania County, NC February 16, 2024  Figures 3.1 – 3.48: Vegetation Plot Photographs and Site Aerial Photographs  3.19 Vegetation Plot 19 : 8/23/2023  3.21 Aerial overview of West Fork French  Broad River looking upstream: 8/24/2023  3.23 Aerial overview of UT3 and West Fork  French Broad River confluence: 8/24/2023  3.20 Vegetation Plot 20 : 8/23/2023  3.22 Aerial overview of the of UT8 and West Fork  French Broad River confluence: 8/24/2023  3.24 Aerial overview of UT5 and West Fork  French Broad River confluence: 8/24/2023  Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Transylvania County, NC February 16, 2024  Figures 3.1 – 3.48: Vegetation Plot Photographs and Site Aerial Photographs  3.25 Aerial overview UT5: 8/24/2023  3.27 UT1 Culvert looking downstream:  3/30/2023  3.29   UT2A  Culvert looking downstream,  3/30/2023  3.26 Aerial overview UT7: 8/24/2023  3.28 UT1 Culvert looking upstream:  3/30/2023  3.30 UT2A Culvert looking upstream:  3/30/2023  Owen Farms Mitigation Site | DMS Project No. 100064  MY3 Monitoring Report  Figures 3.1 – 3.48: Vegetation Plot Photographs and Site Aerial Photographs  3.31 UT2 Culvert looking downstream:  3/30/2023  3.33  UT2 Single Thread Channel: 3/30/2023  3.32 UT2 Culvert looking upstream:  3/30/2023  3.34 UT4 Culvert looking downstream:  3/30/2023  3.35 UT4 Culvert Crossing looking upstream:  3/30/2023  3.36 Downed fence line along UT4: 3/30/2023  Transylvania County, NC February 16, 2024  Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Transylvania County, NC February 16, 2024  Figures 3.1 – 3.48: Vegetation Plot Photographs and Site Aerial Photographs  3.37 Repaired fence line along UT4:  3/30/2023  3.39 Aerial photo of broken beaver dam on  UT5 at STA 18+25: 8/24/2023  3.38 Beaver dam located on UT5 at STA 18+25:  6/30/2023  3.40 Beaver dam on UT7 below XS14: 6/30/2023  3.41 Broken beaver dam on UT7 above XS14:  6/30/2023  3.42 Repaired area near STA 10+00 WFFBR:  3/30/2023  Owen Farms Mitigation Site | DMS Project No. 100034  MY3 Monitoring Report  Transylvania County, NC February 16, 2024  Figures 3.1 – 3.48: Vegetation Plot Photographs and Site Aerial Photographs  3.43 Juncus sod map between STA 13+90  ‐ 14+50: 8/23/2023  3.45 Juncus sod mat repair at STA 16+50  WFFBR: 6/30/2023  3.44  Woody vegetation along WFFBR at STA  15+25: 8/23/2023  3.46 Aerial photo of Swamp Bog Complex:  8/24/2023  3.47 Juncus sod mat repair at STA 22+35  6/30/2023  3.48 Aerial photo of dead multiflora in Swamp  Bog Complex Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Appendix D – Stream Geomorphology Data Owen Farms Mitigation Site | DMS Project No. 100054  MY3 Monitoring Report  Figures 4.1 – 4.14: Cross Section Photos  4.1 West Fork French Broad Cross Section 1: 3/30/2023 4.3 West Fork French Broad Cross Section 3: 3/30/2023 4.5 West Fork French Broad Cross Section 5: 3/30/2023 4.2 West Fork French Broad Cross Section 2: 3/30/2023 4.4 West Fork French Broad Cross Section 4: 3/30/2023 4.6 West Fork French Broad Cross Section 6: 3/30/2023 Transylvania County, NC February 16, 2024  Owen Farms Mitigation Site | DMS Project No. 100054  MY3 Monitoring Report  Figures 4.1 – 4.14: Cross Section Photos  4.7 UT 8 Cross Section 7: 3/30/2023 4.9 UT 5 Cross Section 9: 3/30/2023 4.11 UT 5 Cross Section 11: 3/30/2023 4.8 UT 8 Cross Section 8: 3/30/2023 4.10 UT 5 Cross Section 10: 3/30/2023 4.12 UT 5 Cross Section 12: 3/30/2023 Transylvania County, NC February 16, 2024  Owen Farms Mitigation Site | DMS Project No. 100054  MY3 Monitoring Report  Figures 4.1 – 4.14: Cross Section Photos  4.13 UT 7 Cross Section 13: 3/30/2023 4.14 UT7 Cros Section 14: 3/30/2023 Transylvania County, NC February 16, 2024  River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 -- -- -- -- -- -- -- -- 2692.85 2692.81 2692.83 2692.76 2696.45 2696.34 2696.51 2696.46 3.60 3.53 3.68 3.70 58.72 46.68 54.47 52.20 Cross Section 1 (Pool) Thalweg Elevation Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Bank Height Ratio French Broad 06010105010020 XS 1 (WFFBR) 3,795 3/30/2023 MAF, WDB 2691.0 2692.0 2693.0 2694.0 2695.0 2696.0 2697.0 2698.0 2699.0 2700.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 El e v a t i o n ( f t ) Distance (ft) XS-1 Pool (WFFBR) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Figures 5.1 – 5.14 Monitoring Cross Section Plots Figure 5.1 Cross Section 1 Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2696.15 2695.96 2696.25 2696.18 1.00 1.07 1.00 1.00 2692.68 2692.53 2692.61 2692.69 2696.15 2696.21 2696.25 2696.18 3.47 3.68 3.54 3.54 61.32 69.39 70.16 65.25 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 2 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 2 (WFFBR) 3,795 3/30/2023 MAF, WDB 2691.0 2692.0 2693.0 2694.0 2695.0 2696.0 2697.0 2698.0 2699.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 El e v a t i o n ( f t ) Distance (ft) XS-2 Riffle (WFFBR) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.2 Cross Section 2 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2694.46 2694.11 2694.48 2694.49 1.00 1.15 1.00 1.00 2691.17 2690.90 2690.90 2690.68 2694.46 2694.58 2694.48 2694.49 3.29 3.68 3.58 3.81 65.45 80.97 68.38 69.43 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 3 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 3 (WFFBR) 3,795 3/30/2023 MAF, WDB 2690.0 2691.0 2692.0 2693.0 2694.0 2695.0 2696.0 2697.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 El e v a t i o n ( f t ) Distance (ft) XS-3 Riffle (WFFBR) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.3 Cross Section 3 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 -- -- -- -- -- -- -- -- 2689.58 2689.43 2689.53 2689.44 2693.64 2693.95 2693.95 2693.93 4.06 4.52 4.42 4.49 71.83 84.77 84.93 84.40 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 4 (Pool) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 4 (WFFBR) 3,795 3/30/2023 MAF, WDB 2688.0 2689.0 2690.0 2691.0 2692.0 2693.0 2694.0 2695.0 2696.0 2697.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 El e v a t i o n ( f t ) Distance (ft) XS-4 Pool (WFFBR) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.4 Cross Section 4 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2690.79 2690.79 2690.88 2690.87 1.00 1.01 1.00 1.00 2688.36 2688.27 2688.04 2688.06 2690.79 2690.81 2690.88 2690.87 2.43 2.54 2.84 2.81 49.82 50.32 53.99 51.8 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 5 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 5 (WFFBR) 3,795 3/30/2023 MAF, WDB 2687.0 2688.0 2689.0 2690.0 2691.0 2692.0 2693.0 2694.0 2695.0 2696.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 El e v a t i o n ( f t ) Distance (ft) XS-5 Riffle (WFFBR) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.5 Cross Section 5 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2691.20 2691.11 2691.36 2691.33 1.00 1.06 1.00 1.00 2686.44 2686.52 2686.53 2686.57 2691.20 2691.40 2691.36 2691.34 4.76 4.88 4.83 4.77 138.26 149.49 150.40 150.30 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 6 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 6 (WFFBR) 3,795 3/30/2023 MAF, WDB 2685.0 2686.0 2687.0 2688.0 2689.0 2690.0 2691.0 2692.0 2693.0 2694.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 El e v a t i o n ( f t ) Distance (ft) XS-6 Riffle (WFFBR) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.6 Cross Section 6 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Figure 5.7 Cross Section 7 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2696.64 2696.74 2696.75 2696.74 1.00 1.02 1.00 1.00 2695.39 2695.78 2695.79 2695.63 2696.64 2696.76 2696.75 2696.74 1.25 0.98 0.96 1.11 8.14 8.40 8.19 8.43 French Broad 06010105010020 XS 7 (UT 8) 41 3/30/2023 MAF, WDB Cross Section 7 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) 2694.5 2695.0 2695.5 2696.0 2696.5 2697.0 2697.5 2698.0 2698.5 0.0 5.0 10.0 15.0 20.0 25.0 El e v a t i o n ( f t ) Distance (ft) XS-7 Riffle (UT 8) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 -- -- -- -- -- -- -- -- 2694.42 2694.53 2694.54 2694.5 2696.50 2696.68 2696.51 2696.5 2.08 1.97 1.97 2.03 14.19 11.96 11.94 11.9 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 8 (Pool) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 8 (UT 8) 41 3/30/2023 MAF, WDB 2694.0 2694.5 2695.0 2695.5 2696.0 2696.5 2697.0 2697.5 2698.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 El e v a t i o n ( f t ) Distance (ft) XS-8 Pool (UT 8) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.8 Cross Section 8 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16,2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 -- -- -- -- -- -- -- -- 2703.98 2704.83 2704.92 2704.86 2705.97 2706.01 2706.04 2706.12 1.99 1.18 1.12 1.26 10.89 4.96 4.90 5.55 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 9 (Pool) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 9 (UT 5) 45.2 3/30/2023 MAF, WDB 2703.0 2704.0 2705.0 2706.0 2707.0 2708.0 2709.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 El e v a t i o n ( f t ) Distance (ft) XS-9 Pool (UT 5) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.9 Cross Section 9 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2702.02 2701.93 2702.02 2701.97 1.00 1.01 1.00 1.00 2701.21 2701.11 2701.02 2700.96 2702.02 2701.94 2702.02 2701.97 0.81 0.83 1.00 1.01 4.37 4.43 5.37 5.27 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 10 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 10 (UT 5) 45.2 3/30/2023 MAF, WDB 2700.5 2701.0 2701.5 2702.0 2702.5 2703.0 2703.5 2704.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 El e v a t i o n ( f t ) Distance (ft) XS-10 Riffle (UT 5) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 Figure 5.10 Cross Section 10 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Figure 5.11 Cross Section 11 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 -- -- -- -- -- -- -- -- 2696.66 2996.60 2696.61 2696.64 2697.47 2697.56 2697.67 2697.76 0.81 0.96 1.06 1.13 4.75 5.40 6.55 7.32 French Broad 06010105010020 XS 11 (UT 5) 45.2 3/30/2023 MAF, WDB Cross Section 11 (Pool) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) 2696.0 2696.5 2697.0 2697.5 2698.0 2698.5 2699.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 El e v a t i o n ( f t ) Distance (ft) XS-11 Pool (UT 5) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2 - 8/18/2022 MY3 - 3/30/2023 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2694.13 2694.49 2694.18 2694.17 1.00 0.75 1.00 1.00 2692.78 2693.23 2693.30 2693.29 2694.13 2694.17 2694.18 2694.17 1.35 0.95 0.88 0.88 7.83 4.28 5.30 4.66 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 12 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 12 (UT 5) 45.2 3/30/2023 MAF, WDB 2692.0 2692.5 2693.0 2693.5 2694.0 2694.5 2695.0 2695.5 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 El e v a t i o n ( f t ) Distance (ft) XS-12 Riffle (UT 5) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY2-8/18/2022 MY3 - 3/30/2023 Figure 5.12 Cross Section 12 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 -- -- -- -- -- -- -- -- 2689.68 2689.67 2689.73 2689.74 2691.25 2691.40 2691.36 2691.4 1.57 1.73 1.63 1.66 8.77 9.06 8.10 8.21 . Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 13 (Pool) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 13 (UT 7) 32.1 3/30/2023 MAF, WDB 2689.0 2689.5 2690.0 2690.5 2691.0 2691.5 2692.0 2692.5 2693.0 2693.5 2694.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 El e v a t i o n ( f t ) Distance (ft) XS-13 Pool (UT 7) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY3-8/16/2022 MY3 - 3/30/2022 Figure 5.13 Cross Section 13 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 River Basin Watershed XS ID Drainage Area (Acres) Date Field Crew Bankfull elevation adjusted to current monitoring year's low top of bank elevation Base MY1 MY2 MY3 MY4 MY5 2689.90 2689.95 2689.96 2689.96 1.00 0.98 1.00 1.00 2689.18 2689.29 2689.25 2689.27 2689.90 2689.94 2689.96 2689.96 0.72 0.65 0.71 0.69 4.56 4.45 4.31 4.34 Low Top Of Bank Elevation Low Top of Bank Max Depth (ft) Low Top Of Bank Cross Sectional Area (ft2) Cross Section 14 (Riffle) Dimensions Bankfull Elevation (ft) - Based on As Built-Bankfull Area Thalweg Elevation Bank Height Ratio French Broad 06010105010020 XS 14 (UT 7) 32.1 3/30/2023 MAF, WDB 2688.5 2689.0 2689.5 2690.0 2690.5 2691.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 El e v a t i o n ( f t ) Distance (ft) XS-14 Riffle (UT 7) Baseline - 2/25/2021 Bankfull - 3/30/2023 MY1 - 9/27/2021 MY3-8/18/2022 MY3 - 3/30/2023 Figure 5.14 Cross Section 14 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Min Max n Min Max n Min Max n Min Mean Med Max n Min Max Min Max n Min Max n Min Max n Min Max n Bankfull Width (ft)28.78 38.38 38.47 47.90 3 30.00 30.00 27.52 39.11 4 28.5 42.58 4 26.94 39.81 4 25.18 39.28 4 4.38 4.38 4.38 4.38 1 8.50 8.50 8.94 10.08 2 7.46 12.48 2 8.10 10.592 9.96 10.41 2 Floodprone Width (ft)47.89 56.15 51.56 69.00 3 93.00 93.00 96.35 430.60 4 96.35 430.6 4 96.35 430.60 4 96.35 430.60 4 8.00 8.00 8.00 8.00 1 100.00 100.00 60.41 491.41 2 60.41 491.41 2 60.41 491.41 2 60.41 491.41 2 Bankfull Mean Depth (ft)1.89 2.12 2.07 2.41 3 2.14 2.14 1.81 3.54 4 1.75 3.34 4 2.00 3.78 4 2.06 3.83 4 0.66 0.66 0.66 0.66 1 0.63 0.63 0.43 0.53 2 0.42 0.42 2 0.51 0.58 2 0.45 0.53 2 Bankfull Max Depth (ft)2.93 3.14 3.20 3.28 3 2.63 2.63 2.43 4.76 4 2.52 4.68 4 2.84 4.83 4 2.81 4.77 4 0.95 0.95 0.95 0.95 1 0.76 0.76 0.81 0.81 2 0.69 0.91 2 1.00 1.06 2 0.88 1.01 2 Bankfull Cross Sectional Area (ft2)69.31 79.83 79.56 90.63 3 69.60 69.60 49.82 138.26 4 49.74 142.14 4 53.99 150.36 4 51.80 150.30 4 2.90 2.90 2.90 2.90 1 5.00 5.00 4.37 4.75 2 3.12 5.28 2 5.37 6.55 2 4.66 5.27 2 Width/Depth Ratio 11.94 18.62 18.58 25.34 3 14.00 14.00 11.05 15.20 4 12.75 19.14 4 7.91 15.39 4 10.26 16.23 4 6.64 6.64 6.64 6.64 1 13.50 13.50 16.87 23.44 2 17.76 29.71 2 19.57 20.76 2 18.79 23.13 Entrenchment Ratio 1.25 1.49 1.44 1.79 3 3.10 3.10 3.50 14.23 4 3.38 14.2 4 3.24 14.11 4 3.83 14.59 4 1.83 1.83 1.83 1.83 1 11.80 11.80 5.99 54.94 2 4.84 65.91 2 5.70 43.28 2 6.06 47.21 2 Bank Height Ratio 1.70 1.90 1.80 2.19 3 1.00 1.00 1.00 1.00 41141.00 1.02 4 1.00 1.00 4 1.20 1.20 1.20 1.20 1 1.00 1.00 1.00 1.00 2 1.00 1.00 2 1.00 1.00 2 1.00 1.00 2 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Min Max n Min Max n Min Max n Min Mean Med Max n Min Max Min Max n Min Max n Min Max n Min Max n Bankfull Width (ft)4.71 4.71 4.71 4.71 1 9.00 9.00 10.50 10.50 1 10.47 10.47 1 10.04 10.04 1 10.80 10.80 1 11.60 11.60 11.60 11.60 1 12.00 12.00 11.37 11.37 1 12.10 12.10 1 12.08 12.08 1 11.89 11.89 1 Floodprone Width (ft)12.80 12.80 12.80 12.80 1 130.00 130.00 71.78 71.78 1 71.78 71.78 1 71.78 71.78 1 71.78 71.78 1 17.00 17.00 17.00 17.00 1 30.00 30.00 422.23 422.23 1 422.23 422.23 1 422.23 422.23 1 422.23 422.23 1 Bankfull Mean Depth (ft)0.57 0.57 0.57 0.57 1 0.67 0.67 0.43 0.43 1 0.43 0.43 1 0.43 0.43 1 0.40 0.40 1 0.70 0.70 0.70 0.70 1 0.92 0.92 0.72 0.72 1 0.57 0.57 1 0.68 0.68 1 0.71 0.71 1 Bankfull Max Depth (ft)0.74 0.74 0.74 0.74 1 0.80 0.80 0.72 0.72 1 0.65 0.65 1 0.71 0.71 1 0.69 0.69 1 0.97 0.97 0.97 0.97 1 1.11 1.11 1.25 1.25 1 0.86 0.86 1 0.96 0.96 1 1.11 1.11 1 Bankfull Cross Sectional Area (ft2)2.69 2.69 2.69 2.69 1 5.60 5.60 4.56 4.56 1 4.45 4.45 1 4.31 4.31 1 4.34 4.34 1 8.19 8.19 8.19 8.19 1 10.30 10.30 8.14 8.14 1 6.90 6.90 1 8.19 8.19 1 8.44 8.44 1 Width/Depth Ratio 8.26 8.26 8.26 8.26 1 13.50 13.50 24.42 24.42 1 24.35 24.35 1 23.35 23.35 1 27.00 27.00 1 16.30 16.30 16.30 16.30 1 13.00 13.00 15.79 15.79 1 21.23 21.23 1 17.76 17.76 1 16.75 16.75 1 Entrenchment Ratio 2.71 2.71 2.71 2.71 1 14.40 14.40 6.84 6.84 1 6.85 6.85 1 7.15 7.15 1 6.65 6.65 1 1.47 1.47 1.47 1.47 1 2.50 2.50 37.14 37.14 1 34.90 34.90 1 34.96 34.96 1 35.50 35.50 1 Bank Height Ratio 3.40 3.40 3.40 3.40 1 1.00 1.00 1.00 1.00 11111.00 1.00 1 1.00 1.00 1 2.79 2.79 2.79 2.79 1 1.00 1.00 1.00 1.00 1 1.00 1.00 1 1.00 1.00 1 1.00 1.00 1 Max part size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) UT 7 Table 11. Monitoring Year 3 Stream Data Summary Owen Farms Mitigation Site / DMS: 100064  ‐  West Fork French Broad River (WFFBR), UT 5, UT 7, UT 8 West Fork French Broad River UT 5 Pre‐Existing Condition (applicaple) Design Monitoring Baseline  (MY0)Monitoring  (MY1) Monitoring  (MY2) Monitoring (MY3) Pre‐Existing Condition (applicaple) Design Monitoring Baseline  (MY0)Monitoring  (MY1) Monitoring (MY2) Monitoring (MY3) C4 C4 83 83 83 40 40 40 300 10 10 10 40 B4 / F4 C4 C4 B4 C4 10 1.06 1.12 1.14 1.08 1.14 1.14 1.14 300 300 0.0034 0.0034 0.0036 0.012 0.006 0.007 0.007 UT 8 Pre‐Existing Condition (applicaple) Design Monitoring Baseline  (MY0)Monitoring (MY1) Monitoring (MY2) Monitoring (MY3) Pre‐Existing Condition (applicaple) Design Monitoring Baseline  (MY0)Monitoring  (MY1) Monitoring  (MY2) Monitoring  (MY3) C4 C4 61.7 61.7 61.7 76.8 76.8 76.8 13 45 45 45 77.8 B4 C4 C4 B4 C4 45 1.00 1.24 1.26 1.03 1.09 1.10 1.10 13 13 0.01120.0246 0.0054 0.0057 0.0379 0.0110 0.0112 Owen Farms Mitigation Site | DMS Project No. 100064 MY2 Monitoring Report Transylvania County, NC February 16, 2024 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area ‐‐ ‐‐ ‐‐ ‐‐2696.25 2695.96 2696.25 2696.18 2694.46 2694.11 2694.48 2694.49 ‐‐ ‐‐ ‐‐ ‐‐2690.79 2690.79 2690.88 2690.87 Bank Height Ratio_Based on AB Bankfull1 Area ‐‐ ‐‐ ‐‐ ‐‐0.97 1.07 1.00 1.00 1.00 1.15 1.00 1.00 ‐‐ ‐‐ ‐‐ ‐‐1.00 1.01 1.00 1.00 Thalweg Elevation 2692.85 2692.81 2692.83 2692.76 2692.68 2692.53 2692.68 2692.69 2691.17 2690.90 2690.90 2690.68 2689.58 2689.43 2689.53 2689.44 2688.36 2688.27 2688.04 2688.06 LTOB2 Elevation 2696.45 2696.34 2696.51 2696.46 2696.15 2696.21 2696.25 2696.18 2694.46 2694.58 2694.48 2694.49 2693.64 2693.95 2693.95 2693.93 2690.79 2690.81 2690.88 2690.87 LTOB2 Max Depth (ft) 3.60 3.53 3.68 3.70 3.47 3.68 3.54 3.54 3.29 3.68 3.58 3.81 4.06 4.52 4.42 4.49 2.43 2.54 2.84 2.81 LTOB2 Cross Sectional Area (ft2) 58.72 46.68 54.47 52.20 61.32 69.39 70.16 65.25 65.45 80.97 68.38 69.43 71.83 84.77 84.93 84.40 49.82 50.32 53.99 51.80 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 2691.20 2691.11 2691.36 2691.33 2696.64 2696.74 2696.75 2696.74 ‐‐ ‐‐ ‐‐ ‐‐‐‐ ‐‐ ‐‐ ‐‐2702.02 2702.02 2701.97 Bank Height Ratio_Based on AB Bankfull1 Area 1.00 1.06 1.00 1.00 1.00 1.02 1.00 1.00 ‐‐ ‐‐ ‐‐ ‐‐‐‐ ‐‐ ‐‐ ‐‐1.00 1.00 1.00 Thalweg Elevation 2686.44 2686.52 2686.53 2686.57 2695.39 2695.78 2695.79 2695.63 2694.42 2694.53 2694.54 2694.47 2703.98 2704.83 2704.92 2704.86 2701.21 2701.02 2700.96 LTOB2 Elevation 2691.20 2691.40 2691.36 2691.34 2696.64 2696.76 2696.75 2696.74 2696.50 2696.68 2696.51 2696.50 2705.97 2706.01 2706.04 2706.12 2702.02 2702.02 2701.97 LTOB2 Max Depth (ft) 4.76 4.88 4.83 4.77 1.25 0.98 0.96 1.11 2.08 1.97 1.97 2.03 1.99 1.18 1.12 1.26 0.81 1.00 1.01 LTOB2 Cross Sectional Area (ft2) 138.26 149.49 150.40 150.30 8.14 8.40 8.19 8.43 14.19 11.96 11.94 11.90 10.89 4.96 4.90 5.55 4.37 5.37 5.27 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area ‐‐ ‐‐ ‐‐ ‐‐2694.13 2694.49 2694.18 2694.17 ‐‐ ‐‐ ‐‐ ‐‐2689.90 2689.95 2689.96 2689.96 Bank Height Ratio_Based on AB Bankfull1 Area ‐‐ ‐‐ ‐‐ ‐‐1.00 0.75 1.00 1.00 ‐‐ ‐‐ ‐‐ ‐‐1.00 0.98 1.00 1.00 Thalweg Elevation 2696.66 2996.60 2696.61 2696.64 2692.78 2693.23 2693.30 2693.29 2689.68 2689.67 2689.73 2689.74 2689.18 2689.29 2689.25 2689.27 LTOB2 Elevation 2697.47 2697.56 2697.67 2697.76 2694.13 2694.17 2694.18 2694.17 2691.25 2691.40 2691.36 2691.40 2689.90 2689.94 2689.96 2689.96 LTOB2 Max Depth (ft) 0.81 0.96 1.06 1.13 1.35 0.95 0.88 0.88 1.57 1.73 1.63 1.66 0.72 0.65 0.71 0.69 LTOB2 Cross Sectional Area (ft2) 4.75 5.40 6.55 7.32 7.83 4.38 5.30 4.66 8.77 9.06 8.10 8.21 4.56 4.45 4.31 4.34 Table 12. Cross Section Morphology Monitoring Summary Owen Farms Mitigation Site / DMS: 100064  ‐  West Fork French Broad River (WFFBR), UT 5, UT 7, UT 8 Cross Section 1 (Pool ‐ WFFBR)Cross Section 2 (Riffle ‐ WFFBR)Cross Section 3 (Riffle ‐ WFFBR)Cross Section 4 (Pool ‐ WFFBR)Cross Section 5 (Riffle ‐ WFFBR) Cross Section 11 (Pool ‐ UT 5)Cross Section 12 (Riffle ‐ UT 5)Cross Section 13 (Pool ‐ UT 7)Cross Section 14 (Riffle ‐ UT 7) Cross Section 6 (Riffle ‐ WFFBR)Cross Section 7 (Riffle ‐ UT 8)Cross Section 8 (Pool ‐ UT 8)Cross Section 9 (Pool ‐ UT 5)Cross Section 10 (Riffle ‐ UT 5) The above morphology parameters reflect the 2018 guidance that arose from the mitigation technical workgroup consisting of DMS, the IRT and industry mitigation providers/practitioners.  The  outcome resulted in the focus on three primary morphological parameters of interest for the purposes of tracking channel change moving forward. They are the bank height ratio using a constant  As‐built bankfull area and the cross sectional area and max depth based on each years low top of bank.  These are calculated as follows: 1 ‐Bank Height Ratio (BHR) takes the As‐built bankful area as the basis for adjusting each subsequent years bankfull elevation.  For example if the As‐built bankfull area was 10 ft2, then the MY1  bankfull elevation would be adjusted until the calculated bankfull area within the MY1 cross section survey = 10 ft2.  The BHR would then be calculated with the difference between the low top of  bank (LTOB) elevation for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator.  This  same process is then carried out in each successive year. 2  ‐LTOB Area and Max depth ‐These are based on the LTOB elevation for each years survey (The same elevation used for the LTOB in the BHR calculation).  Area below the LTOB elevation will be  used and tracked for each year as above.  The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation) will be recroded and tracked above as LTOB max  Owen Farms Mitigation Site | DMS Project No. 100064 MY2 Monitoring Report Transylvania County, NC February 16, 2024 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Appendix E – Hydrologic Data Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Figure 6. Monthly Precipitation Data 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Ra i n ( i n ) Month Owen Farm Monthly Precipitation 2023 (30th / 70th Percentiles) Precipitation 70th Percentile 30th Percentile Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Ra i n ( i n c h e s ) El e v a t i o n ( f t ) Distance (ft) Figure 7.1 West Fork French Broad River Flow Depth West Fork French Broad Water Level Bankfull Daily Rain Totals Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Ra i n ( i n c h e s ) De p t h ( f t ) Time Figure 7.2 UT 5 Flow Depth UT5 Water Level Bankfull Daily Rainfall Totals Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Ra i n ( i n c h e s ) De p t h ( f t ) Time Figure 7.3 UT 7 Flow Depth UT7 Water Level Bankfull Daily Rainfall Totals Beaver Dam built on UT7 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Ra i n ( i n c h e s ) De p t h ( f t ) Time Figure 7.4 UT 8 Flow Depth UT8 Water Level Bankfull Daily Rainfall Totals Bankfull Event Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Table 13. Bankfull Events Summary Overbank Events Gauge ID MY1 MY2 MY3 MY4 MY5 MY6 MY7 West Fork French Broad 8/16/2021, 8/18/20221, 9/1/2021 2/5/2022, 5/26/2022 UT 5 8/16/2021, 8/18/2021, 10/30/2021 UT 7 8/16/2021, 8/18/2021 4/1/2022, 6/12/2022, 9/4/2022 UT 8 8/16/2021, 8/18/2021, 8/31/2021, 10/7/2021 2/5/2022, 3/21/2022, 5/3/2022, 5/26/2022, 9/5/2022 12/15/2022 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Figures 8.1 – 8.5 Wetland Groundwater Gauge Data 0 0.5 1 1.5 2 2.5 3 3.5 -40.0 -35.0 -30.0 -25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 11/1/2022 12/21/2022 2/9/2023 3/31/2023 5/20/2023 7/9/2023 8/28/2023 10/17/2023 Ra i n ( i n c h e s ) Wa t e r T a b l e L e v e l ( i n . ) Figure 8.1: W3 Groundwater Gauge Data Wetland 3, Gauge 1 12 inches below surface Rain Gauge Data Be g i n G r o w i n g S e a s o n 4 / 7 / 2 0 2 3 En d Gr o w i n g S e a s o n 1 0 / 3 0 / 2 0 2 3 Gauge 1 39 days above -12" threshold (19%) Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 11/1/2022 12/21/2022 2/9/2023 3/31/2023 5/20/2023 7/9/2023 8/28/2023 10/17/2023 Ra i n ( i n c h e s ) Wa t e r T a b l e L e v e l ( i n . ) Figure 8.2: W3 Groundwater Gauge Data Wetland 3, Gauge 2 12 inches below surface Rain Gauge Data Gauges 2 102 days above -12" threshold (49%) Be g i n G r o w i n g S e a s o n 4 / 7 / 2 0 2 3 En d Gr o w i n g S e a s o n 1 0 / 3 0 / 2 0 2 3 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 11/1/2022 12/21/2022 2/9/2023 3/31/2023 5/20/2023 7/9/2023 8/28/2023 10/17/2023 Ra i n ( i n c h e s ) Wa t e r T a b l e L e v e l ( i n . ) Figure 8.3: W3 Groundwater Gauge Data Wetland 3, Gauge 3 12 inches below surface Rain Gauge Data Gauges 3 134 days above -12" threshold (68%) Be g i n G r o w i n g S e a s o n 4 / 7 / 2 0 2 3 En d Gr o w i n g S e a s o n 1 0 / 3 0 / 2 0 2 3 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 -40 -30 -20 -10 0 10 20 30 11/1/2022 12/21/2022 2/9/2023 3/31/2023 5/20/2023 7/9/2023 8/28/2023 10/17/2023 Ra i n ( i n c h e s ) Wa t e r T a b l e L e v e l ( i n . ) Figure 8.4: W3 Groundwater Gauge Data Wetland 3, Gauge 6 12 inches below surface Rain Gauge Gauge 6 101 days above -12" threshold (49%) Be g i n G r o w i n g S e a s o n 4 / 7 / 2 0 2 3 En d Gr o w i n g S e a s o n 1 0 / 3 0 / 2 0 2 3 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 11/1/2022 12/21/2022 2/9/2023 3/31/2023 5/20/2023 7/9/2023 8/28/2023 10/17/2023 Ra i n ( i n c h e s ) Wa t e r T a b l e L e v e l ( i n . ) Figure 8.5: W5 Groundwater Gauge Data (Reference) Wetland 5, Gauge 4 12 inches below surface Rain Gauge Gauge 4 85 days above -12" threshold (41%) Be g i n G r o w i n g S e a s o n 4 / 7 / 2 0 2 1 En d Gr o w i n g S e a s o n 1 0 / 3 0 / 2 0 2 2 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 0 0.5 1 1.5 2 2.5 3 3.5 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 11/1/2022 12/21/2022 2/9/2023 3/31/2023 5/20/2023 7/9/2023 8/28/2023 10/17/2023 Ra i n ( i n c h e s ) Wa t e r T a b l e L e v e l ( i n . ) Figure 8.6: W5 Groundwater Gauge Data Wetland 5, Gauge 5 12 inches below surface Rain Gauge Gauge 5 65 days above - threshold (32%) Be g i n G r o w i n g S e a s o n 4 / 7 / 2 0 2 3 En d Gr o w i n g S e a s o n 1 0 / 3 0 / 2 0 2 3 Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Table 14. Wetland Hydrology Summary Monitoring Gauge Performance Standard: 25 Consecutive Days (Success Criteria is 12% of the Growing Season) WETS Station: Brevard, NC Growing Season: 04/07 – 10/30 (206 Days) Max. Consecutive Hydroperiod (%) MY1 2021 MY2 2022 MY3 2023 MY4 2024 MY5 2025 MY 6 2026 MY 7 2027 W3-1 36 27 19 W3-2 36 48 49 W3-3 36 68 68 W5-4 (Reference) 42 42 41 W5-5* 3 13 32 W3-6 n/a 69 49 *Gauge 5 was relocated in 2022 to a more representative area within WS. It was originally installed in a localized high spot within the wetland. Owen Farms Mitigation Site | DMS Project No. 100064 MY3 Monitoring Report Transylvania County, NC February 16, 2024 Appendix F – 2023 IRT Credit Release Meeting Minutes Meeting Minutes Project: Owen Farms Stream and Wetland Mitigation Site (DMS # 100064, USACE: SAW-2018-01165, DWR: 2018-1033v1) Subject: IRT Credit Release Meeting Date: Tuesday, April 18, 2023 Location: Virtual Attendees: NC IRT Paul Wiesner (DMS) Ben Furr (DRG) Jessica Tisdale (HDR) Virtual IRT meeting was held at 11:30am on Tuesday, April 18, 2023 to discuss the MY2 report and approve MY2 credit release. The following represents highlights of discussions that occurred during the meeting: 1.IRT requested that HDR include a stability analysis table and photos detailing the current condition of each repair area by station in the MY3 report. 2.IRT stated that HDR would need to add an additional random/mobile vegetation plot to monitor vegetation within the wetland expansion areas if we wanted to request credit for those areas in the future. IRT also suggested documenting soil data (i.e. collecting soil profiles) in the monitoring plots of wetland expansion areas. 3.IRT requested that HDR include a statement in the MY3 report explaining why Table 3 (Monitoring Plan Components) shows 5 site gauges and 2 reference gauges, but Table 14 (Wetland Hydrology Summary) only shows one reference. DRG explained that Gauges 2 and 3 in W3 serve as reference gauges for the restored portion of W3 (for groundwater). They also serve to monitor surface water within the W3 rehabilitation area. 4.IRT requested that HDR include a note on Table 14, in MY3 report, stating that Gauge 5 was moved in 2022 to a more representative area within W5. 5.IRT suggested removing the ~ symbol from the hydrograph figures in MY3 report. 6.IRT requested that HDR provide a statement in the MY3 report about calves having access inside the easement and how HDR addressed the issue (i.e. installed permanent barriers on kissing gates and repaired fencing). 7.IRT noted that Figure 2.2 of the CCPV was not accurate (it is a duplicate of Figure 2.3), and requested that HDR correct for MY3 report. 8.IRT agreed to a full credit release for MY2.