Loading...
HomeMy WebLinkAbout20190661 Ver 1_Task 6 Credit Release Request Sassarixa Swamp II_20240226February 26, 2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth (khogarth@wildlandseng.com, 540-907-9432) Through: Wildlands Holdings III, LLC We formally request a credit release for the Sassarixa Swamp II Nutrient Offset and Buffer Mitigation Bank Parcel (DWR ID# 2019-0661v1) for completion of Task 6 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 6 and have been approved: Sassarixa Swamp II Nutrient Offset and Buffer Mitigation Bank Parcel Monitoring Year 3 Report and the renewed monitoring bond. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 10% 28,375.200 Square Feet Buffer Preservation NA NA Buffer Enhancement 10%1 5%2 3,428.762 Square Feet1 3,116.487 Square Feet2 Enhancement and enhancement via cattle exclusion1 Coastal headwater2 Generated Nitrogen Nutrient Offset 10% 3,351.200 pounds Delivered Nitrogen Nutrient Offset (Jordan sites only) NA NA Generated Phosphorus Nutrient Offset NA NA Delivered Phosphorus Nutrient Offset (Jordan sites only) NA NA Signature: Attachments: 1) Approved Project Credit Table (include the most recent Asset Table approved by DWR, whether it is the BPDP table or the As-Built table), 2) Approved Credit Release Schedule Include the approved credit release schedule, whether it is the credit release schedule from the MBI/UMBI or from the BPDP, Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft) Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1) % Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Delivered Nutrient Offset: P (lbs) Buffer Rural No Ephemeral Restoration 0-100 T3 25,770 25,770 1 100%1.00000 Yes 25,770.000 Yes 1,344.713 — Buffer Rural Yes Coastal Headwater Restoration 0-100 T5C 29,697 29,697 1 100% 1.00000 Yes 29,697.000 No — — Buffer Rural Yes Coastal Headwater Restoration 101-200 T5C 98,887 98,887 1 33% 3.03030 Yes 32,632.743 No — — Buffer Rural Yes I / P Restoration 0-100 T1, T1A, T1B, T3, T4, T5, T5A, T5B, T6 257,982 257,982 1 100% 1.00000 Yes 257,982.000 Yes 13,461.846 — Nutrient Offset Rural Yes I / P Restoration 101-200 T1, T1A, T1B, T3, T4, T5, T5A, T5B, T6 506,891 1 33%No —Yes 26,450.250 — Buffer Rural Yes I / P Enhancement via Cattle Exclusion 0-100 T1, T1A, T3, T6 53,353 53,353 2 100% 2.00000 Yes 26,676.500 No — — Buffer Rural Yes I / P Enhancement via Cattle Exclusion 101-200 T1, T1A, T3, T6 46,128 46,128 2 33% 6.06061 Yes 7,611.115 No — — Nutrient Offset Rural No Ditch Restoration 0-200 T3 135,331 135,331 1 100%1.00000 No —Yes 7,061.752 — Totals (ft2):1,154,039 647,148 380,369.358 48,318.561 0.000 Total Buffer (ft2):511,817 511,817 Total Nutrient Offset (ft2):642,222 N/A Square Feet Credits 919,227 513,355.940 99,481 34,287.615 0 0.000 1,018,708 547,643.555 Square Feet Credits Nitrogen:7,061.752 Phosphorus:0.000 Nutrient Offset:135,331 Enhancement: Preservation: Total Riparian Buffer: TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals #N/A TOTAL AREA OF BUFFER MITIGATION (TABM) Mitigation Totals Restoration: Table 1. Buffer Project Areas and Assets Sassarixa Swamp II Nutrient Offset and Buffer Mitigation Bank Parcel Monitoring Year 0 - 2021 Neuse 03020201 - Outside Falls Lake 19.16394                     Sassarixa Swamp Credit Release Schedule    Task Project Milestone  % Credit  Available  for Sale  % Riparian Buffer Credit  Release within Coastal  Headwaters Areas  1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded,  Financial Assurance Posted, and Draft Stream Mitigation Plan Approved by IRT 20 None  2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices  Completed, and all Applicable Permits Obtained 20 None  3 Monitoring Financial Assurance Posted and Approval of As‐Built Report 10 25  4 Monitoring Report #1: Approved by the DWR * & financial assurance renewed 10 10  5 Monitoring Report #2: Approved by the DWR * & financial assurance renewed 10 10  6 Monitoring Report #3: Approved by the DWR * & financial assurance renewed 10 5  7 Item B(1) of Section X in this Instrument has been completed and approved by  DWR 5 5   No remaining credits will be released until the conservation easement has  been assigned to an approved land trust or stewardship    8 Monitoring Report #4: Approved by the DWR * & financial assurance renewed 5 5  9  Monitoring Report #5: Approved by the DWR* & financial assurance renewed  for coastal headwater buffer areas, and final site visit by DWR has been  conducted for nutrient offset areas  10 20  10 Monitoring Report #6: Approved by the DWR* & financial assurance renewed  for coastal headwater buffer areas N/A 10  11 Monitoring Report #7: Approved by the DWR* & final site visit by DWR has  been conducted for coastal headwater buffer areas N/A 10   Total 100% 100%