Loading...
HomeMy WebLinkAboutWQ0017530_Monitoring - 12-2023_20240129Monitoring Report Submittal .................................................. Permit Number#* WQ0017530 Name of Facility:* Highlands Cove WWTP Month: * December Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR Highlands Cove WWTP 12-2023.pdf 6.44MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * environmentalinc@aol.com Name of Submitter: * Mark Teague Signature: i Date of submittal: 1/29/2024 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00017530 Is the monitoring report accepted?* Yes NO Regional Office* Asheville Reviewer: _anonymous Review Date: 2/27/2024 FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0017530 Facility Name: Highlands Cove WWTP county: Jackson Month: December Year: 2023 PPI: 001 Flow Measuring Point: ❑Influent DEffluent ❑No flow generated Parameter Monitoring Point: ❑lnfluent pErfluent ❑Groundwater Lowering ❑Surface Water Parameter Code 10 50050 00310 00940 50060 31616 00610 00625 00620 00600 00400 00665 70300 00530 00076 w O FN W ti m v e� ~�v m E a t x oZ •` z m IL 9 T t- $ z a o a r a o oe r-or° n b ev o Va :2 5 t- 24-hr hrs GPD m IL 9 m 9%L m 1L 9 #M00 rnL m /L 9 MOIL 9l m gJL su mgfL mg1L Img�l. NTU 1 07:30 0.5 11,076 05 7 2 329 2 11,999 -- - _ <5 3 11,999 4 07:45 0.5 11,990 0.5 7 2117 5 07:35 13,428 0.5 -- 2.064 6 07:40 0.5 14,444 _ - 0.5 _ 7 2 123 7 07:30 0.5 0 0.6 6.9 2.311 8 07:30 0.5 13,076 0.6 6.8 2 422 9 15,064 _ _- -- - -- - - -- <5 10 15.064 <5 11 07:30 .5 15,064 _._ I 0.6 7 2317 12 07:30 9,987 _ 0.7 ---- 7 _ 2-211 13 07:30 0.5 8,787 0.6 _ _ 7 2.386 14 07:30 0.5 10,111 Q 0 0.5 <4 0.3 1.5 32-5 34 7 4,7 3 P-179 --- 15 07:30 0.5 9,824 0.5 6.9 2.094 _ 16 9,901 - - <5 171 9,901 - <5 18 07:20 0.5 9,901 0.6 ___ 7 2.323 19 07:30 0.5 8,654 I 0.5 7 2.123 20 07:30 05 8,924 0.5 7 2.076 21 07:30 0.5 9,233 0.5 7 +- 2117 - 22 07:45 0.5 8,116 0.5 7 2.087 23 9.989 - <5 - 24 9.989 <5 - -- 25 holiday 9.989 H H H H H H H H H H H H <5 26 holiday 9,989 H H H H H H H H H_ H H H <5 27 09:00 0.5 9.989 0.5 - 7 2.096 28 11:00 0.5 10,111 0.5 _ 7 2119 29 12:00 0.5 11,623 0.5 _ 7 2.227 30 11,623 <5 31 11,623 - - <5 Average: 10,693 0.00 1 0.00 049 1.00 0.10 0.50 1083 11.33 1.67 0.00 f 1.00 1.35 Daily Maximum: 15,064 2.00 1 0.00 0-70 4.00 0.30 1.50 3250 34.00 7.00 I 4.70 0.00 3.00 500 Daily Minimum: 0 2.00 0.00 C 50 4.00 0.30 1.50 32.50 34.00 680 4.70 0.00 3.00 2.06 Sampling Type: Recorder Composite j Composite I Grab Grab Composite Composite Composite Composite Grab Composite Composite Composit Recorder Monthly Avg. Limit: 60,000 10 14 4 5 Daily Limit: - 15 25 6 6-9 10 10 Sample Frequency: Continuous Monthly 3 x Year 5 x week Monthly Monthly Monthly Monthly Monthly 5 x Week Monthly 3 x Year Monthly Continuous FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Sampling Person(s) Name: Dale Wike Name: Name: Environmental, Inc. Name: Pace Analytical Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? mcorroiantCN�orr�rtvlarht If the facility is noncompliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Pennittee Certification ORC: Dale Wike Permittee: Jerry West Certification No.: 996012 Signing Official: Jerry West Grade: WW-4, SI Phone Number: (828)586-5588 Signing Official's Title: Has the ORC changed since the previous NDMR? ClYes ONo Phone Number. Per'mR Expiration: 1�'a - I i . 1/� .j 1� Qq ) C - - I�0 Signature Date Signature Date By this sgnature, I certify Mat this report is accurrate and complete to the best of my knowledge I cenrry under penally of taw. that this document. and ;:.: attachments were prepared under my direction or supervision t, acwrila nc with a system designed to assure that all qualified personnel property gathered and evaluated the infarmation submitted. Based on rr:y :n ury of the person or persons who manage the system, or those persons directly respons"a for gathering the information, a t. 6dormation submitled is. to the best of my knowledge and belief true. accurate, and cornplele. I am aware that Owe are sign ficam penalties for submitting false idonnation, including the possibility of fines and imprisonmend for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM. NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Permit No.: WQ0017530 Facility Name: Highlands Cove WWTP County: Jackson Month: December Year: 2023 Did irrigation occur Field Name: -- -- A Field Name: _ B Field Name: C Field Name: D at this facility? Area (acres): 2.81 Area (acres): 271 Area (acres): 1 Area (acres): 2.13 Cover Crop: Cover Crop: Cover Crop: Cover Crop: []YES ONO _ Hourly Rate (in): 0.1 Hourly Rate (in): 01 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): Field Irrigated? 23.92 Annual Rate (in): 2392 Annual Rate (in): 23.92 Annual Rate (in): 23-92 Weather Freeboard CIYFS LINO Field Irrigated? ❑vEs [DNo Field In'igalled? r7j P E]NO Field Irrigated? DYES []NO jm ma_ a° .*_ c OE v� Im E m ` n M CL F o ►_ _ �v �-a Ea J E m > c z vm F- M 0 o ` x mE M_� a 'o pm>O? �V, OF in ft ft gal min In In gal min in in gal min O in in gal min p in in 1 PC 34 12.8 5.9 0 0 0.D0 0.00 0 0 0.00 0.00 0 0 0.o0 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.001 0 0 O.DO 0.00 0 0 0.00 000 J432 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.60 0.00 0 0 0.00 0.00 0 0 0.00 000 12.9 59 0 0 0.00 0.00 0 0OAO 000 0 0 000 0.00 0 0 000 000 0 0 0.00 0.0oa0 - 000 0.00 0 0 0.00 0.00 0 0 000 000 0 o 0.00 o.00 0 0 0.00 D.00 0 0 0.00 0.00 0 0 000 000 11 C 27 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 12 C 30 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 D 00 13 C 34 EJ� 0 0 0.00 0.00 0 0 0.00 0 00 0 0 0.00 0.00 0 0 000 000 14 C 28 0 _ 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 000 0.00 15 C 31 13 0 0 000,00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 16 0 0 0.00 0.00 0 0 0.00 000 0 D 0.00 0.00 0 0 000 0.00 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0 00 0.00 18 C 33 0 0 0.00 1 0.00 0 0 0.00 O OD 0 0 0.00 0.00 0 0 OAO 0.00 19 C 16 0 0 0.00 0..00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0 00 0.00 C 22 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0 00 0.00 PC 30 0 0 0.00 0.00 0 0 0.00 0 00 0 0 0.00 0.00 0 0 0.00 0.00 C 36 12 9 6 0 0 0.00 0.00 0 0 0.00 0 00 _0 _0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 0.00 0 00 0 0 0.00 0.00 0 0 0.00 000 [26 D 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 0 0 D.06 0.00 0 0 0.00 000 0 0 0.00 0.DO 0 0 000 000 0 0 0.00 0.00 0 0000 0.00 0 0 0.00 0.00 0 0 0.00 0.00 C 50 0 0 0.00 ^0.00 0.00 00 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 C 41 0 0 0.00 _ 0 0 000 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 C 45 13 6 0 0 0.00 0.00 0 0 000 0 00 0 0 0.00 0.00 _0 _0 0.00 000 30 0 0 0.00 0.00 0 0 0 00 0.00 0 0 0.00 0.00 0 0 000 0.00 31 0 0 0.00 0.00 0 0 1 000 0.00 0 1 0 1 0.00- 6.00 0 0 0 0.00 0.00 Monthly Loading: 0 0.00 0 0 00 0 O.OD 12 Month Floating Total (in): 000 0 00 FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Permit No.: WQ0017530 Facility Name: Highlands Cove WWTP County: Jackson Month: December Year: 2023 Did irrigation occur Field Name: E Field Name: G Field Name: H Field Name: I at this facility? Area (acres): 0.84 Area (acres): 11 Area (acres): 0.85 Area (acres): 0.44 GoverCrop� Cover P= Cover p• CoverCro p: ❑YES ONO Hourly Rate (In): 0.1 Hourly Rate (in): 0.1 23.92 Hourly Rate (In): Annual Rate (In): 0.1 23.92 Hourly Rate (in): Annual Rate (in): 0.1 23.92 Annual Rate (in): 23.92 Annual Rate (in): Weather Freeboard Field Irrigated? CjYB Elmo Field Irrigated? DYES [ONO Field Irrigated? DYES ow Field Irrigated? DYES ONO > c a m m rn S w 2 ma i g m9 r E � z OL c > E rn o o >>. xo M_ a E CD a .r p AEea Mv o EmE �a CL > Em _ rn o � A O E E a»mrnc xo 0 J °F in ft I ft gal I min In In gal min in in gal min an In gal min in in 1 0 0 0.00 1 0.00A 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 1 000 2 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 0 0 0.06 6.001 0 0 0.00 0.00 0 0 0.00 0.000 0 000 000 4 0 0 0.00 0.00 ` 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 s 0 0 0.00 0.00 0 0 0.00 a oo 0 0 0.00 0.00 0 0 0.00 0.00 6 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 0 0 0.00 0.00 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0. 00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 _ 0 0 000 000 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 000 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 000 000 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 000 12 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0 o0 000 13 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 000 0 00 14 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 _ 0.00 0 0 000 0.00 15 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0. 0 0 000 0 00 16 0 0 0.00 0.00": 0 0 0 00 0 00 0 0 0.00 0. 0 0 0.00 0.00 17 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0. 0 0 000 0.00 18 0 0 0.00 0.00. 0 0 000 0.00 0 0 0.00 0. 0 0 0.00 0.00 19 0 0 0.00 0.001 0 0 0.00 0.00 0 0 0.00 0. 0 0 0.00 0.00 20 0 0 0.00 0.00 0 0 000 000 0 0 0,00 O..iam 0 0 0.00 0.00 21 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0 0.00 000 0.00 0.00 22 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.oQI 0 23 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 000 24 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.0 00 0.00 0.00 25 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 , 0 0 0.00 0.00 26 0 0 1 0.00 0.00 0 0 000 000 0 0 0.00 0.00 0 0 0.00 000 27 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 a 0 0 00 0.00 28 0 0 0.00 0.00 0 0 ^ 000 000 0 0 0.00 0.00 0 0 0.00 0.00 29 0 0 1 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 000 000 301 1 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.00 0 0 000 000 311 1 1 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 Monthly Loading: 0 0.00 0.00 0 0.00 000 0 0.00 0.00 0 0.00 12 Month Floating Total (in): FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Permit No.: W00017530 Facility Name: Highlands Cove WWTP County: Jackson Month: December Year: 2023 Irrigation occur Field Name: J Field Name: K Field Name: L Field Name: ]VI at this facility? Area (acres): 10.06 Area (acres): ----- 2.2 -_ Area (acres): 5.35 Area (acres): 13.5 Cover Crop: Cover p: Cover Crop: Cover Crop: DYES PINO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Raba (In): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 23.92 Annual Rate (in): 23.92 Annual Rate (In): 23.92 Annual Rate (in): 23.92 Weather Freeboard Field Irrigated? EIYES U]NO Field Irrigated? OYES LINO Field Irrigated? []YES ONO Field Irrigated? Oyes ONO m % EL;a 3 F E -e2 io o � o Eo m o m� a jm F C O E a 0 -0 E.2m -ax o o. H rn oua E>E >�vcco x ox °F in ft ft gal min In In gal min in in gal min In I In gal min in I in 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 0 0 0.00 0.00 0 0 0-00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 0.D0 1 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 0 0 0.00 0.00 a 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 000 12 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 000 13 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 000 0.00 14 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00, 0 0 000 0.00 15 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0. 0 0 0 00 000 16 0 0 0.00 O.OII 0 0 0.00 0.00 0 0 0.00 0. , 0 0 0.00 0.00 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0. 0 0 000 0.00 18 1 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0. 0 0 000 0.00 19 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0. 0 0 0.00 000 20 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0. 0 0 0.00 0.00 21 0 1 0 0.00 0.D0 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 22 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.00 0 0 0.00 0.00 23 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 24 0 0 0.Do 0.00 0 0 0 00 000 0 0 0.00 0.00 0 0 000 0.00 25 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 0.00 0.00 26 0 0 0.00 1 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 000 0.00 27 0 __0 0.00 0.00 0 0 000 0-00 0 0 0.00 0.00 0 0 0.00 000 28 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.00 0 0 0.00 000 29 0 0 0.00 0.00 0 0 000 000 0 0 ^ 0.00 0.00 0 0 0.00 0.00 30 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 0.00 0.00 31 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 0.00 0.00 Monthly Loading: 12 Month Floating Total (in): 0 =0.00 0.00 0 TO-0- 100 0 0.00 0.00 0 0.00 0.00 FORM: NDAR 1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Permit No.: WQ0017530 Facility Name: Highlands Cove WWTP County: Jackson Month: December Year: 2023 Field Name' N Field Name: O Field Name: P Field Name: Did irrigation occur Area (acres): 2A Area (acres): 1.02 Area (acres): 1.11 Area (acres): at this facility? Cover Crop Cover Crop: Cover Crop. Cover Crop: ❑YEs ONo Hourly Rate (in): 0.1 Hourly Rate (in): 01 Hourly Rate (in): _ 0.1 Hourly Rate (in): Annual Rate (in): 23.92 Annual Rate (in): 23.92 Annual Rate (in): 23.92 Annual Rate (in): Weather Freeboard Field Irrigated? Elym (]NO Field Irrigated? ❑YES ONO Field Irrigated? � S BNo Field Irrigated? OYES ❑� NO W 1 U m m ` y m 4Ei e o ro o. rn m m Ha a eo R o v E Ia 0. > a v c $ j e n E _ C E7� J m y � a 0 CL m E_ m c m m T rn E 'v in 0.00 m o a o _ Em ao J p = c Eav �a E m 2 a m m E 2) e a A o = -' x o M °F in ft ft gal 0 min 0 In 0.00 in 0.00 gal 0 min 0 in 000 gal 0 min 0 in 0.00 in 0.00 gal 0 min 0 in #DIV/O! in #DIVIO! 2 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 #DIV/D! #DIV/01 3 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 #DIV/O! #DIV/01 4 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 #DIV/01 #DIV/O! 5 0 0 0.00 0.00 0 0 0-00 0.00 0 0 0.00 0.00 0 O #DIVID! #DIVID! 6 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.00 0 0 #DIV/O! #DIV/01 7 0 0 0.00 6.00 0 0 000 000 0 0 0.00 0.00 0 0 #DIVID! #DIVIO! 8 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 #DIVIO! #DIV/0! 9 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.60 0 0 #DIV/O! #DIV/01 10 0 0 0.00 0.00 0 0 000 000 0 0 0.00 O.OU 0 0 #DIV/O! #DIV/01 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 #DIV/0! #DIV/O! 12 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 #DIVID! #DIV/01 13 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 O.DO 0 0 #DIV/O! #DIV/01 14 0 0 0.00 0.00 0 L0 0 000 000 0 0 0.00 0.00 0 0 #DIV/O! #DIV/O! 15 0 0 O.DO 0.00 0 0.00 000 0 0 0.00 0.00 0 0 #DIVID! #DIV/01 16 0 0 O.OQ 0.00 0 0 0.00 _ 0 00 0 0 0.00 6.00 0 0 #DIVID! #DIVID! 17 0 0 0.00 O.00... r 0 0 0 00 O OD 0 0 0.00 0.00 0 0 #DIV/O! #DIV/01 18 19 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0 0 0.00 0.00 0.00 000 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0 0 #DIV/O! #DIV/01 #DIV/01 #DIV/01 20 0 0 O.W 0.00 I 0 0 0.00 000 0 0 0.00 0.00 I 0 0 #DIV/01 #DIV/01 21 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 #DIV/01 #DIVIO! 22 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 #DIV/01 #DIV/O! 23 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.06 0 0 #DIV/O! #DIV/01 24 0 0 0.00 0.00 0 0 0.00 000 0 0 0.00 0.00 0 0 #DIV/O! #DIVIO! 25 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 26 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 #DIV/O! 27 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 #DIVID! 28 0 0 0.00 0.00 0 0 0 00 0.00 0 0 0.00 0.00 0 0 #DIV/0! 29 0 0 0.00 0.00 0 0 000 0.00 0 0 0.00 0.00 0 0 j#D#DIVID! #DIV/0! 30 0 0 0.00 000 00 0.00 000 0 0 0000.00 0#DIV/0! 31 0 0 0.00 0.00 0 0 000 000 0 0 0.00 0.00 0 0 0 #DIV/0! Monthly Loading: 0 0.00 0 0 00 0 0.00 12 Month Floating Total (in): FORM: NDARA 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Page ---of - -- O� cmviant O Tpent mcorrpiart[ ONtxt{ompl'ant (]fntpiatx QNon-Conpliant pernvrant ONon­-Qderrt Mcortp1gnt ONm-ciompliant If the facility is noncompliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the noncompliance and describe the corrective s fI ,, rat fmiran ANarh nrielitimal shafts if neMSSarv. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Dale Wike Permittee: Jerry West Certification No.: 996012 Signing Official: Jerry West Grade: WW-4, SI Phone Number: 828-586-5588 Signing Official's Title: Has the ORC changed since the previous NDAR-17 Dyes ONO Phone Nu ber: Permit Exp.: r Signature Date Signature Date By this signature, I certify that this report is acwnate and complete to the best of my Imwrledge. n-Vr under penalty of. that this document and all attachments were prepared under my drecbm ." superiti inac�rda ncr designed to assure that qualified personnel properly gattered and evaluated the vtformation SrbRYlled. Based on r'a system :1 my inquiry of the person .,r persons who manage the system, or Horse persons drectly responsible for gatherim the eHanrtaton, the information submitted is to the best of my knowtedge and belief, true, accurate, and complete- i am aware tttat dwre arc significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617