Loading...
HomeMy WebLinkAbout20061693 Ver 3_Application_20071031µ SrATp o ~d w.mnq ~ ~;n STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office P.O. Box 1000 Washington, NC 27889 ATTN: Mr. William Wescott NCDOT Coordinator October 31, 2007 u ~ , ..~' ~~~ j ~,~~'f;P<~... =~ r'; 7 qN0 c ~;Y L,~ ,. A! ' .d;; ; ~q'`~i',^~;, ~'li;n1 LYNDO TIPPETT SECRETARY SUBJECT: Request For Permit Re-issuance for TIl' projects B-4127 in Greene County, U-3613B in Pitt County, and B-3853 in Halifax County. REFERENCE: 1) B-4127 Nationwide Permit Application dated April 4, 2007 2) B-4127 USAGE 404 NW 23 Action ID No. SAW200641550140 November 28, 2006 3) B-4127 Nationwide Permit Modification Application dated March 2, 2007 4) U-3613B Nationwide Permit Application dated February 23, 2006 5) B-3853 Nationwide Permit Application dated October 18, 2006 6) B-3853 USACE 404 NW 23/33 Action ID No. SAW200641559142 dated March 13, 2007 ~ - ~" Dear Sir: The North Carolina Department of Transportation (NCDOT) has been issued Nationwide 23, 33, and 14 permits from the U.S. Army Corps of Engineers (USACE) for projects B-4127, U-3613B, and B-3853 7 which all expired on March 18, 2007. Project construction in jurisdictional areas will not be completed by the end of the 12-month grace period, March 17, 2008. Therefore, we are requesting permit re- issuance. Table 1. Project Information TIP Permit Action ID # NW # DOT Div County Stream Name Location B-4127 SAW200641550140 23 2 Greene Rainbow Creek SR 1438 U-3613B SAW200610791 14 & 33 2 Pitt UT's to Fork Swamp US 70 B-3853 SAW200641559142 23 & 33 4 Halifax Marsh Swamp SR 1708 MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS NATURAL ENVIRONMENT UNIT 1$98 MAH. SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-715-1334 or 919-715-1335 FAX: 919-715-5501 WEBSITE: WWW.NCDOT.ORG LOCATION: PARKER LINCOLN BUQ,DING 2728 CAPrIAL BLVD. SurrE 240 RALEIGH NC 27604 Table 2. Proiect Impacts TIP Perm Wetland Im acts Perm Stream Impacts Temp Wetland Impacts Temp Stream Impacts Perm Surface Water Temp Surface Water Hand Clearing in Wetlands Mechanized Clearing in Wetlands B-4127 0.286 acre 0 0 0 0.01 acre 0 0.18 acre 0.19 acre U-36136 0 277 ft 0 147 ft 0 0 0 0 B-3853 0.269 acre 0 0.304 acre 0 0 0.017 acre 0.574 acre 0 Table 3. Buffer Impacts TIP Zone 1 Zone 2 B-4127 9,707 4,143 U-36138 34,569 17,716 B-3853 0 0 Application is hereby made for re-issue of the USACE 404 permits, the DWQ 401 permits, and buffer certifications. Renewal of CAMA permits will be requested under a separate cover. All permit drawings and plan sheets submitted with the original applications are current and do account for the entire scope of the projects. All. environmental commitments and special conditions referenced in the NW 23, 33, and 14 Permit Applications will continue to be followed throughout project construction. The NCDOT will also continue to adhere to all general conditions set forth in the 401 General Water Quality Certifications (WQC) 3632 and 3634. All general conditions of the Water Quality Certifications will be met. Therefore, in accordance with 15A NCAC 2H, Section .0500(a) and 15A NCAC 26.0200, we are providing copies of this application to the North Carolina Department of Environmental and Natural Resources, Division of Water Quality for their approval. Thank you for your time and assistance with these projects. If you have any questions or need any additional information, please contact Chris Underwood at 919-715-1451. cc: Mr. John Hennessy, NCDWQ (2 copies) Mr. Travis Wilson, NCWRC Mr. Gary Jordan, USFWS Mr. Ron Sechler, NMFS Mr. Michael Street, NCDMF Mr. Steve Sollod, NCDCM Dr. David Chang P.E., Hydraulics Mr. Greg Perfetti P.E., Structure Design Mr. Victor Barbour P.E., Project Services Unit Mr. Mark Staley, Roadside Environmental Mr. C. E. Lassiter P.E., Div. 2 Engineer Sincerely, ~~G-~-- Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA Mr. Richard E. Greene P.E. Div. 4 Engineer Mr. Jay Johnson, Div. 2 Envr. Officer Mr. Jamie Guerrero, Div. 4 Envr. Officer Mr. Scott McLendon, USACE, Wilmington Mr. Jay Bennett P.E., Roadway Design Mr. Majed Alghandour P.E., Progr. and TII' Mr. Art McMillan P.E., Highway Design Ms. Beth Harmon, EEP Mr. Eric Midkiff, Project Planning Engineer Mr. John Williams, Project Planning Engineer Mr. Mark Pierce, Project Planning Engineer