HomeMy WebLinkAboutNCC240462_ESC Approval Submitted_20240227 ROY COOPER 6
1"--j j
Governor y ' `1
ELIZABETH S.BISERII
Secretary
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
May 26, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Town of Mars Hill
ATTN: Mr. Nathan Bennett
P.O. Box 368
Mars Hill, NC 28754
RE: Project Name: SMITH FARM PARK
Acres Approved: 4.0
Project ID: MADIS-2023-009
County: Madison
City: Mars Hill
Address: Forest St.
River Basin: French Broad
Stream Classification: Banjo Creek- Class C
Submitted By:WithersRavenel -Sol Moore, PE
Date Received by LQS:April 27, 2023
Plan Type: Institutional
Dear Mr. Bennett,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications.The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed,you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Asheville Regional Office 12090 US.Highway 70 I Swannanoa,North Carolina 28778
NOR !OAROLNA _..i
ww ^ioron+ .nrauiro�IN /`� 828.296,4500
Letter of Approval with Modifications
Town of Mars Hill
j ATTN: Mr. Nathan Bennett
May 26, 2023
Page 2 of 3
Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerel ,
Fred Walker
Engineer III
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications Required for Approval
ec: Sol Moore (smoore@ withersravenel.corn)
Mack Granger- NCDEQ-LQS (mack.granger@deq.nc.gov)
cc: Regional Office file
Letter of Approval with Modifications
Town of Mars Hill
ATTN: Mr. Nathan Bennett
May 26, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: SMITH FARM PARK
Project ID: MADIS-2023-009
County: Madison
1. Provide notarized executed Financial Responsibility/Ownership form with the
latitude/longitude in Part A.2. Provide copy of current deed for the site. {G.S. 113A-
54.1.(a)}
2. Hatch all areas that must meet NPDES NCG010000 7-day stabilization requirement.
{NPDES NCG010000}
3. Provide double row perimeter measure or super silt fence between any
construction activities and receiving streams. {G.S. 113A-57.(3)}
4. Show stream buffer and stream classification for all receiving waters on the E&SC
plan sheets, {15A NCAC 04B .0106(a)(2)}
5. Provide water bar for construction entrance with stabilized outlet to prevent
concentrated stormwater runoff onto adjacent road. Provide construction detail for
water bar. {G.S. 113A-57.(3)}
6. Provide detail for roadways and trails so that runoff sheet flows from paths instead
of becoming concentrated flows. {G.S. 113A-57.(3)}
7. Provide proposed contour lines in E&SC sheets and include the Limits of
Disturbance in the legend. {G.S. 113A-57.(4)}
8. Revise construction sequence to include the following language: notify NCDEQ LQS
inspector 48 hrs before project starts; no major grading activities or basin
construction are to take place during wet weather or periods of predicted wet
weather i.e. Hurricanes; notify NCDEQ LQS inspector when project is ready for a
close out inspection; file for NPDES NCG010000 e-Notice of Termination when final
close out inspection report is received from NCDEQ LQS; all work within riparian or
trout buffers must be stabilized by the end of each workday; specify order in which
significant E&SC measures must be installed and related areas in which they protect
i.e. TCE,then perimeter controls, stabilized outlets, then basins,then conveyances,
proceed with clearing and grubbing for Phase X, install additional measures X,then
XX, then XXX for Phase II, continue to add stabilization and seeding for areas not
stabilized; site must be "storm ready"before any extended breaks in construction
activities including weekends. {15A NCAC 04B .0106(a)(3)}
9. Provide seeding, fertilizer, mulching types, rates, and details. Due to proximity to
receiving waters fertilizer rates must be determined by a soil test and asphalt
tackifiers are not allowed. {G.S. 113A-57.(3)}
10. Provide verification from jurisdictional authority that post-construction stormwater
permitting has been approved, applied for, or is not required for this project.
' i
to 4 . v) n qz Az eff)
t, . e • 400.1 h.ii
r# NZ. . • 1 to
Mil � ll OtJ1�w���II��11111 � eD
$ pc c=1 5 l ;
nt 41 4: = r.:-. Est .c) a 00
az „:, . n .. - ..
4- 1-1 . elD rft) fl:' 01 iPmi .
° 1 Ca#4)ta . *t :,•w' W tk: '1 •Ilk
s r .0 p
eb }"I a .,, =
CD AU r
- �. - R
CD
. ' et) R
4iW i
�..i► et) - Ouil
it s
. ,./- — • _ ,.- ,. • 0
? t .
m..,
\` Srit I.Z.
�"l' q ,.`wily _
f.
0 �,I .0-P- h Wit- -_ 1 I _-
,it,.k.'-.-...,'„.-4 1.1 e
, 0.1 ),....1/4 ,
.......
,. „‘,..,i.,, ,:..r.._,,,qq,,,...,. /:,:: / ..ii
• cl,
. r) zA . .4. *-.-, '6 ''''\'''' ''Il.riT C--<':,!>7).
ez o c� 4
NV Pik
,,,pniu,.. . c" et 411.! :e0 VOil 1/0
flit 311. lc ,e
I** 0- IV
•
tll IN o. 1 vot- ;1:1 lit tr....4 ;: 4214.•
0
um g = ,..,,,4 > 4. iv;
1y ! I e
.4—i, laz -1Pb- a ,i.„..
�� �1 Az , '
"a I cry IS
1;12' \
rD
0 a 4� wit
�1 ® V . RD
y co (0 fry- . et)