Loading...
HomeMy WebLinkAboutNCG030145 DMR SW (5)Semi-annualStormwaterDischarge MonitoringReport for North Carolina Division of Water Quality General Permit No. NCG03000 Date submitted CERTIFICATE OF COVERAGENO. NCG030145 FACILITY NAME: Newton Instruments COUNTY: Granville PERSON COLLECTING SAMPLES: N/A LABORATORY: Pace Analytical Lab Cert. #: 40RECE1 Comments on sample collection or analysis: Monthlysam ling, EP 22 M5 CENTRALFILES Part A: Stormwater Benchmarks and Monifpo ingx ;1gN ® No discharge this period?Z SAMPLE COLLECTIONYEAR: 2015 SAMPLE PERIOD[—] Jan -June❑ July -Dec or®Monthlyl August 2015 DISCHARGING TO CLASS❑ORW®HQW❑Trout ❑Zero-flow❑Water Supply❑SA []Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/O Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Benchmarks ==> _ - 100 mg/L 6.0-9.0 0.007 mg/L 0.03 mg/L 0.067 m@ 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same par 2For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a chec 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver ' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benc 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture serr electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CF manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan mayso certify, and the re may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elen Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification st "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring require (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areE Permit Date: 11/1/2012-10/31/2017 Page 1 stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing t solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format.Do not reportBelow Detection Limit, BDL, <PQL, Non -detect, ND, or other When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical vale reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See G4 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month. ❑ No discharge this period?" Outfall No. Date Sample 24-hour rainfall Collected' amount, Non -polar O&G/TPH by Total Suspended Solids (mo/dd/yr) Inches EPA 1664 (SGT -HEM) Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Gi Permit Date: 11/1/2012-10/31/2017 Page 2 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PAR- • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEED ENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL?YES IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE?YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: John Holley Mail an original and one copy of this DMR, includina all "No Discharge" reports, within 30 days of receiptof the lab results (or the case of "No Dischame" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge a nd belief, true am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowit (Signature 91fPermittee) Permit Date: 11/1/2012-10/31/2017 /4/Ir (Date) Page 3