Loading...
HomeMy WebLinkAboutNCG020029 DMR SW (2)II ANNUAL SUMMARY DMR - STORMWATER ll SEND TO CENTRAL OFFICE* I RECEIVED STO"WATER DISCHARGE OUTFALLS (SDO) JAN 21 2015 GENERAL PERMIT NO. NCG020000 eENTP*IFILES *Report ALL STORMWA TER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH l of each year. BWR SE TION CERTIFICATE OF COVERAGE NO. NCG020029 FACILITY NAME: East Alamance Quarry PERSON COLLECTING SAMPLES: Josh Turner CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12 Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 COUNTY: Alamance PHONE NO. 336-578-5420 ADD TO LISTERVE? YES ❑ NO ❑ EMAIL: Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' In Tier 2 Monthly # of Months in Monitoring? Tier 2 (/n) Sampling2 Total Flow (MG) Total Suspended Solids (mg/1) Turbidity4 (NTU) Settleable Solids (ml/1) Total Event Rainfall Duration (in) - - - - - 1003'4 See Footnote 3,4 0.1 3 Pit Discharge 6/24/14 N 0.007 ND 2.5 ND 0.1 0.33 Pit Discharge 12/16/14 N 0.015 ND ND ND 0.25 1 If "NO FLOW" or "NO DISCHARGE," enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range. 2Per NCG02: Tier 2 Monthly Sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 31f a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Teir I or Tier 2 responses in the General Permit. 4TSS benchmark values are 100 mg/I except in ORW, HWQ, trout, and PNA waters where they are 50 mg/I. 5The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservois designated as trout waters; 25 NTU for all lakes and reservois, and all salt water; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11 Page 1 of 2 . Part A: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average Date Sample Outfall Collected No. (mo/dd/yr OR NO FLOW)' In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling New Motor Oil Usage (gal/month) Total Flow TPH using method Total Suspended (MG) 1664A SGT -HEM Solids (mg/1) (mg/1) pH Total Event (Standard Rainfall Duration Units) (in) - - 15 3 1003 6-9' Haul Road Basin No Dischar a 25.0 Haul Road Basin No Discharge 58.5 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES E] NO 0 HAVE YOU CONTACTED THE REGION? YES p NO p WHO AT THE REGION HAVE YOU SPOKEN WITH? MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing violatio ' 1/2/2015 (Sl1jn!,4Wre of P mittee) (Date) Pemdi Date: 1/ 010-12/31/2014 Last Revised 01-21-11 Page 2 of 2