Loading...
HomeMy WebLinkAboutNCG020635 DMR WWANNUAL SUMMARY DMR - WASTEWATER IR + EIVED SEND TO CENTRAL OFFICE* I JAN 21 2015 PROCESS MINE/DEWATERING WASTEWATER CENTRAL FILES GENERAL PERMIT NO. NCG020000 DWR SECTION *Report All Wastewater discharge monitoring data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH I of each year. If you have limit violations, you must also have turned in a Limit Violation DMR to your local Regional Office within 30 days of receiving sample results from a lab. CERTIFICATE OF COVERAGE NO. NCG020635 FACILITY NAME: Viewmont Quarry PERSON COLLECTING SAMPLES: Dennis Cobb CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12 LIMITS VIOLATIONS? YES NO Part A: Wastewater Manitnrinn RP.niiiremPnt.Q SAMPLE COLLECTION YEAR: 2014 COUNTY: Guilford PHONE NO. ADD TO LISTERVE? YES NO EMAIL: INDUSTRIAL SAND'? DISCHARGE TO SA WATERS 4? Outfall No. Date Sample Collected' Total Flow Total Suspended Solids' Turbidity3 Settleable Solids pH Fecal Coliforms - mm/dd/yr MG mg/I''2 NTU2'3 ml/12 Standard col/m12,4 Pit Discharge 3/7/14 0.03 5.0 5.3 ND 6.7 Pit Discharge 5/12/14 0.06 ND 2.6 ND 6.7 Pit Discharge 8/14/14 0.06 8.8 1.6 0.1 6.4 Pit Discharge 10/21/14 0.36 4.3 1.6 ND 7.2 An mines must monitor w w dtscnarges for lsS. Only industrial sand mine discharges are subject to TSS limts. 2 I an effluent limit is exceeded, the permittee is required to institute monthly monitoring for that parameter for the remaining permit term. 3The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the Stormwater Discharge Outfall. Alternatively, the permittee may choose to monitor turbidity in the receiveing water, directly upstream and downstream of the discharge. 4Only facilities discharging to SA waters are required to monitor for Fecal coliforms. Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11 Page 1 of 2 Part A: Continued: Wastewater Monitoring Requirements a Outfall No. Date Sample Total Flow Collected Total Suspended Turbidity3 Settleable Solids pH Fecal Coliforms Solids' - mm/dd/yr MG mg/1''2 NTU2,3 ml/I2 Standard col/ml2,4 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW" "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing violations." (Signat of P ittee) (Date) Permit Date: 1/1/2010-12/31/2014 Last Revised 0 1 -21 -11 Page 2 of 2