STREAM RESTORATION
RALEIGH 7 NC
SCO ID #20-21618-02
JANUARY 29, 2024
100% PLANS
R�
w
me*
�J MMM if1��
2110 BLUE RIDGE kOAD
k
f n,3rd S#
PROJECT LOCATION
i �f
s�
ri-_-DIY' I
oberry St
Ba rrri a €1`rer ;5!
R
0]
W
W
H
Q
0
z
0
a
U
W
0
W
of
W
J
¢�
a
aa
Z
w
lL
00
L1_I
}�
U
w
�/
w
C
O
U-
(q C'
U
Lu
w
LLI N
U
U Z U
a
J
�OZ
0
a W J
j
m
O
Z
�o�
¢
J
U
U
o
OD
�z
�a
m
F
o
J
p
z
U�
Cn
z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRG,NSYSTEMS
1 Glenwood Avenue
Raleigh, INC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
4
North Carolina Museum of Art
DATE: 1 /29/2024
w
z
Lam' W
W
U) o
�pCS p
awN Q o
NDEX OF SHEETS z,
_ °w C a
G 001 TITLE SHEET a � o 0
rn
C-201 GENERAL NOTES AND SYMBOLS Cn 0 r
C-202 TYP I CALS o a `n
w
C-203 DETAILS z o Q
C-207 PLAN AND PROFILE SHEETS z
z
C-212 CROSS SECTIONS
C-222 EROSION CONTROL PLANS SCALE: NTS
C-230 TREE REMOVAL PLAN
C-235 PLANTING PLAN TITLE
SHEET
o
G-001
CONSTRUCTION SEQUENCE
GENERAL NOTES
EXISTING FEATURES
400
EXISTING MAJOR COUNTOUR
399
EXISTING MINOR COUNTOUR
TB TB TB
EXISTING TOP OF BANK
BZ 1 BZ 2
BUFFER ZONES
- — — — — — — — —WLB— — — — — — — — -
EXISTING WETLAND BOUNDARY
EXISTING WOODSLINE
EXISTING CONCRETE
EXISTING STONFiROCK
EXISTING PIPE
0
EXISTING TREES
PROPOSED FEATURES
AND STRUCTURES
N
I
PROPOSED STREAM CENTERLINE
— — — — — — — -- — — — — — — —
C F F
PROPOSED CONSTRUCTION LIMITS
PROPOSED TOP OF BANK
24A.
I 410itl" N®R
o�
CONSTRUCTED STONE RIFFLE GEOLIFT WITH WOOD TOE
LOG CROSS VANE
EROSION CONTROL
FEATURES
---------------------------------
LIMITS OF DISTURBANCE (LOD)
TPF TPF TPF
TREE PROTECTION FENCE
TEMPORARY SILT FENCE
SILT FENCE OUTLET TEMPORARY STREAM CROSSING
THE ENGINEER WILL PROVIDE CONSTRUCTION OBSERVATION DURING THE CONSTRUCTION
PHASE OF THIS PROJECT. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE USED DURING
PROJECT CONSTRUCTION IMPLEMENTATION. PRIOR TO BEGINNING ANY LAND DISTURBING
ACTIVITIES NOTIFICATION TO AND RECEIPT OF THE CERTIFICATE OF APPROVAL MUST BE
RECEIVED FROM NCDEQ-LAND QUALITY SECTION. THE CONTACTOR SHALL CALL NCDEQ
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES AT 919-791-4200 TO SCHEDULE A
PRE -CONSTRUCTION MEETING AT LEAST 72 HOURS PRIOR TO PROJECT INITIATION, THE
CONTRACTOR SHALL REFER TO THE APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT
AND SEQUENCING ITEMS AND SHALL BE RESPONSIBLE FOR FOLLOWING THE APPROVED PLANS
AND PERMIT CONDITIONS.
ANY UTILITIES AND RESPECTIVE EASEMENTS SHOWN ON THE PLANS ARE CONSIDERED
APPROXIMATE AND THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES AND ADJOINING
EASEMENTS AND SHALL REPAIR OR RELACE ANY DAMAGED UTILITIES AT HIS/HER OWN
EXPENSE.
THE CONTRACTOR SHALL PREPARE STABILIZED CONSTRUCTION ENTRANCE, HAUL ROADS AND
SHALL MOBILIZE EQUIPMENT, MATERIAL, PREPARE STAGING AREA(S) AND STOCKPILE
AREA(S) AS SHOWN ON THE PLANS. HAUL ROADS SHALL BE PROPERLY MAINTAINED AT ALL
TIMES DURING CONSTRUCTION.
CONSTRUCTION TRAFFIC SHALL BE RESTRICTED TO THE AREA DENOTED AS LIMITS OF
DISTURBANCE OR HAUL ROADS AS SHOWN ON THE PLANS.
THE CONTRACTOR SHALL INSTALL TEMPORARY ROCK DAMS AT LOCATIONS INDICATED ON THE
PLANS.
THE CONTRACTOR SHALL INSTALL TEMPORARY SILT FENCE AROUND THE STAGING AREA(S).
TEMPORARY SILT FENCING WILL ALSO BE PLACED AROUND THE TEMPORARY STOCKPILE
AREA(S) AS MATERIAL IS STOCKPILED THROUGHOUT THE CONSTRUCTION PERIOD.
THE CONTRACTOR SHALL INSTALL ALL TEMPORARY AND PERMANENT STREAM CROSSINGS AS
SHOWN ON THE PLANS IN ACCORDANCE WITH THE APPROVED SEDIMENTATION AND EROSION
CONTROL PERMIT. THE EXISTING CHANNEL AND DITCHES ON SITE WILL REMAIN OPEN
DURING THE INITIAL STAGES OF CONSTRUCTION TO ALLOWS FOR DRAINAGE AND TO
MAINTAIN SITE ACCESSIBILITY.
THE CONTRACTOR SHALL CONSTRUCT ONLY THE PORTION OF THE CHANNEL THAT CAN BE
COMPLETED AND STABILIZED WITHIN THE SAME DAY. THE CONTRACTOR SHALL APPLY
TEMPORARY AND PERMANENT SEED AND MULCH TO ALL DISTURBED AREAS AT THE END OF
EACH WORK DAY, WITH THE REQUIREMENTS OF ESTABLISHING TEMPORARY AND PERMANENT
GROUND COVER THROUGH VEGETATION ESTABLISHMENT.
THE CONTRACTOR SHALL CLEAR AND GRUB AN AREA ADEQUATE TO CONSTRUCT THE STREAM
CHANNEL AN GRADING OPERATIONS AFTER ALL EROSION AND SEDIMENTATION MEASURES HAVE
BEEN INSTALLED AND APPROVED, IN GENERAL, THE CONTRACTOR SHALL WORK FROM
UPSTREAM TO DOWNSTREAM AND IN -STREAM STRUCTURES AND CHANNEL FILL MATERIAL SHALL
BE INSTALLED USING A PUMP -AROUND OR FLOW DIVERSION MEASURES AS SHOWN ON THE
PLANS.
THE CONTRACTOR SHALL BEGIN CHANNEL CONSTRUCTION UPSTREAM AND PROCEED IN A
DOWNSTREAM DIRECTION. THE DESIGN CHANNEL SHOULD BE CONSTRUCTED OFFLINE AND/OR
IN THE DRY, WHENEVER POSSIBLE. THE CONTRACTOR SHALL EXCAVATE AND CONSTRUCT THE
PROPOSED CHANNEL TO PROPOSED DESIGN GRADES AND SHALL NOT EXTEND EXCAVATION
ACTIVITIES ANY CLOSED THAN WITHIN 10 FEET (HORIZONTALLY) TO THE EXISTING STREAM
BANKS IN ORDER TO PROTECT THE INTEGRITY OF THE EXISTING STREAM CHANNEL UNTIL
ABANDONMENT.
THE CONTRACTOR SHALL CONTINUE CONSTRUCTION BY EXCAVATING CHANNEL FILL MATERIAL.
THE CONTRACTOR MAY FILL NON -JURISDICTIONAL DITCHES WHICH DO NOT CONTAIN ANY
WATER DURING THE GRADING OPERATION. ALONG STREAM REACHES EXCAVATED MATERIAL
SHOULD BE STOCKPILED IN AREAS SHOWN ON THE PLANS. IN ANY AREAS WHERE EXCAVATION
DEPTHS WILL EXCEED 10 INCHES, TOPSOIL SHALL BE HARVESTED, STOCKPILED AND PLACED
BACK OVER THESE AREAS TO A MINIMUM DEPTH OF 8 INCHES TO ACHIEVE DESIGN GRADES
AND CREATE A SOIL BASE FOR VEGETATION PLANTING ACCORDING TO THE DESIGN PLANS
AND CONSTRUCTION SPECIFICATIONS.
AFTER EXCAVATING AND CONSTRUCTING THE PROPOSED CHANNEL TO DESIGN GRADES,
INSTALL IN -STREAM STRUCTURES, BIOENGINEERING MEASURES, PERMANENT AND TEMPORARY
SEEDING AND ALL REQUIRED AMENDMENTS, MULCHING, VEGETATION TRANSPLANTS, TO
COMPLETE CHANNEL CONSTRUCTION AND READY THE CHANNEL TO ACCEPT FLOW PER APPROVAL
BY THE ENGINEER.
STREAM FLOW WILL BE DIVERTED BACK INTO THE CONSTRUCTED CHANNEL ONCE THE
RESTORED CHANNEL AND ASSOCIATED RIPARIAN AREA HAS BEEN STABILIZED, AS
DETERMINED BY THE ENGINEER AND IN COMPLIANCE WITH THE APPROVED PERMIT
REQUIREMENTS. ONCE STREAM FLOW IS RETURNED TO A RESTORED CHANNEL REACH, THE
CONTRACTOR SHALL IMMEDIATELY BEGIN PLUGGING, FILLING AND GRADING THE ASSOCIATED
ABANDONED STREAM CHANNEL REACH, AS INDICATED ON THE PLANS, MOVING IN A
DOWNSTREAM DIRECTION TO ALLOW FOR POSITIVE AND ADEQUATE DRAINAGE OF THE
ABANDONED CHANNEL REACH. STREAM FLOW SHALL NOT BE DIVERTED INTO ANY SECTION OF
RESTORED STREAM CHANNEL PRIOR TO THE COMPLETION OF THE CONSTRUCTION OF THAT
REACH OF PROPOSED CHANNEL, INCLUDING, BUT NOT LIMITED TO FINAL GRADING,
STABILIZATION WITH TEMPORARY AND PERMANENT SEEDING AND ALL REQUIRED AMENDMENTS,
MULCHING, VEGETATION TRANSPLANT INSTALLATION, INSTREAM STRUCTURES INSTALLATION,
BIOENGINEERING INSTALLATION, AND COIR FIBER MATTING INSTALLATION.
THE RESTORED CHANNEL SECTIONS SHALL REMAIN OPEN AT THEIR DOWNSTREAM END TO
ALLOW FOR DRAINAGE DURING RAIN EVENTS.
ALL GRADING ACTIVITIES ADJACENT TO THE STREAM CHANNEL AND RIPARIAN AREAS SHALL
BE COMPLETED PRIOR TO DIVERTING STREAM FLOW INTO THE RESTORED STREAM CHANNEL
REACHES. ONCE CONSTRUCTION IS COMPLETED ON A REACH OF PROPOSED STREAM CHANNEL,
ADDITIONAL GRADING ACTIVITIES SHALL NOT BE CONDUCTED WITHIN 10 FEET
(HORIZONTALLY) OF THE NEWLY RESTORED STREAM CHANNEL BANKS. THE CONTRACTOR SHALL
NOT FINALIZE GRADE OR ROUGHEN AREAS WHERE REQUIRED EXCAVATION ACTIVITIES HAVE
NOT BEEN COMPLETED.
ONCE CONSTRUCTION IS COMPLETE WITHIN A PUMP -AROUND WORK AREA OR CONSTRUCTION
WORK PHASE LIMIT, THE CONTRACTOR SHALL APPLY TEMPORARY SEEDING TO ANY AREAS
DISTURBED DURING CONSTRUCTION WITHIN HOURS. ALL SLOPES STEEPER THAN 3:1 SHALL
BE STABILIZED WITH GROUND COVER AS SOON AS PRACTICABLE WITHIN 7 CALENDAR DAYS.
ALL OTHER DISTURBED AREAS AND SLOPES FLATTER THAN 3:1 SHALL BE STABILIZED
WITHIN 4 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITIES.
PERMANENT GROUND COVER SHALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 14
WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF
CONSTRUCTION. ALL DISTURBED AREAS SHOULD HAVE ESTABLISHED GROUND COVER PRIOR TO
DEMOBILIZATION. REMOVE ANY TEMPORARY STREAM CROSSINGS AND TEMPORARY EROSION
CONTROL MEASURE. HAUL ROADS TO BE RESTORED TO A CONDITION EQUAL TO OR BETTER
THAN FOUND PRIOR TO CONSTRUCTION.
ALL REMAINING DISTURBED AREAS SHALL BE STABILIZED BY TEMPORARY AND PERMANENT
SEEDING AND MULCHING BEFORE CONSTRUCTION CLOSEOUT IS REQUESTED AND
DEMOBILIZATION CAN OCCUR. ALL WASTE MATERIAL MUST BE REMOVED FROM THE PROJECT.
THE CONTRACTOR SHALL TREAT AREAS OF INVASIVE VEGETATION THROUGHOUT THE PROJECT
AREA ACCORDING TO THE CONSTRUCTION CONTRACT DOCUMENTS, INCLUDING THE APPROVED
PERMITS, PLANS AND TECHNICAL SPECIFICATIONS PRIOR TO DEMOBILIZATION.
THE CONTRACTOR SHALL COMPLETE ALL REMAINING PLANTING ACTIVITIES, INCLUDING
SHRUB AND TREE PLANTING, REMAINING TRANSPLANTS INSTALLATION, INSTALLATION OF
REMAINING BIOENGINEERING MEASURES AND LIVE STAKE INSTALLATION, ACCORDING TO THE
CONSTRUCTION CONTRACT DOCUMENTS, INCLUDING THE APPROVED PERMIT, PLANS AND
TECHNICAL SPECIFICATIONS. THE CONTRACTOR SHALL COMPLETE THE RE -FORESTATION
PHASE OF THE PROJECT AND CONDUCT REMAINING PERMANENT SEEDING IN ACCORDANCE WITH
THE CONSTRUCTION CONTRACT DOCUMENTS, INCLUDING THE APPROVED PERMIT, PLANS AND
TECHNICAL SPECIFICATIONS.
THE CONTRACTOR SHALL ENSURE THAT THE SITE IS FREE OF TRASH AND LEFTOVER
CONSTRUCTION MATERIALS PRIOR TO DEMOBILIZATION FROM THE SITE. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR OFF -SITE REMOVAL OF ALL TRASH, EXCESS BACKFILL, AND
ANY OTHER INCIDENTAL MATERIALS PRIOR TO DEMOBILIZATION OF EQUIPMENT FROM THE
SITE. THE DISPOSAL AND STOCKPILE LOCATIONS SELECTED MUST BE APPROVED BY THE
ENGINEER AND ANY FEES SHALL BE PAID BY THE CONTRACTOR.
GRADING NOTES
NO GRADING ACTIVITIES SHALL OCCUR BEYOND THE PROJECT LIMITS OF
DISTURBANCE (LOD) AS SHOWN ON THE DESIGN PLANS.
ONCE DESIGN GRADES ARE ACHIEVED AS SHOWN ON THE PLAN AND PROFILE,
THE HEADWATER VALLEY, STREAM AND WETLAND AND FLOODPLAIN AREAS SHALL
BE ROUGHENED USING TECHNIQUES DESCRIBED IN THE CONSTRUCTION
SPECIFICATIONS.
ALL SUITABLE SOIL MATERIAL REQUIRED TO FILL AND/OR PLUG EXISTING DITCHES
AND/OR STREAM CHANNEL SHALL BE GENERATED ON -SITE AS DESCRIBED IN THE
CONSTRUCTION SPECIFICATIONS. ANY EXCESS SPOIL MATERIAL SHALL BE
STOCKPILED IN DESIGNATED AREAS AND/OR HAULED OFF -SITE AS APPROVED BY
THE ENGINEER.
THE PROJECT SITE IS LOCATED AT THE NORTH CAROLINA MUSEUM OF ART AT 2110 BLUE
RIDGE ROAD, RALEIGH, NC 27607.
co
THE PROJECT SITE BOUNDARIES ARE SHOWN ON THE DESIGN PLANS AS THE PROPOSED
LIMITS OF DISTURBANCE. THE CONTRACTOR SHALL PERFORM ALL RELATED WORK ACTIVITIES W
WITHIN THE PROJECT BOUNDARIES AND/OR WITHIN THE LIMITS OF DISTURBANCE (LOD).
THE PROJECT SITE SHALL BE ACCESSED THROUGH THE DESIGNATED ACCESS POINTS SHOWN
ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PERMITTED ACCESS
THROUGHOUT ALL CONSTRUCTION ACTIVITIES.
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS AND MEASURES TO PROTECT ALL
PROPERTIES FROM DAMAGE. THE CONTRACTOR SHALL REPAIR ALL DAMAGE CAUSED BY
HIS/HER OPERATIONS TO ALL PUBLIC AND PRIVATE PROPERTY AND LEAVE THE PROPERTY IN
GOOD CONDITION AND/OR AT LEAST EQUIVALENT TO THE PRE -CONSTRUCTION CONDITIONS.
UPON COMPLETION OF ALL CONSTRUCTION ACTIVITIES, THE AREA SHALL BE RESTORED TO A o
CONDITION EQUAL TO OR BETTER THAN FOUND PRIOR TO CONSTRUCTION.0-1
U
W
0
THE TOPOGRAPHIC BASE MAP WAS DEVELOPED USING SURVEY DATA COLLECTED BY STEWART,
INC. ON 1A2/2021 THE HORIZONTAL DATUM WAS TIED TO NAVD83 NC STATE PLANE
COORDINATED SYSTEM, US SURVEY FEET AND NAVD88 VERTICAL DATUM USING VRS NETWORK
AND NCGS MONUMENT. IT IS POSSIBLE THAT EXISTING ELEVATIONS AND SITE CONDITIONS
MAY HAVE CHANGED SINCE THE ORIGINAL SURVEY WAS COMPLETED. IT IS THE CONTRACTOR
RESPONSIBILITY TO CONFIRM EXISTING GRADES AND ADJUST QUANTITIES, EARTHWORK AND
WORK EFFORTS AS NECESSARY.
THE CONTRACTOR SHALL VISIT THE CONSTRUCTION SITE AND THOROUGHLY FAMILIARIZE
>
HIMMERSELF WITH ALL EXISTING CONDITIONS PRIOR TO BEGINNING CONSTRUCTION. THE
CONTRACTOR SHALL VERIFY THE ACCURACY AND COMPLETENESS OF THE CONSTRUCTION
J
Q
SPECIFICATIONS AND DESIGN PLANS REGARDING THE NATURE AND EXTENT OF THE WORK
<
cy_
DESCRIBED.
a
H
aa
THE CONTRACTOR SHALL BRING ANY DISCREPANCIES BETWEEN THE CONSTRUCTION PLANS AND
Z
U)
SPECIFICATION AND/OR FIELD CONDITIONS TO THE ATTENTION OF THE ENGINEER BEFORE
lL W
CONSTRUCTION BEGINS.
Lu
o
U
w
THERE SHALL BE NO CLEARING OR REMOVAL OF ANY NATIVE VEGETATION OF SIGNIFICANCE,
LU
73
O
co
U_
O co o
U
Li
OTHER THAN THOSE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
�
0f
C) z C)
J
Lu O z
THE CONTRACTOR SHALL EXERCISE CARE DURING GRADING ACTIVITIES IN THE VICINITY OF
0-a ate=
LJ ry a a cD
NATIVE VEGETATION AND TRESS OF SIGNIFICANCE AT THE CONSTRUCTION SITE. ALL
0
�
�
� w
m
O
GRADING IN THE VICINITY OF TREES NOT IDENTIFIED FOR REMOVAL SHALL BE MADE IN A
Z
�
Q�Q
Z
¢
p
MANNER THAT DOES NOT DISTURB THE ROOT SYSTEM WITHIN THE DRIP LINE OF THE TREE.
�
U
o
Op
WORK ACTIVITIES ARE BEING PERFORMED AS AN ENVIRONMENTAL RESTORATION PLAN. THE
U
a
CONTRACTOR SHALL MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS, PROTECT
PUBLIC SAFETY AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE
m
CONSTRUCTION WORK. ALL AREAS SHALL BE KEPT NEAT, CLEAN AND FREE OF ALL TRASH
o
z
J
U)
AND DEBRIS AND ALL REASONABLE PRECAUTIONS SHALL BE TAKE TO AVOID DAMAGE TO
Z
u
W
EXISTING ROADS, VEGETATION, TURF, STRUCTURES AND PRIVATE PROPERTY.
0
PRIOR TO START OF WORK, THE CONTRACTOR SHALL SUBMIT THE SOURCE OF MATERIALS,
INCLUDING AGGREGATES, EROSION CONTROL MATERIAL, WOOD AND NATIVE PLANTING
MATERIAL TO THE ENGINEER FOR REVIEW AND APPROVAL. NO WORK SHALL BE PERFORMED
UNTIL THE SOURCE OF MATERIAL IS APPROVED BY THE ENGINEER. PRIELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
THE CONTRACTOR SHALL BE HELD SOLELY RESPONSIBLE FOR ANY NECESSARY COORDINATION
BETWEEN THE VARIOUS COUNTY, STATE OR FEDERAL AGENCIES, UTILITY COMPANIES,
HIS/HER SUB —CONTRACTORS AND THE ENGINEER FOR THE DURATION OF THE PROJECT.
PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL SUBMIT THEIR DETAILED PLANTING TRANSYSTEMS
SCHEDULE TO THE ENGINEER FOR REVIEW. NO WORK SHALL BE PERFORMED UNTIL THIS 1 Glenwood Avenue
SCHEDULE IS APPROVED BY THE ENGINEER. THE DETAILED PLANTING SCHEDULE SHALL Tel:igh,NC29903
e1:919.789.9977
CONFORM TO THE PLANTING REVEGETATION PLAN AND SHALL INCLUDE A SPECIES LIST AND License:
F- 453
License: F-0453
TIMING SEQUENCE.
THE CONTRACTOR IS REQUIRED TO INSTALL IN —STREAM STRUCTURES AND CULVERT PIPES
USING A BACKHOE/EXCAVATOR WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE
STRUCTURES AND MATERIAL INCLUDING LOGS, STONE AND TEMPORARY WOOD CONSTRUCTION
MATS.
North Carolina Museum of Art I
DATE: 1 /29/2024
n
n
z
�O
U
w
W
U) Of o
DOC
0
O
co CD
z
2
O
Z lY N
J
C
�w
ago
o
U
_U)O
r
m
��W
oa
o
w
z
o
a
z
z
SCALE: NTS
NOTES/SYMBOLS
C-201
EXISTING GROUND
TYPICAL SECTION NO. 1
REGENERATIVE STORMWATER CONVEYANCE (RSC)
POOL -OR- RIFFLE
VARIES
0 to 5 FT WBKFL
................................
Dmax
VARIES
0to5 FT
USE TYPICAL SECTION NO.1 AS FOLLOWS:
STA. 11 + 00 TO STA. 17 + 00 -L-
VARI ES
0 to 5 FT
EXISTING GROUND
Y
TYPICAL SECTION NO. 2
¢
RIFFLE WITH BANKFUL BENCH r
m
co
0
W
co
WBKFL
..
3 Dmax 3•�
I tit
BENCH/CHANNEL CAN W
BE TIED DIRECTLY B
INTO EXISTING BANK
Reach 1 - UT to House Creek
FEATURE
Riffle
Pool
RSC Riffle
RSC Pool
Width of Bankful, W. (ft)
13.6
17.4
15.0
15.0
Average Depth, RKF (ft)
0.9
2.1
WA
WA
Maximum Depth, Dmax (ft)
1.2
3.0
1.5
3.0
Width to Depth Ratio, W/D
16
WA
WA
WA
Ba n kfu I Area, ABKF (ft')
11.6
36.3
WA
WA
Bottom Width, WB (ft)
8.0
4.0
WA
WA
Station
Elevation
X
Y
11 +47.00
412.99
2088059.9029
748572.6040
11 +86.00
412.04
2088094.2716
748590.7422
11 +97.00
409.54
2088103.9024
748596.0331
12+01.00
409.54
2088107.1776
748598.3284
12+12.00
412.08
2088115.6672
748605.3204
12+27.98
410.03
2088127.8889
748615.6156
12+39.52
408.09
2088136.7148
748623.0503
12+46.82
408.09
2088142.3530
748627.6834
12+55.68
409.98
2088150.5610
748630.7865
12+66.00
409.15
2088160.6190
748629.1773
12+75.00
406.65
2088167.5358
748623.5583
12+79.00
406.65
2088169.9930
748620.4020
12+90.00
409.18
2088176.7504
748611.7223
13+03.00
407.70
2088184.7364
748601.4644
13+14.00
405.20
2088191.4958
748592.7863
13+18.00
405.20
2088194.0990
748589.7505
13+29.00
407.74
2088202.3486
748582.5040
13+42.00
406.25
2088213.0008
748575.0522
13+53.00
403.75
2088222.0149
748568.7476
13+57.00
403.75
2088225.2927
748566.4551
13+68.00
406.29
2088234.3068
748560.1506
13+81.00
404.81
2088244.9597
748552.6998
13+92.00
402.31
2088254.2582
748546.8390
13+96.00
402.31
2088257.8396
748545.0588
14+07.00
404.84
2088268.1366
748541.2200
14+20.00
403.36
2088280.8858
748538.7715
14+31.00
400.86
2088291.8723
748538.5229
14+35.00
400.86
2088295.8584
748538.8497
14+46.00
403.40
2088306.6851
748540.7637
14+59.00
401.91
2088319.4154
748543.3980
14+70.00
399.41
2088330.1872
748545.6269
14+74.00
399.41
2088334.1042
748546.4375
14+85.00
401.95
2088344.8760
748548.6665
14+98.00
400.47
2088357.6063
748551.3007
15+09.00
397.97
2088368.3781
748553.5297
15+13.00
397.97
2088372.2951
748554.3402
15+24.00
400.50
2088383.0669
748556.5692
15+37.00
399.02
2088395.7972
748559.2035
15+48.00
396.52
2088406.5690
748561.4325
15+52.00
396.52
2088410.4861
748562.2430
EXISTING GROUND
STREAM VERTICAL PROFILE
ELEVATION TABLE
Station
Elevation
X
Y
15+63.07
399.13
2088421.3880
748564.1215
15+78.00
397.17
2088436.3071
748564.2364
15+89.00
395.07
2088447.3067
748564.1423
15+93.00
395.07
2088451.3065
748564.1081
16+04.00
397.21
2088462.3061
748564.0140
16+15.00
396.13
2088473.3057
748563.9199
16+26.00
393.63
2088484.3053
748563.8258
16+30.00
393.63
2088488.3052
748563.7916
16+41.00
396.16
2088499.3048
748563.6975
16+54.00
394.68
2088512.3043
748563.5863
16+65.00
392.18
2088523.3039
748563.4922
16+69.00
392.18
2088527.3038
748563.4579
16+80.00
394.71
2088538.3034
748563.3638
16+97.88
391.23
2088556.1488
748562.3293
17+45.15
386.60
2088603.3068
748559.0868
17+45.50
385.52
2088603.6545
748559.0461
17+54.90
384.28
2088612.7279
748556.6967
17+63.30
385.52
2088620.0685
748552.6533
17+81.70
384.24
2088634.2714
748540.9687
17+92.80
383.04
2088644.5809
748537.1144
18+03.90
384.24
2088655.5400
748538.1334
18+25.40
382.70
2088675.3809
748546.3222
18+36.20
381.70
2088686.0534
748547.8221
18+47.10
382.70
2088696.8904
748546.8928
18+88.10
381.34
2088736.6520
748540.9322
18+92.30
379.94
2088740.7641
748540.1397
18+96.50
381.34
2088744.5255
748538.2987
19+55.10
378.44
2088787.4532
748498.5564
19+66.20
377.20
2088797.3132
748493.4880
19+77.40
378.44
2088807.9923
748490.1589
20+30.80
376.52
2088859.9082
748495.6845
20+37.50
375.32
2088866.5846
748495.6825
20+44.10
376.52
2088872.8884
748493.8053
20+64.00
375.50
2088888.1867
748481.2379
20+72.40
374.30
2088895.6396
748477.4181
20+81.60
375.50
2088904.6381
748475.6695
21 +30.90
373.62
2088952.6151
748468.5102
21 +36.40
372.26
2088958.0890
748468.3350
21 +41.50
1 373.62
2088962.9784
748469.7185
21 +80.00
1 371.50
2088995.5761
748490.0125
VARIES
0 to 5 FT
REFER TO CROSS SECTIONS TO
IMPLEMENT TYPICAL SECTION NO. 2 BETWEEN:
STA. 17 + 45 TO STA. 2 8 + 15
VARIES
0 to 5 FT
TYPICAL SECTION NO. 3
POOL WITH BANKFUL BENCH
WBKFL
s\� Dmax 3 3.A_A 6:1
WB
REFER TO CROSS SECTIONS TO
IMPLEMENT TYPICAL SECTION NO. 3 BETWEEN:
STA. 17 + 45 TO STA. 2 8 + 15
VARIES
0to5 FT
BENCWCHANNEL CAN
BE TIED DIRE5TT y����������/���
INTO EXISTING\\BA`MK\\\\\\\\\`
BENCH/CHANNEL CAN
BE TIED DIRECTLY
INTO EXISTING BANK
Station
Elevation
X
Y
21 +90.60
370.54
2089005.8981
748492.3021
22+01.10
371.50
2089016.3674
748492.0020
22+41.80
369.68
2089054.5368
748478.3781
22+52.10
368.52
2089064.6539
748479.8066
22+62.40
369.68
2089073.2053
748485.3987
22+97.50
367.96
2089090.8538
748515.5803
23+07.50
366.78
2089099.0654
748521.1484
23+17.50
367.96
2089108.8584
748522.7397
23+75.30
365.90
2089163.2692
748503.5371
23+81.40
364.58
2089169.2929
748502.6540
23+86.90
365.90
2089174.7745
748502.9814
24+45.70
363.32
2089232.0244
748507.1270
24+57.20
362.16
2089243.4837
748507.0422
24+68.50
363.32
2089254.3052
748510.1599
25+06.70
361.88
2089288.6494
748526.0868
25+11.00
360.50
2089292.9314
748525.7695
25+14.80
361.88
2089296.6448
748524.9650
25+39.30
360.46
2089320.5530
748519.6193
25+49.20
359.26
2089330.3552
748520.2691
25+59.40
360.46
2089339.2307
748525.1321
25+77.00
359.20
2089353.3784
748535.4979
25+84.60
357.62
2089360.7308
748537.2808
25+94.70
359.20
2089370.6420
748535.8144
26+14.00
358.16
2089386.9637
748525.5784
26+22.10
356.56
2089394.1189
748521.8257
26+30.50
358.16
2089402.2757
748519.9190
26+58.10
356.74
2089429.7957
748518.5583
26+68.10
355.10
2089438.5652
748513.9238
26+77.60
356.74
2089444.3001
748506.4376
27+01.40
355.24
2089455.6836
748485.7524
27+11.50
353.66
2089464.3949
748480.8032
27+21.72
355.23
2089474.5026
748480.0444
27+56.20
353.06
2089508.1399
748486.2381
27+66.50
351.92
2089518.3072
748484.6699
27+77.60
353.06
2089528.7918
748481.0734
28+00.27
352.92
2089547.3170
748468.2162
28+08.76
353.01
2089553.5546
748462.4567
28+13.27
352.87
1 2089556.8687
1 748459.3977
W
z
0
a
U
0
W
0
W
of
W
J
¢
(Y
Z)
o
H
�
aa
Z
Cn
LL
LU
00
w
Q
U
w
C
OLL
Q (/) (D
U
=
LLJ
LLI N
U
U z U
Q
J
LUOz
a
Q
0�=
LL1
IY
a Q
J LU J
m
J
O
Z
�o�
¢
:3U
U
o
OD
�z
�a
m
�
�
o
J
O
z
(n
Z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
4
North Carolina Museum of Art
DATE: 1 /29/2024
n
n
z
�O
U
LU
W
U) o
Z)OCS
O
z
2
O
z C)f N
J
C
�LU
Q � 0_
o
C)
_U)O
r
m
OQ
LU
LU
Z
O
Q
z
z
Z)
SCALE: NTS
TYPICAL
C-202
L Rifflo
VARIES
* * , * .... ... .. ... .. �. 2111111
-.t
9l:
San&Wood Chip Mix
REGENERATIVE STORMWATER CHANNEL
TYPICAL PROFILE
ALTERNATING POOLS AND RIFFLES
LPool
VARIES
Woody Debris
p
laced as directed
.....
............
.................
....................
.......................
........................
.........................
.........................
..........................
...........................
...............................
.................................
.....................................
.........................................
..............................................
................................................
............................................
.........................................
......................................
..................................
.............................. .
.......................... .
...................... ..
.................. ...
.............. .....
.......... ........
. ..............
\\VV\\ .. .........
Existing Ground
NOTES:
1. IF NATIVE ROCK IS NOT AVAILABLE, QUARRIED ROCK MAY BE
SUBSTITUTED IN THE SAME SIZES. OVERLAY QUARRIED ROCK WITH
NATIVE BED MATERIAL.
2. ALL SMALLER ROCK SHALL BE HETEROGENEOUS AND WELL MIXED.
3. BOULDERS SHOULD HAVE A MINIMUM DIMENSION OF 2' x 2' x 2.
TYPICAL RIFFLE —POOL SEQUENCE
kTIVE ROCK*
3OULDERS
Riffle — Pool Sequence (Typical)
*Equivalent to Class I Rip Rap or
on —site stone meeting Class 1 gradation
varies 10-15 ft
MW P
An
4V 'MW4.A%
W C4 a 7, &PE P&O'
Sand/Woodchip Mix
0
Section A -A'
Riffle Weir Cross Section through Cobble
Sand/Woodchip Mix
3.0 ft
L■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■
r■r■r■r■r■r■r■r■r■r■J■r■r■1
■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■
■r■f ■�■■r■r■r■r■.■■r■r■f■1
■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■
r■r■r■r■r■f■r■r■r■r■f■r■1
.r.r.f.r.r.r.r.r.r.r.r.1
%■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■ti■
r•r■r■r■r■r•r■r■r■r■r■r
■ti ■ ti ■ ti ■ti ■ti■L■ ti ■ ti ■ ti ■ti ■ ti ■
Section B-B'
Pool Cross Section
Filter Fabric
1.0 ft
varies
SECONDARYLOGS
AND WOODY DEBRIS
O
u_
Native Rock*
BEGIN INVERT
ELEVATION
SEND INVERT
_ ELEVATION
HEADER
LOG
Boulders
Buried 1—ft min.
*Equivalent to Class I Rip Rap or
on —site stone meeting Class 1 gradation
SET INVERT ELEVATION BASED
ON DESIGN PROFILE
TRANSPLANTS
OR LIVE STAKES
EROSION CONTR70L
MATTING —
PRIMARY LOGS VARY.
SPACE MIN 12' APART
TOE OF STREAM BANK
TOP OF STREAM BANK
BACKFILL WITH
ON -SITE ALLUVIUM
NON -WOVEN
GEOTEXTILE FABRIC
(TYPICAL)
varies NOTES:
1. PRIMARY LOGS SHOULD BE AT LEAST 12" OR MORE IN DIAMETER AND SPACED 12' ON -CENTER,
RELATIVELY STRAIGHT, HARDWOOD, RECENTLY HARVESTED AND EXTENDING INTO THE BANK 5' ON
EACH SIDE OF STREAM BANK.
2. SECONDARY LOGS SHOULD BE AT LEAST 4" IN DIAMETER AND NO LARGER THAN 10" AND EXTEND INTO
THE BANK TON EACH SIDE. WOODY DEBRIS MATERIAL SHALL BE VARYING DIAMETER TO ALLOW
MATERIAL TO BE COMPACTED.
3. NON -WOVEN GEOTEXTILE FABRIC SHOULD BE NAILED TO THE HEADER LOG BELOW THE BACKFILL.
4. ROOT WADS CAN BE USED INSTEAD OF TRANSPLANTS OR LIVE STAKES PER DIRECTION OF ENGINEER.
5. AFTER TRENCH HAS BEEN EXCAVATED A LAYER OF SECONDARY LOGS AND WOODY DEBRIS SHOULD BE
PLACED WITH MINIMAL GAPS. A LAYER OF ON -SITE ALLUVIUM SHOULD BE APPLIED TO FILL VOIDS
BETWEEN SECONDARY LOGS BEFORE ADDITIONAL LAYERS ARE PLACED.
6. SEE TYPICAL SECTION FOR CHANNEL DIMENSIONS.
5' MINIMUM
BURIED INTO
BANK
VBANKFULL STAGE
\A
SECTION A -A
•
OWN
IMP
CONSTRUCTED LOG RIFFLE
NOT TO SCALE
5' MINIMUM
BURIED INTO
BANK
TOP OF STREAM BANK
HEADER
LOG
FOOTER
LOG
W
0
0
z
0
a
U
W
>
W
W
J
a
<�
0
aa
zU)
lL w
0Of
0
W
o
D
ICY_
WO_
CQCD=
I..1—
w
U) LU
Of
C) Z C)
Q
J
LUOz
a
0�=
w
O�
aQ11
J
m
J
O
Z
�o�
�o
¢
J
U
U
o
OD
�z
La
m
�
0�
o
J
O
z
J�
Cn
z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
z
20
Cn
O CS
z
awe
O o
W 4
U�0 C:)
r
_U)O
C/)
Oa
LL
O
SCALE: NTS
DETAILS
Y
W
W
U
w
Cn
D
O
2
0
H
m
w
2
a
z
z
C-203
TOP OF
STREAMBANK
OPTIONAL
COVER LOG
A SCOUR
I POOL
e
ROOTWAD (TYP.)
TRANSPLANTS
PLAN VIEW
EROSION CONTROL MATTING
BERM (0.5' MAX. HT.) BERM(S) TOP OF
RESTORED NOT TO EXTEND BEYOND STREAMBANK
STREAMBANK LIMITS OF ROOTWADS.
BANKFULL STAGE
> 1/2 OF ROOT MASS BASE FLOW
IS BELOW BASE FLOW
\ _
ROOTWAD
.+. s
ENTIRE ROOTWAD TRUNK IS
BELOW STREAMBED.
TRANSPLANTS
RESTORED
STREAMBANK
COVER LOG
(OPTIONAL)
SECTION A -A
ROOTWADS WITHOUT TRANSPLANTS
> 1/2 OF ROOT MASS
IS BELOW BASE FLOW
ROOTWAD a
ENTIRE ROOTWAD TRUNK IS -
BELOW STREAMBED.
NOTES:
1. THE TRENCHING METHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR
THE LOG PORTION OF THE ROOTWAD. A COVER LOG SHOULD BE INSTALLED
UNDERNEATH THE ROOTWAD IN A TRENCH EXCAVATED PERPENDICULAR
TO THE BANK AND BELOW THE RESTORED STREAMBED. ONE-THIRD OF THE
ROOTWAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS.
GEOTEXTILE /
FABRIC
LOGS BURI DIN
STREAMBANK
AT AST 5'
.-. s
s ,
s
B
wz-�v
I
fth
w r
q
SCOUR\
010 POOL
� O
J
L1L
1
ROOTWAD
(OPTIONAL)
PLAN VIEW
ROOTWADS
NOT TO SCALE
INVERT/ GRADE POINT
STONE
BACKFILL
HEADER
BOULDER
BERM (0.5' MAX. HT.) TOP OF
NOT TO EXTEND BEYOND STREAMBANK
LIMITS OF ROOTWADS.
BANKFULL STAGE
BASE FLOW
COVER LOG
(OPTIONAL)
SECTION A -A
ROOTWADS WITH TRANSPLANTS
HEArr"
FOOTER LOG
(OPTIONAL)
STONE BACKFILL
NON -WOVEN
GEOTEXTILE FABRIC
5' MINIMUM
SECTION A -A
p 2/3 BANKFULL STAGE
FLOW— �o�o s�Op�
RESTORED STREAMBED ELEVATION FR
7
N r
NOTES:
1. LOGS SHOULD BE 12" TO 18" IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD, HEADER
AND RECENTLY HARVESTED. LOG
2. LOGS SHOULD BE BURIED INTO THE STREAM BED AND BANKS
AT LEAST 5 FEET.
3. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS. FOOTER LOG
4. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER LOG AND (OPTIONAL)
EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER LOG AND THEN
UPSTREAM TO A MINIMUM OF FIVE FEET. GEOTEXTILE FABRIC SHOULD BE NAILED TO THE
LOG BELOW THE BACKFILL.
5. EXCAVATE A TRENCH BELOW THE BED FOR FOOTER LOG AND PLACE FILL ON
UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK.
6. START AT BANK AND PLACE FOOTER BOULDERS FIRST AND THEN HEADER BOULDERS.
7. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS.
8. AN OPTIONAL COVER LOG CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT
AT DIRECTION OF ENGINEER.
9. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER
BOULDERS.
10. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE
STRUCTURE WITH ON -SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER
BOULDER AND LOG.
11. VEGETATION TRANSPLANTS CAN BE USED INSTEAD OF ROOTWADS, PER DIRECTION OF ENGINEER.
12. BOULDERS MUST HAVE MINIMUM DIMENSION OF 2'X2'X2'
GRADE CONTROL LOG J-HOOK VANE
NOT TO SCALE
HEADER
BOULDER
PROFILE B-B
Ir
O�
2/3 BANKFULL
STAGE
B
BOULDER
(OPTIONAL)
Q A
INVERT/
GRADE POINT
A
NON -WOVEN
�GEOTEXTILE FABRIC
/ ARM ANGLE
200 TO 300
I SCOUR
POOL �
/ p t
l A
-TOP OF STREAM BANK ROOT WAD
\
�/`-t/ (OPTIONAL)
BURY LOGS INTO
BANK AT LEAST 5'
HEADER -
LOG
PLAN VIEW FOOTER LOG
NOTES:
1. LOGS SHOULD BE AT LEAST 10" IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD,
AND RECENTLY HARVESTED.
2. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS.
3. ROOTWADS SHOULD BE PLACED BENEATH THE HEADER LOG AND PLACED SO THAT
IT LOCKS THE HEADER LOG INTO THE BANK. SEE ROOTWAD DETAIL.
4. BOULDERS OF SUFFICIENT SIZE CAN PLACED ON TOP OF HEADER LOG FOR ANCHORING,
PER DIRECTION OF ENGINEER.
5. LOGS SHOULD BE BURIED INTO THE STREAM BED AND BANKS AT LEAST 5 FEET.
6. GEOTEXTILE FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL.
7. TRANSPLANTS CAN BE USED INSTEAD OF ROOTWADS, PER DIRECTION OF ENGINEER.
LOG VANE
NOT TO SCALE
/
-7
-kT
BURY INTO
i
BANK 5'
MINIMUM
(TYP.)
ROOTWAD
INVER'
ELEVATIOI
} TOP OF STREAM BANK
O
J
O
z
w B
J
J
O
O
-1.3X CHANNEL WIDTH
/ I SCOUR \
POOL I
PLAN VIEW
t
W
LARGE STONE_
ON DOWNSTREM
OF LOGS BURY INTO
BANK 5'
MINIMUM
(TYP.)
LARGE STONE
ON DOWNSTREM
OF LOGS
NOTES:
1. LOGS SHOULD BE AT LEAST 12 INCHES IN DIAMETER, RELATIVELY STRAIGHT
HARDWOOD AND RECENTLY HARVESTED.
2. LOGS >24 INCHES IN DIAMETER MAY BE USED ALONE WITHOUT AN
ADDITIONAL LOG FILTER FABRIC SHOULD STILL BE USED TO SEAL AROUND
LOG, AT THE DIRECTION OF THE ENGINEER.
3. PLACE FOOTER LOGS FIRST AND THEN HEADER (TOP) LOG. SET HEADER
LOG AT A MAXIMUM OF 3 INCHES ABOVE THE INVERT ELEVATION.
4. CUT A NOTCH IN THE HEADER LOG APPROXIMATELY 30% OF THE CHANNEL
BOTTOM WIDTH AND EXTENDING DOWN TO THE INVERT ELEVATION. NOTCH
SHALL BE USED TO CENTER FLOW AND NOT EXCEED 3 INCHES IN DEPTH.
5. USE GEOTEXTILE FABRIC FOR DRAINAGE TO SEAL GAPS BETWEEN LOGS.
6. INSTALL VEGETATION TRANSPLANTS FROM TOE OF STREAM BANK TO TOP
OF STREAM BANK.
7. SEE TYPICAL SECTION FOR CHANNEL DIMENSIONS.
LOG WEIR
NOT TO SCALE
Y
00
d
a
TOP OF STREAM BANK Q
INVERT — FLOW o
ELEVATIONco
W
co
SCOUR STREAMBED
POOL STONE BACKFILL
HEADER NON -WOVEN o
LOG GEOTEXTILE FABRIC
FOOTER LOG 5' MINIMUM
SECTION A -A
SET INVERT ELEVATION -
BASED ON DESIGN PROFILE
EROSION CONTROL
,h MATTING p BANKFULL STAGE
_ BASEFLOW :.:7:
_ .,� .
HEADER
LOG
SECTION A -A FOOTER
LOG
f11ATrZ��
i
PROFILE B-B
INVERT
ELEVATION
SCOUR
POOL
HEADER LOG -
FOOTER LOG -
TOP OF STREAM BANK
TRANSPLANTS
OR LIVE STAKES
TOP OF STREAM BANK
FLOW
STREAMBED
PROFILE B-B
STONE BACKFILL
NON -WOVEN
GEOTEXTILE FABRIC
Lu
W
J
a
lY
<�
o
H
�
aa
ZU)
LL W
oDf
LU
U
w
LU
C
O
U_
0,0
U
Li
I..1—
w
LLI N
U
C) Z C)
a
J
� o
0-
a
3
O�2
Lu
IY
Q CD
a
J LU LUm
O
Z
J
�o�
¢
J
U
U
o
OD
Z
La
Co
o
J
O
z
(n
Z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
Y
W
LU
z 0�
�O 0
W
W
U 0 0
DOC O
z o
z 0� N J >_
IZW \
a�0 0 I-_ D
UI-- r m
=U)O
oa o
Z LU
2
o a
Z
Z
SCALE: NTS
DETAILS
C-204
EXTEND WOODY DEBRIS MATERIAL
TO 1/4 BANKFULL WIDTH
TOP OF RESTORED STREAM BANK
STAKE TOP LAYER OF
EROSION CONTROL
MATTING IN 6" TRENCH
(SEE COIR FIBER MATTING
DETAIL)
BACKFILL 1.0' LIFTS OF
COMPACTED ON -SITE
SOIL TO REACH TOP OF
STREAM BANK (TYP.)
PLACE 6" THICK LAYER
OF V- 6" DIAMETER
WOODY DEBRIS
OPTIONAL COVER LOGS AND/OR ROOT WADS
INSTALLED IN LOCATIONS AS SHOWN ON
PLANS AND PER RESPECTIVE DETAILS
0
J
LL
NOTES:
PLAN VIEW
FLOW
SCOUR I
\ POOL f
w\ OPTIONAL FOUNDATION LOGS TO BE INSTALLED
AT ANGLES SHOWN BETWEEN 15-250
TOP OF RESTORED STREAM BANK PLAN VIEW
4' DEEP (TYP.) STOP LIFT WILL BE LEFT UNCOMPACTED
BANKFULL STAGE o
uws �;;,r s; F �. »+n qM+�rpyLr; r• iff
HORIZONTAL SETBACK FOR LIFT
,:;�'NOT TO EXCEED APPROX. 1.0'
LIVE BRANCH CUTTINGS TO MATCH
\\�%':,, ;iM,�,•';.,;;� :�H:�`;".`.;j� LIVE STAKE PLANTING LIST
EROSION CONTROL MATTING
ENCOMPASSES LIFT
-8
\//�\//�///\,y",�,�.,.,*, 'rv'tiit a. yyn^t....4.4+'•`«�•4a t' v BASEFLOW
SECTION A -A
POINT BAR
(SEE TYPICAL SECTIONS)
1:7�•�C•]:7����t1:7�_1�i13��7
INSTALL OPTIONAL FOUNDATION
LOGS SUCH THAT AT LEAST HALF OF
THE LOG DIAMETER IS BELOW THE
RESTORED STREAMBED ELEVATION.
GEOLIFT W/ TOE WOOD
TOE OF STREAM BANK
HEAD OF RIFFLE
INVERT ELEVATION
TOP OF STREAM BANK
16" MIN. THICKNESS
STONE BACKFILL
TAIL OF RIFFLE
INVERT ELEVATION
NOT TO SCALE
TOP OF STREAM BANK
p BANKFULL STAGE
RIFFLE Dmax = MAX DEPTH
16" MIN. THICKNESS
STONE BACKFILL
' F-A NKFUL
SAGE
FLOW
HEAD OF RIFFLE -
INVERT ELEVATION
SECTION A -A
TOE OF STREAMBANK
EROSION CONTROL
MATTING SHOULD BE
PLACED BENEATH STONE
BACKFILL
TAIL OF RIFFLE
INVERT ELEVATION
\ p BASE FLOW
PROFILE B-B 16" MIN. THICKNESS
STONE BACKFILL
POOL
STO I`
BACk
POOL
(1.3X BA
T(
STREAM
T(
STREAM
B BEGIN STEP INVERT
�rl
ti
���
1 1-1 I I 1 ;�
•
'.
H
gy
H (SEE
13)
E
FILL
G TOE
INVERT
SET INVERT ELEVATION TRANSPLANTS -
BASED ON DESIGN PROFILE OR LIVE STAKES
EROSION CONTROL TOP OF STREAM BANK
MATTING p BANKFULL STAGE
p BASEFLOW
f
1 % - 2% CROSS SLOPE NOTCH (SEE
BURY INTO �- BANK 5' NOTE 13)
MINIMUM SECTION A -A
(TYP.)
:,:f3AN-K-FUQL STAGE STEP INVERT
ELEVATION NOTCH (SEE POOL TO POOL SPACING
FLOW NOTE 13) VARIES. SEE NOTE #9 FOR POOL
� conrini� CC(11 IICC�ACnITC
H = STEP BASEFLOW
HEIGHT
F�1►�II�II �l�J �I
NOTES: FLAN VIEW
1. LOGS SHOULD BE AT LEAST 12 INCHES IN DIAMETER, RELATIVELY STRAIGHT HARDWOOD AND
RECENTLY HARVESTED.
2. LOGS >24 INCHES IN DIAMETER MAY BE USED ALONE WITHOUT AN ADDITIONAL LOG FILTER FABRIC
SHOULD STILL BE USED TO SEAL AROUND LOG. LOGS SHOULD EXTEND INTO THE BANKS 5' ON EACH
SIDE.
3. SOIL SHALL BE WELL COMPACTED AROUND BURIED PORTION OF FOOTER LOGS WITH BUCKET OF
TRACK HOE.
4. INSTALL GEOTEXTILE FILTER FABRIC UNDERNEATH LOGS.
5. UNDERCUT POOL BED ELEVATION 8 INCHES TO ALLOW FOR LAYER OF STONE. INSTALL LARGE STONE
BACKFILL ALONG SIDE SLOPES.
6. INSTALL EROSION CONTROL MATTING ALONG COMPLETED BANKS SUCH THAT THE EROSION CONTROL
MATTING AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUT ELEVATION.
7. INSTALL LARGE STONE BACKFILL ALONG SIDE SLOPES.
8. FINAL CHANNEL BED SHAPE SHOULD BE ROUNDED, COMPACTED, AND CONCAVE, WITH THE ELEVATION
OF THE BED APPROXIMATELY 0.5 FT DEEPER IN THE CENTER THAN AT THE EDGES.
9. AVERAGE POOL TO POOL SPACING SHALL BE SHOWN ON THE PROFILE OR SPECIFIED BY ENGINEER
BASED ON EXISTING CONDITIONS SUCH AS SLOPE AND SUITABLE FILL MATERIAL. RIFFLE STEP -POOLS
OR CASCADE POOLS MAY BE SUBSTITUTED IN AREAS WHERE EXISTING SLOPES EXCEED 10% AS
DETERMINED BY THE ENGINEER.
NEW STREAMBANK
SHALL BE TREATED AS
SPECIFIED IN PLANS
OPTIONAL ROOT WAD PLACEMENT
OR BANK PROTECTION AS
DIRECTED BY ENGINEER
CHANNEL BOTTOM/
INVERT ELEVATION
NON -WOVEN
GEOTEXTILE
FABRIC
CHANNEL TO BE
RELOCATED
PROFILE B-B \-RESTORED
STREAMBED
HEADER
LOG
FOOTER
LOG
POOL
%\� X X
yl\�%N\%\\` NYI\\
LARGI' TONE
BACKFILL
10. INTERIOR LOGS SHOULD BE AT A SLIGHT ANGLE (-70 DEGREES) FROM THE
STREAMBANK AND CROSS SLOPES SHOULD BE 1-2%.
11. PLACE FOOTER LOGS FIRST AND THEN HEADER (TOP) LOG. SET HEADER
LOG AT A MAXIMUM OF 3 INCHES ABOVE THE INVERT ELEVATION.
12. AVERAGE STEP HEIGHTS/DROPS SHALL NOT EXCEED 0.5 UNLESS SHOWN
OTHERWISE.
13. CUT A NOTCH IN THE HEADER LOG APPROXIMATELY 30% OF THE CHANNEL
BOTTOM WIDTH AND EXTENDING DOWN TO THE INVERT ELEVATION. NOTCH
SHALL BE USED TO CENTER FLOW AND NOT EXCEED 3 INCHES IN DEPTH.
14. THE NUMBER OF STEPS MAY VARY BETWEEN BEGINNING AND END
STATIONING. SEE LONGITUDINAL PROFILE FOR STATION AND ELEVATION.
15. USE GEOTEXTILE FABRIC FOR DRAINAGE TO SEAL GAPS BETWEEN LOGS.
16. PLACE VEGETATION TRANSPLANTS FROM TOE OF STREAMBANK TO TOP OF
STREAMBANK.
17. SEE TYPICAL SECTION FOR CHANNEL DIMENSIONS.
STONE AND LOG STEP POOL
TOP OF STREAMBANK
NEW FLOW DIRECTION
CHANNEL BLOCK
PLAN VIEW
PLACE UNCOMPACTED FILL 1.5'
ABOVE FINISHED GRADE
1. DIG A TRENCH BELOW THE RESTORED STREAMBED NOTES:
FOR THE STONE BACKFILL. 1. COMPACT DITCH PLUG MATERIAL FOR BACKFILL
2. FILL TRENCH WITH CLASS "A" AND "B" STONE BACKFILL, USING HEAVY EQUIPMENT IN 10 INCH LIFTS.
AND OVERLAY WITH 0.5 FT OF NATIVE CHANNEL MATERIAL. 2. CONSTRUCT DITCH PLUG WITH COMPACTED SOIL USING
SUITABLE MATERIAL IN ACCORDANCE WITH THE TECHNICAL
SPECIFICATIONS.
3. PLACE FILL MATERIAL IN LOCATIONS SHOWN ON PLANS OR AS
CONSTRUCTEDSTONE RIFFLE DIRECTED BY ENGINEER TO ALLOW FOR SETTLING.
NOT TO SCALE
SECTION A -A
CHANNEL BLOCK
NOT TO SCALE
BACKFILL
NOT TO SCALE
FLOODPLAIN DEPRESSION PER
LOCATIONS SHOWN ON PLANS.
FLOODPLAIN DEPRESSION
DEPTHS SHALL NOT EXCEED
8"-14".
CHANNEL FILL
z
0
a
U
W
W
0
>
W
uj
w
J
a
<�
0
aa
z
W
LL_
O
Df
w
Q
Z)
U
w
LU
C
O
U_
(/
U
=
w
U)LUN
U
0Y
IY
UzU
a
J
LUoz
x
W
�
U) (D
dLU
m
O
Z
J
�o�
¢
J
U
U
o
OD
z
�a
m
�
o
J
O
z
U)
z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
tD
North Carolina Museum of Art
DATE: 1 /29/2024
Y
W
W
z 0�
U
O
- LU
U) Of o D
DOCS O
2
z O
z N J
W \ H
ago o D
U - m
= U) O
��U
Oa LU
z LU
O a
z
z
SCALE: NTS
DETAILS
C-205
STONE BACKFILL
VANE ANGLE
200 TO 300
BOULDER SILL
(BURIED)
"1 /.i
BOTTOM
WIDTH OF
CHANNEL
PLAN VIEW
INVERT/ GRADE POINT
NO GAPS BETWEEN
BOULDERS ALONG
VANE ARM
HEADER
BOULDER
1
J
-FOOTER
BOULDER
RESrn0cn
STREj
ELE\
STONE BACKFILL
NON -WOVE...
GEOTEXTILE FABRIC
5' MINIMUM
SECTION A -A
RESTORED 2/3 BANKFULL STAGE
STREAMBED -_ _
ELEVATION %
4%_ O7
FLOW-- ARM S%(
STONE
BACKFILL
NON -WOVEN
GEOTEXTILE FABRIC
PROFILE B-B
21= N_ LL STAGE
FLOW
RIFFS
RESTORED
NOTES: STREAMBED
1. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER ELEVATION STONE
BOULDERS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM BACKFILL
FOOTER BOULDER, AND THEN UPSTREAM TO A MINIMUM OF FIVE FEET.
2. EXCAVATE A TRENCH BELOW THE STREAM BED FOR FOOTER BOULDERS
AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM \�
AND STREAM BANK. NON -WOVEN
3. START AT BANK AND PLACE FOOTER BOULDERS FIRST AND THEN GEOTEXTILE FABRIC
HEADER BOULDERS. START SLOPE AT 2/3 THE BANKFULL STAGE.
4. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE
SPECIFICATIONS. ACTUAL NUMBERS OF BOULDERS MAY VARY.
5. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT
IMPROVEMENT AT DIRECTION OF THE ENGINEER.
6. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER
AND FOOTER BOULDERS.
r
m
,DER sA'k\ a
ILDER I Y/ TRANSPLANTED VEGETATION, r
WITH ROOTMASS, AND SOIL m
:::- .:,...,...:....•. MATERIAL
FOOTER ':: ; :''.: ::::.
BOULDER
:;.:::,.:,;... ,,.• TOP OF STREAM BANK W
Q
HEADER
BOULDER
FOOTER
BOULDER
- INVERT/ GRADE POINT RESTORED-
STREAMBED
ELEVATION
-HEADER _
BOULDER
BASEFLOW
BOU
PROFILE C-C
7. AFTER ALL PLACED, FILL IN THE UPSTREAM
SIDE OF THE TSOTRU STRUCTURE WITH ON -SINE BACKFILL HAS NE ALLUVIUM TO THE ELEVATION OF BOULDER CROSS VANE
THE TOP OF THE HEADER BOULDERS.
8. BOULDERS MUST HAVE A MINIMUM DIMESNION OF 2'X2'X2'
TRENCH LIMITS FO
24" MAX. TYP (TRENCH ONLY)
- Il1\l11 �
-1111111�
36" MAX. TYP
SMALL MATTING STAKES
A
PLAN VIEW OF STREAM BANK
LARGE MATTING STAKES
INSTALL EDGE OF EROSION CONTROL MATTING IN 12 INCH DEEP
NOT TO SCALE
TOP OF STREAM BANK
EROSION CONTROL
MATTING TO BE
EXTENDED TO TOE
OF SLOPE. KEY IN
NO LESS THAN 6
INCHES.
�nR�I,FFLE
SCOUR
POOL
2.5 INCH GALVANIZED
ROOFING NAIL
TYPICAL LARGE MATTING STAKE
LENGTH
24.00 60.96 CM TAPERED T POINT'
WIDTH
1.5 IN 3.81 CM
1.5 IN 3.81 CM
TOE OF STREAM BANK
;.: :.
RESTORED STREAMBED
O
PLAN VIEW OF STREAM BANK
TRANSPLANTED VEGETATION,
WITH ROOTMASS, AND SOIL
MATERIAL
TOP OF STREAM BANK
BANKFULL STAGE
TOE OF STREAM BANK
BASE FLOW
RESTORED STREAMBED
SECTION A -A
NOTES:
1. EXCAVATE A HOLE IN THE RESTORED STREAM BANK THAT WILL
ACCOMMODATE THE SIZE OF TRANSPLANT TO BE PLANTED.
BEGIN EXCAVATION AT TOE OF THE STREAM BANK.
2. EXCAVATE THE ENTIRE TRANSPLANT ROOT MASS AND AS
MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE. IF ENTIRE
ROOT MASS CAN NOT BE EXCAVATED AT ONCE, THE
TRANSPLANT IS TOO LARGE AND ANOTHER SHOULD BE
SELECTED.
3. PLANT TRANSPLANT IN THE RESTORED STREAM BANK SO THAT
VEGETATION IS ORIENTATED VERTICALLY.
4. FILL IN ANY HOLES OR VOIDS AROUND THE TRANSPLANT AND
COMPACT.
5. ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED.
6. WHEN POSSIBLE, PLACE MULTIPLE TRANSPLANTS CLOSE
TOGETHER SUCH THAT THEIR ROOT MASSES CONTACT.
VEGETATION TRANSPLANTS
NOT TO SCALE
z
0
a
iY
0
W
0
>
W
uj
W
J
o
of
aa
Z
W
LL.
O
w
Q
U
LL
w
w
C
O
�
Q (�
U
=
I..1-
w
Co
U) LLJ N
U
U z U
a
J
LUoz
0-
a
Off_
w
IY
aQ(D
J LU J
m
J
O
Z
�o�
¢
J
U
U
o
OD
0�
Z
La
2
}
�
m
o
J
O
z
U)
Z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
AE
North Carolina Museum of Art
DATE: 1 /29/2024
n
n
TOP OF STREAM BANK z 0�
p BANKFULL STAGE U
O w
W
U) o D
TYPICAL SMALL MATTING STAKE o
:j\\j\\j\\j\\j\\j\\j\\j\\j\\j\\j
/ / SMALL MATTING STAKES (TYP.) z o
\\r\r\\r\\r\\r\\r\\r\ r\\r\\r\\r\\� a w
//\/ e
\//\�j\//\//\//\ / LEG LENGTH 11.00 IN 27.94 CM Z � N J
\\j\\j \j\\j\\j\\\ \ HEAD W 1.25 IN 3.18 CM o 0-
/%\\/ 0.40 IN 1.02 CM O < 4t
a C a
TOE OF STREAM BANK LEG WIDTH 0.60 IN 1.52 CM TAPERED TO POINT � w o �
a o_
LEG THICKNESS ESS 0.40 IN 1.02 CM U o rn
TOTAL LENGTH 12.00 IN 30.48 CM U m_
O
LARCxE MATTING STAKES (TYP.) \//�/%/%/ p BASEFLOW NOTES: O a p
v%\/\ \\ \\ /� - 1. RESTORED STREAM BANKS MUST BE SEEDED AND w
//\//\//\/\ \//\/\ z LL
\/\\ RESTORED STREAMBED MULCHED PRIOR TO PLACEMENT OF EROSION CONTROL Q
O
MATTING.
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ 2. SEE TECHNICAL SPECIFICATIONS FOR MATTING STAKE z
SPACING REQUIREMENTS.
SECTION A - A
INSTALL EROSION CONTROL MATTING AT TO 3. PLACE LARGE STAKES ALONG ALL MATTING SEAMS, IN
OF SLOPE BY KEYING IN MATTING NO LESS THE CENTER OF STREAM BANK, AND TOE OF SLOPE.
THAN 6 INCHES AND SECURING WITH LARGE
MATTING STAKES.
EROSION CONTROL MATTING
SCALE: NTS
DETAILS
NOT TO SCALE
C-206
o
�
�
m
m
� TRAV-4-N L
0
N :748674.57'
TRAV-3-NL
E:2087937.95'
`�
N:748663.89' o
EL:429.95'
W
E:2087707.551p
`
0p
o
E L:458.48'
0"
�'� �
STI AT EDGE
OF
`
PAT — N SURVEYED
�
CP,
EG NE TIVE
ST RM A R C AN
(Ty
11;_
]►
z
43�a
`
W
PR P SED
/F
T P OF NK
o �
ST TE O
NO TH AR LIN
_r tip
��
o
B.M. 0181 PG. 136
�.
PIN 785- 1-6 41
00011,
W
Of
21 0 BL E IDG R � X
y
BL E L
ryLu
O
Lu
h'
N
.7
•o
BEGIN C
R
a
a
o
0 -7-
4 7.
0 :ti
Z CO
ti
lL w
00
U
,�
O
m
Y�
U
w L.L
(n o
Q C)
/
oa
ST
o0
gti
'`
g
LU
a J UOz
U
s-
w � �U(D
6'S
0 � aw J
QQ
�C�
m 0
Z
00
�soa
T
Z Z)
J 0
2 vo
z�
EX.
B NK
00
LL
a
o� 08
Lu
Cn
z
Lu
��
3
�
D
STREAM ALIGNMENT
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
PROFILE LEGEND
435
PROPOSED
THALWEG
435
TRANSYSTEMS
— — — — — — —
— — — — — — —
GROUND
—
1 Glenwood Avenue
Raleigh, NC27603
77
Tel:EXISTING
Fax919.789.991
Fax:919.789.9591
License: F-0453
1
North Carolina Museum of Art
425
425
DATE: 1 /29/2024
i
Y
w
w
z
�O U
D
Cho
O
\
aO
z
wN a
415
415
02E0
w
a 0 0 D
11
U 1— r m
_CnO
C
i
oa o
o a
z
z
HORIZONTAL SCALE: 20:1
405
405
PLANSHEET
10 + 00 11 + 00 12 + 00
C-207
TRAV-5-N L
r
m
N:748732.22'
Q
420
E:2088231.17'
• - -
m
0
ELA22.10'
W
co
EX.
TOP OF BANK
�24 O
W
W
0
, l9��
417 o e
2
6
\
46,0
41000
415 0O
414.0
40�0
V A
\
c \ 412,
N
ti
/ /
o
v
W
SED STREAM LIGN
T
1• /
\
/
��'
BZ 2
�<
8�
BZo
_C�
40900Lu
w
_ n
c✓
Z 1
LO
J
Q
a
,.
\
— WLB —
— —
—
+
.�0
a
of
\
eti
--_
N
a
z cn
r
m
J —
F Q U
1• \ -- ~/
lL W
�U
\
_---
°°a —C
---° e —
v
�---
W
~ 11 w
Z LL
W O LL
Y
w
0
O
W
7
L
W
0 o
2 W ° �
U)LUN
( Z (
0�
_
Lu O z
a �
C J
=
w °0
W
o� awLU
_ Q � Q
z� ~��
m O
Z
tW
J
PROPOSED TOP
BANK
a
070�
N/F
m
o J
SATE OF
o
-I NA
z
o
M.
2 , PG. 61
a2
,
°90� P I
5-31- 41 812
01
21
LUE
s
z
a
o80�?2\
PRIELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
PROFILE LEGEND
415
PROPOSED THALWEG
435
TRANSYSTEMS
— — — — — — — — — — — — — —
—
1 Glenwood Avenue
Raleigh, NC27603
GROUND
77
Tel:EXISTING
Fax:919.789.9591
Fax919.789.991
License: F-0453
01
North Carolina Museum of Art
405
i
425
DATE: 1 /29/2024
Y
W
W
z
0
—
W
~ (n
U o D
DO(L O
—
��
O
aWz
z � N
395
��
415
J �
°ate Q
ago D
_cnO
U
oa
z W
2
o a
z
z
HORIZONTAL SCALE: 20:1
385
405
12 + 00
13 + 00
14 + 00
15 + 00
16 + 00
17 + 00
PLANSHEET
C-208
40 °
"
m
TRAV-6-N L '
'
DETAIL
,
N:748605.30 ,-�
,
, '
\\
PIPE OUTLET STABILIZATION
E:2088616.2 J .0
�0
( Not to Scale)
2ft
r
m
0
'
EL:394.64
\0°
A 392°0
( P� Proposed Bed
Elevation
Lu
J Proposed
Top of Bank
C0
Q
Bz , o PIPE OUTLET 0° \ �Tuck Geotextile
�'
10
3�6°
�°
TABI LIZ
�
°
1.5' � � � a Minimum of lft
Channel Bed NC
I�P�
Geotextile*
�
E389°0
�
bL E D ETAI L
PROP D
STREAM
G N M E
Length
(Variable)
*Place Geotextile Under Rock
= 14 Ft. in Locations Directed by Enginee
p � p
B,M
-
p
/
�
8 °0
Type of Liner= Natural Rock - Keyed -In PIN
�
+--
�
BZ I
�
BZ 2
TRAY-7-NL
STA. 1 -L-
386°�
211
OVE
�p
p REMOVE
30" DP
N:748576.90'
r--
N
Bz '
E:2088933.03'
Q
�B\
U �'
H
A
38.01
I �
EL:383.74
z
— — — — —
C C
0
w
—
,,
W
--
--
/
Bz
EX I N G DA AGED
m
o
ZZ
-0 6�
a
E TO BE MOVED
� �—
—
Z
_
w HE WALL —
of
c
°
_
��
�� _
_
EX�OP— OF BANK
V) NCDOT 43.8.01
Q
C
W
P CE 48LF
RCP_
\
C
g
Q
B U �'
•o
cLu
ENDS
ti
O
�o
BZ'
O
N ,.
Q
Q
o
\\
D
a
2 `'�
P
F
\ F
— C —_
\ C
\\
C
V
Z U)
� —
ASPHAL E P ►—
LL_ w
O°
580
o
0),o
M
aQ`
o
/
TB /
W W
7 T
ZD
w0� ow
1 p
Y
_
F
Uj LU
C) Z U
.D
�a aU)=
DETAIL
\
oo
oo ,,
o �C
V Vj
1—
w tr LL�Lu
d LU w
o� Q M Q
r
Z O
- ASPHALT
PATH PAVEMENT REPAIR
\
s
a J � CD
Z �
( Not to Scale)
2—ASPHALT CONCRETE
\.\ °�
0L
0°08�.
J U
O Q
o
SURFACE COURSE, Type S9.513
'\
Z
\ \
o \�
0
0 a
f X X 6" AGGREGATE
\
6
H
m
LIMITS OF PIPE TRENCH
BASE COURSE
2
0
o
z
INCLUDE EXCAVATION
FOR REMOVAL OF
APPROVED SUITABLE
\
0°i6�
Z
w
o
EXISTING PIPE
BACKFILL MATERIAL
\
OZ6�
1
MATERIAL FOR
\�y { PIPE FOUNDATION
\\
BZ
\
0'00�_
0
X=MIN.3 FT.
W=PIPE TRENCH WIDTH;
*OR MATCH EXISTING
SEE NCDOT STD DWG 300.10 PAVEMENT THICKNESS
PRELIMINARY FLANS
Al IPE IN ACCOON NCED AS ALT RET SPECIOFICBE ONS PLETED 0°�0 2
IF1 A
DO NOT USE FOR CONSTRUCTION
PROFILE LEGEND
TRANSYSTEMS
Glenwood Avenue
Raleigh, INC 27603
395
PROPOSED THALWEG
395
l
�
EXISTING GROUND
Fax:919.789.959t
Fa:99.789.991
License: F-0453
�l
North Carolina Museum of Art
385
385
DATE: 1 /29/2024
r~
I
/
�
w
�0 U
/
w
Cn
—
joel—_
1Cn
0f o �
�OCL
_
\
�U)� z O
awe
375--
i
/
375
z2EN of
Quo
/
o �
r m
L
_ Cn O
_
Cn
Oa LU
LL
O Q
z
z
HORIZONTAL SCALE: 20:1
365
365
17+00
18+00
19+00
20+00
21 +00
22 +00
PLANSHEET
C-209
Y
00
d
d
Q
33 PG. 1361
��
z , 3�2° �o
CONCRETE DEBRI$- 3�
0
Lu
_ 1
TO BE REMOVE
co
JE RIDGE RD
�
36°90
�j��
BZ 2
0
ti
Bz S50
ti oo
j
,�\�' as
Bz
°
BZ7
BZ 1
°
s
°O
0
BZ1
C
37000
W
W
FS6
B 37 2 00
— —
O A O
O
+
D
e
>
W
N
N
rn C C F Q
♦/_
V J
—
O
°°°
—
°
O
S ° to
I"�
J
a
w
Q
z
Z
S
°S
F
°
°
W
rn rn
rn
oo
\
OS W
W
H
°UL
2 '
Z
—
to
zU)
lL w
°
LU
IV
+
LJJ
z z:)2
LLJ o LL
o
c,
N
O gL�
�'�'
S
H U) Of Lu N
p\�
O
O LLB
y
°°°y
BZ
< TRAY-B-NI L ��S
ez'
W O Z
a
�a ate=
o � w Lu
m
yy
o�
N :748477.63' o
e 7
z- C:) Of
Q o
�Bz °z��
E:2089320.58'
v
SS
0°6 f
EL:364.60'
o
°°
oo
B
Z 2
2
r
O P S
T
EX.
F
z
0�
0\
3°g�
S
U
06,
o
w
0
R P SE OP Or o°y�
3°6g
0°99�
O
16
PREI,IMINARY PLANS
DO NOT USE FOR CONSTRUCTION
PROFILE LEGEND
375
PROPOSED
THALWEG
375
TRANSYSTEMS
—
— — — — — —
— — — — — — — —
1 Glenwood Avenue
Raleigh, NC27603
GROUND
77
Tel:EXISTING
Fax:919.789.9591
Fax919.789.991
License: F-0453
n
—
North Carolina Museum of Art
365
3 65
—
—
DATE: 1 /29/2024
�
W
z
U
�OCn
I
'
w
U o
O
O�
\,co
awN Q
355
—
355
0�0
a4t a
ago
_"
ss000lo
U - m
_CnO
oa o
z w
w �
o a
z
z
HORIZONTAL SCALE: 20:1
345
345
22 + 00
23 + 00
24 + 00
25 + 00
26 + 00
27 + 00
PLANSHEET
C-210
Y
00
d
d
Q
3 00
o
P O PO E D
\'�
co
o° STREAM 366° �°
LIGNMENT `
ROP SED
TO A
36
\ \
�O,
\
\
ESTIM TED EDGE OF CD
�o 0
Z'
PATH NOT SURVEYED o
.° �s�o
\
m O D LAND TRAIL 3
0
D
36100
_
EX. RI P RAP
3 5
Ln
rn
�v �v TEMP RY
q
°
to ° °
��
\
` STREA RO
Lij
w
-
Can
END C STRUCT
--
Z w
(J STA. 8 + 13. 0
; - a°
OU
m
TRAY-9-
-
�
LU U- � o�
U LAL/
�Z
2.48
°5
�30
CoN:748
LU
of9714.65z
8
Q J� o z
EL:351.40
�
'CD
° ° a °aa�� °
Lj- LU J
��Off
m
0
� oo
�,�o
� ° f,
z d
U �
O
Q
o
O
E
'T
(Y
�3 O
N
. H
OCo
�a
2
}
z
U)
a
E
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
PROFILE LEGEND
375
PROPOSED THALWEG
375
TRANSYSTEMS
— — — — — — — — — — — — — —
—
1 Glenwood Avenue
Raleigh, NC27603
GROUND
77
Tel:EXISTING
Fax919.789.991
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
365
365
DATE: 1 /29/2024
Y
W
W
z
�O U
w
U) � o D
DOCS O
2
co CD O
�\
z
LU
z N
355
355
J
J CD}
�
°ate a
Quo D
o
U r m
=cn0
U
z
^
w
o Q
z
z
HORIZONTAL SCALE: 20:1
345
345
22 + 00
28 + 00
29 + 00
30 + 00
PLANSHEET
C-211
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-212
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-213
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-214
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-215
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-216
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-217
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-218
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-219
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-2 2 0
0 2.5 5 PROJ. REFERENCE NO. SHEET NO.
N CMA I C-2 21
EROSION
CONTROL NOTES
GENERAL NOTES
PROJECT SITE DETAILS:
DISTURBED AREA: 3.6 ACRES
RIVER BASIN: NEUSE; SUB —BASIN: CRABTREE CREEK
RECEIVING WATER: HOUSE CREEK (27-33-13, C;NSW)
REFER TO PLAN SHEET C-224 FOR SELECTED EROSION CONTROL DETAILS ANTICIPATED FOR THIS PROJECT.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2018 NCDOT STANDARD DRAWINGS AND SPECIFICATIONS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
ALL CONSTRUCTION SHALL COMPLY WITH THE APPLICABLE REGULATIONS SET FORTH BY THE NCG-010000 GENERAL
CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2019 AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES.
THIS EROSION CONTROL PLAN HAS BEEN ESTABLISHED IN A MANNER TO ALLOW ACCESS TO THE STREAM AND
FLOODPLAIN AT LOCATIONS SELECTED BY THE NORTH CAROLINA MUSEUM OF ART ADMINISTRATION.
LOCATION OF EROSION MEASURES MAY BE FIELD ADJUSTED AT DIRECTION OF THE ENGINEER TO ALLOW STREAM
CONSTRUCTION OPERATIONS TO PROCEED PROPERLY.
CONSTRUCTION SEQUENCE
1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS.
2. HOLD PRE —CONSTRUCTION CONFERENCE ACCORDING TO PROJECT CONTRACT DOCUMENTS.
3. INSTALL EROSION CONTROL MEASURES REQUIRED FOR THE PROPOSED CONSTRUCTION ACTIVITIES ACCORDING
TO EACH CONSTRUCTION PHASE.
4. A PUMP —AROUND SYSTEM IS REQUIRED WHEN WORKING IN THE LIVE STREAM. INSTALL IMPERVIOUS DIKES AT
AND DOWNSTREAM ENDS OF PUMP —AROUND LOCATIONS. THE PUMP —AROUND OPERATION SHALL BE PERFORMED
BETWEEN THESE DIKE LOCATIONS
5. DEWATERING FOR CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE PERFORMED
IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
6. CONSTRUCT THE PROPOSED IMPROVEMENTS AS SHOWN ON THE PLANS CORRESPONDING
TO THE CONSTRUCTION PHASES.
7. INSPECT THE EROSION CONTROL MEASURES WEEKLY AND AFTER EVERY RAINFALL. MAKE ANY NEEDED REPAIRS.
8. UPON COMPLETION OF WORK AND AT THE DIRECTION OF THE ENGINEER, REMOVE ALL TEMPORARY
EROSION CONTROL MEASURES.
9. THIS PLAN MAY BE MODIFIED WITHIN THE DELINEATED LIMITS OF CONSTRUCTION TO SUIT SITE SPECIFIC
CONDITIONS AT THE DISCRETION OF THE ENGINEER.
SEEDING REQUIREMENTS
ALSO SEE PLANTING PLAN — SHEET C-235
TEMPORARY SEEDING
APPROVED DATE
TYPE
PLANTING RATE LBS/ACRE
JAN 1 - MAY 1
RYE GRAIN (SECALE CEREALE)
120
GROUND AGRICULTURAL LIMESTONE
2,000
10-10-10 FERTILIZER
750
STRAW MULCH
4,000
MAY 1 - AUG 15
GERMAN MILLET (SETARIA ITALICA)
40
GROUND AGRICULTURAL LIMESTONE
2,000
10-10-10 FERTILIZER
750
STRAW MULCH
4,000
AUG 15 - DEC 30
RYE GRAIN (SECALE CEREALE)
120
GROUND AGRICULTURAL LIMESTONE
2,000
10-10-10 FERTILIZER
1,000
STRAW MULCH
4,000
W
H
Q
0
z
0
a
U
0
W
0
W
Of
W
J
a
0
aa
zU)
lL
w
O�
w
o
U
L.L
w
�/
w
C
O
Q C/)
U
Lu
=
I..1—
w
(DLL
U) LLJ N
U
U z U
a
J
�Oz
�a
ate=
w
IY
Q(D
0
Z
COL,
JwLU
m
i
O
Z
�o<
¢
J
U
U
of
OD
�z
0a
_
}
�
Co
o
J
O
z
U
(n
z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art I
DATE: 1 /29/2024
n
n
z
20
U
w
Cn
cwn
DOCS
D
O
Cn
z
2
O
z of N
J
\
IY w
a�0
0
H
_U)O
U
Oa
0
w
z w
2
O
a
z
z
HORIZONTAL SCALE: NTS
EROSION
CONTROL
PLANS
C-222
MINIMUM 10
LINE WIRES
K
OCA
NORTH
EFFECTIVE: 01 /31 /08
8'-0" MAXIMUM
FRONT VIEW
STEEL POST
-WOVEN WIRE FABRIC
-SILT FENCE FABRIC
I
FILL SLOPE
N
2f
5
'GRADE
8" MINIMUM COVER
o
OVER SKIRT •
N
ANCHOR SKIRT AS DIRECTED
BY ENGINEER
SIDE VIEW
IMUM 12-1 /2 GAUGE
ERMEDIATE WIRES
GRADE
MAINTENANCE NOTES:
1, INSPECT BAG AFTER EACH SIGNIFICANT RAINFALL OF 1 INCHES
OR GREATER, OVER A 24-HOUR PERIOQL. MAKE ANY REPAIRS
IMMEDIATELY,
2. INSPECT THE SILT FENCE TO BE SURE THE BOTTOM OF THE
3. GEOTEXTILE IS KEYED IN PROPERLY.
4• AT A MINIMUM, REMOVE AND DISPOSE OF ALL SILT
ACCUMULATIONS WHEN DEPTH REACHES 1/2 THE HEIGHT OF THE
GEOTEXTILE. DO NOT UNDERMINE THE FENCE DURING CLEANOUT-
5. DISPOSE OF SEDIMENT BY HAULING IT TO AN APPROVED WASTE
SITE WITH APPROPRIATE PERIMETER PROTECTION.
6. REMOVE AND REPLACE DETERIORATED OR CLOGGED SILT FENCE.
7• REPLACE SILT FENCE REMOVED FOR ACCESS AT THE END OF
EACH DAYS OPERATION.
8. INSTALL ADDITIONAL POSTS OR WIRE BACKING IF FENCE IS
SAGGING.
STANDARD TEMPORARY SILT FENCE
8' MAX.
VARIABLE AS DIRECTED BY THE ENGINEER
1 WIRE FENCE MIN. 10 GA.
RNING SIGN LINE WIRES
iRANGE, UV RESISTANT
IGH - TENSILE STRENGTH
OILY BARRICADE FABRIC (TYPICAL)
SIDE VIEW
_ II' POLY -BARRICADE FABRIC (TYPICAL)
FRONT VIEW
NOTE: FOR TREE PROTECTION ONLY
NOTES
1. TREE PROTECTION FENCING MUST BE INSTALLED AT A MINIMUM RADIUS OF THE CRITICAL ROOT ZONE
(SEE DETAIL TPP-02 FOR EXAMPLES)
2. THE TREE PROTECTION FENCING MUST REMAIN IN PLACE FOR THE DURATION OF THE PROJECT
UNLESS OTHERWISE APPROVED BY URBAN FORESTRY STAFF.
3. APPROVED IMPACT PROTECTION DEVICES MUST BE REMOVED AFTER CONSTRUCTION WHEN APPLICABLE.
4. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50'
ON CENTER FOR THE REMAINDER
5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTED AREA.
6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.
7. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH BASED ON ACTUAL FIELD CONDITIONS.
6. SIGNS ARE TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL WITH LETTERS A MINIMUM OF 2 1/2" HIGH, CLEARLY LEGIBLE
AND SPACED AS SHOWN.
AK
COUNT
NORTH CAROLIN,
EFFECTIVE: 01 /31 /08
IC OR
-IES
12-1/2 GA.
RMEDIATE
-S
3RADE
PROVIDE WARNING
LANGUAGE IN BOTH
ENGLISH AND SPANISH,
AS SHOWN
40"
TREE PROTECTION AREA
DO NOT ENTER
ZONA DE PROTECCION
PARA ARBOLES - NO ENTIRE
WARNING SIGN DETAIL
CONTACT INFORMATION:
CITY OF RALEIGH PARKS, RECREATION AND
CULTURAL RESOURCES DEPARTMENT
URBAN FORESTER:
TREES@RALEIGHNC.GOV
WWW. RALEIGH NC.GOV
EROSION
CONTROL DETAILS
GEOTEXTILE 1, PROVIDE STABILIZED OUTLET TO STREAM BANK,
2. WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS
DIRECTED, A SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO
ELEVATE THE ENTIRE FILTER BAG FOR DEWATERING ABOVE NATURAL GROUND.
MAINTENANCE NOTES
1, REPLACE AND DISPOSE OF FILTER BAG(S) WHEN IT IS FULL OF SEDIMENT
OR WHEN IT IS IMPRCTICAL FOR BAG TO FILTER SEDIMENT,
2, PROVIDE A SUFFICIENT QUANTITY OF FILTER BAGS TO CONTAIN SILT FROM
PUMPED EFFLUENT, INOT TO SCALE
STANDARD FILTER BAG FOR DEWATERING ACTIVITIES
1 LAYER OF WOVEN
GEOTEXTILE
(NOTE 8)
WOVEN GEOTEXTILE
APPROXIMATE EXISTING
GROUND SURFACE
TOP OF BANK
ORDINARY HIGH
WATER MARK (OHWM)
TOE OF BANK
WOVEI
G EOTEXTI L
Q
INSTALL STABL
APPROACI
RAMP/TIMBER MA'
(IF NECESSARY
TIMBER MATS
(NOTE 3)
SEE NOTE
CROSS-SECTION A -A'
PLAN VIEW
TOP OF
MUST BE
ABDN$ TI
THE WAS
STEEL FENCE PO
HIRE FENCE
HAROwARE CLOTH
FILTER OF
WASHED S
BURY WIRE FENCE AND HARDWARE CLOTH
COUNT
ORTTI CAROLK
EFFECTIVE: 01 /31 /08
12-IN. DIA. COMPOST
FILTER SOCK - SIDEBOARD
(NOTE 9)
DECKING
X FILTER FABRI(,
ON GROUND
6" OF UPPER EOGE OF
FABRIC IN TRENCH
SECTION VIEW
YN_ I SILT FENCE
AND HARDWARE
STEEL FENCE POST
CLOTH IN TRENCH
SET MAX 2' APART
WN. 18" INTO SOLIII[
GROUND
MAINTENANCE NOTES:
t• INSPECT THE DEVICE PERIODICALLY AND AFTER 1 INCH RAINFALL OVER 24
HOUR PERIOD FOR DAMAGE AND SEDIMENT ACCUMULATION TO CONFIRM THE
DEVICE IS FUNCTIONING PROPERLY,
2. AT A MINIMUM, REMOVE SEDIMENT FROM THE DEVICE WHEN
ACCUMULATIONS REACH ONE-HALF THE HEIGHT OF THE SEDIMENT CONTROL
STONE.
3. REPLACE OR CLEAN THE SEDIMENT CONTROL STONE AS NEEDED TO ALLOW
WATER TO DRAIN THROUGH THE DEVICE BETWEEN RAINFALL EVENTS.
4• REPAIR AREAS WHERE OUTLET BECOMES UNDERMINED DUE TO
CONCENTRATED FLOWS,
STANDARD SILT FENCE OUTLET
DECK WIDTH VARIES
BASED ON EQUIPMENT WIDTH
1 LAYER OF WOVEN
GEOTEXTILE
(NOTE 8)
RUNNER
ABUTMENT ----- --
2 LAYERS OF 12-OZ.
NON -WOVEN GEOTEXTILE 2 LAYERS OF 12-OZ.
(NOTE 7) NON -WOVEN GEOTEXTILE TIMBER MATS
(NOTE 7) (NOTE 3)
CROSS-SECTION B-B'
12-IN. DIA. COMPOST
FILTER SOCK - SIDEBOARD
(NOTE 9)
DECKING
RUNNER
ABUTMENT
GENERAL NOTES
1.
A PRE -FABRICATED BRIDGE OR FLATBED RAILCAR MAY BE SUBSTITUTED FOR THE TEMPORARY
CONSTRUCTION BRIDGE.
2.
INSTALL THE BRIDGE IN A MANNER THAT WILL MINIMIZE SEDIMENT FROM ENTERING SURFACE
WATERS.
:OMPOST 3.
BRIDGE MUST BE DESIGNED BY CONTRACTOR'S ENGINEER TO SUPPORT EXPECTED LOADS. RUNNERS
- SIDEBOARD
ARE TO BE INSTALLED AT OUTER EDGE OF BRIDGE DECKING HOOK HOLES.
4.
SECURELY ANCHOR BRIDGE AT ONE (1) END USING STEEL CABLE OR CHAIN.
5.
ABUTMENTS SHOULD BE PLACED PARALLEL TO, AND ON, STABLE GROUND SUCH THAT THE
S
STRUCTURE IS AT OR ABOVE TOP OF BANK TO PREVENT ENTRAPMENT OF FLOATING MATERIALS
AND DEBRIS.
- 6.
CONTRACTOR TO COVER HOOK HOLES AS NECESSARY TO PREVENT ACCUMULATION OF SEDIMENT
I
ON NON -WOVEN GEOTEXTILE. OWNER'S DESIGNATED ENVIRONMENTAL REPRESENTATIVE TO
APPROVE OF METHOD AND MATERIALS USED TO COVER HOOK HOLES PRIOR TO INSTALLATION.
A' 7.
INSTALL TWO (2) LAYERS OF 12-OZ. NON -WOVEN GEOTEXTILE.
8.
USE ONE (1) SACRIFICIAL LAYER OF WOVEN GEOTEXTILE ON THE BRIDGE "RUNNERS" TO PROTECT
THE NON -WOVEN GEOTEXTILE DURING THE TEMPORARY BRIDGE INSTALLATION.
9.
ALTERNATIVE MATERIALS MAY BE USED FOR SIDEBOARDS WITH APPROVAL, PRIOR TO
INSTALLATION, FROM OWNER'S DESIGNATED ENVIRONMENTAL REPRESENTATIVE.
10.
THE CONTRACTOR SHALL REMOVE SEDIMENT DEPOSITED ON BRIDGES PRIOR TO REMOVING
BRIDGE.
11.
REMOVE TEMPORARY EQUIPMENT BRIDGES IN AREAS WHERE TRAVEL LANE IS NO LONGER
-
REQUIRED.
12.
TEMPORARY EQUIPMENT BRIDGES SHALL BE REMOVED SLOWLY AND CAREFULLY TO MINIMIZE
)LES
SEDIMENT FALLING FROM THE BRIDGE DURING REMOVAL OPERATIONS.
13.
APPLY NATIVE RIPARIAN SEED AND COIR MATTING TO FORMER TEMPORARY EQUIPMENT BRIDGE
LOCATIONS WITHIN RIPARIAN SEEDING AREAS IN ACCORDANCE WITH THE NATIVE RIPARIAN AREA
SEEDING SPECIFICATIONS.
MAINTENANCE NOTES
1.
INSPECT AT LEAST ONCE PER SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS OF A RAIN EVENT
GREATER THAN OR EQUAL TO 1.0-IN. IN 24 HOURS.
2.
TEMPORARY BRIDGE WILL BE MAINTAINED IN A CONDITION THAT WILL PREVENT SEDIMENT FROM
ENTERING THE SURFACE WATERS.
3.
REMOVE SEDIMENT DEPOSITED ON BRIDGE AS NECESSARY.
TEMPORARY TIMBER BRIDGE
FOR STREAM CROSSING
w
0
>
w
Of
w
J
a
2�
OO
H
a
Z
U)
LL-
W
O
0
LU00
Uz ILL
w
Y
n/
LU
O�
U_
acne
_
LU
U) LU N
U
Of(~)
Z U
LUOz
aJ
a
OI_-=
LU
O�
aQo
0
J W J
m
J
O
Z
�oOf
¢
J
U
U
o
OD
�z
La
2
}
�
10�
m
o
J
O
z
U)
Z
Ui
w
0
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, INC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
1R
n
Z
�O
�
U
W
G7
U) o
DOS
O
U)
2
O�
Z N
J
>_
Of LU 4t
ago
o
z:)
U
_U)O
r
m
Of of U)
Oa
LU
uJ
Z LL
�
O
a
Z
Z
HORIZONTAL SCALE: NTS I
EROSION
CONTROL
PLANS
C-223
DIKE
PROVISIONS)
EXAMPLE OF PUMP -AROUND OPERATION
NOTES:
1) All excavation shall be performed in only dry or isolated
sections of channel.
2) Impervious dikes are to be used to isolate work from
stream flow when necessary.
3) All graded areas shall be stabilized within 24 hours.
4) Maintenance of stream flow operations shall be incidental
to the work. This includes polyethylene
sheeting, diversion pipes, pumps and hoses.
5) Pumps and hoses shall be of sufficicient size to dewater
the work area.
SPECIAL STILLING BASIN
(SEE PROJECT SPECIAL PROVISIONS)
Utilize a Stabilized Outlet Instead of
a Special Stilling Basin If Pumping
Clean Water
IMPERVIOUS
(SEE PROJECT SPECIAL
1
1
/
I
/
1
SPECIAL STILLING
(SEE PROJECT SPECIAL
DEWATERING PUMP
I �
I �
I �
IMPERVIOUS DIKE I 1
I I EXISTING
(SEE PROJECT SPECIAL PROVISIONS) 1 I STREAM
CHANNEL
I I
1
1 1
I 1
TEMPORARY ' 1
FLEXIBLE HOSE 1 1
1 1
1 I
I I
1 1
1 LOW 1
1 1
1 1
1 �
1 �
1
1 �
1 ♦`
1 �♦
I S1.
1 �
/
r
000 000 out*�
BASIN
PROVISIONS)
SEQUENCE OF CONSTRUCTION FOR TYPICAL WORK AREA
1. INSTALL SPECIAL STILLING BASIN(S).
2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE.
3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING
OPERATIONS FOR STREAM DIVERSION.
4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING
APPARATUS. DEWATER ENTRAPPED AREA. AREA TO BE DEWATERED SHALL
BE EQUAL TO ONE DAY'S WORK.
5. PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLANS.
6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL
OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND
TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM IMPERVIOUS DIKES FIRST).
7. ALL GRADING AND STABILIZATION MUST BE COMPLETED IN ONE DAY WITHIN
THE PUMP AROUND AREAS BETWEEN THE IMPERVIOUS DIKES.
THE IMPERVIOUS DIKE LOCATIONS AS SHOWN ON THIS SHEET ONLY SHOW THE
UPPER AND LOWER EXTENT OF WORK FOR EACH STREAM SEGMENT. THE
CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION
OF THE IMPERVIOUS DIKE(S) FOR EACH DAYS WORK.
8. REMOVE SPECIAL STILLING BASIN(S) AND BACKFILL. STABILIZE DISTURBED AREA
WITH SEED AND MULCH.
IMPERVIOUS DIKE
(SEE PROJECT SPECIAL PROVISIONS)
PUMP —AROUND PUMP mum
0]
W
U)
CO
CO
H
Q
0
Z
O
F
a
O
0
W
0
W
J
a
0
aa
z
CO
lL
o0f
w
o
L.L
w
C
O
�
0 (o �
U
Lu
=
I..1—
w
U) LLI N
U
U z 0
Q
J
LU0Z
a
Q
0�=
w
aQ-
0
Z:)
JwLU
m
ZJ
�si
¢O
�
o
:3U
(<
o
OD
z
0a
m
F
�
o
J
O
Z
U)
z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRG,NSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
Z
�O
U) o
ROCS
aw-
Z I)f CV
0 NCD
Qfw
a�0
U�—
_U)O
U)
0<
O
Y
w
w
U
w
W
D
O
O
rn
0
w
a
Z
Z
HORIZONTAL SCALE: NTS
EROSION
CONTROL
PLANS
C-223a
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCGO1 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Stabilize within this
Site Area Description
many calendar
Timeframe variations
days after ceasing
land disturbance
(a) Perimeter dikes,
swales, ditches, and
7
None
perimeter slopes
(b) High Quality Water
(HQW) Zones
7
None
(c) Slopes steeper than
If slopes are 10' or less in length and are
3:1
not steeper than 2:1, 14 days are
7
allowed
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
(d) Slopes 3:1 to 4:1
14
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
-7 days for perimeter dikes, swales,
(e) Areas with slopes
ditches, perimeter slopes and HQW Zones
flatter than 4:1
14
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
Temporary Stabilization
Permanent Stabilization
• Temporary grass seed covered with straw or
• Permanent grass seed covered with straw or
other mulches and tackifiers
other mulches and tackifiers
• Hydroseeding
• Geotextile fabrics such as permanent soil
• Rolled erosion control products with or
reinforcement matting
without temporary grass seed
• Hydroseeding
• Appropriately applied straw or other mulch
• Shrubs or other permanent plantings covered
• Plastic sheeting
with mulch
• Uniform and evenly distributed ground cover
sufficient to restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the
problem has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in
high foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
❑NSI TE CONCRETE WASHOUT
STRUCTURE WITH LINER
SANDBAGS (TYP_)
OR STAPLES
10 NIL
SILT rENCE 1-1 PLASiI SANDBAGS (TYP_)
SILT rEMCE_�
SIDE SL LINING OR STAPLES
(TYP_
CLEARLY MARKED SIGNAGE
CONCRETE NOTING DEVICE q$'%24' MIN-)
WA$FQIT
SECTION A -A
' U 1AL LOCATION DETERMINED IN :IELD
2- THE CONCRETE WASHOUT STRUCTURES SMALL
BE MAINTAINED WHEN THE LIQUID AND/OR
SOLID REACHES 752 Or THE STRUCTURES
CAPACITY_
3LONCRETE WASHOUT STRUCTURE NEEDS TO DE
CLEARY MARKED WITH SIGNAGE NOTING DEVICE -
BELOW GRADE WASHOUT STRUCTURE
NOT TO SCALE
fP)
ION
SANDBAGS (TYP_)
tcm&-
OR STAPLES
1_ ACTUAL LOCATION DETERMINED IN
rIELD
CLEARLY MARKED SIGNAGE
NOTING DEVICE CIO-X24- MIN)
2- THE CONCRETE WASHOUTT
F
STRUCTURES SHALL BE MAINTAINED
WHEN THE LIOUID AND/OR SOLID
REACHES 752 Or THE STRUCTURES
CAPACITY TO PROVIDE ADEQUATE
HOLDING CAPACITY WITH A MINIMUM
PLAN
12 INCHES Or rREEBOARD-
3CONCRETE WASHOUT STRUCTURE
NEEDS TO BE CLEARY MARKED WITH
SIGNAGE NOTING DEVICE -
ABOVE GRADE WASHOUT
STRUCTURE
NOT TO SCALE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING
EFFECTIVE: 04/01/19
W
0
Z
0
F
a
U
0
W
0
W
Of
W
J
¢
D
a
aa
z
lL LU
oQf
LU
o
U
LL
w
Y
LLI
C
O
Q (o �
U
Lu
I..1-
w
U)U)N
U
)LU
Z U
J
LU0Z
a
0�=
LU
IY
X U) 0
0
5
a W
m
o�
O
ZJ
�J
�
¢
o
:3U
U
of
00
�z
�a
m
�
o
J
o
Z
0
U)
z
U)
ri�
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRG,NSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
z
20
U) 0f o
�0CS
awl
Z ofCV
0 N
CD
of LU
a�0
U�-
=U)0
�U
� U)
0a
0
U)
z
J
C)
0
r
Y
w
w
U
w
W
D
0
o
a
m
0
w
a
z
z
HORIZONTAL SCALE: NTS
EROSION
CONTROL
PLANS
C-224
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF -INSPECTION
Self -inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to or
greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
Frequency
Inspect
(during normal
Inspection records must include:
business hours)
(1) Rain gauge
Daily
Daily rainfall amounts.
maintained in
If no daily rain gauge observations are made during weekend or
good working
holiday periods, and no individual -day rainfall information is
order
available, record the cumulative rain measurement for those un-
attended days (and this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
At least once per
1. Identification of the measures inspected,
Measures
7 calendar days
2. Date and time of the inspection,
and within 24
3. Name of the person performing the inspection,
hours of a rain
4. Indication of whether the measures were operating
event > 1.0 inch in
properly,
24 hours
5. Description of maintenance needs for the measure,
6. Description, evidence, and date of corrective actions taken.
(3) Stormwater
At least once per
1. Identification of the discharge outfalls inspected,
discharge
7 calendar days
2. Date and time of the inspection,
outfalls (SDOs)
and within 24
3. Name of the person performing the inspection,
hours of a rain
4. Evidence of indicators of stormwater pollution such as oil
event > 1.0 inch in
sheen, floating or suspended solids or discoloration,
24 hours
5. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
At least once per
If visible sedimentation is found outside site limits, then a record
site
7 calendar days
of the following shall be made:
and within 24
1. Actions taken to clean up or stabilize the sediment that has left
hours of a rain
the site limits,
event > 1.0 inch in
2. Description, evidence, and date of corrective actions taken, and
24 hours
3. An explanation as to the actions taken to control future
releases.
(5) Streams or
At least once per
If the stream or wetland has increased visible sedimentation or a
wetlands onsite
7 calendar days
stream has visible increased turbidity from the construction
or offsite
and within 24
activity, then a record of the following shall be made:
(where
hours of a rain
1. Description, evidence and date of corrective actions taken, and
accessible)
event > 1.0 inch in
2. Records of the required reports to the appropriate Division
24 hours
Regional Office per Part III, Section C, Item (2)(a) of this permit.
(6) Ground
After each phase
1. The phase of grading (installation of perimeter E&SC
stabilization
of grading
measures, clearing and grubbing, installation of storm
measures
drainage facilities, completion of all land -disturbing
activity, construction or redevelopment, permanent
ground cover).
2. Documentation that the required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
SECTION B: RECORDKEEPING
1. E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The
following items pertaining to the E&SC plan shall be kept on site and available for inspection
at all times during normal business hours.
Item to Document
Documentation Requirements
(a) Each E&SC measure has been installed
Initial and date each E&SC measure on a copy
and does not significantly deviate from the
of the approved E&SC plan or complete, date
locations, dimensions and relative elevations
and sign an inspection report that lists each
shown on the approved E&SC plan.
E&SC measure shown on the approved E&SC
plan. This documentation is required upon the
initial installation of the E&SC measures or if
the E&SC measures are modified after initial
installation.
(b) A phase of grading has been completed.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate completion of the
construction phase.
(c) Ground cover is located and installed
Initial and date a copy of the approved E&SC
in accordance with the approved E&SC
plan or complete, date and sign an inspection
plan.
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
Complete, date and sign an inspection report.
requirements for all E&SC measures
have been performed.
(e) Corrective actions have been taken
Initial and date a copy of the approved E&SC
to E&SC measures.
plan or complete, date and sign an inspection
report to indicate the completion of the
corrective action.
2. Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
3. Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).
Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with
the other requirements listed below. Occurrences outside normal business hours
may also be reported to the Department's Environmental Emergency Center
personnel at (800) 858-0368.
Occurrence
Reporting Timeframes (After Discovery) and Other Requirements
(a) Visible sediment
.
Within 24 hours, an oral or electronic notification.
deposition in a
•
Within 7 calendar days, a report that contrains a description of the
stream or wetland
sediment and actions taken to address the cause of the deposition.
Division staff may waive the requirement for a written report on a
case -by -case basis.
•
If the stream is named on the NC 3n_'Ud) list as impaired for sediment -
related causes, the permittee may be required to perform additional
monitoring, inspections or apply more stringent practices if staff
determine that additional requirements are needed to assure
compliance with the federal or state impaired -waters conditions.
(b) Oil spills and
.
Within 24 hours, an oral or electronic notification. The notification
release of
shall include information about the date, time, nature, volume and
hazardous
location of the spill or release.
substances per Item
1(b)-(c) above
(c) Anticipated
.
A report at least ten days before the date of the bypass, if possible.
bypasses [40 CFR
The report shall include an evaluation of the anticipated quality and
122.41(m)(3)]
effect of the bypass.
(d) Unanticipated
.
Within 24 hours, an oral or electronic notification.
bypasses [40 CFR
•
Within 7 calendar days, a report that includes an evaluation of the
122.41(m)(3)]
quality and effect of the bypass.
(e) Noncompliance
.
Within 24 hours, an oral or electronic notification.
with the conditions
•
Within 7 calendar days, a report that contrains a description of the
of this permit that
noncompliance, and its causes; the period of noncompliance,
may endanger
including exact dates and times, and if the noncompliance has not
health or the
been corrected, the anticipated time noncompliance is expected to
environment [40
continue; and steps taken or planned to reduce, eliminate, and
CFR 122.41(I)(7)]
prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6)].
•
Division staff may waive the requirement for a written report on a
case -by -case basis.
NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING
EFFECTIVE: 04/01/19
W
Q
0
z
0
a
U
0
W
0
W
Of
W
J
a
o
H
aa
Z
U)
lL w
00
w
o
L.L
LI..I
C
O
LL
Q (o
U
=
I..1-
w
Co
U)U)N
U
)LU
z U
Q
J
L O Z
0-
Q
O _
LIJ
IY
0
a
0
Z)
Q
Jw�
J
m
O
Z
�o�
¢
J
U
U
of
OD
Z
U
Q
F
m
o
J
O
z
U
U)
Z
U)
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRG,NSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
Z
�0
Uo
00CS
awl
Z I)f CV
0 N CD
Qfw
a�0
U�-
_ U) 0
U
� U)
0Q
Z ,L
0
U)
Z
J
0
0
r
Y
W
w
U
w
W
D
0
o
a
m
0
w
a
Z
Z
D
HORIZONTAL SCALE: NTS
EROSION
CONTROL
PLANS
C-224a
'G 8
64
G
0
Qo
0 Sq�
023 00
0 S��
O'000
0°Lo0 -
0 80�
z
0
a
U
0
W
0
W
of
W
J
a
a
aa
zU)
lL w
O(-)
w
o
L.L
w
C
O
0LL
C/)�
U
Lu
= I..1—
w
U) LLJ N
U
(~jzU
a
J
LUOz
x
w�
U)(D
0
Z
a W J
m
J
O
Z
�o<
�o
¢
J
U
U
of
OD
�z
�a
Co
o J
O
z (n
z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
4
North Carolina Museum of Art
DATE: 1 /29/2024
V
w
w
z
20 U
w
Cn
cwn�o D
DOCS O
co co z O
z Of N J
of w \ H
a�0 0
U r m
_U)O
oa 0
w z
w 2
o a
z
z
D
HORIZONTAL SCALE: 20:1
EROSION
CONTROL
PLANS
C-225
4�Jou \ \
434a0 �\
43200
430°o \
42200 � —
EX. P OF BANK
�✓0 0
;s oo�
°o
FENCING ARZSCTND WETLA
0
0
0
+ N
so N
U
N w
W =
Z N
J W
= W
U N
H
Y
00
d
d
Q
0]
W
U)
C0
n
01
z
O
a
U
0
W
0
W
of
W
J
a
a
aa
zU)
lL w
O(-)
w
o
L.L
w
C
Cl)
0 C/)
U
=
I..1—
w
'oLL
LLI N
U
U Z U
a
J
�Oz
a
a
03=
w
tY
aQ-
0
Z
JwLU
m
i
O
Z
�o<
¢
J
U
U
of
OD
�z
�a
_
}
F-
Co
o
J
O
z
(n
z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
4
North Carolina Museum of Art
DATE: 1 /29/2024
Y
w
w
z
�O U
w
Cn o D
DOCS O
Cn 2
co co z O
Uj
CD
W \ H
a�0 0 �
U r m
_Cj)O
U
oa 0
Z w
o a
z
z
HORIZONTAL SCALE: 20:1
EROSION
CONTROL
PLANS
C-226
412 Q
41L0
405.0
I'Ao ��3� Opt
0
LO
+ ,o
NO N
� N
Q U
V)
W
W W
z =
J N
= W
U W
H N
Q
O
i`-------------- — — — — — — — — — —__
00g0/ /-—-—-—-—-—-—-—-—-—-— - — - — -— — - — - — - - — - — - — - — - — -
406.0 405.0
/ 404D
40 -0
LUE
' TI TES EDGE O
0 TH SURVEYED —
r11 ITI CT
-- 40/00
40000 3970 00
SPIN
211 D-I
0
0
+ 00
N N
N N
�Q U
GO lw�
W I,Lj
UUjUj
Y
00
d
d
Q
0]
W
U)
C0
n
i
z
U
a
U
W
W
0
W
of
w
J
a
0
aa
zU)
LL.
w
00
w
Q
U
L.L
w
w
C
O
Q C/) �
U
Lu
=
I..1—
w
LLI N
U
(~jz0
a
J
LUOz
�
xU)(D
w
0
Z
a W J
m
J
O
Z
�o<
¢
J
U
U
of
00
�z
�a
Co
o
J
O
z
U)
z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
Y
w
w
z
20 U
w
U) D
D0CS 0
Cn 2
z 0
CD
w \ H
a�0 0 �
U r m
_Cj)0
U
0a 0
w z
w 2
0 a
z
z
HORIZONTAL SCALE: 20:1
EROSION
CONTROL
PLAN
C-227
\ \ Q)
ADO.QD
0
\ \'\ O
ESTIWAT EDGE O
SURVEYED
\ 375.0
-- N/F _ 38500 \ — ------ ------ 37goo ' Z
0]
W
U)
C0
W
H
Q
0
z
O
a
U
0
W
0
W
of
W
J
a
a
aa
zU)
lL w
O(-) w o
W
w LL
Y
U) a�� _
H w U) U
(~jzU
a J �Oz
a a 0�=
w IY aQ(D
0 Z Jw�
a~ Q M Q z 0
O zJ ��¢o
J U U Of
o
L0 OD
�z
+ 0%,
as
Co
I` N
_ }
� o J
O z Cn
N N ��
z U)W
Q U
N PRELIMINARY FLANS
WDO NOT USE FOR CONSTRUCTION
U.J LJJ
Z x
J
N TRANSYSTEMS
1 Glenwood Avenue
LU Raleigh, NC 27603
Tel:919.789.9977
U � F License:
F-04591
License: F-0453
North Carolina Museum of Art
00
DATE: 1 /29/2024
Y
w
w
z
20 U
w
Cn
cwn0fo D
DOCS O
2
z O
z 0� N J
w \ H
aOf0 0 D
U F-- r m
_U)O
U
Oa 0
z w
w 2
O a
z
z
HORIZONTAL SCALE: 20:1
CD.
EROSION
� \ CONTROL PLAN
C-228
)oo
\ — _ — — _ — _ — _ — _ _ _ ------- _ _ - /
o
SEE SHEET C-229A FOR
ADDITONAL STAGING AREA
Y
00
d
d
Q
0]
W
U)
C0
W
H
Q
0
Z
O
F
a
U
0
W
0
W
of
J
a
0
aa
zU)
lL w
OQf
w
o
U
w
�/
wL
C
O
0L.C/) �
U
Lu
=
w
LLI N
U
(~jzU
a
J
LU0z
a
a
0�=
LIJ
IY
Q (D
0
Z)
a
JwLU
m
J
O
Z
�o�
¢
J
U
U
o
OD
�z
�a
F
m
o
J
O
z
(n
z
U
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TR�NSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
4
North Carolina Museum of Art
DATE: 1 /29/2024
n
n
0
�
20
U
ILLJ
w
W
U) � o
ROCS
O
z
2
O
z of N
J
\
W
a�0
0
H
U ~
O
~1.-U)
-
m
00��
0<
0
w
z LL
O
a
z
z
HORIZONTAL SCALE: 20:1
EROSION
CONTROL
PLANS
C-229
/C�
66�
0
0
01)
Q0
03
cc
rq
/0C)
O
Cl)'
I
o�
�
\ S)
0
0
OD
0
0
0
C
O
O
0
CO
\�
o
co
TRAV-15-IRS IN CONC.
N:748157.96'
E:2089638.79'
EL:355.19'
QO
o vC
cc
O
0
o�
n
i
Z
O
F
a
U
0
W
0
W
of
W
J
a
a
aa
zU)
lL w
OQf
w
o
L.L
w
C
O
0 CIO �
U
= I..1—
w
LLI N
U
(~jzU
a
J
LU0z
a
a
0�=
w
IY
aQ(D
0
J LU J
m
J
O
Z
�o�
¢
J
U
U
o
OD
�z
�a
m
F
o J
O
z U)
z
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
4
North Carolina Museum of Art
DATE: 1 /29/2024
V
w
w
z
20 U
w
Cn
cwn�o D
DOCS O
Cn 2
co co z O
Uj
CD
w \ H
ago o �
U r m
_Cj)O
U
oa o
w z
w 2
O z
z
HORIZONTAL SCALE: 20:1
EROSION
CONTROL
PLANS
C-229a
7PT
rml MWa.in 1i
IV, IIVV.
'G 815
.'.1. 1361
-6489
DGE RD
TRAY-3-N L
N :748663.89'
E:2087707.55'
EL:458.48'
7PT
10TREE
8TREE
7TREE (D
0 7TREE
C- - — - — _ _ _ _ - _ - _ - _ ` — - _ _ _ - _ _ _ - — - — _ — _ — - —
EIP
\ \ TRAY-4-N L
\ N :748674.57'
\ \ E:2087937.95'
\ \ EL:429.95' \A
O \
0 \
10TREE
12TREE 8TREE
(D (D
7TREE
(D
6TREE
0 11TREE
0- \ \
\ \
� \ \,
rn \
6TREE
0
EIP C)
8TREE
07TREE
13TREE
ESTIMATED EDGE OF
PATH - NOT SURVEYED
9TREE TRIPLE
20PT
7TREE 0 13PT
12PT \
9PT 14PT S
13PT 12PT 8PT 7PT �Oa
8PT 7PT
10PT
10PT
12TREE
10TREE TRIPLE
13PT
11 PT 7TREE `s6'-
11 PT 12PT c5`
12PT W6PT 8PT 8PT 14PT 12PT 14PT `9� \
0 6TREE 15PT 7PT (D
"D
6PT 8PT
7PT
7TREE
6TREE
o
13PT 10PT 7TREE 10PT
6TREE 'c�
12PT 12PT O-
10PT 10PT 2
14PT 11PT 15PT
10PT (D 7TREE
7TREE 12PT
(D 9TREE 7TREE
8TREE C)
10TREE
PT
N/F
STATE OF
NORTH CAROLINA
B.M. 2018, PG. 1361
PIN 0785-31-6741
2110 BLUE RIDGE RD
0
6TREE
0
i rr+r�ir�
0 TREE TREES TO BE REMOVED
l mrzE I KEEb I v mr-MAIN
22TREE (D
I
PT
/ - 2TREE 16PT / O
c W
20TREE C)
41
10TREE TRIPLE
(D
/
14TREE 0.16TRE-t DBL
6T E c0 (7
/ / TB
7TREE16
?8T EE
26PT1-1
0
24PT 20TR 1
22PT-
0
i is I Ktc . 26PT 0 17TREE DBL
16TREE
A� 26PT 15T
0
13TRE
12TREE
(D
7TREE
16TREE TB
6TREE
0
10TREE
-0
Ileo
7TR1
3 2 P T
15TREE
0 6TREE
8PT
11 PT 8TRE BL
14PT
15PT 9PT gTREE
0 12PT 9PT
(D 15TREE
15PT 15PT 15PT
11PT O
12QR (D
�IQ)
41
PT
15TREE 41ti
08TREE
/3AR
TREE REMOVAL TABLE
TREE
DESCRIPTION
LOCATION
STA. LT/RT
N:
E:
16PT
11+35 LT
748568.4433
2088048.1320
16TREE DBL
11+63 LT
748587.7019
2088070.5825
28PT
11+76 RT
748581.9292
2088087.2663
6TR1
0]
W
U)
C0
W
H
Q
0
>
W
Of
Lu
W
J
a
Z
U)
lL w
00
w
o
U
L.L
W
Y
w
C
O
Q (0 �
U
=
�/
I..—
w
0, L U) N
U
Of
UZU
a
J
�oz
�U11
w�
0
D
awW
m
O
Z
J
�CD�
�o
�
—j
U
U
o
OD
Z
La
z:
m
o
J
O
z
U)
Z
uj
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
AE
North Carolina Museum of Art
DATE: 1 /29/2024
n
n
z
�O
U
w
cw0fo n
DOCS
D
O
z
2
O
Uj
Z N
J
�
CD
0 N
<
\
w �
a�0
0
H
U
_U)O
-
m
U
Oa
0
w
z w
2
O
a
z
z
HORIZONTAL SCALE: 20:1
TREE
REMOVAL
PLAN
C-230
3 16TREE
r
18TREE��
6TREE
10TREE
\
— _ — _ — _ _ _ — _ — _ _ _ — _ — _ _ _ — _ — _ _ _ — _ —
i
------------------
ESTIMATED EDGE OF
PATH - NOT SURVEYED
r312TREE
8TREES:>"\
1) 17TREE
o4
C),20TREE 14TREE
15TREE10TREE
_ _ C) 28TREE
\ C)" 8TRE�6, ,9,M
13PT 12PT 0 6TREE 6TREE J
12TREE DBL \ �� \ ) 11 TREE 18TREE
8TREE
—WLB— — — — — — — — — — — —
� � \ 14PT ���'�
C3-1)
-- - TB 14PT 6TREE 14TREE
i
c 12TREE F11 TREE
0TREE � —� —----------
1 /
I Q,13TREE TB 6�
6TREE _ T --� --- — �s� Q,��
O/ F EE Tg TREED_-eREE-----------------
0 14TREE Tg TB 12TREE
m
8TREE , Tg, 1 E 10TREE (-)
0
6TREE 13TREE �; — F 12TREE
13TREE 18TREE 10TREE DBLL� \ 20PT
TB - 12TREE
=� 24PT c15TREE
— $SEE
cj
� 10TREE
0
�W\73 — TB
C12TREE '� 11TREE 10TREE r � 12TREE N/F
j B 12TREE
�� 13TREE 10TREE 15TREE
STATE OF
NORTH CAROLINA
13PT 1OPT 13TREE 8TREE Cj 8TREE
B.M. 2018, PG. 1361
_, � 301-T L ' 18PT (��� 15PT
�9 w
TREE REMOVAL TABLE
TREE
DESCRIPTION
LOCATION
STA. LT/RT
N:
E:
8TREE
12+61 LT
784641.9134
2088157.9793
8TREE
13+71 RT
748555.0873
2088233.6778
10TREE
13+90 RT
748541.1763
2088249.0645
6TREE
13+91 LT
748558.5218
2088260.3140
6TREE DBL
13+96 LT
748555.7742
2088262.6939
20PT
14+07 RT
748534.2562
2088266.3750
15TREE
14+38 RT
748526.7346
2088301.5223
8TREE
14+44 RT
748525.6699
2088308.1127
7TREE
15+24 LT
748557.0934
2088383.1941
PIN 0785-31-6741
2110 BLUE RIDGE RD
0 TREE TREES TO BE REMOVED
C) TREE TREES TO REMAIN
No
■■
c/i
W
z
J
MT
E
0]
W
U)
C0
W
H
Q
0
z
O
F
a
U
W
0
W
of
W
J
a
a
aa
zU)
lL w
OQf
w
o
U
LL
w
�/
w
C
O
0 C/) �
U
Lu
=
w
LU N
U
U z U
a
J
LUOz
a
a
0=
LIJ
IY
x Cn CD
0
a LU J
m
O
Z
j
�o�
¢
J
U
U
o
OD
�z
�a
m
F
o
J
O
z
U
U)
z
U)
W
0
(� PRELIMINARY FLANS
MDO NOT USE FOR CONSTRUCTION
N
V TRG,NSYSTEMS
1 Glenwood Avenue
Raleigh, NC 903
Te1:919.78789.9.9977
F 5
WLicense: F-0453
W
WNorth Carolina Museum of Art
W
N DATE: 1 /29/2024
z
20
U) 0f o
ROCS
awl
z of CV
0 N CD
of W
ago
U�—
_U)O
U
� U)
Oa
z ,L
O
U)
z
8-1
O
0
r
Y
W
W
U
w
W
O
O
a
H
m
LY
C)
w
a
z
z
HORIZONTAL SCALE: 20:1
TREE
REMOVAL
PLAN
C-231
O
10TREE
LO 13TREE C)
7M�
r
11TREE / J
/
N
� I /
Q U '
wte� i
C.) 8TREE
c
W ----81 MTFfi EE
LU LJJ ---=
X1TRE ---
z C
J
W c
U w
V) 12TREE
Q12TREE 18PT
12TREE
15TREE
---------- --- ------------------
``------------------------------------------------_-
ESTIMATED EDGE OF
/TRAV-6-NL PATH — NOT SURVEYED
N :748605.30'
i
E:2088616.26'
EL:394.64'
i
0 7TREE
7/TREE
c
�J 14TREE
8TREE
14TREE
j C 7TREE
10TREE TRIPLE
16TREE
'x 24TREE
TB 15TREE
8TREE
C TB _ -C
TREE4RIPLE — —
TREE REMOVAL TABLE
TREE
DESCRIPTION
LOCATION
STA. LT/RT
N:
E:
X1TREE
16+90 RT
748559.9633
2088548.4703
X2TREE
16+93 LT
748570.6198
2088551.7233
12TREE TRIPLE
17+58 RT
748552.9778
2088613.8784
7TREE
17+67 RT
748542.6061
2088617.0515
11TREE
17+70 RT
748545.2207
2088623.0244
X3TREE
17+95 LT
748542.9212
2088648.7875
12TREE
17+93 RT
748528.1673
2088643.4277
X4TREE
19+77 RT
748489.9752
2088807.7980
12TREE CLUMPX
20+05 LT
748496.5518
2088835.5358
LEGEND NOF
0 TREE TREES TO BE REMOVED
TREE TREES TO REMAIN
� TB
F
8TREE 18PT
y v 9TREE 13TREE
9,� \ 15TREE )
_ c 3 0 P T
\c
+2TREE—
�y c F
C-) T
\E � X3
Z�
B.M.
PIN
2110 E
10TREE
1:
32TREE �
27PT �� �� i
8TREE a' \� y �� 9TREE i
� �'� �� 20TREE
� 10TREE F V c c 38TREEs
� \ F 1 -REE CL U ICI PX� �� C�
14PT�c ---C / B
\_ X4TRE
6TREE 12TREE-
12TREE
(12TREE �' TREE
s
42TREE
8TREE C ° '0
I 0 10TREE 13TREE
15TREE
0
0
N
N
Q
B � /
F
m
36TREE /c
26TREE
7TREE � F
� 7TREE F--t-TF�EE
30TREE � �
35TREE ___----�
28TREE 28T 7TREE 28TREE
30TREE 24TREE
�``� � � � 22TREE
3 �' � � �=
24TREE �s 8TREE �26TREE
Cl) 30TREE C),
�� 7TREE
7TREE CLUMPX4 14TREE
M
M
N
U
W
W
Uj
Uj
0]
W
U)
C0
W
H
Q
0
z
O
F
a
U
0
W
0
W
of
W
J
a
a
aa
zU)
LL
LU
O
Qf
w
Q
�
Y
LLI
Cl)aco
U
LU
Ll l
� LU N
U
U z U
a
J
w0z
x
LLI
IY
U)
0
IL a W J
m
O
Z
J
�gof
J
U
U
o
OD
�z
�a
m
F
o
J
O
z
U
U)
z
U)
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art I
DATE: 1 /29/2024
n
n
z
�O
U
ILLJ
LU
W
U) o
ROCS
O
z
2
O
z C)f N
J
�
of
ago
o
�
::)
U �
_U)O
r
m
U)
oa
o
LU
z LL
2
o
a
z
z
HORIZONTAL SCALE: 20:1
TREE
REMOVAL
PLAN
C-232
N/F --------
STATE OF _
NORTH r.ARnI INA --� - —
M. 2018) PG. 1361
)IN 0785-31-6741
BLUE RIDGE RD
24TREE
15TREE
14TREE
16TREE 10TREE
�24TREE
8TREE
F
rn REE 0 16TREE
cn CNN
7TREE 10PT
7JV
11TREE 11TREE C�
s
9TREE C—It
11TREE CJ 7TREE
C)" 8TREE
1C 11TREE 24TREE 13TREEr
J
— _ 26TREE 21 TREE
— — 3 30TREE
CY� 15TREE
F
rn r
Z \� � F �
��TREE � �
rn X THE /C
y � 7 20TREE
C X6TREE
F 12T�EE' � �%
� —' � °� 7TREE
Z�
ESTIMATED EDGE OF
PATH - NOT SURVEYED
9TREE C") 8TREE
7TREE 10TREE C) 8TREE 48TREE
7TREE
Y
�
\
m
\
d
'\
Q
0]
Lu
co
co
16TREE 18TREE
10TREE 15TREE 8TREE
O ���� a 13TREE
CD
8TREE 14TREE
14TREE F F
C'
24� 24TREE
12TREE
12TREE 8TREE 22TREE
° 10TREE \ _ _
F _ F
22TREE
ti
� j APT 11TREE
45TREE \
/ F
/
/
s
26TREE 12TREE7TREE
, 20TREE 20TREE °
—
REE k��)TA�EE F 10TREE 28TREE °�'012TREE
18TREE
22TREE 0 �� 20TREE 22TREE 32TREE
� 48TREE
30TREE
� �; 10TREE
s3 18TREE 14TREE
22TREE 15TREE 28TREE
28TREE
r 10TREE 10TREE
Cj 24TREE 28TREE
28TREE 10TREEC-')"14TREE
QJ '
) 16TREE DBL
�
13TREE20TREE
Cj, �ti'
20TREE
� 36TREE
TREE REMOVAL TABLE
TREE
DESCRIPTION
LOCATION
STA. LT/RT
N:
E:
8TREE
22+19 LT
748497.5473
2089038.0448
X5TREE
22+53 LT
748488.9564
2089062.1228
X5TREE
22+70 RT
748487.7313
2089084.8941
X6TREE
23+92 LT
748504.6902
2089179.8900
8TREE
27+36 RT
748476.0891
2089490.7503
\ .j 16TREE M
F \ ��° 7TREE N N
i
2
F 6TREE s3
\ � F _ _ F-
\ V
W
`\ 8TRE W
7TREE CL) 7TREE � 18TREE
C,
v Z MOM
24TREE
22TREE 10TRI
22TREE 18TREE
W
U
iW107 Ln
8TREE rL 8TREE
0 TREE TREES TO BE REMOVED
tiff TREE TREES TO REMAIN
W
H
Q
0
z
0
a
U
0
W
0
W
of
W
J
a
D
0
z
U)
LL w
O
Qf
w
o
U
L.L
w
�/
w
C
O
0(�Co
U
=
I..1—
w
LLI N
U
U z U
a
J
LuOz
x
w
IY
U) (D
0
5a
L J
m
O
Z
J
�oOf
¢
J
U
U
o
OD
z
La
m
�
o
J
O
z
U
U)
z
U)
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
AE
North Carolina Museum of Art
DATE: 1 /29/2024
n
n
z
20
U
w
Cn
cwn
DOCS
D
O
co CD
z
2
O
z NCD
J
\
w �
ago
o
H
�
U
_U)O
r
m
U
Oa
o
LU
z w
2
O
a
z
z
HORIZONTAL SCALE: 20:1
TREE
PROTECTION
FENCE
C-233
--_- _ _ _ - _ --
---------------------------1 _
\ LEGEND
\ \ 0 TREE TREES TO BE REMOVED
\ \ TREE TREES TO REMAIN
REE \ \
3 17TREE \ `\ ESTIMATED EDGE OF
Bz , 12TREE \v v PATH — NOT SURVEYED
C-') 17TRE ez V v N
2 \ \ m
rn
15TREE \'\ \
M = 82 \,
r F 7TREE \ \
M M TB \C \,\ TEMPORARY
I'1'I 3TREE \ \ STREAM CROSSING
\ 12 EE3 10
14T\REE 3
\ \
20TREE l 0 16T E \ 12TREE
�
ti \
TREE �,� 20 EE "� c�� ,\ �
18TREE TB
m
i
N / ly
18TREE N�-
% \ i
v 20TREE 12TREE \
z 24TREE�
; 20TR
FREE 34TREE T� TRAY-9- 14 R 3 18TREE
�s�
N :748 42 2UTREE -0
18TREE j 9T RE 9714.65 22TREE
% B
C-"
B � 12TREE 14 :351.40' 6TREE m
18TREE 7TREE
� 10TREE
TB
� 10TREE 13TREEGo le
TB
12TREE �)
� C 19TREE
20TREE(—" 8TREE m °
TB 7TRifE
m
48TREE 6TREE �✓ Te Te a
re
7TREE 14TREE
9TREE
9
0 �
a
a
a a i
Qi
i
a
0]
W
D
U)
W
H
Q
0
Z
O
F
a
U
0
W
0
W
of
W
J
a
D
a
zU)
lL W
OQf
w
o
L.L
W
C
O
Q C/) C)
U
=
W
U) LLI N
U
U Z U
a
J
�Oz
a
0 T-
LLJ
OY
0
a LU J
m
O
Z
J
Z)U
E-�
J
o
OD
�z
�a
F
m
o
J
O
z
U�
(n
z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
tQ dQ
H�
North Carolina Museum of Art I
DATE: 1 /29/2024
n
n
z
20
U
W
(n o
D 0�
D
O
coCD
Cn
z
_
O
------____
aW�
Z � N
J
}
\
W �
ago
o
H
�
U
_U)O
r
m
U
Oa
o
W
Z IL
2
O
a
HORIZONTAL SCALE: 20:1
TREE
REMOVAL
PLAN
C-234
PLANTING REQUIREMENTS
PLANTING ZONE 1
Bare Root Plantings
Proposed Spacing 10' x 10' (435 stems per acre)
Species
Common Name
Size
Stratum
Composition %
Indicator
Aesculus s Ivatica
Painted buckeye
0.25" - 1.0"
Subcanopy
5
FAC
Asimina triloba
Pawpaw
0.25" - 1.0"
Shrub
10
FAC
Betula nigra
River birch
0.25" - 1.0"
Canopy
15
FACW
Car inus caroliniana
American hornbeam
0.25" - 1.0"
Subcanopy
10
FAC
Corpus amomum
Silky dogwood
0.25" - 1.0"
Shrub
5
FACW
Corylus cornuta
Beaked hazelnut
0.25" - 1.0"
Subcanopy
5
FACU
Euonymus americana
American strawberry bush
0.25" - 1.0"
Shrub
5
FAC
Amelanchier arborea
Serviceberr
0.25" - 1.0"
Subcanopy
10
FAC
Lindera benzoin
S icebush
0.25" - 1.0"
Shrub
5
FAC
Platanus occidentalis
Sycamore
0.25" - 1.0"
Canopy
10
FACW
Ulmus americana
American elm
0.25" - 1.0"
Canopy
15
FACW
Viburnum nudum
Possumhaw
0.25" - 1.0"
IShrub
15
JOBL
PLANTING ZONES 1 AND 1A
Herbaceous - 1 gallon container
Proposed Spacing 10' x 10' 435 stems per acre
Species
Common Name
Composition %
Indicator
Phe o teris hexa ono tera
Broad Beech Fern
10
FAC
Osmundastrum cinnamomeum
Cinnamon Fern
15
FACW
Sceptridium dissectum
Cut Leaf Grape Fern
10
FAC
Woodwardia areolata
Netted Chain Fern
15
FACW
Adiantum pedatum
Northern Maidenhair Fern
10
FACW
Onoclea sensibilis
Sensitive Fern
15
FACW
Saururus cernuus
Lizards Tail
5
OBL
Lobelia cardinalis
Cardinal Flower
10
FACW
Carex lu ulina
Hop Sedge
15
OBL
Carex frankii
Frank's Sedge
15
OBL
PLANTING ZONE 2
Bare Root Plantings
Proposed Spacing 10' x 10' (435 stems per acre)
Species
Common Name
Size
Stratum
Composition (%)
Indicator
Aesculus sylvatica
Painted buckeye
0.25" - 1.0"
Shrub
5
FAC
Betula nigra
River birch
0.25" - 1.0"
Canopy
10
FACW
Car inus caroliniana
American hornbeam
0.25" - 1.0"
Subcanopy
5
FAC
Carya ovata
Shagbark hickory
0.25" - 1.0"
Canopy
5
FACU
Celtis laevigata
Hackberr
0.25" - 1.0"
Canopy
5
FACW
Cornus florida
Flowering dogwood
0.25" - 1.0"
Subcanopy
10
FACU
Corylus cornuta
Beaked hazelnut
0.25" - 1.0"
5
FACU
Euonymus americana
American strawberry bush
_Subcanopy
0.25" - 1.0"
Shrub
5
FAC
Rhus aromatica
Fragrant sumac
0.25" - 1.0"
Shrub
5
UPL
Magnolia vir iniana
Sweetba
0.25" - 1.0"
Subcanopy
5
FACW
Ju lans nigra
Black walnut
0.25" - 1.0"
Canopy
5
FACU
Lindera benzoin
S icebush
0.25" - 1.0"
Shrub
5
FAC
Platanus occidentalis
Sycamore
0.25" - 1.0"
Canopy
5
FACW
Quercus falcata
Southern red oak
0.25" - 1.0"
Canopy
15
FACU
Rhus glabra
Smooth sumac
0.25" - 1.0"
Shrub
5
UPL
Rhus copallinum
1winged sumac
0.25" - 1.0"
IShrub
15
FACU
PLANTING ZONE 1A
5 gallon containers
Proposed Spacing 15' x 15' (193 stems per acre)
Species
Common Name
Stratum
Composition %
Indicator
Betula nigra
River birch
Canopy
20
FACW
Callicarpa americana
American beautyberry
Shrub
5
FACU
Carpinus caroliniana
American hornbeam
Subcanopy
5
FAC
Corpus amomum
Silky dogwood
Shrub
10
FACW
Euonymus americana
American strawberry bush
Shrub
5
FAC
Magnolia virginiana
Sweet -bay
Subcanopy
15
FACW
Lindera benzoin
S icebush
Shrub
10
FAC
Platanus occidentalis
Sycamore
Canopy
15
FACW
Ulmus americana
American elm
Canopy
15
FACW
PLANTING ZONES 2 AND 2A
Herbaceous 1 gallon container
Proposed Spacing 10' x 10' (435 stems
per acre)
Species
Common Name
Composition %
Indicator
Phe o teris hexa ono tera
Broad beech fern
30
FAC
Polystichum acrostichoides
Christmas fern
50
FACU
Osmundastrum cinnamomeum
Cinnamom fern
110
FACW
Woodwardia areolata
Netted chain fern
110
FACW
PLANTING ZONE 2A
5 gallon containers
Proposed Spacing 15' x 15' (193 stems per acre)
Species
Common Name
Stratum
Composition (%)
Indicator
Betula nigra
River birch
Canopy
10
FACW
Car inus caroliniana
American hornbeam
Subcanopy
10
FAC
Cornus florida
Flowering dogwood
Subcanopy
10
FACU
Euonymus americana
American strawberry bush
Shrub
5
FAC
Rhus aromatica
Fragrant sumac*
Shrub
5
UPL
Cornus alba
Red osier dogwood
Subcanopy
10
FACW
Callicar a americana
American beauty berry
Shrub
5
FACU
Cornus racemosa
Gray dogwood
Subcanopy
5
FAC
Leucothoe fontanesiana
Highland do hobble
Shrub
20
FACW
Rhus glabra
Smooth sumac*
Shrub
5
UPL
Ulmus americana
American elm
Canopy
10
FACW
Rhus copallinum
Winged sumac*
Shrub
5
FACU
* one gallon container
SEEDING REQUIREMENTS
Permanent Herbaceous Seeding - Zones 1, 1A, 2 and 2A
Application
Rate 20 Pounds per Acre
Species
Common Name
Composition (%)
Indicator
Asclepias incarnate
Swamp Milkweed
0.50%
OBL
Carex vulpinoidea
Fox Sedge
2.00%
OBL
Carex lupulina
Hop Sedge
0.30%
OBL
Carex frankii
Frank's Sedge
0.30%
OBL
Chamaecrista fasciculata
Partridge Pea
3.00%
FACU
Chasmanthium latifolium
River Oats
5.00%
FACU
Conoclinium coelestinum
Blue Mist Flower
0.50%
FAC
Coreopsis lanceolate
Lanceleaf Coreopsis
1.00%
FACU
Elymus hystrix
Eastern Bottle -Brush Grass
0.30%
UPL
Elymus virginicus
Virginia Wildrye
20.00%
FACW
Helianthus angustifolius
Narrowleaf Sunflower
0.20%
FACW
Impatiens capensis
Jewelweed
1.00%
FACW
Juncus effusus
Soft Rush
0.50%
FACW
Lobelia cardinalis
Cardinal Flower
0.50%
FACW
Lobelia siphilitica
Great Blue Lobelia
0.50%
FACW
Panicum anceps
Beaked Panicgrass
10.00%
FAC
Panicum rigidulum
Redtop Panicgrass
5.00%
FACW
Panicum virgatum
Switchgrass
20.00%
FAC
Rudbeckia hirta
Blackeyed Susan
2.00%
FACU
Smallanthus uvedalia
Bear's Foot
0.20%
NI
Sorghastrum nutans
Indiangrass
27.00%
FACU
Ir Tradescantia ohiensis
Ohio Spiderwort
10.20%
FAC
Stream Banks
Live Stakes
Proposed S acing 3' x 4' 3,630 stems per acre
Species
Common Name
Composition (%)
Indicator
Sambucus canadensis
Elderberry
30
FAC
Salix nigra
Black willow
10
OBL
Salix sericea
Silkywillow
20
OBL
Corpus amomum
ISilky dogwood
40
1 FACW
Permanent Herbaceous Seeding - Zones 3
Application Rate 20 Pounds per Acre
Species
Common Name
Composition (%)
Indicator
Achillea millefolium
Yarrow
0.30%
FACU
Asclepias tuberosa
Butterfly Milkweed
0.80%
NI
Baptisia albescens
Spiked Wild Indigo
0.10%
NI
Baptisia australis
Blue False Indigo
0.30%
FACU
Bouteloua curtipendula
Side Oats Grama
0.30%
NI
Chamaecrista fasciculata
Partridge Pea
1.00%
FACU
Chamaecrista nictitans
Sensitive Pea
0.70%
FACU
Coreopsis lanceolate
Lanceleaf Coreopsis
3.00%
FACU
Elymus virginicus
Virginia Wildrye
18.50%
FACW
Eragrostis spectabilis
Purple Lovegrass
0.50%
UPL
Heliopsis helianthoides
Oxeye Sunflower
2.00%
FACU
Monarda fistulosa
Wild Bergamot
1.30%
UPL
Penstemon digitalis
Tall White Beardtongue
0.30%
FAC
Penstemon laevigatus
Appalachian Beardtongue
0.20%
FACU
Pycnanthemum tenuifolium
Narrowleaf Mountainmint
0.80%
FACW
Rudbeckia hirta
Blackeyed Susan
3.00%
FACU
Schizachyrium scoparium
Little Bluestem
65.60%
FACU
Solidago nemoralis
Gray Goldenrod
0.40%
NI
Solidago odors
Licorice Scented Goldenrod
0.10%
NI
Tradescantia ohiensis
Ohio Spiderwort
0.80%
FAC
Temporary Seeding
Pure Live Seed
Approved Dates
Species Name
Common Name
Stratum
Density
(lbs/ac)
Aug 15 - May 1
Secale cereale
Rye grain
Herb
120
May 1 - Aug 15
Setaria italics
German millet
Herb
40
►O NOT REMO
MU LC
�xJ
DO NOT PLACE MULCH WITHIN
OF TRUNK OR STEM.. .
*EXACT LEN
WITHIN INI
RANGE TO
DETERMINE[
ENGINEER I
FIELD
F_
�o
i
*4 1
00
"' "'r "',MAGED BRAN(-
TREE OR SHRUB
J " OF ROOT
ABOVE GRADE
RETENTION RIP
FINISH GRADE
APACT BACKFILL
OIL AT BOTTOM C
MIN. OF 4"
PLANT HOLE WIDTH (X) TO BI
THE ROOT BALL SIZE OR CON IAINtK
DIAMETER.
2"
MULCH DETAIL
STAKING DETAIL
(TREES 6'-101
USE AS DIRECTED BY FIELD ENGINEER
X
NYLON STRAPPING
1/A" WC)Or)FN STAKF
TREE OR SHRUB PLANTING DETAIL TREE OR SHRUB PLANTING DETAIL
(LEVEL GROUND)
(SLOPING GROUND)
W
Q
0
z
0
a
U
0
W
0
W
Of
W
J
a
0
aa
zU)
LL
w
OQf
w
o
U
LL
w
w
C
Cl)
0(/)C)
U
Lu
I..1-
w
LLI N
U
U z U
Q
J
LUoz
a
0
wO�
d LU J
m
O
Z
J
�o�
¢
J
U
U
o
OD
�z
0a
2
}
F
m
o
J
O
z
U
(n
z
Lu
W
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art I
DATE: 1 /29/2024
n
n
z
�O
U
w
Cn
cwn0fo
Do
D
O
z
2
O
z 0fj N
J
CD
0w4t
Quo
o
= v, O
U
~
Oa
o
w
zw
O
Q
z
z
D
NTS
PLANTING
PLAN
C-235
\ -
— - — - — - — - — - — - — --
EIP
If
--
TRAV-5-N L
N:748732.22'
E:2088231.17'
EL:422.10'
/
/
ESTIMATED EDGE OF - — - — - — —
PATH — NOT SURVEYED
j�
ZONE\ 1
LLL
ZONE 2
ZONE 3
0=�/'
ZONE lA
7777
ZONE 2A
THE OWNER WILL DIRECT THE PLANTING IN ZONES lA AND 2A BY INSTALLING PIN FLAGS
LABELED WITH PLANT COMMON NAME AND CONTAINER SIZE. CONTRACTOR TO PROVIDE
A MINIMUM OF TWO WEEKS NOTICE PRIOR TO BEGINNING PLANTING IN ZONES lA AND 2A
TO ALLOW INSTALLATION OF PIN FLAGS
0]
W
U)
C0
W
H
0
z
O
F
a
U
U)
W
0
J
lY
H
a
ZU)
LLw
00
ED0
I.LI
aJ
0-a
w
Ir
0
Z)
Z
i
Z)
J
U
OD
Z
�a
F-
IY
O
z
w
0
z
0
o_
Lu m
U �
LL
w n/
U
aC/)CD
Lu
U
HLLUN
(� z U
Lu O z
0�2
x U)
IL <
JwJ m O
�o� Z
U �
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRG,NSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art
DATE: 1 /29/2024
z
20
U) 0f o
ROCS
awl
z CV
0 NCD
ofw
a�0
U�—
_U)O
tU
U)
oa
z I-
O
V
W
W
U
w
W
O
T-
o
a
m
0
w
a
z
z
HORIZONTAL SCALE: 40:1
PLANTING
PLAN
C-236
N
0
0-
ESTIMATED EDGE OF
PATH - NOT SURVEYED \ /
\ ESTIMATED EDGE OF
PATH - NOT SURVEYED
i
TRAV-8-N L
N:748477.63'
E:2089320.58'
EL:364.60'
TRAV-9-N L
N:748442.48'
E:2089714.65'
EL:351.40'
ESTIMATED EDGE OF
PATH - NOT SURVEYED
or
5963
x 352.05
W P-3441-CH K
PLANTING PLAN
LEGEND
r
� i
ZONE 1
ZONE 2
ZONE 3
ZONE lA
7777
7777
ZONE 2A
0]
W
U)
C0
W
H
Q
0
Z
O
F
a
U
0
W
0
w
of
w
J
a
0
aa
Z
LL LU
00
W
Q
U
LL
w
n/
LL
ED
C
0
Cl)
Q W�Co:)
U
Lu
I..1—
w
W N
U
U z U
J
LUOz
a
a
O�=
w
Ir
x U) cD
0
Z
awLU
m
j
<o<
O
Z
�o
¢
J
U
U
o
00
�z
�a
m
F
o
J
O
z
U
z
U)
Lu
w
0
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
TRANSYSTEMS
1 Glenwood Avenue
Raleigh, NC 27603
Tel:919.789.9977
Fax:919.789.9591
License: F-0453
North Carolina Museum of Art I
DATE: 1 /29/2024
n
n
z
20
U
w
Cn
cwn
DOCS
D
O
���
U)
z
2
O
z NCD
J
\
IY W
a�0
0
H
_U)O
Oa
LU
w
LL
2
O
a
z
z
HORIZONTAL SCALE: 40:1
PLANTING
PLAN
C-237