Loading...
HomeMy WebLinkAboutSW6240204_Supplement-EZ Form_20240226 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ Dollar General Market-Store 825705 2 Project Area(ac) 2.21 acres 3 Coastal Wetland Area(ac) 0 acres 4 Surface Water Area(ac) - - 0 acres 5 Is this project High or Low Density? - -- Highh 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 10 feet 8 WiII the vegetated setback remain vegetated? Yes _ - 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-dr N/A - 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland f 15 Permeable Pavement 16 Sand Filter 1 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter - 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Robert Wingate,PE-Technical Manager 28 Organization: The John R.McAdams Company,Inc. 29 Street address: 621 Hillsborough Street,Suite 500 30 City,State.Zip: Raleigh,North Carolina 27603 31 Phone num ber(s): - 919-361-5000 - 32 Email: wingate@mcadamsco.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here Designer SEAL �� ?nature of Designer • 050226 i - I N-...• •,\ 4:* 0.2/1 /20 29 6c W\`v %.•` Date Seal ,,..rrrrri'''.`` DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM N/A Sand Filter 5 Total drainage area(sq ft) 96,411 sf 47,916 sf _ 6 Onsite drainage area(sq ft) 96,411 sf 47,916 sf 7 Offsite drainage area(sq ft) 0 sf 0 sf _ 8 Total BUA in project(sq ft) 38,600 sf 37,000 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) N/A N/A _ New BUA not on subdivided lots(subject to 10 permitting)(sf) N/A N/A 11 Offsite BUA(sq ft) 0 sf 0 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 21,579 sf 20,169 sf -Sidewalk(sq ft) 2,150 sf 2,150 sf -Roof(sq ft) 12,480 sf 12,480 sf -Roadway(sq ft) 0 sf 0 sf -Future(sq ft) 1,591 sf 1,591 sf -Other,please specify in the comment box below(sq ft) 800 sf 610 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) N/A N/A New infiltrating permeable pavement not on 14 subdivided lots(sq ft) N/A N/A Existing BUA that will remain(not subject to 15 permitting)(sq ft) N/A N/A 16 Existing BUA that is already permitted(sq ft) 0 sf 0 sf 17 Existing BUA that will be removed(sq ft) 0 sf 0 sf 18 Percent BUA 40% 77% 19 Design storm(inches) 1 in 1 in 20 Design volume of SCM(cu ft) 2232 cf 2232 cf 21 Calculation method for design volume Simple Simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Other BUA includes curb and gutter,propane tank pad,and internal landscape areas counted as impervious. SAND FILTER 1 Drainage area number 1 2 Minimum required treatment volume(cu ft) 5.1 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yco 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? No 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes SAND FILTER MDC FROM 02H.1056 18 SHWT elevation(fmsl) <219.00 19 Type of sand filter(open or closed) Open 20 If closed,will the filter will be pre-cast or pour-in-place? 21 If closed,top of grate elevation(fmsl) N/A 22 Is this sand filter designed to attenuate peak flows? Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 1250 cf 24 Will there be a permanent pool in the sediment chamber? J No _ 25 Bottom of the sediment chamber(fmsl) 224.50 26 Area of the sediment chamber(square feet) I 2,223 sf 27 Physical depth of the sediment chamber(inches) 25.8 in _ 28 Ponding depth in the sediment chamber,above any permanent pool 30 in (inches) 29 Elevation of top of weir between chambers(fmsl) 225.2 Sand Chamber 30 Volume that can be retained in the sand chamber(cubic feet) 1250 cf _ 31 Bottom of the sand chamber(fmsl) 223.00 32 Area of the sand chamber(square feet) 1,418 sf 33 Physical depth of the sand chamber(inches) 12 in 34 Ponding depth in the sand chamber,above the sand surface 30 in (inches) 35 Elevation of the bypass device(fmsl) 225.2 36 Type of bypass device Outlet Control Structure 37 Mechanism for distributing flow over the sand surface Rock weir 38 Sand specification for sand chamber ASTM C-33 _ 39 Depth above underdrain pipe(inches) minimum 17 in 40 Will the media be maintained to drain at least two inches per hour at Yes the sand surface? 41 Is at least one clean-out pipe provided at the low point of each Yes underdrain line? 42 Will clean-out pipes be capped? Yes ADDITIONAL INFORMATION J 43 Please use this space to provide any additional information about the sand filter(s): Sand Filter 3 4:24 PM 2/14/2024