Loading...
HomeMy WebLinkAbout20240305 Ver 1_Vanderpool Non-Notifying NWP 27_Reduced_20240220Providing Sound Environmental Solutions 10565 Highway 421 South Trade, TN 37691 ph/fax: 423.727.4476 adam@bfec.ora February 14, 2024 Mrs. Amanda Fuemmeler US Army Corps of Engineers 151 Patton Avenue; Room 208 Asheville, NC 28801-5006 RE: Vanderpool WNCSI — Vanderpool Creek Restoration Vilas, Watauga County, NC Mrs. Fuemmeler, Enclosed please find the referenced project notification with the following attachments: 1) Agent Authorization Forms 2) Site Maps 3) Construction/Site Plans 4) Site Photosheets 5) NRCS documentation - MOA/CPA-52 6) Wetland Determination BFEC is submitting this package as a non -notifying NW 27 with the NRCS acting as the lead federal agency. Documentation of this being a NRCS project is included in Attachment 7 (MCA). This project proposes the bank stabilization approximately 3825 ± linear feet (LF) of Vanderpool Creek, 990 ± LF of Unnamed Tributary 2 (UT 2), and 100 ± LF of Unnamed Tributary 1 (UT 1). The project site is located along Vanderpool Rd. And Charlie Thompson Rd. (36.261693°,-81.755712°), just 5.5 miles northwest of the Town of Boone in Watauga County. This project encompasses approximately 140.15 acres across six parcels (PIN: 1982857928000, 1982669177000,1982658298000,1982647449000,1982669412000,and 1982846474000) owned by Vanderpool Farms, LLC and one parcel (PIN: 1982764134000) owned by Ryan and Carrie Miller. The proposed design includes bank stabilization using natural channel structures (rock sills, crossvanes, toewood, rootwad revetments) and Priority 1 restoration in some areas along Vanderpool Creek. These structures will allow for bank stabilization and erosion control within the project reach. Brushy Fork Environmental Consulting, Inc. will be the authorized agent for this permit application. There will be approximately 4,915 ± LF of stream impacts and no wetland impacts. If you have any questions give me a call at 423.727.4476. Sincerely, Adam Williams CC: Andrea Leslie - NCWRC AGENT ATJTIIORIZXFION FORM FOR WNCSI STREAM PROJECTS PROPERTY LEGAL DESCRIPTION: LOT NO. N/A PLAN NO. N/A PARCEL ID: 1982857928000, 1982669177000,1982658298000,1982647449000,1982846474000,1982669412000 STREET ADDRESS: 394 and 476 Vanderpool Rd., Vilas, NC 28692 (36.261693°. -81.755712°),Property Owner: Vanderpool Farms, LLC lvI(_ar.orie Hrozencik)__ Property Owners Street Address (if different than above): 885 Vanderpool Rd., Vilas 8692 The property owners above have entered into a Memorandum of Understanding with Resource Institute, Inc. that authorizes the activities proposed on the subject property (see attached). As an authorized representative of Resource Institute, I do hereby authorize Adam Williams____ , of Brushy Fork Environmental Consulting, Inc. _ (Contractor/Agent) (Consulting Firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. 'k.sP nU( , 1 ► r Authorized Date` 1 p/ I3 /.� o a 3 enr, C 4 Mc� clC�.2/l 11 v AGENT AUTHORIZATION FORM FOR WNCSI STREAM PROJECTS PROPERTY LEGAL DESCRIPTION: LOT NO. NIA PLAN NO. —_N.La PARCEL ID: 1982764134000 STREET ADDRESS. 338 Vanderpool Fed., Was, NC 28692 Property Owner: Ryan A. and Carrie A. Miller Property Owners Street Address (if different than above); The property owners above have entered into a Memorandum of Understanding with Resource Institute, Inc. that authorizes the activities proposed on the subject property (see attached). As an authorized representative of Resource institute, I do hereby authorize Adam Williams of Brushy Fork Environmental Consulting, Inc. (contractor/Agent) (Consulting Firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. We hereby certify the above information submitted in this application is true and accurate to the,best of r knowledge. i � I Authorized Signature: Date: J411111firIVA&I.s� '.f T ,r i V. _� ) Vanderpool Farms r •/ Parcel Ma : { 1'1, • End of Reach: r 1"' '� 36.26490,-81.75900 Miller, an Arthur and Carrie Annette by PIN:1982764134000 Vanderpool Farms, PIN: 1982669412000 r f ti i '1 Vanderpool Farms, L C M . 4- PIN:1982857928000 J 'r r '`!1 Vanderpool Farms, LLG End of Reach: PIN: 1982669177000 UT1 - 36.2631 °,-81.75520 41 Start of Reach: _ s L 36.2631 End of Reach: 36.2617°-81.7584° , t '.� 'br e •. _ Vanderpool rarms, LLC �� 1.' 'Y PIN:1982658298000 - '� � ' Vanderpool Farms, P� PIN:198285------0 41 UT2 •.;. ��ii, . Start of Reach: 36.2601 °,-81.75840 + �' Vanderpool Farms, LLC • Vanderpool Farms, LLC 1982846474000 PIN:1982647449000 � y'' a Watauga County, NC o Start of Reach: 36.25850,-81.75000 ., LbL Legend En Miller Parcel N �0 Streams 0 300 600 900 1,200 Feet W E ,• Vanderpool Parcels �, v °a8ahinS � s i is not to be construed as surveyed data. All boundaries are approximate GIs data taken from public data sources. BFEC 2024. Vanderpool FarmsOr Rd- . �' - f 421, Aw. 3%Rt Topographic Map is .F 3 s�tC, nrc'ek 7 ly_ I � J r- rL l- �� � "yip'"- 40 �f A i ' f rIrt • /ro r et Cre J • 1 y >F.>• Ilk 91 fml�" l• ► . - -- `5tot`� saw �i y . f 1'j Ole �^ 41 Iq �.9•. r StP RICH M O U N TA I N" lip Jones rse �!e e j su f ff . f y�aSgrL-1eek r. ,,3xt� f.gar G rove �cencl+ ll5•Highv�ts ,/ r ti r�7j fkf S rivet% 371 O?O-do, S r� f {� C3�rY n r$, o'g r M 'bias '. °yf Unvq% s► a - _ f r tree -9w Coe Fpr� q �9U9a.�/� o�. .. . I. • �°grp./ f � t- {? w t r•Ye ".011 r. 1 � ��r x VMS, AS w v3 *//e � f � % Kth9•st Boone •-Y ��f , Qalr7,s �e 1� APP�r e ta ... ����'' ■-��C � , University @ St Q'Y; Syr s Gtan04c� rJe; N"o' Cteek h freak Cb�• 'FG - VsiYe AAfluttfaira r N � Legend �n=� � 0 0.75 1.5 2.25 3 �� Parcels Miles W E Map is not to be construed as surveyed data. All boundaries are approximate GIS data taken from public data sources. BFEC 2024. Legend T Soil Unit PuE 1\I - CdE - PuF ChF - SkC�t� - CkD - SnB _ - CkE W o snD 0 175 350 700 1,050 1,400 E � °_° � SnD Feet � CsE - SoD - DeB - SoE - EdC UkF EdD - WaD ISM HE Q Parcels I..J Map is not to be construed as surveyed data. All boundaries are approximate GIS data taken from public data sources. BFEC 2024. WESTERN NORTH CAROLINA STREAM INITIATIVE s, Legend M s,reams 3�0 am900 Feet W $ ParoeJ n f' VANDERPOOL CREEK STABILIZATION SHEET INDEX COVER 1 OVERALL SITE PLAN 2-6 VANDERPOOL CREEK PLAN AND PROFILE A-K 7-17 UNNAMED TRIBUTARY 1 PLAN AND PROFILE L 18 UNNAMED TRIBUTARY 2 PLAN AND PROFILE M-O 19-21 VANDERPOOL CREEK CROSS -SECTIONS 1-40 22-35 UNNAMED TRIBUTARY CROSS -SECTIONS 1-2 36 UNNAMED TRIBUTARY CROSS -SECTIONS 1-9 37-39 TYPICAL CROSS SECTIONS 40-42 MORPHOLOGICAL TABLES 43-45 CONSTRUCTION DETAILS Cl-C17 EROSION & SEDIMENT CONTROL DETAILS C18-23 GENERAL NOTES: 1. STREAM ASSESSMENT DATA (LONGITUDINAL PROFILE, CROSS -SECTIONS, ETC.) PRESENTED HEREIN COLLECTED BY BFECIBFED. 2. CONTOUR DATA PRESENTED IN THIS DOCUMENT IS TAKEN FROM NCDOT LIDAR DATA (2' and 10' CONTOURS). 3. HORIZONTAL AND VERTICAL GRID CONTROL TIED TO PROJECT BY BFED. SURVEY DATA USED FOR DESIGN IS RELATIVE TO ITSELF AND APPROXIMATELY SET TO REAL WORLD COORDINATES BASED ON LIDAR DATA. 4. PRIOR TO CONSTRUCTION, BFEC WILL FLAG TREES APPROVED TO BE REMOVED DURING CONSTRUCTION AS AN EFFORT TO PRESERVE THE EXISTING RIPARIAN BUFFER. EROSION AND SEDIMENT CONTROL NOTES: 1. ONCE SITE CONSTRUCTION WITHIN AN AREA HAS CEASED ALL DISTURBED AREAS WILL BE IMMEDIATELY SEEDED (TEMPORARY & PERMANENT SEED), MATTED (COIR AND COCONUT FIBER EROSION CONTROL BLANKET, NAG C700BN), AND STABILIZED (SEE SHEET C18). 2. LIVE STAKES AND BIODEGRADABLE MATTING STAKES WILL BE USED TO SECURE THE MATTING. 3. BROADCAST SEEDING RATES WILL BE AS SPECIFIED ON SHEET C18. 4. NATIVE SHRUB AND TREE SPECIES WILL BE PLANTED THROUGHOUT THE PROJECT AREA ATA RATE OF 350+ STEMS/ACRE, SECURING NEAR BANKAREASAND PROVIDING FUTURE SHADING OF CHANNEL (SEE CHANNEL REVEGETATION DETAIL SHEET C18). 5. PRECAUTIONS WILL BE TAKEN TO KEEP HEAVY EQUIPMENT OUT OF THE STREAM CHANNEL EXCEPT WHERE ABSOLUTELY NECESSARY TO INSTALL BANK STABILIZATION/ENHANCEMENT MEASURES AND IN -STREAM STRUCTURES. 6. NO CONSTRUCTION ACTIVITIES WILL OCCUR OUTSIDE THE CONSTRUCTION LIMITS AS SHOWN ON THE SITE PLAN. Vanderpool Farms Topographic Map el;rire.v' Y 7 N +j r � _ EZ C0 1J6lINTAIIV •f '`Et . �csu ram... 4! .e �► -E f Ty75 ��' h •"A' K.-,A sr F, er _ 01, Y �C4 `. MCW.. Eg1 NEU— GNM In MMQP- ffVW I2PS P GIXP.. GE�rSD. V` . FhO. MP. eRC.w- � Kd4�[:C NL Dwrom Wyly: Ea J 21frK ET1 vs •c arwnac &A ama Sn9 Kong). lc1 oposstvd1dap ccmruaw . Rw L'* -2S liar Cmrffnm y Legend N Q oParcmis ; 0 0.75 9.5 2,25 3Miles E 5 �64� CS TO THE BEST OF MY KNOWLEDGE, JUDGMENT, No AND BELIEF THESE PLANS MEET APPLICABLE RESOU RC_. E NRCS STANDARDS AND LOCAL AND STATE REGULATIONS. c 0 0 w W Sheet 7 o -Za� �THIS � THE LOCATIONS OF EXSTINGLAN DOES NOT PURPORT UNDERGROUND UTILITIES, PIPES'T VALVES; ETC. TO SHOW ALL EISTING UTILIES; LINES;PESAS SHOWN OARE IN AND M 0 250 500 APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE Feet ENGINEER. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES, LINES, rS PIPES, ETC. BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT RESULT FROM THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES, PIPES AND VALVES. THE CONTRACTOR SHALL NOTIFY THE e Qi ENGINEER OF ANY CONFLICTS WITH EXISTING AND PROPOSED FACILITIES TO DETERMINE IF AN ITEM WILL _ c NEED TO BE RELOCATED. 1 sra �n THE ENGINEER HAS MADE NO EXAMINATION TO DETERMINE WHETHER ANY HAZARDOUS OR TOXIC MATERIALS _o s6sfO4x _ o ARE PRESENT OR CONTAINED IN, UNDER, OR ON THE SUBJECT PROPERTY OR ITS WATERS, OR IF ANY t O HAZARDOUS OR TOXIC MATERIALS HAVE CONTAMINATED THIS OR OTHER PROPERTIES OR ITS WATERS IN P sa o ANY WAY WHATSOEVER. NO SUB —SURFACE EXAMINATION OF ANY TYPE HAS BEEN MADE BY THE Sos` 6 0 ENGINEER, AND ACCORDINGLY, NO OPINION IS EXPRESSED OR INFERRED ON ALL SUCH MATTERS. z LQ FURTHER, NO OPINION IS RENDERED AS TO ANY VIOLATION OF ANY ENVIRONMENTAL LAWS OR REGULATIONS, EITHER FEDERAL, STATE, OR LOCAL RELATED TO THE INFORMATION SHOWN ON THIS PLAN _ AND THE ENGINEER IS IN NO WAY LIABLE FOR ANY VIOLATION OF SUCH ENVIRONMENTAL LAWS SHOULD s ° Mks .ks 60% PROGRESS DRAWINGS SUCH EXIST. °siosxsoQx `sto2x''sio CO DO NOT USE FOR CONSTRUCTION BASE MAP LIDAR DATA COLLECTED BY BFED. FOR DESIGN PURPOSES, PREFERENCE WAS GIVEN TO ACTUAL LAND —SURVEYED DATA WHEN CONTOUR DISCREPANCIES WERE OBSERVED. o 0 � 0 13+ ks� / i � � / I_"°e1ID19 pO ks 1 ors / 0+00 23+00 26+ xs2 Zrs o2 a l � O 27+0 � os Oa o s o�� r, d�tQ �o s,-so-::oz��sz°8 ea �a� 2s�2 S I;� f I \ y 92x 2 N � � U N e 4+00 33+0 LEGEND ��O%ooOo PAVED ROADS -� / POWERLINE GRAVEL ROADS j ach 2A EXISTING UTILITY POLE IXI I �-f { //���M�-OO�J • p �'(�� STING TOP OF BANK PROPERTY LINES o i EXISTING THALWEG FENCE EXISTING TRIBUTARY EXISTING STRUCTURES c� ro o ° - / 2' IXISTING CONTOURS EXISTING GARDEN •= m 10' EXISTING CONTOURS EXISTING STRUCTURES m N U EXISTING TREES CULVERT/INLET c ks 9 ® v WETLAND SAMPLE POINT Q) O � PROPOSED DESIGN �j U U z L_. BOULDER PROPOSED N REVETMENT CENTERLINE O PROPOSED TOP OF O z 82 q CROSS VANE (step) �'(O8� BANK L BANKFULL BENCHING to00 + CROSS VANE (no step) of CONSTRUCTED RIFFLE �►, —i_ 0— _si-t" 5° k'pb -HOOK TEMPORARY/PERMANENT • $ry i5 �� \�i q� STREAM CROSSING O Jt�� o'ti ROCK STEP LOG SILL C 0 D �Jr J 00*mmmM% ROCK SILL Y Q \ ROOTWAD LOG J-HOOK REVETMENT Sheet s° 5, 2 .J TOEWOOD TREE TO BE REVETMENT � REMOVED i411111��jP llllllll�i�l F 0 150 299.9999 Feet �jlllll �I 60% PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION 09 0 x� - z %�► ` �-� ;i�®off I6x XS O n = �9k tq x43 20 XS2j S p ry2�oo X Iq2 9x40 ""1,. x� 22� 02 r 3 00 G l XS k ' • � � XS 24Stq JxBI XS26Stq���2?x86 21 96 \1 I f SAQ �S , S29St Q2Sx0 \ `y' ®ti �i Sfg2Sx9 x62 i . I �\�XS32SI 33SIg2,x each 1 4 1 f I I0SIq r�/ ( 60 II 1 f 2SIq� S 3 q . o t 8'Aa do zG /oo .a�� oo ,ti %2+ Y73�o0 XSI4Stg10x *Sl 90 XS each 1 A �C°� �R� v°) cu ~_ S � O � T L 2 tQ I, / co l ,C N / N LEGEND ��O%ooOo PAVED ROADS ti / POWERLINE I / GRAVEL ROADS -Q1 EXISTING UTILITY POLE EXISTING TOP OF BANK PROPERTY LINES EXISTING THALWEG FENCE 0 EXISTING TRIBUTARY IM EXISTING STRUCTUREScu ,N EXISTING GARDEN 2' EXISTING CONTOURS 0 N /1 ) � N � 10' EXISTING CONTOURS EXISTING STRUCTURES � O vJ EXISTING TREES CULVERT/INLET WETLAND SAMPLE POINT � Q) � U _O PROPOSED DESIGN L_. BOULDER PROPOSED / O t y REVETMENT ,, / `' CENTERLINE O C ro U CL z Q PROPOSED TOP OF CROSS VANE (step) �'(O8� BANK cc o) y BANKFULL BENCHING \` CROSS VANE (no step) � SIM CONSTRUCTED RIFFL-HOOK TEMPORARY/PERMANENT °Op®° STREAM CROSSING (� 1 ROCK STEP LOG SILL 00•00=% ROCK SILL ROOTWAD LOG J-HOOK REVETMENT Sheet D TREE BE REVEFM D REVETMENT REMOVED 3 -Z c') o 0) � cl) o 100 zoo z Feet C/) ro a � � o O W 60%PROGRESSDRAWINGS o DO NOT USE FOR CONSTRUCTION .� :2�o zs o C I �e+� / ,+pp� k (1 6 Aldv �cP J �`J s� �s 03) o .� • \ x � 0 6 + p. N ,g+LpO ' � + b Cl� a x n� Sn +� • �' O U / c� �O¢ g x Tl w I o (yS Y �� 9 Lp x 6 LEGEND ^ VJn� / PAVED ROADS / Y(j��x GRAVEL ROADS POSTE / \ �� IXISTING ING UTILITY POLE '•'� ��/0 po L 9 PROPERTY LINES IXISTING TOP OF BANK V p EXISTING THALWEG FENCE o i L O "P Q' O B' �/ EXISTING TRIBUTARY EXISTING STRUCTURES O N 4 Q �/ Z IXISTING CONTOURS EXISTING GARDEN O rocu ';yyr�F o n 9 4/ Q �L � O / A Q 4 / �/ 10' EXISTING CONTOURS EXISTING STRUCTUREScu p 0o YY �L� v a� O EXISTING TREES CULVERT/INLET �cu 4 h Q o� 2B PROPOSED DESIGN (j U Z x BOULDER PROPOSED 0 t N p jI REVETMENT ,, / O O n / `� CENTERLINE V Q PROPOSED TOP OF L z CROSS VANE (step) —'(O8� BANK cc � 9n � � V�n CROSS VANE (no step) BANKFULL BENCHING L to SIMN �i CONSTRUCTED 3 xJ� / a RIFFLE 0 V n � p J-HOOK J � � TEMPORARY/PERMANENT O STREAM CROSSING V n� ROCK STEP Q- ROCK SILL LOG SILL �> ROO—D LOG J-HOOK Sheet REVETMENT \ TOEWOOD TREE TO BE \ REVETMENT REMOVED 4 0 20 40 \ Feet 60%PROGRESS DRAWINGS DO NOT USE FOR CONSTRUCTION 46 x _\ 1100 — I p O 0 25+00 124+00 y y y y y y y y y y y y o \ y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y 00 _ y y y y y y "�.y y y y y y y y y y y y y y ya y� y y y y N y y y y y y y y y y y y y y y y y y \ y y y y y y x \� w ew LEGEND PAVED ROADS / ti i POWERLINE a GRAVEL ROADS -Q1 IXISTING UTILITY POLE IXISTING TOP OF BANK ✓ PROPERTY LINES EXISTING THALWEG 0 ` � EXISTING TRIBUTARY EXISTING STRUCTURES w cu ro ._. - � 2' IXISTING CONTOURS EXISTING GARDEN Qa � ro ro u 10' EXISTING CONTOURS EXISTING STRUCTURES p EXISTING TREES CULVERT/INLET 1 a) G (j PROPOSED DESIGN L_. BOULDER PROPOSED O -C N REVETMENT CENTERLINE O PROPOSED TOP OF �' L z CROSS VANE (step) �.��� BANK `• /) o + CROSS VANE (no step) BANKFULL BENCHING lI�JJ to SIM CONSTRUCTED RIFFLE -HOOK TEMPORARY/PERMANENT STREAM CROSSING ROCK STEP ROCK SILL LOG SILL ROOTWAD REVETMENT LOG J-HOOK Sheet CN REVETM D ww WO REVETMENT TREE BE4 D REMOVED �i 0 60 120 Feet 60% PROGRESS DRAWINGS \ DO NOT USE FOR CONSTRUCTION o P a 0 �l liiiulsl i�����i�� Ili o rq i�� r i%l�l�illf1i����ll��iil�rhi +s ryl! N Q � UP 00 N0- K GE x8p p x�y x 110 �"yY 0 j� r LEGEND ,�O%ooOo PAVED ROADS GRAVEL ROADS EXISTING TOP OF BANK EXISTING THALWEG EXISTING TRIBUTARY Z EXISTING CONTOURS 10' EXISTING CONTOURS EXISTING TREES PROPOSED DESIGN L_. BOULDER REVETMENT CROSS VANE (step) CROSS VANE (no step) -HOOK ROCK STEP 00amml% ROCK SILL ROOTWAD REVETMENT TOEWOOD REVETMENT W IN 'V POWERLINE EXISTING UTILITY POLE UL PROPERTY LINES _ FENCE 0 O EXISTING STRUCTURES cu .ro EXISTING GARDEN ro � EXISTING STRUCTURES , c o CULVERT/INLET 0 3) N U Uz PROPOSED CENTERLINE 0 :tz ro z PROPOSED TOP OF BANK +L BANKFULL BENCHINGSIM y CONSTRUCTED RIFFLE °Op®° TEMPORARY/PERMANENT STREAM CROSSING LOG SILL LOGJ-HOOK Sheet -EE TO REMOVEEDE 6 0 30 60 Feet Excavate scour pool upstream rock step v� N Remove berm, grade XA-bankfull bench, 2:1 slo o floodplain terra / 7*1 2940 2938 2936 2934 2932 m m 2930 Q 0 2928 2926 2924 2922 2920 2918 \x� x1_ Ox �x�x Station Extend 4" PVC to X re -aligned scoAtoe set invert at baRemove underc sycamo 7Remove Remove trees infloodplain Remove uprooted trees on floodplainamage, undercut trees Upper Reach Vanderpool Centerline Preserve barrfc trees, add alluvial ma erial along toe A 00 EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL W Sheet 7 0 30 60 Feet IS I Fill cut through channel during benching . Remove dead trees 4 r r Remove tree debris crossing channel Fx 00 2922 2920 2918 2916 ,T 2914 (D Q 2912 O :3 2910 2908 2906 2904 2902 c�0 1�x N Remove X l undercu Q c� xoo o ;.1014 �:15 ♦ r�`:� lids Upper Reach Vanderpool Centerline CIO Remove tre v� debris w �^ - Q V^^ W 00 0 V ' 0�y Ar Re tre y,�Nar w chan no wood revet �1 �3 1x�0 Ix 2 Nn bxh �Nn� � bx1xO� y�xl n'D�x 5x�y���n 5x1� x�� 6 bxL� bx 2, bx1�� �5h �56 -e �59 1x Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL N � m al OU z¢ Yg N O O U Sheet 8 0 30 60 Feet (,J C% � Q 00 ° N Q 00 o+o Remove tree debris in channel V + o i eof— 4 i N W Re lign channel away o fr m steep slope FA 0 1 0 s 1 Exi g St Y, r Rem r i n / 0 Remove trees to realign channel Upper Reach Vanderpool Centerline 2908 2906 2904 2902 ,T 2900 m Q 2898 O :3 2896 2894 2892 2890 2888 1X1bx15 XL� Xh0 XA 0'10A xL� xh� x1� xl5 1x0 1 1 ,� 1 �x0 0 0 0 ,xagx0 Station 10100 Existing Spoil elevation, re CQ o��o � C/) 3 ro v Ncoo � + E 0 1 �r 0 w W 10 0 S 0 EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL N � m al OU N O O U Sheet 9 N 0 30 60 FeetC) y k 4 1 k Oo 2896 2894 2892 2890 ,T 2888 Q 2886 O :3 2884 2882 2880 2878 2876 'aa • • dW f Y� �I� �.•. T �y 41 R `� ,/1�'/�•• �.rY,•%fin A may% � ,',�//_ y � �' • FA 1 ■■■■■■ ■■■■■ ■■■■■ ■■■■■ MIN IME ■■ ice■■■■i■ i■■■i■ i■iNA■ ■ IML INN -x- O xl� x5� x'A'D ° O xlS x 6 x15 O xl� x5� x1 3 O x� xO �� �� �\ �^ xO �ti �ti �'� �ti x0 �3 �3 �3 x0 xO Station Shallow channel bedrock EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL N � m al OU z¢ Yg U N O O U a� a� U o 'u ro N -Q Fro M 9 o U Uz O CL �N CL Sheet 10 0 30 60 Feet 0 Remove debris at top of bank, Grade Remove undercut to terrace 2:1 slope cn —+ cn + 00 16+00 14,00 SDJ. Bedrock lined channel k00 15+00 Transition to narrow stream Bedrock lined channel Remove tree in channel r AA cn Q Cn 00 CA M Remove undercut trees I Rewro�undercut trees, grade to terrace 2:1 slope Upper Reach Vanderpool Centerline NO cn Q + Remove 00 N o undercut tree To Bedrock lined ch no bankfull bench to narrow valley 2882 2880 2878 2876 - 2874 ,T (D Q 2872 0 2870 L 2868 + ca 2866 iu iu iu 2864 ° 2862 J J Y J x�5 x5° x15x15yx� x1`'6"��" O 5 x00 �� �� �� x0 �� �� �� ` x0 �b �b �b x \� 4�0 N1x1 x�0 �5 �y �b 9 �1 �1 Station 77-' s+oo �q .n1. Via. EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL 0 N z¢ Yg N O O U Sheet 11 0 30 60 Feet 10 Remove excess substrate from riffle 1 is+00 Remove metal girders along top of bank, harvest undercut trees on left bank N O Remove debris �4- along top of bank Q 0 . 1 sr.t�r"Id Kemove undercut trees 2870 2868 2866 2864 ,T 2862 Q 2860 O :3 2858 2856 2854 2852 2850 Remove debris along top of bank and relocate farm equipment N N T + 20+00 1 oxo 1—�WL�t WA-=961 Replace existing log Protect tree step with J-Hook with Boulder Revetment Route drainage upstream of J-Hook vane Upper Reach Vanderpool Centerline ■ ������A■■�■�A��■ram �� � �����■■�■�F�,-■��F vMM M`7 XIP NA. X �� �� X �18, 15 xO� I\gXXa 9x� �gXc�O 1q 5ti�e Station X3' 0 h NgX1 x�0 tiOX� o tiOX� 1 x�0 5ti Do not disturb utility guide wire ' ,?x00 21 k00 EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL N � m al OU N O O U Sheet 121 0 30 60 Feet 23+00 N o pp---- 00 MWM►oNn from top ol • • N• • Preserve large sycamore with Jer Revetment ove u d rcut +—o Pres�ive large poplar tree Install Bou7of Revetment i7 n fro gabion baskets Upper Reach Vanderpool Centerline f F F F F F F F F F F F F F F F F F F F F /FF Jr�F F F F F F F F F FF F FsfackeFd F F \ F F F Ro F F F F F F F F F f� yldleit F F F F\ k ro N F F F F F F F cm f oan F F F F F F F F F F F Q ng Rp rfio� FdgmF F FF= F F F F EE OT :\ F F F Fs ucturFe F o nsplant F F Ro F F F F �- al trees w i Z C/) Relocate p—o—n-d intake 4" PVC (EL: 2844.7) 2856 2854 2852 2850 ,T 2848 Q 2846 O 2844 2842 + + + + + + N Co N 15 N N N 2840VY O N M N N N N N 2838 ° J J J J J J 2836 3Ed d= d= d= d= d= O �X Xti' X5� X1' �X96O x�' x5� X1' x�6 p XyS x3� X5� X1' O �x°� , xo �ti �� �. 1. �xo �� �� h ���`�xo 6 �ti3 �3 �3 ��(O �� �� x1 �5ti �5ti �5ti �5ti �5ti Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL N 0 � m al OU z¢ Yg N O O U Sheet 131 0 30 60 Feet _ i 0 � ^ti °x A . n Transplant ornamental trees N Ca CD to W W N ° Cr -) N 10 N ° O ° 0 6" PVC pipe, install 0- outlet protection from N invert to bank to N N ° o \ 0 p N ° I 1 o I / _r" to 1 ° WET Bedrock linedP,el with steps nsaoutl tection from .,.. invert to ank toe Vanderpool Downstream Centerline 2842 2840 2838 ,T 2836 m Q 2834 O 2832 N 2 } ca 2830 coco 2828 J J J J Y 2826 1 X�5 hx�� Xtiyx�6 X5�yx6� x14�x9� XL� X��6x6ti X�5 Xti�x�'' X`P X�5 �x1 L� �x� a' L�ati L�a� Lati bx� tib Rba� tib ,xQ � �x� ti� ti9 3� 3� 3ti 33 Station -Za��� rubble, er Revetment, CU '= CA) o0 r w Z 71 � co 6" PVC (2) from pond, outlet protection a, �install to bank toe w 31 }00 EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL Sheet 141 0 30 60 Shorten 6" PVC, install Feet outlet protection to V) bank toe Remove pine tre itr-' ercut roots 3 Bedrock step i i i i and channel i 15" RCP, install outlet protection to bank toe IIIIIIIIIIIIIIIIIIIIIIIIII� N Q -till x & b �R�� o Remove existing v boulder/concrete along left bank r o c Shorten 4" PVC invert to realigned left streambank, Cn _ add outlet protection to cn z W x� 1 bank toe Q Z Remove undercut N trees a� c Vanderpool Downstream Centerline 2834 2832 2830 ,T 2828 m Q 2826 2824 N W N n% 2822 t t O + 2820 O O O Y O 2818 O X�5 X5o X15 O X�5 X5o X15 xl e O X�5 X5o X15 O xO �QxO �Q tiQ �� �ti�Ox0 10 3� 3� xO 1 h x� �53 �53 Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL Sheet 15 ���1 Feet ��*20. 1 MM ' oxp Backfill existin4kchannel to bankfull i It elevation, hary t existing substrate ��, for oposed chan 2826 2824 2822 2820 rn 2818 Q 0 2816 2814 2812 2810 2808 Remove undercut trees Realign channel away from road, harvest substrate and backfill original channel Bankfull bench to to exceed 16- total width across left and right banks \Install 36" CMP Culvert Outlet Protection Inst 4 CMP culy outlet prote n an ru an en in nd new stream Vanderpool Downstream Centerline ■1►.��lii7_iiiiiiiii �■1■1�9\1�r1i■■■■■■ii ■�■�■■ ���.li_ iiiiii ■I■I■■ ������� iiiiii �MIMIMI MIMIMEM■e■■■IMIMUM`MIM.M■■■ 1x�O 1X1� xOO tiX�� tiX�o tiX1� xOO 3X� 3X�o �x1 b OO � 3 �� 3 3 3 �� 3 3 6� ��x 3 3 ���• ��x �53 �53 Station 35+00 EXISTING CONDITION 1-5-�PROPOSED CONDITION PROPOSED BANKFULL w 0 30 60 Feet ID 0 '00 X V) W 00 V) Q Backfill existing bedrock lined Cn + channel to bankfull elevation harvest existing substrate e available _00,-801 got �801— —801 �i 39A,00 N N � W O Q Q 0:) N + o- o W o Protect trees during grading Grade channel using Reach 2a geometry at bridge 1 X 1 10 801 \�1 W 1 l� D $0L-8QI8� II bench not to exceed 16' cross left and right banks o _ o � Install Culvert Outlet Protection a�—ClvtP O -- Vanderpool Downstream Centerline 2816 2814 2812 2810 m 2808 Q 0 2806 2804 N + M M M + co M 2802 + ca O N N N O N 2800 O) O) O) O) O) 2798 = O O O O O O xti' X5° X1 hX9�O xti' 5° X15 O X xti' X5° X % ' X O ff O ��x0 35 35 �bx0 3b 3b 3b �1 31 31 31 x0 3�x� �53 �53 Station 38+00 42+12 1 7 EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL w I\ \ ocate pond\ in ke 4" PVC (EL. 844.7') Ok2� S� MA Spa Ornamental -11111 *S tree transplant v� Remove existing dam structure ^ti 0 Install Single Rock Step Pool Channel ,IIgsee detail C 15) Unnamed Tributary I Centerline 2850 2848 — 2846 ,T 2844 m Q 2842 0• N � 2840 ° 0 0 0 2838 Q Q Q 2836 ° J J J O O O 2834 � 3 OxOO� a Xti OX�� OX�S�� x�X1�OxQ(b +5 Station 0 M O ry ° o° ° C EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL W TO InstallRock Sill . • -•• • at • • \•-••n Priority• - fl- • 2868 2866 2864 2862 rn 2860 Q o' 2858 2856 2854 2852 2850 Backfill existing channel to bankfull elevation, harvest existing -substrate for new \ I grade minimum total 1 bankfull bench width Unnamed Tributary 2 Centerline ■■■■■■■■■■■■■ ■■ill■ ': i�■■■■■■■■■■ Ali.�■III��I■■I®■!�I■■!I■■1■■�■I��i!�I.R�I`A���_ �F��11�■dl■�li�■I■�I■■�I■■�■1®■�®�11�11�i�1�� ��■�11��1■�I■■1��1■■1■■L��I�E�I�■I�E��i� ���Ilq�la�l■■I■��1i�■1■■��I1�■II�■I��I�i��� 111011R1101■111I111111IMEl■ 1BM.1�■I�I�i�� E��11®�I®�IE�■I®E1®!�■■d®IE�®IE�■I�1�_ Xb"°X5° °X1ID xoo Xti' X5° , X1' X9�00 qq Station `LX�h R,X�° `LX1h xQ0 �Xr�S x�0 3 1 N 0 0 EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL W N 0 � m al OU N O O U Sheet 19 0 30 60 Feet Q 2858 2856 2854 2852 rn 2850 Q 0 2848 2846 2844 2842 2840 c X N cxn r� emove to pip nd re-alig an �'17 0. �,— 0 G e mu a 12' Tie Priority 1 channel / a II b ch widt + back into exiting / stream elevation o 6" PVC pipes, stabiliz outlet channe ut Unnamed Tributary 2 Centerline ■■■■■■■■■■■■■ I.M.1� MEMMIN�■■■■■■■■■■ I■1■MMI\_ n ■■■■■■■■■ �■1■■I�Irllrir . _ ■■■■■■■■ 1�■1■■ICI■�■■�■■�■��■■1■■■Irl■?r'—■—■�■_ 1M, IM■alE�■11®■71■�I■I��■1■■■1■IA�a �®1■®I���I■l�l■■ll�l�®■1■®■1■IL��I■trall�• 11M IMM IBM IM M I■ MIN MIME ■IMINI MI■■NIwEms ��1■�I���I■�I■�l■nF•.'ItMil■■■1�1■�I■■�I�■�■ ��1®�IEIE�IE�E�I®E�I�I�tl■'1■■®1®IE�E�I®■IIE�■�■ xO� X00� y�xR'� hx5� `'�xlhxlh xO� Je ye b 6� 1 Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL w R N � m al OU z¢ Yg U N O O U N 'coCli ro Fro cu M � ro N O o .ro iz z� C c c� c CL Sheet 201 ©11 0 60 _�-Feet • Narrow total bankfull Install Rock Sill a 0X b0 a G' � �� J Unnamed Tributary 2 Centerline 2850 2848 2846 2844 m 2842 Q 0 2840 2838 2836 2834 2832 x6O 1 x 1X�� 1X�o 1X1� x�O x OX�� OX�o 0X1� x�O qX �9Xry0 Q x"� Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL w Vanderpool XS 1 Sta 0+51 c/) o 294 N 3 ro v N coo � O 294 r O m m c w Q 0 c 293 0 c/) N N C 293 C �Ll 0 �0 ell ox 3, ox 0 ox 5, ox b° ox 0 °XO °Xb EXISTING Station � CONDITION Vanderpool XS 2 Sta 1 +04 294 PROPOSED CONDITION m 294 PROPOSED BANKFULL Q 'o 293 WATER N SURFACE ¢ o g W N O O U 293 0° °x�o ell ex, e0 ex, °xbo ell) ell 0, 0" 0" N Station U Vanderpool XS 3 Sta 2+41 293 Q ,N N � ro ro ° C� o c= 293 c") ° o n U cj Z U � 292 0 U 292 Sheet o do bo o, e3, e e5, o o Station 22 Vanderpool XS 4 Sta 2+87 0 293 O N c') 3 ro v 0 293 m w Q � 292 .O N N C C W 292 ellox�o ell ex, e ex, ebb ello ell, e", OXq� EXISTING b Station CONDITION Vanderpool XS 5 Sta 3+93 293 PROPOSED CONDITION 292 ,T PROPOSED LL BANKFULL Q 'o 292 WATER SURFACE W ¢ g N O O U 291 ello\� oll 03, o0 05, obo Station U Vanderpool XS 6 Sta 4+31 'o 0 293 'N cu N � ro ro o z 292 c � � CC,, Z ro O U O ) j 292 0 U 291 eo do 3, 0 5o bo to to qo ,o Sheet el)Ox Ox Ox eOx eOx Ox Ox 0 \ �X,�� Station 23 Vanderpool XS 7 Sta 4+73 elloxbo ell oxbo oxbo oxbo oxbo &110 ell, e(") 1Xoo \x�o 1X�� Station Vanderpool XS 8 00 oxbo ell oxbo oxbo oxbo oxbo oxlo 0" Station Vanderpool XS 9 Sta 5+72 el) 0\,o odo 03, 00 05, obo 010 eAb Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL 1-57�WATER SURFACE N � N O m al z¢ O OU Yg U U N U 'o o N � ro ro U _ Z U o O co, o z� U cn � co co O i U Sheet 24 Vanderpool XS 10 Sta 6+08 c o 292 c') 3 ro v N coo � O 291 C O w Q � o 291 c) N N C C 290 W ell °x°° e0 ex, e61) EXISTING >b Station CONDITION Vanderpool XS 1 1 Sta 6+59 292 PROPOSED CONDITION 291 m PROPOSED BANKFULL Q 'o 291 WATER SURFACE o ¢ g W N O O U 290 x ell ex, e ex, e elf ell oxQ° 01 x � o� .101) a� Station U Vanderpool XS 12 Sta 7+73 °o o 2915 N c ro N c� 291 m � c 290 co co 0 U 290 Sheet &\o do 30 �0 5o bo �o to qo °x °x °x °x °x °x °x °x OxgO Station 25 Vanderpool XS 13 Sta 8+87 c/) _ o 291 c') 3 ro v N coo � O C O 290 m ( Q c L-u c) 290 N N C 289 C W ° x�0 0 ll 0 x30 0 0 0 x, 0 61) 0 xl0 ell, 0 EXISTING Station CONDITION Vanderpool XS 14 Sta 10+90 290 PROPOSED CONDITION 290 m PROPOSED BANKFULL Q 'o 289 WATER SURFACE ¢ g W N O O U 289 0 ll ell 0xell') o 0 0 0 0 0 0 ell Station Vanderpool XS 15 Sta 11 +91 °o o 290 ,N M ro Lo 0) c� 289 C� U U z m O ro co zrg Q a� o � ocu 289 (n co co 0 U 2885 Sheet �0 yo 30 �0 50 b0 �0 �0 q0 �0 o °° e e e e e e e e e °° �x �xti Station 2 6 Vanderpool XS 16 Sta 12+65 OX Station Vanderpool XS 17 Sta 13+88 m m Q \0 ry0 ell 0x e 0x e e OX�� Station Vanderpool XS 18 Sta 15+85 ell ono oll 03, o0 05, obo 010 ell Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL 1-57�WATER SURFACE N � N O m al z¢ O OU Yg U U Qi Qi U O Q N o 'u •N ro pp cp U c v z co � O ° � z> c N CIO N co co O U Sheet 271 Vanderpool XS 19 Sta 16+82 o 288 N O c') 3 ro v ca ~ Ncoo � o _\ O 287 O \ W Q � � � O 287 � � N O W 286 ell EXISTING Station CONDITION Vanderpool XS 20 Sta 18+43 287 PROPOSED CONDITION m 287 PROPOSED BANKFULL Q 'o 286 WATER SURFACE ¢ g W N O O U 286 ell ex, e N Station U Vanderpool XS 21 Sta 19+40 °o o Q 'u ro 287 N c ro Q) c� U U o z 286 286 0 U 28s �o �0 30 0Sheet °x °x °x ell 28 Station ��co0) � o��o Vanderpool XS 22 Sta 20+31 286 p 0 m_ o Q 286 W O � 285 000 ox�o ell ex, eOX�1 Station Vanderpool XS 23 Sta 21 + 18 EXISTING CONDITION 286 PROPOSED CONDITION 286 m m Q o PROPOSED BANKFULL 28s WATER ca 285SURFACE W ¢ g N 0"00 Ox�O ell Ox3O Ox�O Ox50 OX�1 0 o U Station a� a� Vanderpool XS 24 Sta 21 +96 U 'o 286 O o Q 'u ro N •N c ro 285 �1 � m N or cD N Q 04 o O � z 285 V N > � O 284 V ell Sheet ell ex, e0 ex, O b0 Sheet Station 29 Z��o Vanderpool XS 28 Sta 25+08 0 285 O N c') 3 ro v ro °~ 0 O 284 m c cp L-u Q � 0 0 c) 284 .O N N C C W 283 61) oXoo ox�o ell oxoo e ex, e ox��oX1R EXISTING b Station CONDITION Vanderpool XS 29 Sta 25+26 285 PROPOSED CONDITION 284 PROPOSED m BANKFULL Q 'o 284 WATER SURFACE W ¢ g N O O U 283 OXO� �x�o ell ex, e 0 ex, oxbo ell ell, OXO� N N Station U Vanderpool XS 30 Sta 25+62 °o 0 N N 285 M ro Q) c� L6 2j U o z 284 m fNi) OO O N 28404cn� 0 U 283 Sheet 61) OXOO ox�o ell ex, e ex, e ox10 ell, e", OXQQ Station 301 Vanderpool XS 28 Sta 25+08 c') 0 285 N O c') 3 ro 3 ca ~ N coo � O C 284 w Q o� � o 284 .O N N C C W 283 01) ell °x°° e ex, e °x1°ox1 EXISTING Station CONDITION X Vanderpool to 2 +2 p S 2 9S 5 6 285 PROPOSED CONDITION ,T 284 PROPOSED BANKFULL Q 'o 284 WATER SURFACE16 ¢ g W N O O U 283 01) °x`° ell ex, e ex, e ell° ell, °xll, N Station CU Vanderpool XS 30 Sta 25+62 °o o 285 Qi 'N M ro z C6 U U o 284 N O c ro O � z' O � j 284 0 U 283 Sheet ell ex, e0 ex, °xb° °x1° ell, °xQ° ox°° oxQQ 31 Station Z��o Vanderpool XS 31 Sta 25+90 0 284 O N 0 O 284 m c cp L-u Q � 0 0 283 .O N N s; s; W 283 ell ell ex, e ex, eb° ell° ell, OxQ° OL EXISTING Station CONDITION Vanderpool XS 32 Sta 26+62 284 PROPOSED CONDITION 284 PROPOSED m BANKFULL Q 'o 283 WATER SURFACE16 W ¢ g N O O U 283 ell ell ex, e0 ex, Oxb° Ox1° ell ell') \XO° \XOb N Qi Station U Vanderpool XS 33 Sta 27+38 °o 0 Q 'u ro N N 284 c ro CY) Q) c c") ° o 284 M O v O N 283 0 U 283 Sheet �0 ry0 30 �0 50 b0 �0 �0 q0 ec� 32Station ==a m m Q Vanderpool XS 34 Sta 29+96 00 Ox�o Ox�o Ox00 Ox�O Ox�O OxbO Ox10 Ox Station Vanderpool XS 35 Sta 31 +42 00 Ox�O Ox�O Ox00 Ox�O Ox Station Vanderpool XS 36 Sta 33+96 Ox�O OxbO Ox10 Ox �0 e x�0 ell x30 0 x, xb0 xll0 xl0 xq0 x�0 x�0 el) 0 0 0 0 0 0 0 0 �x00 �xLp Station EXISTING CONDITION PROPOSED CONDITION PROPOSED BANKFULL 1-57�WATER SURFACE w N � N O m al z¢ O OU Yg U U a� a� U O Q N o 'u •N ro M U O ° Z U o -c ro co � O � z> c N N CIO co co O U Sheet 331 Vanderpool XS 37 Sta 34+90 c') 0 M 282 N O ro c') 3 ro v Ncoo � 0 282 O O w Q � 281 i L-u 281 ,�+s x\0 x`LO 0 0 x30 xb0 x50 xb0 x10 x00 x90 0 0 0 0 0 0 0 EXISTING oXoo , Xoo , Xo� Station CONDITION � Vanderpool XS 38 Sta 35+92 282 PROPOSED CONDITION ,T 281 PROPOSED m BANKFULL Q 'o 281 WATER SURFACE ¢ o g W N O O U 280 �0 y0 30 �0 50 b0 10 �0 q0 e e e e e e e e N ellOx °Xqp Qi Station U Vanderpool XS 39 Sta 37+ 13 °o o 281 � .N E ro (C$ "ro ) ° o z U U o 281 cv) O c ro m 280 c/) O U 280 Sheet �o �0 30 05o bo 10 �o °x °x °x e°x e °x °x el) ell,Station 34 �z co0) c o��o ro °~ 0 O W i N N W Vanderpool XS 40 Sta 38+26 EXISTING 2si CONDITION 2810— PROPOSED ,T CONDITION m Q 2805— PROPOSED BANKFULL 280WATER \o do 30 05o bo lo �o ca SURFACE z ¢ ° g ell ell, O O U Station a� a� U Q ,N � �ro ro C M o C) U roZ U c') p o ro U C co co O i U Sheet 35 �z co0) l) ro °~ UT 1 XS 1 Sta 0+24 c 0 28s W Z 285 i m c Q •� -�- W o' 284 EXISTING CONDITION cc 284 PROPOSED b 0 ell 30 0 50 0 oxo° °x\°x °x �x ox oXb� CONDITION Station PROPOSED BANKFULL 1-57�WATER SURFACE W ¢ g N O O U UT 1 XS 2 Sta 0+52.5 28s n :Q w, ro 285 ;N m � � .o O N U o 0 ro 284 U z O -c O ro O � N 2840 co co x\0 xll x l xb0 x l xb0 0 OX�p 0 0 0 0 0 0 Station Sheet 36 c') o��o UT2 XS 1 Sta 0+48 287 c/) 0 O 287 j m w Q � o' c/) 286 N N C C W 286 x�o ell xx3o 0 x�o x l oXoo 0 oXbo � EXISTING F Station CONDITION UT2 XS 2 Sta 2+91 286 PROPOSED CONDITION 286 PROPOSED m BANKFULL m Q 'o 28s WATER SURFACE16 W ¢ g N O O U 28s N ell 0 \,0 ell e3l e 0 eSl o bo ell)01011 Station c � UT2 XS 3 Sta 4+06 286 ro C M ro Q) cv) U ° ro 286 CL n O c v z O N 28s rj) co O U 28s Sheet el) ox\o oxlo ox�o e 0 ox�o Oxbo ell oxlo el) OXQ� ■� 7 Station �+ • UT2 XS 4 Sta 5+08.5 c 286 c') 3 ro 3 N coo � O C 285 m_ 'S w Q � o c 285 l i 284 W EXISTING °xQ� Station CONDITION UT2 XS 5 Sta 5+75 286 PROPOSED CONDITION 28s m_ PROPOSED BANKFULL Q 'o 285 WATER SURFACE16 o ¢ g W N O O U 284 �o do 30 �0 5o bo 10 �o qo N e °x °x °x °x & e oOXq� Station UT2 XS 6 Sta 6+45 o 2855 N Ri ro ° o C M ro Q) CO U ° o Uz 285 i cl) z� Q 284 a-i 0 U 284 Sheet e\o do 3l 0 5o bo 10 °x °x °x °x °x °x el)°x °X1� 38 Station UT2 XS 7 Sta 7+ 14 0 285 O N C/) 3 rod L 0 285 m_ � w Q � 284 � .O N N C C 284 W ell ex l e ex l eb° °x1° ell OX� EXISTING Station CONDITION UT2 XS 8 Sta 8+ 14 285 PROPOSED CONDITION 284 PROPOSED m BANKFULL Q 'o 284 WATER 57�SURFACE N O O U 283 x°° ° \° ° ti° ° 3° ° ° 5° ° b° °1° X1� �` 0 0 Station :Q UT2 XS 9 Sta 9+26 ro N 285 �ro RS m ° o O c ro Q) 0) U ° o 284 ro Z N z> O � O 284 co co 0 U 283 Sheet el) Station ell ex l Ox01 Station 39 m m Q 293 m m Q 0' 293 Reach I a Vanderpool Typical Riffle ell ex, e0 o b5 Station Reach I a Vanderpool Typical Scour Pool ox�o ell e0 b5 o" Station Reach I b Vanderpool Typical Riffle W-bkfl 2.5 1 ' 4 ell o 0 oll 03° 030 Station Reach I b Vanderpool Typical Scour Pool W-bkfl 2.5 � D A-bkfI �3 1 bkfl ell °x�o ell ox�o °X3 Station Reach la Typical Cross Section Table Riffle Scour Pool Bankfull Area (A-bkf, sq ft) 17.5 22.0 Bankfull Width (W-bkf, ft) 17.0 17.0 Bankfull Mean Depth (ft) 1.0 1.3 Bankfull Max Depth (D-bkf, ft) 1.5 2.3 Bankfull W/D (Stream Type) 16.5 (Cb) 13.1 Inner Berm Width (ft) 12.5 12.5 Inner Berm Max Depth (ff) 0.75 1.60 Approx. Wetted Width (ff) 9.8 9.8 Approx. Wetted Max Depth (ft) 0.3 1.1 Channel Bottom Width (W-bottom, ff) 9.8 1.0 Reach 1 b Typical Cross Section Table Riffle Scour Pool Bankfull Area (A-bkf, sq ft) 17.9 21.3 Bankfull Width (W-bkf, ft) 15.0 15.0 Bankfull Mean Depth (ft) 1.2 1.4 Bankfull Max Depth (D-bkf, ft) 1.8 2.6 Bankfull W/D (Stream Type) 12.6 (Cb/Eb) 10.6 Inner Berm Width (ff) 10.4 10.4 Inner Berm Max Depth (ft) 0.9 1.7 Approx. Wetted Width (ft) 7.4 7.4 Approx. Wetted Max Depth (ff) 0.3 1.1 Channel Bottom Width (W-boffom, ft) 7.4 0.8 PROPOSED CONDITION � PROPOSED BANKFULL PROPOSED LOW FLOW INNER -BERM CHANNEL Reach 2a Vanderpool Typical Riffle 293 Cn O m N �o (D < W-bkfl o oT Q O* D-bkfl 2 5 A-bkfl W Z 293 c� z� �x�o O ll OxOx�b i ell 0 Station N Reach 2a Vanderpool Typical Scour Pool c w 293 m W-bkfl (D Q O 2.5 D-bkfl A-bkfl 3 293 292 Ox�� Ox�, Ox�� 0"00 Ox�b Station Reach 2b Vanderpool Typical Riffle z ¢ o g 293 N 0 0 U 0 m m W-bkfl O 3 o p A-bkfl 1 ; - 293 0 0 0 L .N -0 E ro �0 ox el ox� e C� o ro OX00 Station co c �� Reach 2b Vanderpool Typical Scour PoolCn °o o z 293 co co a m W-bkfl V (D < cu U o s ID-bkfl PROPOSED PROPOSED ~ A-bkfl CONDITION BANKFULL a 293 PROPOSED LOW FLOW Sheet �o INNER -BERM CHANNEL oxtio ox3o ox�o o oXoo oX�Q 41 Station Reach 2a Typical Cross Section Table Riffle Scour Pool Bankfull Area (A-bkf, sq ft) 26.3 30.7 Bankfull Width (W-bkf, ft) 18.0 18.0 Bankfull Mean Depth (ft) 1.50 1.7 Bankfull Max Depth (D-bkf, ft) 2.2 3.0 Bankfull W/D (Stream Type) 12.3 (Cb/Eb) 10.6 Inner Berm Width (ft) 12.4 12.4 Inner Berm Max Depth (ft) 1.10 1.90 Approx. Welted Width (ft) 9.7 9.7 Approx. Welted Max Depth (ft) 0.6 1.4 Channel Bottom Width (W-bottom, ft) 8.4 1.8 Reach 2b Typical Cross Section Table Riffle Scour Pool Bankfull Area (A-bkf, sq ft) 26.6 33.1 Bankfull Width (W-bkf, ft) 21.0 21.0 Bankfull Mean Depth (ft) 1.26 1.6 Bankfull Max Depth (D-bkf, P P o° e 2 2 Unnamed Tributary I Typical Riffle • Unnamed Tributary I Typical Scour Pool C! Unnamed Tributary 2 Typical Riffle Unnamed Tributary 2 Typical Scour Pool 4 W-bkfl N 2.5 D-bkfl 1 �3 1 UT 1 Typical Cross Section Riffle Scour Pool Bankfull Area (A-bkf, sq ft) 11.1 13.0 Bankfull Width (W-bkf, ft) 13.0 13.0 Bankfull Mean Depth (ft) 0.85 1.0 Bankfull Max Depth (D-bkf, ff) 1.3 1.8 Bankfull W/D (Stream Type) 15.3 13.0 Inner Berm Width (ft) 9.1 9.1 Inner Berm Max Depth (ft) 0.65 1.15 Approx. Wetted Width (ft) 7.0 7.0 Approx. Wetted Max Depth (ft) 0.3 0.8 UT 2 Typical Cross Section Riffle Scour Pool Bankfull Area (A-bkf, sq ff) 5.1 7.4 Bankfull Width (W-bkf, ff) 9.0 9.0 Bankfull Mean Depth (ff) 0.6 0.8 Bankfull Max Depth (D-bkf, ft) 0.8 1.4 Bankfull W/D (Stream Type) 15.9 11.0 Inner Berm Width (ff) 7.0 7.0 Inner Berm Max Depth (ft) 0.4 1.0 Approx. Welted Width (ft) 6.0 6.0 Approx. Wetted Max Depth (ft) 0.2 0.8 PROPOSED CONDITION PROPOSED BANKFULL PROPOSED LOW FLOW INNER -BERM CHANNEL �z co0) l) 0 c 0 w Vanderpool Creek 1a Z cn a� a� c c w .,r N m m O U z¢ Yg U N O O Pool Area (sq ft) Avg: 20.0/ Range: 17.4-22.8 Avg: 22.0/ Range: 22.0-22.0 U c� 06 � o U ro Pool to Pool Spacing (ft) Avg: 33.0/ Range: 5.7-82.3 Avg: 31.3 / Range: 10.0-64.0 ro 'o .N _ O -Q ro ro o roU c j U roo � UZ Q Z> U 0 'o 0 Sheet 43 Station 0+00 - 15+88 0+00 - 15+40 Drainage Area (sq mi) 0.9 0.9 Stream Type G4 / 64 C4b Estimated Bankfull Velocity (ft/sec) Avg: 6.1/ Range: 4.6-7.3 Avg: 6.1/ Range: 5.9-6.5 Estimated Bankfull Discharge (tuft/sec) Avg: 105.8/ Range: 77.6-129.8 Avg: 107.0/ Range: 103.8-114.0 Bankfull Width /Depth Ratio Avg: 24.1 / Range: 10.5-40.5 Avg: 16.6 / Range: 16.5-17.4 Floodprone Width Avg: 37.7/ Range: 17.0-59.5 Avg: 48.4/ Range: 39.0-59.8 Bank Height Ratio Avg: 1.8/ Range: 1.2-3.2 Avg: 1.0/ Range: 1.0-1.0 Step Height (ft) Avg: 0.7/ Range: 0.2-1.5 Avg: 0.7/ Range: 0.3-1.3 Step Length (ft) Avg: 6.1 / Range: 1.7-16.2 Avg: 5.0/ Range: 2.3-8.5 Pool Bkf Width (ft) Avg: 21.5 / Range: 17.2-35.2 Avg: 17.0/ Range: 17.0-17.0 Pool Bkf Depth (ft) Avg: 1.0/ Range: 0.6-1.2 Avg: 1.3/ Range: 1.3-1.3 P-P Spacing Ratio Avg: 1.6/ Range: 0.3-4.9 Avg: 2.0/ Range: 0.6-3.8 Inner Berm Depth (ft) Avg: 0.4/ Range: 0.3-0.5 Avg: 0.6 Vanderpool Creek 1b Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 15+88 - 27+40 15+40 - 24+71 Drainage Area (sq mi) 0.9 0.9 Stream Type G4 / B4 C4b / E4b Bankfull Area (sq ft) Avg: 17.6/ Range: 16.2-19.9 Avg: 17.4/ Range: 16.7-17.6 Bankfull Area (sq ft) Avg: 17.4/ Range: 17.0-17.8 Avg: 18.0/ Range: 17.9-18.5 Bankfull Width (ft) Avg: 20.4/ Range: 13.0-26.1 Avg: 17.0 Bankfull Width (ft) Avg: 14.0/ Range: 12.9-15.9 Avg: 15.0/ Range: 15.0-15.3 Bankfull Depth (ft) Avg: 0.9/ Range: 0.6-1.2 Avg: 1.0 Bankfull Depth (ft) Avg: 1.2/Range: 1.1-1.4 Avg: 1.2/ Range: 1.2-1.2 Bankfull Max Depth Avg: 1.4/Range: 1.1-1.7 Avg: 1.5 Bankfull Max Depth Avg: 1.9/ Range: 1.6-2.1 Avg: 1.8/ Range: 1.8-1.8 Estimated Bankfull Velocity (ft/sec) Avg: 6.0/ Range: 5.8-6.4 Avg: 8.0/ Range: 7.7-8.4 Estimated Bankfull Discharge (tuft/sec) Avg: 109.2/ Range: 104.7-114.1 Avg: 144.2/ Range: 138.0-150.4 Bankfull Width /Depth Ratio Avg: 11.3/ Range: 9.4-14.2 Avg: 12.6/ Range: 12.6-12.7 Floodprone Width Avg: 22.6/ Range: 14.429.2 Avg: 32.9/ Range: 20.7-37.2 Entrenchment Ratio Avg: 1.9/ Range: 1.3-3.5 Avg: 2.8/ Range: 2.3-3.5 Entrenchment Ratio Avg: 1.6/ Range: 1.2-2.1 Avg: 2.2/Range: 1.4-2.5 Bank Height Ratio Avg: 2.4/ Range: 1.5-3.7 Avg: 1.0/ Range: 1.0-1.0 Sinuosity 1.2 1.1 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0380 0.0433 Water Surface Slope (ft/ft) 0.0335 0.0350 Riffle Length (ft) Avg: 27.7/ Range: 7.9-67.8 Avg: 28.1/ Range: 14.9-46.0 Riffle Length (ft) Avg: 17.6/ Range: 6.1-39.6 Avg: 22.3/ Range: 14.0-38.0 Riffle Length Ratio Avg: 1.4/ Range: 0.3-4.3 Avg: 1.7/ Range: 1.0-2.7 Riffle Length Ratio Avg: 1.3/ Range: 0.4-2.9 Avg: 1.5/ Range: 0.9-2.5 Riffle Slope (ft/ft) Avg: 0.0407/ Range: 0.0200-0.0620 Avg: 0.0507/ Range: 0.0320-0.0650 Riffle Slope (ft/ft) Avg: 0.0330/ Range: 0.0150-0.0490 Avg: 0.0420/ Range: 0.0270-0.0620 Riffle Slope Ratio Avg: 1.1/ Range: 0.6-1.8 Avg: 1.2/ Range: 0.7-1.5 Riffle Slope Ratio Avg: 1.0/ Range: 0.4-1.5 Avg: 1.3/ Range: 0.8-1.9 Step Height (ft) Avg: 0.7/ Range: 0.2-4.0 Avg: 0.65 / Range: 0.3-1.0 Step Length (ft) Avg: 7.1 / Range: 1.4-13.7 Avg: 5.0/ Range: 5.0-9.3 Pool Area (sq ft) Avg: 20.7 / Range: 17.6-22.8 Avg: 21.3 / Range: 21.3-21.3 Pool Bkf Width (ft) Avg: 16.9/ Range: 14.7-19.3 Avg: 15.0/ Range: 15.0-15.0 Pool Bkf Depth (ft) Avg: 1.3/ Range: 0.9-1.5 Avg: 1.4/ Range: 1.4-1.4 Pool Max Depth (ft) Avg: 1.8/ Range: 1.3-2.3 Avg: 2.3/ Range: 2.3-2.3 Pool Max Depth (ft) Avg: 2.1/ Range: 1.8-2.5 Avg: 2.6/ Range: 2.6-2.6 Pool Length (ft) Avg: 11.1/ Range: 2.3-21.1 Avg: 15.4/ Range: 6.0-28.4 Pool Length (ft) Avg: 12.0/ Range: 2.8-39.1 Avg: 15.8/ Range: 8.2-24.8 Pool Length Ratio Avg: 0.6/ Range: 0.1-1.1 Avg: 0.9/ Range: 0.4-1.5 Pool Length Ratio Avg: 0.9/ Range: 0.2-2.9 Avg: 1.1/ Range: 0.5-1.6 Pool to Pool Spacing (ft) Avg: 25.6/ Range: 9.8-51.9 Avg: 31.0/ Range: 16.0-70.0 P-P Spacing Ratio Avg: 1.9/ Range: 0.7-3.8 Avg: 2.1/Range: 1.1-4.7 Inner Berm Area (sq ft) Avg: 5.8/ Range: 4.9-6.5 Avg: 13.0 Inner Berm Area (sq ft) Avg: 7.2/ Range: 5.8-9.0 Avg: 12.8 Inner Berm Width (ft) Avg: 14.8 / Range: 11.0-18.5 Avg: 12.5 Inner Berm Width (ft) Avg: 9.8/ Range: 7.6-12.2 Avg: 10.4 Inner Berm Depth (ft) Avg: 0.8/ Range: 0.6-0.8 Avg: 0.6 Inner Berm Max Depth (ft) Avg: 0.7/ Range: 0.6-0.9 Avg: 0.75 Inner Berm Max Depth (ft) Avg: 1.0/ Range: 0.8-1.1 Avg: 0.9 D50 (mm) Avg: 18.0 Avg: 18.0 D50 (mm) Avg: 18.0 Avg: 18.0 D84 (mm) Avg: 75.0 Avg: 75.0 D84 (mm) Avg: 75.0 Avg: 75.0 Vanderpool Creek 1b Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 15+88 - 27+40 15+40 - 24+71 Drainage Area (sq mi) 0.9 0.9 Stream Type G4 / B4 C4b / E4b Bankfull Area (sq ft) Avg: 17.6/ Range: 16.2-19.9 Avg: 17.4/ Range: 16.7-17.6 Bankfull Area (sq ft) Avg: 17.4/ Range: 17.0-17.8 Avg: 18.0/ Range: 17.9-18.5 Bankfull Width (ft) Avg: 20.4/ Range: 13.0-26.1 Avg: 17.0 Bankfull Width (ft) Avg: 14.0/ Range: 12.9-15.9 Avg: 15.0/ Range: 15.0-15.3 Bankfull Depth (ft) Avg: 0.9/ Range: 0.6-1.2 Avg: 1.0 Bankfull Depth (ft) Avg: 1.2/Range: 1.1-1.4 Avg: 1.2/ Range: 1.2-1.2 Bankfull Max Depth Avg: 1.4/Range: 1.1-1.7 Avg: 1.5 Bankfull Max Depth Avg: 1.9/ Range: 1.6-2.1 Avg: 1.8/ Range: 1.8-1.8 Estimated Bankfull Velocity (ft/sec) Avg: 6.0/ Range: 5.8-6.4 Avg: 8.0/ Range: 7.7-8.4 Estimated Bankfull Discharge (tuft/sec) Avg: 109.2/ Range: 104.7-114.1 Avg: 144.2/ Range: 138.0-150.4 Bankfull Width /Depth Ratio Avg: 11.3/ Range: 9.4-14.2 Avg: 12.6/ Range: 12.6-12.7 Floodprone Width Avg: 22.6/ Range: 14.429.2 Avg: 32.9/ Range: 20.7-37.2 Entrenchment Ratio Avg: 1.9/ Range: 1.3-3.5 Avg: 2.8/ Range: 2.3-3.5 Entrenchment Ratio Avg: 1.6/ Range: 1.2-2.1 Avg: 2.2/Range: 1.4-2.5 Bank Height Ratio Avg: 2.4/ Range: 1.5-3.7 Avg: 1.0/ Range: 1.0-1.0 Sinuosity 1.2 1.1 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0380 0.0433 Water Surface Slope (ft/ft) 0.0335 0.0350 Riffle Length (ft) Avg: 27.7/ Range: 7.9-67.8 Avg: 28.1/ Range: 14.9-46.0 Riffle Length (ft) Avg: 17.6/ Range: 6.1-39.6 Avg: 22.3/ Range: 14.0-38.0 Riffle Length Ratio Avg: 1.4/ Range: 0.3-4.3 Avg: 1.7/ Range: 1.0-2.7 Riffle Length Ratio Avg: 1.3/ Range: 0.4-2.9 Avg: 1.5/ Range: 0.9-2.5 Riffle Slope (ft/ft) Avg: 0.0407/ Range: 0.0200-0.0620 Avg: 0.0507/ Range: 0.0320-0.0650 Riffle Slope (ft/ft) Avg: 0.0330/ Range: 0.0150-0.0490 Avg: 0.0420/ Range: 0.0270-0.0620 Riffle Slope Ratio Avg: 1.1/ Range: 0.6-1.8 Avg: 1.2/ Range: 0.7-1.5 Riffle Slope Ratio Avg: 1.0/ Range: 0.4-1.5 Avg: 1.3/ Range: 0.8-1.9 Step Height (ft) Avg: 0.7/ Range: 0.2-4.0 Avg: 0.65 / Range: 0.3-1.0 Step Length (ft) Avg: 7.1 / Range: 1.4-13.7 Avg: 5.0/ Range: 5.0-9.3 Pool Area (sq ft) Avg: 20.7 / Range: 17.6-22.8 Avg: 21.3 / Range: 21.3-21.3 Pool Bkf Width (ft) Avg: 16.9/ Range: 14.7-19.3 Avg: 15.0/ Range: 15.0-15.0 Pool Bkf Depth (ft) Avg: 1.3/ Range: 0.9-1.5 Avg: 1.4/ Range: 1.4-1.4 Pool Max Depth (ft) Avg: 1.8/ Range: 1.3-2.3 Avg: 2.3/ Range: 2.3-2.3 Pool Max Depth (ft) Avg: 2.1/ Range: 1.8-2.5 Avg: 2.6/ Range: 2.6-2.6 Pool Length (ft) Avg: 11.1/ Range: 2.3-21.1 Avg: 15.4/ Range: 6.0-28.4 Pool Length (ft) Avg: 12.0/ Range: 2.8-39.1 Avg: 15.8/ Range: 8.2-24.8 Pool Length Ratio Avg: 0.6/ Range: 0.1-1.1 Avg: 0.9/ Range: 0.4-1.5 Pool Length Ratio Avg: 0.9/ Range: 0.2-2.9 Avg: 1.1/ Range: 0.5-1.6 Pool to Pool Spacing (ft) Avg: 25.6/ Range: 9.8-51.9 Avg: 31.0/ Range: 16.0-70.0 P-P Spacing Ratio Avg: 1.9/ Range: 0.7-3.8 Avg: 2.1/Range: 1.1-4.7 Inner Berm Area (sq ft) Avg: 5.8/ Range: 4.9-6.5 Avg: 13.0 Inner Berm Area (sq ft) Avg: 7.2/ Range: 5.8-9.0 Avg: 12.8 Inner Berm Width (ft) Avg: 14.8 / Range: 11.0-18.5 Avg: 12.5 Inner Berm Width (ft) Avg: 9.8/ Range: 7.6-12.2 Avg: 10.4 Inner Berm Depth (ft) Avg: 0.8/ Range: 0.6-0.8 Avg: 0.6 Inner Berm Max Depth (ft) Avg: 0.7/ Range: 0.6-0.9 Avg: 0.75 Inner Berm Max Depth (ft) Avg: 1.0/ Range: 0.8-1.1 Avg: 0.9 D50 (mm) Avg: 18.0 Avg: 18.0 D50 (mm) Avg: 18.0 Avg: 18.0 D84 (mm) Avg: 75.0 Avg: 75.0 D84 (mm) Avg: 75.0 Avg: 75.0 �z co0) 0 c 0 w a� a� c w (1.4 J �. N N O z¢ O Yg U U N c� w, ro O .N N cu roro ° o ro o0 N U Uz 0 c� U 0 'o 0 Sheet 44 Vanderpool Creek 2a Vanderpool Creek 2b Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 27+40 - 32+76 24+71- 29+84 Station 32+76- 42+12 29+84 - 38+42 Drainage Area (sq mi) 1.32 1.32 Drainage Area (sq mi) 1.6 1.6 Stream Type E4b Cob /E4b Stream Type Cob Cob Bankfull Area (sq ft) Avg: 27.1 /Range: 25.4-29.1 Avg: 26.3 Bankfull Area (sq ft) Avg: 30.7 Range: 29.6-31.7 Avg: 26.6 Bankfull Width (ft) Avg: 16.1 / Range: 15.6-16.7 Avg: 18.0 Bankfull Width (ft) Avg: 24.2 Range: 22.8-25.6 Avg: 21.0 Bankfull Depth (ft) Avg: 1.7/ Range: 1.5-1.8 Avg: 1.5 Bankfull Max Depth Avg: 2.7/ Range: 2.5-2.9 Avg: 2.2 Estimated Bankfull Velocity (ft/sec) Avg: 8.4 / Range: 7.8-8.8 Avg: 6.3 Estimated Bankfull Discharge (cuft/sec) Avg: 228.4/ Range: 198.1-255.7 Avg: 164.7 Bankfull Width /Depth Ratio Avg: 9.6 / Range: 9.0-11.0 Avg: 12.3 Floodprone Width Avg: 63.2/ Range: 42.6-84.9 Avg: 40.2/ Range: 35.0-42.9 Entrenchment Ratio Avg: 3.9/ Range: 2.7-5.3 Avg: 2.3/ Range: 1.9-2.4 Entrenchment Ratio Avg: 2.5 Bank Height Ratio Avg: 1.2 / Range: 1.0-1.4 Avg: 1.0 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0260 0.0280 Riffle Length (ft) Avg: 17.5 / Range: 13.9-22.9 Avg: 22.7 /Range: 17.0-36.4 Riffle Length Ratio Avg: 1.1/ Range: 0.9-1.4 Avg: 1.3/ Range: 0.9-2.0 Riffle Slope (ft/ft) Avg: 0.0200/ Range: 0.0150-0.0240 Avg: 0.0310/ Range: 0.0110-0.0500 Riffle Slope Ratio Avg: 0.8/ Range: 0.6-0.9 Avg: 1.1/ Range: 0.4-1.8 Step Height (ft) Avg: 0.7/ Range: 0.3-1.5 Avg: 0.6/ Range: 0.2-1.1 Step Length (ft) Avg: 9.7/ Range: 1.6-23.0 Avg: 5.0/ Range: 1.8-9.3 Pool Area (sq ft) Avg: 30.5 / Range: 25.2-35.6 Avg: 31.3 / Range: 30.7-33.1 Pool Area (sq ft) Avg: 29.4/ Range: 28.1-30.4 Avg: 32.4/ Range: 31.8-33.1 Pool Bkf Width (ft) Avg: 14.3/ Range: 11.9-17.3 Avg: 18.8/Range: 18.0-21.0 Pool Bkf Depth (ft) Avg: 2.2 / Range: 1.8-2.6 Avg: 1.7 / Range: 1.6-1.7 Pool Max Depth (ft) Avg: 3.2 / Range: 2.9-3.4 Avg: 2.9 / Range: 2.6-3.0 Pool Length (ft) Avg: 16.8 / Range: 4.6-35.0 Avg: 19.5 /Range: 13.5-28.4 Pool Length (ft) Avg: 16.1 Range: 5.1-46.0 Avg: 19.6 / Range: 6.6-42.5 Pool Length Ratio Avg: 1.0/ Range: 0.3-2.2 Avg: 1.1/ Range: 0.8-1.6 Pool Length Ratio Avg: 0.7/ Range: 0.2-1.9 Avg: 0.9/ Range: 0.3-2.0 Pool to Pool Spacing (ft) Avg: 25.5 / Range: 10.5-43.5 Avg: 34.4 /Range: 17.5-57.3 P-P Spacing Ratio Avg: 1.6 / Range: 0.7-2.7 Avg: 1.9 / Range: 1.0-3.2 Inner Berm Area (sq ft) Avg: 5.6 / Range: 4.9-6.1 Avg: 19.2 Inner Berm Area (sq ft) Avg: 5.6 Range: 4.9-6.1 Avg Inner Berm Width (ft) Avg: 11.8 / Range: 7.6-18.1 Avg: 12.4 Inner Berm Width (ft) Avg: 11.8 / Range: 7.6-18.1 Avg: 15.6 Inner Berm Depth (ft) Avg: 0.5 / Range: 0.3-0.8 Avg: 0.9 Inner Berm Max Depth (ft) Avg: 0.7 / Range: 0.6-1.1 Avg: 1.1 D50 (mm) Avg: 22.0 Avg: 22.0 D84 (mm) Avg: 88.0 Avg: 88.0 Bankfull Depth (ft) Avg: 1.3 / Range: 1.2-1.3 Avg: 1.3 Bankfull Max Depth Avg: 2.3 / Range: 2.2-2.5 Avg: 1.8 Estimated Bankfull Velocity (ft/sec) Avg: 7.1 / Range: 7.0-7.2 Avg: 5.6 Estimated Bankfull Discharge (cuft/sec) Avg: 216.4/ Range: 212.5-220.3 Avg: 149.E Bankfull Width /Depth Ratio Avg: 19.1 /Range: 17.5-20.7 Avg: 16.6 Floodprone Width Avg: 59.6/ Range: 56.9-62.2 Avg: 53.0 / Range: 2.2-2.7 Avg: 2.5 Bank Height Ratio Avg: 2.0 / Range: 1.6-2.4 Avg: 1.0 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0260 0.0270 Riffle Length (ft) Avg: 27.1 / Range: 9.3-80.3 Avg: 21.1 /Range: 12.1-33.0 Riffle Length Ratio Avg: 1.1/ Range: 0.4-3.3 Avg: 1.0/ Range: 0.6-1.6 Riffle Slope (ft/ft) Avg: 0.0210/ Range: 0.0120-0.0300 Avg: 0.0320/ Range: 0.0180-0.0410 Riffle Slope Ratio Avg: 0.8/ Range: 0.5-1.2 Avg: 1.2/ Range: 0.7-1.5 Pool Bkf Width (ft) Avg: 20.1/ Range: 17.6-21.5 Avg: 21.0/ Range: 21.0-21.0 Pool Bkf Depth (ft) Avg: 1.4/ Range: 1.3-1.5 Avg: 1.5/ Range: 1.5-1.6 N Pool Max Depth (ft) Avg: 2.6/ Range: 2.2-3.0 Avg: 2.4/ Range: 2.3-2.6 / Pool to Pool Spacing (ft) Avg: 32.5 / Range: 9.5-86.4 Avg: 34.2 /Range: 18.0-77.0 P-P Spacing Ratio Avg: 1.3 / Range: 0.4-3.6 Avg: 1.6 / Range: 0.9-3.7 / : 20.2 Inner Berm Depth (ft) Avg: 0.5 / Range: 0.3-0.8 Avg: 0.65 Inner Berm Max Depth (ft) Avg: 0.7 / Range: 0.6-1.1 Avg: 0.9 D50 (mm) Avg: 18.0 Avg: 18.0 D84 (mm) Avg: 75.0 Avg: 75.0 Vanderpool Creek 2b Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 27+40 - 32+76 24+71- 29+84 Station 32+76- 42+12 29+84 - 38+42 Drainage Area (sq mi) 1.32 1.32 Drainage Area (sq mi) 1.6 1.6 Stream Type E4b Cob /E4b Stream Type Cob Cob Bankfull Area (sq ft) Avg: 27.1 /Range: 25.4-29.1 Avg: 26.3 Bankfull Area (sq ft) Avg: 30.7 Range: 29.6-31.7 Avg: 26.6 Bankfull Width (ft) Avg: 16.1 / Range: 15.6-16.7 Avg: 18.0 Bankfull Width (ft) Avg: 24.2 Range: 22.8-25.6 Avg: 21.0 Bankfull Depth (ft) Avg: 1.7/ Range: 1.5-1.8 Avg: 1.5 Bankfull Max Depth Avg: 2.7/ Range: 2.5-2.9 Avg: 2.2 Estimated Bankfull Velocity (ft/sec) Avg: 8.4 / Range: 7.8-8.8 Avg: 6.3 Estimated Bankfull Discharge (cuft/sec) Avg: 228.4/ Range: 198.1-255.7 Avg: 164.7 Bankfull Width /Depth Ratio Avg: 9.6 / Range: 9.0-11.0 Avg: 12.3 Floodprone Width Avg: 63.2/ Range: 42.6-84.9 Avg: 40.2/ Range: 35.0-42.9 Entrenchment Ratio Avg: 3.9/ Range: 2.7-5.3 Avg: 2.3/ Range: 1.9-2.4 Entrenchment Ratio Avg: 2.5 Bank Height Ratio Avg: 1.2 / Range: 1.0-1.4 Avg: 1.0 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0260 0.0280 Riffle Length (ft) Avg: 17.5 / Range: 13.9-22.9 Avg: 22.7 /Range: 17.0-36.4 Riffle Length Ratio Avg: 1.1/ Range: 0.9-1.4 Avg: 1.3/ Range: 0.9-2.0 Riffle Slope (ft/ft) Avg: 0.0200/ Range: 0.0150-0.0240 Avg: 0.0310/ Range: 0.0110-0.0500 Riffle Slope Ratio Avg: 0.8/ Range: 0.6-0.9 Avg: 1.1/ Range: 0.4-1.8 Step Height (ft) Avg: 0.7/ Range: 0.3-1.5 Avg: 0.6/ Range: 0.2-1.1 Step Length (ft) Avg: 9.7/ Range: 1.6-23.0 Avg: 5.0/ Range: 1.8-9.3 Pool Area (sq ft) Avg: 30.5 / Range: 25.2-35.6 Avg: 31.3 / Range: 30.7-33.1 Pool Area (sq ft) Avg: 29.4/ Range: 28.1-30.4 Avg: 32.4/ Range: 31.8-33.1 Pool Bkf Width (ft) Avg: 14.3/ Range: 11.9-17.3 Avg: 18.8/Range: 18.0-21.0 Pool Bkf Depth (ft) Avg: 2.2 / Range: 1.8-2.6 Avg: 1.7 / Range: 1.6-1.7 Pool Max Depth (ft) Avg: 3.2 / Range: 2.9-3.4 Avg: 2.9 / Range: 2.6-3.0 Pool Length (ft) Avg: 16.8 / Range: 4.6-35.0 Avg: 19.5 /Range: 13.5-28.4 Pool Length (ft) Avg: 16.1 Range: 5.1-46.0 Avg: 19.6 / Range: 6.6-42.5 Pool Length Ratio Avg: 1.0/ Range: 0.3-2.2 Avg: 1.1/ Range: 0.8-1.6 Pool Length Ratio Avg: 0.7/ Range: 0.2-1.9 Avg: 0.9/ Range: 0.3-2.0 Pool to Pool Spacing (ft) Avg: 25.5 / Range: 10.5-43.5 Avg: 34.4 /Range: 17.5-57.3 P-P Spacing Ratio Avg: 1.6 / Range: 0.7-2.7 Avg: 1.9 / Range: 1.0-3.2 Inner Berm Area (sq ft) Avg: 5.6 / Range: 4.9-6.1 Avg: 19.2 Inner Berm Area (sq ft) Avg: 5.6 Range: 4.9-6.1 Avg Inner Berm Width (ft) Avg: 11.8 / Range: 7.6-18.1 Avg: 12.4 Inner Berm Width (ft) Avg: 11.8 / Range: 7.6-18.1 Avg: 15.6 Inner Berm Depth (ft) Avg: 0.5 / Range: 0.3-0.8 Avg: 0.9 Inner Berm Max Depth (ft) Avg: 0.7 / Range: 0.6-1.1 Avg: 1.1 D50 (mm) Avg: 22.0 Avg: 22.0 D84 (mm) Avg: 88.0 Avg: 88.0 Bankfull Depth (ft) Avg: 1.3 / Range: 1.2-1.3 Avg: 1.3 Bankfull Max Depth Avg: 2.3 / Range: 2.2-2.5 Avg: 1.8 Estimated Bankfull Velocity (ft/sec) Avg: 7.1 / Range: 7.0-7.2 Avg: 5.6 Estimated Bankfull Discharge (cuft/sec) Avg: 216.4/ Range: 212.5-220.3 Avg: 149.E Bankfull Width /Depth Ratio Avg: 19.1 /Range: 17.5-20.7 Avg: 16.6 Floodprone Width Avg: 59.6/ Range: 56.9-62.2 Avg: 53.0 / Range: 2.2-2.7 Avg: 2.5 Bank Height Ratio Avg: 2.0 / Range: 1.6-2.4 Avg: 1.0 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0260 0.0270 Riffle Length (ft) Avg: 27.1 / Range: 9.3-80.3 Avg: 21.1 /Range: 12.1-33.0 Riffle Length Ratio Avg: 1.1/ Range: 0.4-3.3 Avg: 1.0/ Range: 0.6-1.6 Riffle Slope (ft/ft) Avg: 0.0210/ Range: 0.0120-0.0300 Avg: 0.0320/ Range: 0.0180-0.0410 Riffle Slope Ratio Avg: 0.8/ Range: 0.5-1.2 Avg: 1.2/ Range: 0.7-1.5 Pool Bkf Width (ft) Avg: 20.1/ Range: 17.6-21.5 Avg: 21.0/ Range: 21.0-21.0 Pool Bkf Depth (ft) Avg: 1.4/ Range: 1.3-1.5 Avg: 1.5/ Range: 1.5-1.6 N Pool Max Depth (ft) Avg: 2.6/ Range: 2.2-3.0 Avg: 2.4/ Range: 2.3-2.6 / Pool to Pool Spacing (ft) Avg: 32.5 / Range: 9.5-86.4 Avg: 34.2 /Range: 18.0-77.0 P-P Spacing Ratio Avg: 1.3 / Range: 0.4-3.6 Avg: 1.6 / Range: 0.9-3.7 / : 20.2 Inner Berm Depth (ft) Avg: 0.5 / Range: 0.3-0.8 Avg: 0.65 Inner Berm Max Depth (ft) Avg: 0.7 / Range: 0.6-1.1 Avg: 0.9 D50 (mm) Avg: 18.0 Avg: 18.0 D84 (mm) Avg: 75.0 Avg: 75.0 �z co0) ro °~ 0 c 0 Unnamed Tributary Ito w a� a� c w �. N z¢ Yg U N O O U Ncla co .� Q '� .ro ~ ,N N -0 ro 0 � U ° o N OD ro � � c - c U 0 0 Q 0 Sheet 45 Vanderpool Creek Unnamed Tributary 2 to Vanderpool Creek Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 0+00 - 0+98.7 0+00 - 0+98.7 Station 0+00 - 9+85 0+00 - 9+57 Drainage Area (sq mi) 0.41 0.41 Drainage Area (sq mi) 0.12 0.12 Stream Type Cob Cob Stream Type C4b/E4b Cob Bankfull Area (sq ft) Avg: 11.0 /Range 11.0 - 11.1 Avg: 11.0 Bankfull Area (sq ft) Avg: 5.1 Range: 4.9-5.2 Avg: 5.1 Bankfull Width (ft) Avg: 13.3 /Range: 11.1-15.0 Avg: 13.0 Bankfull Width (ft) Avg: 10.0/ Range: 6.6-17.0 Avg: 9.0 Bankfull Depth (ft) Avg: 0.85/ Range: 0.7-1.0 Avg: 0.85 Bankfull Depth (ft) Avg: 0.6/ Range: 0.3-0.8 Avg: 0.6 Bankfull Max Depth Avg: 1.9/ Range: 1.8-2.0 Avg: 1.3 / Bankfull Max Depth Avg: 1.1/ Range: 0.7-1.6 Avg: 0.8 Estimated Bankfull Velocity (ft/sec) Avg: 3.8/ Range: 2.5-4.7 Avg: 3.8/ Range: 3.7-3.9 Estimated Bankfull Discharge (cuft/sec Avg: 17.4/ Range: 13.0-24.2 Avg: 19.5/ Range: 19.0-20.0 Bankfull Width /Depth Ratio Avg: 21.11 Range: 8.3-56.0 Avg: 15.9 Floodprone Width Avg: 29.9/Range: 12.1-53.5 Avg: 34.0/ Range: 25.0-61.4 Entrenchment Ratio Avg: 3.3/ Range: 1.5-6.2 Avg: 3.8/ Range: 2.7-6.8 Bank Height Ratio Avg: 1.3 / Range: 1.0-2.0 Avg: 1.0 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0290 0.0295 Riffle Length (ft) Avg: 13.1/ Range: 5.9-26.0 Avg: 13.7/ Range: 12.0-22.0 Riffle Length Ratio Avg: 1.4/ Range: 0.5-3.6 Avg: 1.5/ Range: 1.3-2.4 Riffle Slope (ft/ft) Avg: 0.0285 / Range: 0.0052-0.0600 Avg: 0.0320/ Range: 0.0100-0.0500 Riffle Slope Ratio Avg: 1.0/ Range: 0.2-2.1 Avg: 1.1/ Range: 0.3-1.6 Step Height (ft) Avg: 0.5/ Range: 0.2-1.4 Avg: 0.4/ Range: 0.2-0.8 Step Length (ft) Avg: 4.3 / Range: 0.9-16.2 Avg: 4.0 Pool Area (sq ft) Avg: 6.0/ Range: 5.5-6.4 Avg: 7.3/ Range: 7.2-7.4 Pool Bkf Width (ft) Avg: 9.9 / Range: 6.8-13.5 Avg: 9.0 a) IM Pool Bkf Depth (ft) Avg: 0.6/ Range: 0.5-0.8 Avg: 0.8 Pool Max Depth (ft) Avg: 1.5/ Range: 0.9-1.7 Avg: 1.4 Pool Length (ft) Avg: 7.6/ Range: 2.1-18.8 Avg: 9.8/ Range: 9.0-12.0 Pool Length Ratio Avg: 0.8/ Range: 0.2-2.3 Avg: 1.1/ Range: 1.0-1.3 ro==A Pool to Pool Spacing (ft) Avg: 18.1/ Range: 5.8-37.0 Avg: 23.4/ Range: 13.0-36.0 P-P Spacing Ratio Avg: 2.0/ Range: 0.5-4.1 Avg: 2.6/Range: 1.4-4.0 Inner Berm Area (sq ft) Avg: 1.2 /Range: 1.1-1.2 Avg: 1.9 Inner Berm Width (ft) Avg: 4.9/ Range: 2.5-6.9 Avg: 7.0 Inner Berm Depth (ft) Avg: 0.3 / Range: 0.2-0.5 Avg: 0.3 Inner Berm Max Depth (ft) Avg: 0.6 / Range: 0.4-0.9 Avg: 0.4 Unnamed Tributary 2 to Vanderpool Creek Stream Assessment Parameters Existing Condition Proposed Condition Stream Assessment Parameters Existing Condition Proposed Condition Station 0+00 - 0+98.7 0+00 - 0+98.7 Station 0+00 - 9+85 0+00 - 9+57 Drainage Area (sq mi) 0.41 0.41 Drainage Area (sq mi) 0.12 0.12 Stream Type Cob Cob Stream Type C4b/E4b Cob Bankfull Area (sq ft) Avg: 11.0 /Range 11.0 - 11.1 Avg: 11.0 Bankfull Area (sq ft) Avg: 5.1 Range: 4.9-5.2 Avg: 5.1 Bankfull Width (ft) Avg: 13.3 /Range: 11.1-15.0 Avg: 13.0 Bankfull Width (ft) Avg: 10.0/ Range: 6.6-17.0 Avg: 9.0 Bankfull Depth (ft) Avg: 0.85/ Range: 0.7-1.0 Avg: 0.85 Bankfull Depth (ft) Avg: 0.6/ Range: 0.3-0.8 Avg: 0.6 Bankfull Max Depth Avg: 1.9/ Range: 1.8-2.0 Avg: 1.3 / Bankfull Max Depth Avg: 1.1/ Range: 0.7-1.6 Avg: 0.8 Estimated Bankfull Velocity (ft/sec) Avg: 3.8/ Range: 2.5-4.7 Avg: 3.8/ Range: 3.7-3.9 Estimated Bankfull Discharge (cuft/sec Avg: 17.4/ Range: 13.0-24.2 Avg: 19.5/ Range: 19.0-20.0 Bankfull Width /Depth Ratio Avg: 21.11 Range: 8.3-56.0 Avg: 15.9 Floodprone Width Avg: 29.9/Range: 12.1-53.5 Avg: 34.0/ Range: 25.0-61.4 Entrenchment Ratio Avg: 3.3/ Range: 1.5-6.2 Avg: 3.8/ Range: 2.7-6.8 Bank Height Ratio Avg: 1.3 / Range: 1.0-2.0 Avg: 1.0 Sinuosity 1.2 1.1 Water Surface Slope (ft/ft) 0.0290 0.0295 Riffle Length (ft) Avg: 13.1/ Range: 5.9-26.0 Avg: 13.7/ Range: 12.0-22.0 Riffle Length Ratio Avg: 1.4/ Range: 0.5-3.6 Avg: 1.5/ Range: 1.3-2.4 Riffle Slope (ft/ft) Avg: 0.0285 / Range: 0.0052-0.0600 Avg: 0.0320/ Range: 0.0100-0.0500 Riffle Slope Ratio Avg: 1.0/ Range: 0.2-2.1 Avg: 1.1/ Range: 0.3-1.6 Step Height (ft) Avg: 0.5/ Range: 0.2-1.4 Avg: 0.4/ Range: 0.2-0.8 Step Length (ft) Avg: 4.3 / Range: 0.9-16.2 Avg: 4.0 Pool Area (sq ft) Avg: 6.0/ Range: 5.5-6.4 Avg: 7.3/ Range: 7.2-7.4 Pool Bkf Width (ft) Avg: 9.9 / Range: 6.8-13.5 Avg: 9.0 a) IM Pool Bkf Depth (ft) Avg: 0.6/ Range: 0.5-0.8 Avg: 0.8 Pool Max Depth (ft) Avg: 1.5/ Range: 0.9-1.7 Avg: 1.4 Pool Length (ft) Avg: 7.6/ Range: 2.1-18.8 Avg: 9.8/ Range: 9.0-12.0 Pool Length Ratio Avg: 0.8/ Range: 0.2-2.3 Avg: 1.1/ Range: 1.0-1.3 ro==A Pool to Pool Spacing (ft) Avg: 18.1/ Range: 5.8-37.0 Avg: 23.4/ Range: 13.0-36.0 P-P Spacing Ratio Avg: 2.0/ Range: 0.5-4.1 Avg: 2.6/Range: 1.4-4.0 Inner Berm Area (sq ft) Avg: 1.2 /Range: 1.1-1.2 Avg: 1.9 Inner Berm Width (ft) Avg: 4.9/ Range: 2.5-6.9 Avg: 7.0 Inner Berm Depth (ft) Avg: 0.3 / Range: 0.2-0.5 Avg: 0.3 Inner Berm Max Depth (ft) Avg: 0.6 / Range: 0.4-0.9 Avg: 0.4 BOULDER REVETMENT Restore disturbed area with Riparian Seeding (see Detail) Streambank Matting, (see Detail) Existing Ground Bankfull Elevation Proposed Ground—,/2 Max. Header Rock Wooden Stake Streambed Backfill with suitable Footer Rock alluvial material (see Note 7) Geotextile Liner (if needed, see Note 3) Section A -A View N. T. S. Rock Sill, extend into streambank (see Note 8) Edge of Water at Normal Flow Plan View N. T. S. Top of Bank (Bankfull) Header Rock Footer Rock Toe of Bank Slope Geotextile Liner �Backfill with suitable (if needed, alluvial material see Note 3) (see Note 7) w N � m a7 OU z¢ Yg N O O U Notes: 7. Footer Rocks and Header Rocks shall be backfilled with gravel alluvial 1. Boulder Revetments shall be installed along the base of the design material, if suitable size and consistency is available. Suitable backfill shall streambank toe at locations and stream lengths designated in the Site Plans. have a minimum median diameter of 2" and not exceed 6" dia. It shall drain .o 2. For Vanderpool Creek and UT1, Footer, Header, and Sill Rock shall be min. quickly and support weight without shifting or sinking. For fine sediment N 3.5' dia. long axis, min. 3.0' dia. intermediate axis and min. 2' dia. height. For substrates, outside gravel may be needed for backfill and Footer Rocks shall ro UT2, the min. shall be 2' dia. long axis, min. 1.5' dia. intermediate axis and be supported with a layer of stone, as approved by the Project Engineer. � o min. 1.0' dia. height. 8. Sill Rocks shall extend into the bank a minimum of 12' for Vanderpool Creek, 3. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 6' for UT1, and 4' for UT2. 7oz/sq yd; Tensile Strength 180 Ibs). Geotextile Liner shall be installed if 9. After Boulder Revetment has been installed, backfill streambank with clean v v z backfill is fine-grained, as approved b the Project Engineer. Place Liner g pp Y 1 g soil fill material and compact at the proposed bank angle. p p p g CO behind all rock layers and key in at the bottom. Trim excess or visible fabric. 10. Stabilize streambank with Riparian Seeding, Streambank Matting, and c a� z� 4. Footer Rocks shall extend below scour depth or to bedrock, whichever is Livestaking (see Details). C) shallower. The scour depth is estimated to be the max. pool depth near the structure, unless otherwise specified. 5. Header Rocks must extend upwards above the normal flow water surface and have an even grade along the length of the Revetment. 6. Install two or more Header Rocks overlain and offset backwards moving up the bank if existing substrate elevation is below that needed for Header Sheet Rock to extend up to normal flow elevation or if additional protection is needed for exposed tree roots or other bank feature. Do not exceed the ^ J inner berm elevation. C 1 Riffle alluvial gravel layer, Section A - A View N. T. S. Notes: 1. Constructed Riffle lengths and slopes are provided in the Longitudinal Profile. For 4. Unnamed Tributaries, Head of Riffle and End of Riffle elevations are listed in Structure Tables (Log/Rock Sills and Step structures). 2. Constructed Riffles within the proposed 5. Priority 1 (UT2) and Re -Alignment (VC, UT1) channels shall be composed of natural alluvial gravel and cobble materials harvested from the existing channel 6. substrate prior to backfilling. 3. For Vanderpool Creek, the median particle size is coarse gravel (16-32 mm; a - 14 in), as CONSTRUCTED RIFFLE Top of Bank (Bankfull) oe �� ......, aded approved by the Project Engineer. For UT2, the size is ... Avoid alluvial materials with excess fine sediments derived from bank erosion. Ensure well graded materials from fine gravel to very coarse gravel. Excavate streambed minimum 4" below finished grade and add gravel material. Line entire active bed to prevent scour along the bank toe. Create heterogeneity in Constructed Riffles by embedding cobbles and woody debris within the gravel substrate. 0 Plan View N.T.S. 0 w Sheet C2 Apex Step Rock Riffle Streambed -I Footer Rock 0.4- 0.5' �--Poo/ Splash - Rock Section A (At apex) N. T. S. Header Rock Footer Rock Splash Rock _ Backfill — Existing (see Note 2 and 3) Streambed Geotextile Liner Proposed (see Note 4 and 5) Section B (At vane arm) N. T. S. Bankfull Max Depth HeightArm Arm Apex Footer Rock Arm Bankfull Tie -In (see Note 8) �-----"�----;--W Bankfull - Bank Toe Arm Profile View N. T. S. CROSS VANE WITHOUT STEP Edge of Water at Normal Flow Top of Bank (Bankfull) V y I y y Apex Rocks I y y (see Note 8) ✓y I y IV �i y Header Rock W W Footer Rock W 41 y / 41 11, Existing Streambed Proposed Streambed y I ! Riffle y y y ! y l IPooY 41 y y y ,uyyy ! y y Glide w w ! y Arm Apex Elevation, (See Structure Table) y y y W 4Backfill with suitable v alluvial gravel -cobble �lnix (see Note 2 and 3) y Geotextile Liner �(as needed, © see Note 4 and 5) � W Rock Cutoff Sill, y ! (see Note 10) y yl .v Arm Bankfull Tie -In Elevation ! (See Structure Table, Note 8) 41 `i y y ! L L V y y y W y Flow W W! W 'k Splash Rocks y ! (as needed) �Bankfull Width Excavate Scour Pool Plan View See Structure Tables on Next choot Notes: 1. For Vanderpool Creek, Header, Footer, and Sill Rocks shall be min. 3.5' dia. long axis, min. 3.0' dia. intermediate axis, and min. 2.0' dia. height. For UT2, min. 2.0' dia. long axis, min. 1.5' dia. intermediate axis, and min. 1.0' dia. height. 2. Vane Arm Header and Footer Rocks shall be backfilled with alluvial material composed of a gravel -cobble mix if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of approximately 2", and shall not exceed 9". The material shall drain quickly, and support weight without shifting or sinking. Larger diameter rocks can be used at the apex of the arm wedge for scour protection, installed below the Arm Apex Elevation. Do not place sod or soil on top of the Header Rocks nor use them to backfill behind Vane Arm. Any topsoil placed along the Vane Arm shall be for temporary erosion control seeding and shall be no more then 1-2" depth. The topsoil shall shall not extend above the elevation of the Header Rocks. 3. Backfill behind the Vane Arm flush with the Header Rock elevation until meeting the streambank contour. 4. For finer sediment substrates, outside gravel shall be brought in for backfill or Geotextile Liner shall be installed (see note 5). Footer Rocks shall be supported with a layer of stone to prevent sinking or shifting, as approved by the Project Engineer. 5. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Place liner behind the arm (upstream side), draped from top of rock structure to bottom of footer rock and extend a minimum of half the trench bottom width. Trim excess or visible fabric. 6. At the structure apex, extend Footer Rock below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max pool depth associated with the structure). 7. Step Height is the Total Structure Drop of the water surface. Maximum water surface (structure) drop across the Apex Rock is XX' measured along the stream thalweg. See Section A and Structure Table. 8. Gaps between Apex Header Rocks will not be included due to step feature. The thalweg elevation shall be at the top of Header Rocks. 9. For Vanderpool Creek 1 a and UT2, Structures will be tied in at bankfull elevation. For Vanderpool Creek 2a, structures will be tied in at 3/4 bankfull max depth. 10. For Vanderpool Creek, Sill Rocks shall extend min. 12' into streambank. For UT2, Sill Rocks shall extend min. 6' into streambank. 11. After vane arms are installed, stabilize all disturbed streambank with Riparian Seeding, Streambank Matting, and Livestakes (see Details). w N z¢ Yg N O O U Sheet C3 Apex Step Rock Riffle Streambed-1 Footer Rock) 0.3' Step Rock / r 0.3' S Poo/ tep \-Splash Rock Section A (At apex) N. T. S. Poo/ Bankfull Max Depth Arm Arm Bankfull Height Tie -In (see Note 9) Arm Apex Flow --- x J ----': ---- = Bankfull _ � J Dr a f J J Bank Toe Footer Rock) Proposed Streambed Existing Streambed Arm Profile View N. T. S. CROSS VANE WITH STEP Header Rock Footer Rock Splash Rock _ Backfill Existing (see Note 2 and 3) Streambed Geotextile Liner Proposed (see Note 4 and 5) Streambed Section B (At vane arm) N. T. S. Reach la Structure dimension Table Parameter 1/3 Bankfull Width 5.7 Vane Arm Angle (deg) 19.0 Stream Length (ft) 16.6 Vane Arm Length (ft) 17.5 Vane Slope (%) 0.049 Vane Arm Height (ft) Bankfull Hoax Depth (ft) 0.85 1.5 Structure Grade Drop (ft) 0.4.0.6 Notes: Key in at bankfull elevation Edge of Water at Normal Flow Top of Bank (Bankfull) I W i W y W Apex Rock y y (see Note 8) W Y.3 W Header Rock � I Footer Rock y y i y y r l Reach la Cross Vane (Step) Elevation Table Cross- vane # Centerline Station Apex Thalweg EL (ft) Arm Apex EL (ft) Apex Bankfull EL (ft) Arm Bankfull Tie -In EL (ft) Total Structure Drop (ft) 1 3+78-3+94.6 2919.60 2919.65 2921.10 2920.50 0.60 Structures are tied -in at bankfull elevation Structures will be staked out by construction oversight prior to construction W i Riffle y W �I Arm Apex Elevation, (see Structure Table) W W W jIV'Backfill with suitable v alluvial gravel -cobble mix 1 X (see Note 2 and 3) Geotextile Liner (as needed � Osee Note 4 and 5) B y Rock Cutoff Sill, .__���12' min. Pool i 'I - Arm Bankfull Tie -In WiW W! Elevation y W W y y WI (see Note 9, Structure wW Wi Table) Glide y y I W W W W q, Splash Rocks w u y W W W W W ! (as needed) Ir I I I I W Flow W W Excavate Scour Pool Bankfull Width Plan View N. T. S. w Notes: with a layer of stone to prevent sinking or shifting, as approved by the Project d c �°-CU ro 1. Header, Footer, and Sill Rocks shall be min. 3.5' dia. long axis, min. 3.0' dia. Engineer. intermediate axis, and min. 2.0' dia. height. 5. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq C0 2. Vane Arm Header and Footer Rocks shall be backfilled with alluvial material yd; Tensile Strength 180 Ibs). Place liner behind the arm (upstream side), draped ro composed of a gravel -cobble mix if suitable size and consistency is available. from top of rock structure to bottom of footer rock and extend a minimum of half o a o Suitable backfill shall have a min. median diameter of approximately 2", and shall the trench bottom width. Trim excess or visible fabric. not exceed 9". The material shall drain quickly, and support weight without shifting 6. At the structure apex, extend Footer Rock below scour depth or to bedrock, °o o.ro or sinking. Larger diameter rocks can be used at the apex of the arm wedge for whichever is shallower. (The scour depth is assumed to be the max pool depth scour protection, installed below the Arm Apex Elevation. Do not place sod or soil associated with the structure). on top of the Header Rocks nor use them to backfill behind Vane Arm. Any topsoil 7. Step Height is the Total Structure Drop of the water surface. Maximum water placed along the Vane Arm shall be for temporary erosion control seeding and surface (structure) drop across the Apex Rock is 0.3' and internal step rock is 0.3' shall be no more then 1-2" depth. The topsoil shall shall not extend above the measured along the stream thalweg. See Section A and Structure Table. elevation of the Header Rocks. 8. Gaps between Apex Header Rocks will not be included due to step feature. The 3. Backfill behind the Vane Arm flush with the Header Rock elevation until meeting thalweg elevation shall be at the top of Header Rocks. the streambank contour. 9. Structures will be tied in at bankfull elevation. Sheet 4. For finer sediment substrates, outside gravel shall be brought in for backfill or 10. After vane arms are installed, stabilize all disturbed streambank with Riparian Geotextile Liner shall be installed (see #5 below). Footer Rocks shall be supported Seeding, Streambank Matting, and Livestakes (see Details). n i/ Reach 1a Structure Dimension Table Reach 2a Structure Dimension Table Parameter 1/3 Bankfull Width 6.0 Vane Arm Angle (deg) 18.0 Stream Length (ft) 17.4 Vane Arm Length (ft) 19.4 Vane Slope (%) 0.052 Vane Arm Height (ft) 1.0 Bankfull Max Depth (ft) 2.2 3/4 Bankfull 1.65 Structure Grade Drop (ft) 0.4-0.5 Notes: Structures Tied in at 3/4 bankfull max depth, or 0.55 below bankfull elevation Reach UT2 Structure Dimension Table Parameter 1/3 Bankfull Width 3.0 Vane Arm Angle (deg) 20.0 Stream Length (ft) 8.2 Vane Arm Length (ft) 8.8 Vane Slope (%) 0.045 Vane Arm Height (ft) 0.4 Bankfull Max Depth (ft) 0.8 Structure Grade Drop (ft) 0.3-0.4 Notes: Key In Structures at bankfull elevation Reach la Cross Vane Elevation Table Cross- vane # Centerline Station Apex Thalweg EL (ft) Arm Apex EL (ft) Apex Bankfull EL (ft) Arm Bankfull Tie -In EL (ft) Total Structure Drop (ft) 2 13+80 - 13+96.6 2879.85 2880.00 2881.35 2880.85 0.50 Structures are tied in at bankfull elevation Structures will be staked out by construction oversight prior to construction Reach 2a Cross Vane Elevation Table Cross- vane # Centerline Station Apex Thalweg EL (ft) Arm Apex EL (ft) Apex Bankfull EL (ft) Arm Bankfull Tie -In EL (ft) Arm 3/4 Bankfull Tie -In EL (ft) Total Structure Drop (ft) 3 25+35 - 25-52.4 2837.40 2837.55 2839.60 2839.10 2838.55 0.50 Structures are keyed in at 3/4 bankfull elevation, or 0.55'below bankfull elevation Structures will be staked out by construction oversight priorto construction Reach UT2 Cross Vane Elevation Table Cross -vane # Centerline Station Apex Thalweg EL (ft) Arm Apex EL (ft) Apex Bankfull EL (ft) Arm Bankfull Tie -In EL (ft) Total Structure Drop (ft) 1 0+30-0+38.8 2864.60 2864.70 2865.40 2865.10 0.30 2 1+94 - 2+02.8 2859.90 2860.00 2860.70 2860.40 0.30 �z co0) l) N�o 0 O W 0 0 N N W N ca z¢ Yg U N O O U c � � ,N E ro N ro 2 Q U) o ro C � �U O or U U UZ 0 o � i Z� S; c O 2 U Sheet C5 CO Splash Rock Apex Header_ Step Rock Flow 1-0.3-0.5' Footer Rock) Section A (at Apex of Hook) N. T. S. Header Rock Footer Rock Splash Rock - BacWill (see Note 2-3) Existing �- Streambed Geotextile Liner Proposed (see Note 4-5) Streambed Section B (At vane arm) N. T. S. Slope top to match point bar Bankfull Elevation Bankfull f Section C (Hook Cutoff Sill) N. T. S. J-HOOK STEP ROCK VANE Edge of Water at Normal Flow Riffle .Y W y pex Roc�ks otsee 8: Jxcavate Rock CutoffSill (see Note 10)Pool W GI "d Bankfull Max Depth Arm Arm Bankfull Height Tie -In (see Note 9) Arm Apex --'"'. . . w -X grope --- — = Top of Bank/Bankfull fw J f. . J - Bank Toe Header Rock Existing Footer Rock Streambed Proposed Streambed Arm Profile View N. T. S. Top of Bank i W W (Bankfull) ' Y J i Arm Apex Elevation, �,,-'—(see Structure Table) d Backfill with alluvial � gravellcobble mix .,----(see (see Note 2-3) v 4, Geotextile Liner �(see Note 4-5) Arm Bankfull Tie -In Elevation, (see Note �9, Structure Table) 'S our Pool Rock Cutoff Sill w y W y y J W (See Note 10) W .Y .Y \,Splash Bonkfull % Rocks Width Plan View See Structure Tables on Next Sheet Rock or Log Vanes can be used, depending on presence of bedrock Notes: 1. For Vanderpool Creek, Header, Footer, and Sill Rocks shall be min. 3.5' dia. long axis, min. 3.0' dia. intermediate axis, and min. 2.0' dia. height. For UT2, rocks shall be min. 2.0' dia. long axis, min. 1.5' dia. intermediate axis, and min. 1.0' dia. height. 2. Vane Arm Header and Footer Rocks shall be backfilled with alluvial material composed of a gravel -cobble mix if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of approximately 2", and shall not exceed 9". The material shall drain quickly, and support weight without shifting or sinking. Larger diameter rocks can be used at the apex of the arm wedge for scour protection, installed below the Arm Apex Elevation. Do not use sod or soil to backfill behind the vane arm. Topsoil along the vane arm shall be no more than 1-2" depth if seeding for temporary erosion control and shall not extend above the elevation of the header rocks. 3. Backfill behind the vane arm flush with the header rock elevation until meeting the streambank contour. 4. For finer sediment substrates, outside gravel shall be brought in for backfill or Geotextile Liner shall be installed (see #3 below). Footer Rocks shall be supported with a layer of stone to prevent sinking or shifting, as approved by the Project Engineer. 5. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Place liner behind the arm (upstream side), draped from top of rock structure to bottom of footer rock and extend a minimum of half the trench bottom width. Trim excess or visible fabric. 6. At the structure apex, extend Footer Rock below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max pool depth associated with the structure). 7. Step Height is the Total Structure Drop of the water surface. Maximum water surface (structure) drop across the Apex Rock is 0.5' measured along the stream thalweg. See Section A and Structure Table. 8. There are no gaps between Apex Rocks, thalweg elevation shall be at the top of Apex Header Rocks. 9. For Vanderpool Creek Reach 1 a and 2b and UT2, Structures will be tied in at bankfull elevation. For Vanderpool Creek Reach 1 b and 2a, Structures will be tied in at 3 bankfull max depth. 10. For Vanderpool Creek, Sill Rocks shall extend min. 12' into streambank. For UT2, Sill Rocks shall extend min. 6' into streambank. 11. After vane arms are installed, stabilize all disturbed streambank with Riparian Seeding, Streambank Matting, and Livestakes (see Details). w Sheet C6 Splash Rock Apex Header_ Step Rock Flow F0.3-0.5' Footer Rock Section A (at Apex of Hook) N. T. S. Header Log Footer Log Splash Rock Existing J- — - •• Backfill Streambed Geotextile Proposed f Liner Streambed Section B (At vane arm) N. T. S. J r J-HOOK STEP LOG VANE Edge of Water at Normal Flow, Riffle ex Rocks ie Note 8) Eder ock-\ Top of Bank �(Bankfull) Embed Log min substrate, 5' min Arm Apex Elevation, Top of Anchor Rock (see Structure Table) Backfill with alluvial gravellcobble mix (see Note 3) Geotextile Liner -(see Note 3 and 4) © Anchor Rocks pinning in logs on front and back Arm Bankfull Tie -In Elevation (see Note 9, Structure Table) " Rock Cutoff Sill (see Note 10) Glide �f i W W Oy V• y �/ `Y `Y W W i ij/t Slope top to W match point bar Bankfull w dth �� Bankfull Elevation Plan View ------ 1 l2 Bankfull --- N. T. S. Section C (Hook Cutoff Sill) N. T. S. Bankfull Max Depth Rock Cutoff roaot Sill (see Note 10) J i i % y /y W !L .Y J y xcavat W S our Poc w y y Anchor Rock Arm Height Arm Bankfull Tie -In (see Note 8) Top of Bank/Bankfull l Bank Toe Geotextile 7 Header Log Liner Footer Log Arm Profile View See Structure Tables on Next Sheet Rock or Log Vanes can be used, depending on presence of bedrock Notes: 1. Header and Footer Logs shall be min. 12" diameter. 2. For Vanderpool Creek, Header, Footer and Sill Rocks shall be shall be min. 3.5' dia. long axis, min. 3.0' dia. intermediate axis, and min. 2.0' dia. height. For UT2, rocks shall be min. 2.0' dia. long axis, min. 1.5' dia. intermediate axis, and min. 1.0' dia. height. 3. Vane arm logs shall be backfilled with alluvial material composed of a gravel -cobble mix if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of approximately 2", and shall not exceed 9" dia. The material shall drain quickly, and support weight without shifting or sinking. Larger diameter rocks can be used at the apex of the arm wedge for scour protection, installed below the Arm Apex Elevation. For finer sediment substrates, outside gravel shall be brought in for backfill or Geotextile Liner shall be installed (see #4 below). Footer Logs shall be supported with a layer of stone to prevent sinking or shifting, as approved by the Project Engineer. 4. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Place liner behind the logs (upstream side), draped from top of log structure to bottom of footer log and extend a minimum of half the trench bottom width. Fasten liner every 6-12" with common 9d nails and washers at midpoint along length of log. Trim excess or visible fabric. 5. Offset Header Log forward into channel 1 /2 dia. or less over Footer Log to create an undercut habitat, but maintaining stability of vane arm. 6. At the structure apex, extend Footer Rock below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max. pool depth associated with the structure). 7. Step Height is the Total Structure Drop of the water surface. The maximum water surface (structure) drop across the Apex Step Rocks is 0.5' measured along the stream thalweg. See Section A and Structure Table. 8. There are no gaps between Apex Rocks, the thalweg is at the top of the Header Rocks. 9. For Vanderpool Creek Reach 1 a, 2b, and UT2, Header Logs will be tied in at the bankfull elevation and pinned in by Anchor Rocks. For Vanderpool Creek Reach 1 b and 2a, Header Locis shall be tied in at 3/4 bankfull max depth. 10. For Vanderpool Creek, Sill Rocks shall extend min. 12' into streambank. For UT2, Sill Rocks shall extend min. 6' into streambank. 11. After vane arms are installed, stabilize all disturbed streambank with Riparian Seeding, Streambank Matting, and Livestakes (see Details). W N z¢ Yg N O O U Sheet C7 ��co0) 03 ~ cti a N�o 0 S; O W N N S; S; W N m m z¢ O U Yg N U O O U s .N ro N ro Q C o ro C �U O Q) or U U UZ 0 o ro i Z� C c O U Sheet C8 Reach la Structure Dimension Table Parameter 1/3 Bankfull Width 5.7 Vane Arm Angle (deg) 19.0 Stream Length (ft) 16.6 Vane Arm Length (ft) 17.5 Vane Slope (%) 0.049 Vane Arm Height (ft) 0.85 Bankfull Max Depth (ft) 1.5 Structure Grade Drop (ft) 0.4-0.5 Notes: Structures Tied in at Bankfull elevation Reach lb Structure Dimension Table Parameter 1 Reach 2a Structure Dimension Table Parameter 1/3 Bankfull Width 6.0 Vane Arm Angle (deg) 18.0 Stream Length [ft] 17.4 Vane Arm Length (ft) 19.4 Vane Slope (°,�) 0.952 Vane Arm Height {ft} 1.0 Bankfull Max Depth (ft) 2.2 3/4 Bankfull 1.65 Structure Grade Drop [ft] 0.4-0.5 Notes: Structures Tied in at 3/4 hankfull max depth, ar 0.55 below Bankfull elevation Reach 26 Structure Dimension Table Parameter 1/3 Bankfull Width 7.0 Vane Arm Angle (deg) 18.0 Stream Length (ft) 21.5 Vane Arm Length {ft} 22.6 Vane Slope 0.053 Vane Arm Height (ft) 1.2 Bankfull Max Depth {Ft} 1.8 Structure Grade Drop (ft) 0.4-0.5 Notes: Structures Tie in at Bankfull elevation Reach la 1-Hook Elevation Table Reach la 1-Hook Elevation Table 1-Hook # Centerline Station Apex Thalweg EL [Ft] Ann Apex EL [ft] Apex Bankfull Ann Bankfull EL [ft] Tie-in EL [ft} Total Structure Drop [Ft] 1 4+42 - 4+98.6 2917.fl0 2917.19 2918.9D 2918.00 D.SD 2 5+48 - 5+fi4.fi 2911.95 2912.15 2913.45 2913.Q0 Q.45 3 6+36 6+52.6 29D8.70 2908.85 2910.20 2909.70 Q.50 4 8+30-8+4fi.6 29D1.15 2901.30 Z902.65 2902.15 0.50 9 9+34 - 9+9D.6 2897.90 2897.69 2899.OD 2898.50 0.9� 6 7 10+34 - lfJ-50.6 11+72 - 11-88.6 2893.75 2889.30 2894.f10 2889.49 Z895.25 2894.85 2890.80 289D.30 0.40 0.90 8 12+52 - 12-68.6 2887,8Q 2887.90 2889.30 2888.75 Q.55 Structures are tied -in at hankfull elevation Structures will be staked out by construction oversight prior to construction Reach lb J-Hook Elevation Table J-Hook q Centerline Station Apex Thalweg EL [ft} Arm Apex EL [ft} Apex Bankfull EL [ft} Arm Bankfull Tie -In EL {ft} Arm 3�4 Bankfull ]ce-In Total Structure prop (ft) 9 15+85.0- 16+00.4 2870.60 2870.65 � 2872.30 2871.80 2871.35 0.50 10 17+30 - 17+45.4 2866.50 2866.65 � 2868.30 2867.80 2867.35 0.50 11 18+Q6-18+21.4 2864,4Q 2864,55 � 2866.20 2865.7Q 2865.25 O.SD 12 18+84- 18+99.4 2861.80 2861.95 � 2863.60 2863.10 2862.65 0.50 13 19+50 - 1965.4 2859.10 2859.25 2860.90 2860.40 2859.95 0.50 14 20+84 - 20.95.4 2854.80 2854.90 � 2856.60 2856.D5 2855.60 0.55 15 21+22 - 21+37.4 2853.50 2853.65 2855.30 2854.80 2854.35 0.50 16 23+30 23+45.4 2847.00 2847.15 � 2848.80 2848.30 2847.85 0.50 Structures are tied in at 3�4 hankfull max depth, or 0.49' below hankfull elevation Structures will he staked out by construction oversight prior to construction Reach Za 1-Hoak Elevation Table 1-Hook 1i Centerline Station Apex Thalweg EL {ft} Arm Apex EL {ft} Apex Bankfull EL {ft] Arm Bankfull Arm 3�4 Bankfull Tie -In EL [Ft} Tie -In EL [ft] Total Structure Drop [Ft} 17 27+64 - 27+81.4 2831.10 2831.25 2833.3❑ 2832.80 2832.25 ❑.50 18 28+D8 - 28+25.4 2829.8 2830.09 2832.00 2831.6D 2831.05 ❑.4D 19 28+42 - 2909.4 2828.2 2828.45 2830.40 2830.00 2829.45 0.40 Structures are tied in at 3�4 hankfull max depth, or D.59' below hankfull elevation Structures will be staked out by construction oversight prior to construction Reach 2h 1-Hook Elevation Table 1-Hook # Centerline Station 2D 3D+51-30+72.5 Apex Thalweg EL(ft) 2823.95 Arm Apex EL ft [ } 2824.05 Apex Bankfull EL(ft) 2825.75 Arm Bankfull Tie- In EL ft { ] 2825.25 7otal5tructure Drop ft p { ] D.50 21 31+70 - 31+91.5 2821.5 2821.60 2823.30 2822.8D 0.50 22 32+58-32-795 2818-6 2818.70 2820.40 2819-90 � 0.50 23 33+64 - 33+85.5 2814.E 2814.70 2816.40 2815.40 0.50 24 34+25.34+46.5 2813.4 2813.50 2815.20 2814.7D � 0.50 25 35+14 - 35+35.5 26 36+52 - 36+73.5 2811.8 28D6.5 2811.9D 2806.7D 2813.6D 2808.30 2813.1D 2807.9D D.50 D.40 27 37+54 - 37+75.5 2804.8 2804.90 2806.60 2806.10 0.50 Structures are tied -in at Bankfull elevation Structures will be staked out by construction oversight priorto construction Reach UT2 Structure Dimension Table Parameter 1/3 Bankfull Width 3.0 Vane Arm Angle {deg] 20.0 Stream Length (ft) 8.2 Vane Arm Length (ft) 8.8 Vane Slope (%j 0.045 Vane Arm Height (ft) p.4 Bankfull Max Depth (ft) D.8 Structure Grade Drop (ft) 0.3-0.4 Notes Tie In Structures at Bankfull elevation Reach UT2 J-Hook Log/Rock Vane Elevation Table J-Hook # Centerline Station Apex Thalweg EL [ft] Arm Apex EL [ft] Apex Bankfull EL (ft) Arm Bankfull Tie -In EL [ft} Total Structure Drop (ft) 1 ❑+58 - D+66.2 2864.aD 2864.10 2864.80 2864.50 0.30 2 ❑+87 - l]+95.2 �863.20 2863.30 2864.�0 2863.70 0.30 3 1+40. 1+48.2 Z861.60 2861.70 2862.46 286Z.10 0.30 4 1+65. 1+73.2 Z860.90 2860.90 2861.70 2861.30 0.40 S 2+21 - �29.2 �859.10 2859.20 2859.90 2859.66 0.30 6 2+49. 2+57.2 Z85330 2853.40 2854.16 2853.80 0.30 7 3+04. 3+1Z.2 Z856.80 2856.90 2857.60 2857.30 0.30 8 3+30 - 3+38.2 2856.1D 2856.20 2856.90 2856.60 0.3D 9 3+56. 3+64.2 Z855.50 2855.60 2856.36 2856.00 0.30 10 3+83 - 3+91.2 Z854.70 2854.80 2855.50 2855.20 0.30 11 4+60 - 4+68.2 2852.2D 2852.30 2853.00 2852.70 0.30 12 5+02 - 5+10.2 �851.a0 2851.1}0 2851.80 2851.40 0.40 13 5+30 - 5+38.2 2850.00 2850.00 2850.80 2850.40 0.40 14 5+71 - 5+79.2 2849.6D 2849.70 2850.40 2850.10 0.30 15 5+96 - 6+�4.2 �848.a0 2848.10 2848.80 2848.50 0.30 16 6+37 - 6+45.2 2846.30 2846.30 2847.10 2846.70 0.40 17 5+91 - 6+99.2 2843.7D 2843.70 2844.50 2844.10 0.40 18 7+56 - 7+64.2 �841.a0 2841.10 2841.80 2841.50 0.30 19 7+82 - 7+96.2 Z840.40 2840.50 2841.26 2840.90 0.30 20 8+26 - 8+34.2 2839.4D 2839.50 2840.20 2839.90 0.30 21 9+03 - 9+11.2 �838.10 2838.20 2838.90 2838.66 0.30 Structures are tied -in at Bankfull elevation Structures will Be staked out by construction oversight prior to construction O Edpe of Water ROCK/LOG SILL Top of Bank (Bankfull) I W I W W ieotextile Liner W I y W (see Note 4) W W W iW J Extend Sill W �iW V o Bank Toe (see— NoteI W 2) I W W Edge of Water at Normal Flow ,s On !� W Riffle W W I Bracing Rock IW J W W W WI I v V v I I W W W Sill Log, min. 12" diameter iW V W W W I W W W I W W W Bankfull Width =)OC' � Bankfull Width =)OC' Plan View N. T. S. Flow ---L, Pool Geotextile Liner (see Note 4) Rock Rocks Footer Rock (see Note 6) SPr_tinn A IV. I.J. Flow---?_, G\ \de Pool Geotextile Liner (see Note 4) Sill Log Scour Rocks RJR —le _Footer Rock (see Note 6) CO -�M o��o Notes: 1. For Vanderpool Creek, Sill Rocks, Header and IC-1 Footer Rocks shall be min. 2.5' dia. For UT2, rocks Q shall be min. 1.5' dia. EE o 2. Sill Logs shall be min. 12" dia. Minimum lengths are T determined by channel bottom width plus 4' extended into bank toe: w VC R1 a - 18'; R1 b - 16'; R2a - 17; R2b - 20'; UT2 - 14' 3. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Co a, Tensile Strength 180 Ibs). Place liner on the upstream side of both footer rock and sill rock/log and key in at the bottom. Geotextile Liner shall be installed if backfill is fine-grained, as approved by w the Project Engineer. Trim excess or visible fabric. 4. Sill Rocks/Logs are placed just below the bankfullc channel bottom, ensuring thalweg elevation at the center rock or center of the log. Anchor rocks can be used to provide toe protection at bank toe. Anchor rocks shall not extend above the inner berm elevation. 5. Install Footer Rocks if Sill log/rock does not extend below upstream pool scour depth, as approved by the Project Engineer. 6. Place scour rocks on front side of Sill (riprap, 6-9") to protect against scour while riffle substrate seals. 7. For Rock/Log Sills at the head of riffle, construct the ul. riffle starting at the Rock/Log Sill and extend the riffle length downstream. Ensure a pavement layer of substrate covers the Log/Rock Sill. For Rock/Log Sills at end of riffle, ensure a pavement layer of substrate covers the Log/Rock Sill and extends into m m the run. See Constructed Riffle Detail. w ¢ g N O O U Extend Sill Rocks/Log into Bank Toe (see Note 2) Bankfull _Elevation _____ Sill RockslLog below 112 Bankfull proposed streambed --------- elevation Rx.All Section B (shown for rock only) N. T. S. See Structure Tables on Next Sheet Rock or Log Structures can be used, depending on presence of bedrock and material availabilty Sheet C9 Edge of Water Fop of Bank 'Bankfull) ROCK STEP Apex Step Rock Flow 7 Geotextile Liner Riffle — (see Note 2) _ W i Geotextile Liner 4W W W W © W `1' (see Note 2) W W , Feu n W l- ' Footer RockSp xtend Sill Ito bank (see Note 6) Bankfull Width Plan View N. T. S. Section A N. T. S. Section B N. T. S. Rock Notes. 1. For Vanderpool Creek, Step, Footer, and Sill Rocks shall be min. 3.5' dia. long axis, min. 3.0' dia. intermediate axis, and min. 2.0' dia. height. For UT2, rocks shall be min. 2.0' dia. long axis, min. 1.5' dia. intermediate axis, and min. 1.5' dia. height. 2. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Geotextile Liner shall be installed if substrate is fine-grained, as approved by the Project Engineer. Place Liner on the upstream side of all rock layers and key in at the bottom. Trim excess or visible fabric. 3. Extend Footer Rock below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max. pool depth associated with the structure). 4. Step Height is the Total Structure Drop of the water surface. The water surface (structure) drop across the Step Rocks is XX' measured along the stream profile. See Section A and Structure Table. 5. The proposed thalweg is at the top of the Header Step Rocks. 6. For Vanderpool Creek, extend Sill Rocks into Sank min. 12'. For UT2, extend 6' into bank. Structures will be keyed in at 1 /2 max. bankfull depth (inner berm elevation). See Structure Tables on Next Sheet. Rock or Loa Structures can be used, depending on presence of bedrock and material availabilty w "AL 9"r-i N � m al OU N O O U Sheet C10 FLOW HEADER LOG FOOTER LOG STFA SPLASH ROCKS GEOTEXTILE LINER POOL (see Note 2)��. V _ 12" MIN a� 1 —T FOOTER ROCK (FOR SUPPORT AS NEEDED) PROFILE VIEW (A N.T.S. HEADER LOG (see Note 3) FOOTER LOG BRACING ROCK FOOTER ROCK (AS NEEDED — FOR SUPPORT) SPLASH ROCK Notes: 1. For Vanderpool Creek, Log Step Footer Rocks shall be min. 3.5' dia. long axis, min. 3.0' dia. intermediate axis, and min. 2' dia. height. For UT2, rock shall be min. 2.0' dia. long axis, min. 1.5' dia. intermediate axis, and min. 1.0' dia. height. 2. Bracing Rocks shall be min. 18" dia. and brace both Header and Footer Logs. 3. Log Step Header and Footer Logs shall be 12" dia. tree trunks with all branches and rootwads removed. 4. Header and Footer Log minimum lengths are determined by channel bottom width plus 4' extended into bank toe: VC R 1 a - 18'; R 1 b - 16'; R2a - 17; R2b - 20'; UT2 - 14' 5. Splash Rocks in the pool shall be 6-9" median diameter stone. A larger Splash Rock shall be placed in front of the structure below the maximum pool depth to protect against scour. 6. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Geotextile Liner shall be installed if substrate is fine-grained, as approved LOG STEP CREATE A CHANNEL THALWEG (see Note 8) BANKFULL (BKF)WIDTH REAMBED SECTION VIEW (B N.T.S. by the Project Engineer. Place Liner on the upstream side of all rock layers and key in at the bottom. Trim excess or visible fabric. 7. Extend Splash Rocks a minimum 12" below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max. pool depth associated with the structure). 4. All Rocks must be touching and fit snug against each other to ensure a tighter seal. 5. Step Height is the Total Structure Drop of the water surface. The water surface (structure) drop across the Step Logs is measured along the stream profile. See Section A and Structure Table. 6. The proposed thalweg is at the top of the Header Step Log. 7. Structures will be keyed in at 1 /2 max. bankfull depth (inner berm elevation). 8. Create a distinct thalweg in the middle third of the channel by notching the log; creating an angle with the log and the bracing rock; using a natural curvature in the trunk; or using two Header Logs crossing the channel bottom at opposing angles. EDGE OF WATER AT NORMAL FLOW TOP OF BANK (BANKFULL) BRACING ROCK—,___,"1 _ -- STEP FOOTER ROCK_� (AS NEED FOR SUPPORT) 1 SPLASH ROCKS BANKFULL (BKF) WIDTH PLAN VIEW N.T.S. � - CIO 0 O 5 W GEOTEXTILE C/) LINER Note 2) "I'�e c HEADER LOG /-(see Note 3) LOG I W See Structure Tables on Next Sheet Rock or Log Structures can be used, depending on presence of bedrock and material availabilty ►6 N 0 ca m a O U N O O U Sheet C11 �z 100) l) Vanderpool Creek Rock/Log Sill Elevation Table v 3 ro cCi j ~ N�o Q 0 O 0 W O O O L7 .O i N N O s: W N m a z¢ O U Yg N O O U U N '� ro .N -Q E ro L7 � ro O O c� ° O o U v z °> C z O O c O 2 Sheet C12 Reach Rock/ Log Sill # Centerline Station Thalweg EL (ft) Bank Toe EL [ft) Bankfull EL (ft) 1a 1 1138 2890.40 2890.70 2892.20 1b 2 1776 2865.20 2865.50 2867.30 1b 3 1926 2860.30 2860.60 2862.40 1b 4 2402 2844.10 2844.40 2846.20 2a 5 2746 2832.00 2832.30 2834.50 2b 6 3238 2819.40 2819.70 2821.50 2b 7 3344 2815.40 2815.70 2817.50 Structures will be staked out by construction oversight staff prior to construction LIT2 Rack/Log Sill Elevation Table 1 0+00 2865.00 2865.20 2865.90 2 0+08 2865.10 2865.30 2865.90 3 0+44 2864.30 2864.50 2865.10 4 0+72 2863.70 2863.90 2864.50 5 1+01 2862.90 2863.16 2863.70 6 1+25 2862.00 2852.20 2862.80 7 1+53 2861.30 2861.50 2862.10 9 2+08 2859.60 2859.80 2860.40 10 2+35 2858.80 2859.00 2859.60 11 2+63 2858.00 2858.20 2858.80 12 2+90 2857.20 2857.46 2858.a0 13 3+18 14 3+44 2856.50 2855.80 2856.70 2856.00 2857.30 2856.60 15 3+70 2855.20 2855.46 2856.00 16 3+97 2854.40 2854.60 2855.20 17 4+23 2853.40 2853.60 2854.20 18 4+48 2852.60 2852.80 2853.40 19 5+16 2850.60 2850.86 2851.40 20 5+59 21 6+22 2849.10 2846.90 2849.30 2847.10 2849.90 2847.70 zz 7+69 2840.70 2840.90 2841.50 23 8+10 2839.80 2840.00 2840.60 Structures will be staked out by construction Reach 2b Rock/Log Step Elevation Table Reach lb Rock/Log Step Elevation Table Rock/Log Step # Centerline Station Thalweg {Step] EL (ft} Bankfull EL (ft) 1/2 Bankfull Tie -In EL ( Total Drop Reach 2a Rock/Log Step Elevation Table Rock/Log Step # Centerline Station Thalweg (Step) EL (ft) Bankfull EL (ft) 1/2 Bankfull Tie -In EL (ft) Total Drop Structure (ft) 1 24+94 2839.20 2841.40 2840.30 1.00 2 27+10 2833.30 2835.50 2834.40 0.60 3 27+28 2832.70 2834.90 2833.80 0.70 4 29+84 2825.90 2828.10 2827.00 0.60 Structures will be staked out by construction oversight staff prior to construction Reach UT2 Rock/Log Step Elevation Table Rock/Log Centerline Thalweg Bankfull (ft) 1/2 Bankfull Total Drop ROOTWADS WITH LOG FOOTERS F/oyv q Top of Bank �(Bankfull) Edge of Waterer at Normal Flow Rootwad \ �y Bracing Rock (see Note 7) Toe of Bank Slope Footer co -�M o��o Notes. 1. Rootwads shall be installed at a depth sufficient enough to IC-1 saturate half the root ball and trunk at normal flow elevation. If Q addtional bank protection is needed, add additional layers of c r toewood on top of this structure. Do not elevate Rootwads. o 2. For Vanderpool Creek, Rootwads shall consist of a 12-18" dia. hardwood tree with 15-20' trunk and 5' min. root ball dia. For UT2, use 8-10" dia hardwood trees with 10-15' trunks and 3' min. root ball dia. Trunks shall be relatively straight and free of breaks. c0 3. Rootwads shall be installed directed upstream into flow with no more than a 15' departure angle from the bank. 4. Space Rootwads so that root balls overlap 6" min. to create an interlocking unit. 5. Rootwads shall be angled at min. 2-3%slope downward back into w the bank in order to maintain saturation. Anchor Rock (see Note 8) Backfill with suitable alluvial material 8• (see Note 9) q 9. Plan View N.T.S. Streambank Matting (see Detail) Restore disturbed areas with Riparian Seeding (see Detail) 10 Existing Ground Normal Flow B kfull 1 1 Elevation Proposed Ground \ 2 Max Wooden Stake Rootwad ' Anchor Rock (see Note 8) 12 Fill in between Rootwads with Streambed woody debris Scour Pool Backfill with suitable Footer Log alluvial material, (see Note 9) Section A - A View N.T.S. Footer Logs shall be min. 12" intermediate axis dia. and shall be placed at a depth sufficient to prevent scour and to allow for greater than half of the root ball to extend below the normal flow elevation, in order to maintain saturation. Scour depth is estimated as the proposed pool depth, unless otherwise stated. Bracing Rocks shall be 18" dia. and placed near the base of the root ball with no gaps. Rocks shall be placed between Rootwad trunks and at either end of Rootwad installations in order to prevent Rootwads from shifting. Anchor Rocks shall be 12-18" dia. and placed on top of Rootwad trunks, offset back into the bank. Offset distance depends on where weight is needed along trunk to adequately keep Rootwad from floating. For larger root balls and trunk base, Anchor Rocks shall be placed at base of trunk. Footer Logs and Bracing Rocks shall be backfilled with gravel alluvial material, if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of 2" and not exceed 6" dia. It shall drain quickly and support weight without shifting or sinking. For fine sediment substrates, outside gravel may be needed for backfill and Footer Rocks shall be supported with a layer of stone, as approved by the Project Engineer. Excavate scour pool out in front of Rootwads to the proposed pool depth (see Longitudinal Profile) After Rootwads have been installed, backfill streambank with clean soil fill material and compact at the proposed bank angle. Backfill shall start at base of Rootwad, or top of Anchor Rock and extend upwards at X:X slope. Stabilize streambank with Riparian Seeding, Streambank Matting, and Livestaking (see Details). Rootwads with Loa Footers shall be used in lower energy meander bends with larger radius of curvatures. Use Rootwad Revetments downstream of structures, bridges/culverts, higher energy meander bends with tighter radius of curvature. 7T; N 0 � m al OU z¢ Yg N O O U Sheet C13 ROOTWAD REVETMENT F/oyv q Top of Bank �(Bankfull) Edge of Water f at Normal Flow \ Rootwad y, Anchor Rock (see Note 8) Bracing Rock Footer Rock w Toe of Bank Slope ' IL � Backfill with suitable alluvial material (see Note 9) A Plan View N.T.S. Streambank Matting (see Detail) Existing Ground Elevation \ Normal Flow Proposed Ground Anchor Rock 2 (see Note 8) 1f Rootwad Restore disturbed areas with Riparian Seeding (see Detail) Bankfull Elevation Wooden Stake Bracing rock between Rootwads A Streambed Scour Pool -"'� A Footer Rock Backfill with suitable alluvial material (see Note 9) Section A - A View N.T.S. Notes: 1. For Vanderpool Creek, Rootwads shall consist of a 12-18" dia. hardwood tree with 15-20' trunk and 5' min. root ball dia. For UT2, use 8-10" dia hardwood trees with 10-15' trunks and 3' min. root ball dia. Trunks shall be relatively straight and free of breaks. 2. Rootwads shall be installed directed upstream into flow with no more than a 15' departure angle from the bank. 3. Space Rootwads so that root balls overlap 6" min. to create an integrated revetment. 4. Rootwads shall be angled at min. 2-3% slope downward back into the bank in order to maintain saturation. 5. Footer Rocks shall be min. 2.0' intermediate axis dia and placed at a depth sufficient to prevent scour and to allow for greater than half of the root ball to extend below the normal flow elevation, in order to maintain saturation. Scour depth is estimated as the proposed pool depth, unless otherwise stated. 6. Rootwad trunks must be submerged below the normal flow elevation in order to function properly, creating a scour pool to effectively dissipate energy. If bank protection is needed above the Rootwad Revetment, add additional layers of toewood. 7. Bracing Rocks shall be 18" dia. and placed near the base of the root ball with no gaps. Rocks shall be placed between Rootwad trunks and at either end of Rootwad Revetment to prevent Rootwads from shifting. 8. Anchor Rocks shall be 12-18" dia. and placed on top of Rootwad trunks near the base of the trunk, offset back into the bank to achieve streambank slope (see Note 11). 9. Footer Rocks and Bracing Rocks shall be backfilled with gravel alluvial material, if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of 2" and not exceed 6" dia. It shall drain quickly and support weight without shifting or sinking. For fine sediment substrates, outside gravel may be needed for backfill and Footer Rocks shall be supported with a w N � m al OU N O O U layer of stone, as approved by the Project Engineer. 10. Excavate scour pool out in front of Rootwads to the proposed pool depth (see Longitudinal Profile) 11. After Rootwad Revetment has been installed, backfill streambank with clean soil fill material and compact at the proposed bank angle. Backfill shall start at top of Anchor Rock and extend ro upwards at design slope. CO .N 12. Stabilize streambank with Riparian Seeding, Streambank Matting, � ro ro and Livestaking (see Details). a� Q o ro U Rootwads with Log Footers shall be CO c) a� a used in lower energy meander bends with larger radius of curvatures. Use Rootwad Revetments downstream of structures, bridges/culverts, higher Sheet energy meander bends with tighter radius of curvature. C 14 FLOW i TIT 24" MIN GEOTEXTILE LINER (see Note 2) /—STEP ROCK SPLASH —12" ROCKS POOL 12" MIN L-24"—J PROFILE VIEW (A) FOOTER ROCK N.T.S. FOOTER ROCK SPLASH ALTERNATE T1 BETWEEN STRUCTURES Notes: 1. Rock Step Headers, Footer and Sill Rocks shall be min. 3.0' dia. long axis, min., 3.0' dia. intermediate axis, and min. 2' height. 2. Header Rocks are slab rocks and must be min. 24" intermediate axis and greater than 6" height. Header Rock total height equals the Step Height. 3. Splash Rocks in the pool shall be 6-9" median diameter stone. A larger Splash Rock shall be placed in front of the structure below the maximum pool depth to protect against scour. 4. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Geotextile Liner shall be installed if substrate is fine-grained, as approved by the Project Engineer. Place Liner on the upstream side of all rock layers and key in at the bottom. Trim excess or visible fabric. 5. Extend Footer Rocks and Splash Rocks a min. 12" below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max. pool depth associated with the structure). SINGLE ROCK STEP POOL WTI BANKFULL (BKF)WIDTH ::K SECTION VIEW (B) N.T.S. 6. All Rocks must be touching and fit snug against each other to ensure a tighter seal. 7. Step Height is the Total Structure Drop of the water surface. The water surface drop across the Step Rocks is measured along the stream profile. See Section A and Structure Table. 8. The proposed thalweg is at the top of the Header Step Rocks. 9. Structures will be keyed in at 1 /2 max. bankfull depth (inner berm elevation). Header rocks shall extend to the inner berm elevation on each bank. 10. Extend Rock Sills into each streambank min. 9.0'. TOP OF B, (BANKF STEP ROCK FOOTER ROCK SPLASH ROCl< EDGE OF WATER )TEXTILE NER Note 4) -XTEND SILL NTO BANK TOE 'see Note 10) I� BANKRILL �I (eK�w�on� PLAN VIEW N.T.S. Reach UT1 Single Rock Step Pool Elevation Table 1/2 Total Thalweg Rock Centerlin Bankfull Bankfull Drop (Step) EL Step it e Station (ft) Tie -In EL Structure (ft) (ft) (ft) 1 0+42 2845,70 2847.00 284635 0.45 2 0+56 2845,15 2846.45 2845.80 1.05 3 0+67 2844,10 2845A0 2844.75 1.55 4 0+78 1 2842,55 1 2843,85 1 2843,20 1 1.55 5 0+89 1 2841,00 1 2842,30 1 2841,65 1 1.55 Structures will he staked out by construction oversight staff prior c 0 O W W N � m al OU z¢ Yg N O O U Sheet C15 SINGLE ROCK VANE Edge of Water at Normal Flow W I W Y Header Rock Footer Rock Splash Rock Backfill (see Note 2, 3) Existing f Streambed Geotextile Liner (see Note 3, 4) Proposed Streambed Section A (At vane arm) N. T. S. On Bankfull Max Depth Arm Arm Bankfull .v Height Arm Apex Tie -In (see Note 7) Flo't��W�W�IWWW�.�.W Footer Roc Arm Profile View N. T. S. -----'�-- - --- Top of Bank/Bankfull IW -Bank Toe 'Existing k Streambed Proposed Streambed Reach lb Single Rock Vane Dimension Table Parameter 1/3 Bankfull Width 5.0 Vane Arm Angle (deg) 18.0 Stream Length (ft) 15.4 Vane Arm Length (ft) 16.2 Vane Slope (%) 0.056 Vane Arm Height (ft) 0.90 Bankfull Max Depth (ft) 1.8 2/3 Bankfull Max Depth (ft) 1.2 Structure Grade Drop (ft) 0 Notes: Structures Tied in at 2/3 bankfull max depth, or 0.6 below bankfull elevation Pool Top of Bank (Bankfull) Arm Apex Elevation, W W i (See Structure �. I Table) ,IIIX W W i � i Backfill with W i suitable alluvial Va'he At gravel -cobble mix Angle i (see Note 2 and 3) Y W W W W W W W Y W W W W W i W Y I Y W Bankfull Width Plan View N. T. S. Geotextile Liner (see Note 3 and 4) *O Footer Rock Header Rock Rock Cutoff _ f Sill, (see Note 8) 11Arm Bankfull Tie -In Elevation (See Structure Table, Note 7) Splash Rocks (as needed) \Excavate Scour Pool Single Rock Vane Structure Table Single Apex Arm Apex Arm Rock Centerline Thalweg Apex EL Bankfull Bankfull Vane # Station EL (ft) (f0 EL (ft) Tie -In EL (f0 1 16+66 - 16+81.4 2867.70 2868.00 2869.50 2868.90 2 3 4 Structures are keyed in at 314 bankfull max depth. Bankfull drops 0.45' between Arm Apex and Arm Tie -In Structures will be staked out by construction oversight staff prior to construction Notes: 1. For Vanderpool Creek, Header, Footer, and Sill Rocks shall be min. 3.5' dia. long axis, min. 3.0' dia. intermediate axis, and min. 2.0' dia. height. For UT2, Header, Footer, and Sill Rocks shall be min. 2.0' dia. long axis, min. 1.5' dia. intermediate axis, and min. 1.0' dia. height. 2. Vane Arm Header and Footer Rocks shall be backfilled with alluvial material composed of a gravel -cobble mix if suitable size and consistency is available. Suitable backfill shall have a min. median diameter of approximately 2", and shall not exceed 9". The material shall drain quickly, and support weight without shifting or sinking. Larger diameter rocks can be used at the apex of the arm wedge for scour protection, installed below the Arm Apex Elevation. Do not use sod or soil to backfill behind the vane arm. Topsoil along the vane arm shall be no more than 1-2" depth if seeding for temporary erosion control and shall not extend above the elevation of the header rocks. 3. Backfill behind the vane arm flush with the header rock elevation until meeting the streambank contour. 4. For finer sediment substrates, outside gravel shall be brought in for backfill or Geotextile Liner shall be installed (see note 5 below). Footer Rocks shall be supported with a layer of stone to prevent sinking or shifting, as approved by the Project Engineer. 5. Geotextile Liner shall be medium weight non -woven polypropylene (Weight 7oz/sq yd; Tensile Strength 180 Ibs). Place liner behind the arm (upstream side), draped from top of rock structure to bottom of footer rock and extend a minimum of half the trench bottom width. Trim excess or visible fabric. 6. At the structure apex, extend Footer Rock below scour depth or to bedrock, whichever is shallower. (The scour depth is assumed to be the max pool depth associated with the structure). 7. Structures will be keyed in at the bankfull elevation. 8. For Vanderpool Creek, Rock Sills extend into the bank min. 12'. For UT2, Rock Sills extend 6'. 9. After vane arms are installed, stabilize all disturbed streambank with Riparian Seeding, Streambank Matting, and Livestakes (see Details). w N � mai OU N O O U Sheet C16 -�� TOEWOOD REVETMENT .5 �M Notes: v°) 1. Toewood Revetments consist of large woody debris (logs, branches, shrubs) and rootwads installed at various angles EE along the toe of bank slope in order to narrow the low flow Z a channel along riffles/runs. Toewood Revetments improve flow, prevent mid -channel bars, and encourage deposition on the w newly created bench. 2. Extend the width of the Toewood into the channel XX' and o Edge ofWater� Rootwad Anchor Rock blend in to the bank toe at the upstream and downstream C/) at Normal Flow Footer Log Woody Deb is Toe of ends. Extend the depth of the Toewood a min. XX' below the °' 9 ZZ Bank proposed substrate elevation. Extend the height of the a� Toewood approximately XV above normal flow elevation to create a bench for deposition. Rock Sill Toy xx xx t 5� ` �,,�,� 3. Place Toewood at various angles, but not directly parallel to '�� flow to avoid scouring. Layer Toewood with larger material :t To of and rootwads on the bottom and smaller branches on top. - Bank Compact layers as they are installed. l �U kfull Backfill (�� ) 4. Rootwads shall consist of XX-XX" dia. hardwood trees with XX' � suitable alluvial trunk and XX' min. root ball dia. Trunks shall be relatively material straight and free of breaks. a (see Note 7) 5. Install Rootwads at XX' spacing, directed upstream into flow with no more than a 15' departure angle from the bank, and Plan View on top of foter logs laid perpendicular behind rootballs. N.T.S. 6. Rootwads shall be angled at 2-3% slope downward back into the bank in order to maintain saturation. 7. Backfill Toewood Revetment with gravel alluvial rock material, if suitable size and consistency is available. Suitable Backfill shall drain quickly and support weight without shifting. Add Backfill as Toewood is layered in. For fine sediment substrates, support Footer Logs with a layer of stone to prevent sinking or m m O U shifting, as approved by the Project Engineer. N 8. Place Rock Sills (min. XV dia.) along the upstream and Restore downstream edges of the Toewood Revetment. Streambank disturbed areas 9. Extend Rock Sill laterally XX-XX' into the bank from the front Matting (see with Riparian Toewood elevation back to the inner berm elevation within Exit, gil) Seeding (see the bank. Extend Rock Sill vertically XX' below the proposed Normal Flow Pr°SQ,ygdDetq(l�,kl„ll � Z,,,x Elevation substrate elevation. Elevation Anc)(4Pund ,� 10. Rocks stacked shall be offset 6" towards Toewood for stability. o Wooden Stake ._ •�, ro Rootwack c�11. Anchor Rocks (min. XX' dia.) shall be placed on top of •CU N Woody Debris Toewood to effectively weigh the mass down and prevent ro � floating until saturation achieved. Q) v� o 12. After Toewood Revetment nstallation, Backfill streambank 0) n Riffle orRun� Backfill with with clean soil fill material and compact at the proposed Streamb-1 suitable alluvial v z Footer Log material bank angle. v o (see Note 7) 13. Stabilize streambanks with Riparian Seeding, Erosion Control ° SectionA -AView Matting, and Livestaking (see Details). o �, N. T. S. U Sheet C17 TYPICAL CHANNEL RE -VEGETATION PLAN VIEW DETAIL Native tree and shrub (bareroot or 1-3 gallon containers) species to be planted at a density sufficient to provide 400 trees/acre at maturity -floodplain species include but are not limited to: Genus Species Common Name Acerrubrum Maple, Red Betula alleghaniensis Yellow Birch Cephalanthus occidentalis Buttonbush Corpus amomum Dogwood, Silky Hamamelis virginiana Witch Hazel Lindera benzoin Spicebush Liriodendron tulipifera Poplar, Yellow Oxydendrum arboreum Sourwood Physocarpus sp. Ninebark Platanus occidentalis Sycamore Prunus serotina Cherry, Black Quercus rubra Oak, Northern Red Quercus shumardii Oak, Shumard Sambucus nigra canadensis Elderberry, Common Salix nigra Willow, Black Tilia americana Basswood Any substitutions must be approved by Project Engineer. *Do not plant Betula nigra orJugulands nigra. SYMBOL DESCRIPTION Native sod matting and/or erosion control fabric are to be placed on near bank and disturbed areas when available. 1. Seed immediately with Temporary Seed Mix. 2. Following construction, area to be seeded with a permanent grass/herb mixture. Matting and fabric are to be staked down with large staples and/or native/woody stakes. See Slope Matting detail. 3. Place livestakes in two rows with 5' spacing between rows.Livestake species include: Corpus amomum, Physocarpus opulifolius, Salix serecia, Sambucus canadensis. Any substitutions must be approved by Project Engineer. Note: Planting width will vary based on landowner compliance and project specifications. Sod -matting or — coconut matting applied to nearbank areas of disturbance PLAN VIEW Top of Terrace Combination of container or bare -root native tree &/or shrubs (see riparian planting plan for species) Bankful I Water Surface I:y10111I►Y►�►y��Ito] ►1 Native Livestakes INSPECTION AND MAINTENANCE: This consists primarily of two components, stream stabilization structures (J-Hooks, Cross vanes, etc.) and planting of the stream banks and riparian areas. In the event that the stream structures shift, wash away, settle, or otherwise physically cannot function as designed, contact BFEC/BFED. If the new plantings experience a mortality rate of greater than 25%, the dead/dying plants will need to be replaced. PERMANENT RIPARIAN SEED MIX (STREAMBANK AND RIPARIAN BUFFER): APPLY AT 20 LBS PER ACRE OF DISTURBANCE (per specifications of seed supplier): ERNST CONSERVATION SEED MIX ERNMX-304 (NC MOUNTAINS RIPARIAN MIX) WHICH INCLUDES THE FOLLOWING SPECIES: SWITCHGRASS, INDIANGRASS, BIG BLUESTEM, VIRGINIA WILDRYE, PARTRIDGE PEA, BLACKEYED SUSAN, SWAMP MILKWEED, WILD BERGAMOT, NARROWLEAF SUNFLOWER, OXEYE SUNFLOWER, PURPLESTEM ASTER, BONESET, LICORICE SCENTED GOLDENROD, NEW YORK IRONWEED PERMANENT SEED MIX (OUTSIDE OF RIPARIAN CORRIDOR): APPLY AT 300 LBS PER ACRE OF DISTURBANCE (or per specifications of seed supplier): KENTUCKY BLUEGRASS/TALL FESCUE MIX (LAWN) TEMPORARY SEED MIX AND SPECIFICATIONS: Common Name Rate/Ac Optimal Planting Rye grain 30 Ibs Aug 15 - May 15 Browntop millet 10 Ibs May 15 - Aug 15 Seedbed Preparation: Disturbed soils within riparian areas will be amended to provide an optimum environment for seed germination and seedling growth. Surface soils will be loose enough for water infiltration and root penetration. Lime will be added to the soil to ensure a pH level between 5.5 - 7. Fertilizer (18-46-0) will be added to nutrient deficient areas. All riparian areas will be raked to loosen compacted soil prior to seeding. w Sheet C18 6" Wire Fence min. (if applicable) Geotextile Fabric Backfill and compact soil 24" rn Existing Ground E 8" o mind" 24" 1D min. min. Steel Post PROFILE VIEW NTS SILT FENCE Max. 6' Spacing without fence Max. 8' Spacing with fence Steel Post Wire/Plastic Ties 8" min. 77-""' ...... "' Botto of 24" min. CID Trench Geotextile T I —,'' Fabric SECTION VIEW NTS 24" Existing 6" min. Ground Q Notes: 1. Silt fence shall meet the requirements of the NC Erosion and Sediment Control Planning and Design Manual (2013) Sfd and Spec 6.62. 2. Do not install silt fence across areas of concentrated flow, including streams, ditches, or waterways. 3. Silt fence is limited to fill heights of 10 ff or less, and shall not exceed slope length corresponding to drainage area size and slope (Table 6.62a). 4. Steel posts shall be 5' min. length, with 1.25 lb/linear ff steel. Wooden stakes are not allowed. 5. Geofexfile fabric shall comply with specifications in Table 6.62b. If Wire Fence reinforcement is needed, wire shall be 14 gauge min. with max. 6" mesh spacing and extend to bottom of french. 6. Wire or Plastic ties shall have 50 lb tensile strength min. 7. When two separate sections of geofexfile fabric adjoin each other, they shall overlap by 6" and be double folded. 8. Geofexfile fabric shall be fastened with plastic or wire ties securely to the posts at the fop, vertical midpoint and bottom of geofexfile fabric. 9. The distance between the foe of the fill to the silt fence shall be a minimum of 5'. Flow Space wood stakes every 36" in diamond shape pattern. SLOPE MATTING /-Use key trench on top edge. min. overlap Bottom Edge Note: Rotate stakes 20' towards PLAN VIEW direction of flow to prevent uplift. NTS Fill and compact with topsoil Erosion Control Matting 18" 3 min. 1 Extend matting below normal flow elevation SECTION VIEW NTS Notes: 1. Streambank Matting shall be applied to slopes 3:1 or greater, including all streambanks and terrace slopes. 2. Streambank Matting shall be 700 gram coir fiber matting (20.3 oz./sq. yd.). Rolls shall be 6' min. width. 3. Seed and mulch the ground surface before installing matting (use native Riparian Seed mix plus a temporary cover crop). 4. Alternate fastening devices require Project Engineers approval before use. Extend matting 18" min. past the fop of bank or fop of slope. Upstream fabric overlaps downstream fabric by 6 in. For streambanks, extend matting below normal flow elevation to promote saturation in order to weigh the matting down and encourage a biofilm seal with the underlying soil. For streambanks, do not french or stake the bottom of the matting to avoid disturbance and instability along the foe of slope. Tuck matting behind and under foe protection measures such as revetments and rock. w Sheet C19 TEMPORARY STREAM CROSSING AND CONSTRUCTION ACCESS 2-4" Stone Streamflow PLAN VIEW NTS SECTION A VIEW NTS Notes: 1. Temporary Stream Crossing and Construction Access shall be installed 2. 3. 4. along designated vehicular access routes needed during construction. Temporary Stream Crossing shall pass the 10YR 24HR storm event (31.2 cfs) to meet trout stream requirements Strip topsoil and stockpile for reapplication following construction. Excavate footprint of access road down 8" and install geofexfile liner. Install 24" CMP culvert where sfreamflow is currently flowing within the former Emergency Spillway channel. Ensure culvert is encased in stone bedding throughout length. The culvert length will be 30' to span diagonally under the Temporary Stream Crossing. Place 2-4" clean washed stone over geofexfile liner. Ensure road slope is adequate for 0 "Stone, 8" Depth -.textile Liner drainage, repairing any areas with ponded wafer immediately. 8. Replenish stone layer when surface rock becomes compressed >2", or stone becomes covered with fine sediment. 9. Ensure all sfreamflow passes through culvert, using additional stone and geofexfile to contour channel and divert flow, if necessary. 10. The temporary culvert can pass flows between the 5-YR and 10-YR 24-HR storm event (see fable below). For larger storm events, remove the Temporary Stream Crossing and culvert to allow larger flows through unimpeded, and re -installed these measures when normal flow conditions are re-established. 11. Remove the Temporary Stream Crossing and Construction Access following construction activities according to the Construction Sequence. TEMPORARY CONSTRUCTION 8" depth underlain with Geotextile Fabric Temporary Drainage Pipe, as needed ved Road PLAN VIEW NTS Existing I► 50' min �� Ground 2% slope Paved Road Clean washed stone 2"4' dia., 3" min. undercut priE77of 8" depth placement of stone Non -woven Geotextile Fabric shall be placed under entire width/length Temporary Drainastone as needed SECTION VIEW NTS Notes: 1. Temporary Construction Entrance specifications are described in North Carolina Erosion and Sediment Control Planning and Design Manual (2013) Std and Spec 6.06. 2. Replenish stone when surface rock becomes compressed < 8", stone becomes covered with fine sediment, or sediment is visible on the paved road. w ki Sheet C20 CULVERT OUTLET PROTECTION Notes: Headwall (type, size) 1. Refer to table below in reference to appropriate rock sizes associated with each pipe diameter. Culvert (D=size) 2. Culvert shall be Corrugated Aluminum pipe, diameter XV. 3. Riprap shall be XV median diameter rock (NCDOT Class X). 4. Geotextile liner shall be NCDOT Type X, and extend under the headwall, to the top of riprap layers, and shall be trenched t� minimum 12" into receiving channel bottom. 5. Riprap shall be placed on geotextile with top of rock at or below flow line of culvert and receiving stream. Depth (H) of rock shall extend minimum 2 x riprap median diameter below the flow line, H=XV 6. Riprap apron shall have a minimum width at the culvert outlet (W1) extending 3 x D, and a minimum width at the end of the apron Plan View within the receiving channel (W2) of W1+2.0' on both sides; W 1=XX', W2=XX'. Culvert (D-XX) s/�aEmbankment ?' 7. Riprap apron length (L) shall extend from the culvert invert into the Headwall (type, size) receiving channel a minimum of 5 x culvert diameter, with a 1% Riprap apron slope, L=XX'. If culvert discharges into an existing channel, ensure ripap extends up to the top of the receiving channel bank from the headwall to the end of the apron. Slope >090--� )�O JH 8. Headwall shall be composed of large angular boulders (median diameter XX') extending the width of the apron (W 1) minimum and Geotextile Liner into the channel minimum 1 /2xL. Headwall rock shall extend L minimum 1 x D above top of culvert and shall be underlain by Geotextile Liner. 9. Ensure embankment behind headwall does not exceed 2:1 slope Section View and soil is appropriate for backfill and compaction. RIP RAP SCHEDULE PIPE Q25 D50 Dmax D L W1 W2 15" 2 CFS 3.0" 4.5" 6.8" 8 4' 9' 18" 5 CFS 3.5" 5.25" 7.9" 9' 4.5' 10.5' 24" 10 CFS 5.0" 7.5" 11.3" 13' 6' 15' 30" 22 CFS 6.0" 9.0" 13.5" 16' 7.5' 18.5' Note: Place on filter cloth. Stone shall not block flow of water from pipe or other surface. See outlet protection detail w Sheet C21 j Gr�i(img (Berm or Diversion ditch) f At each end of crossing to prevent surface runoff ftom entering the crossing I Anchor post Min. dia, 5" Line post Min. ilia. 3 1. 2" — J t max See Toe /' \7T, i Tr'mc h Detail Stream Crossing Cross -Section Looking Downstream Bottom wridth: ft- I .efi ramp: ffl. long, slope M or I IN) Right ramp: 11. long, slope (% or H:V) Crossing surface width (parallel to flows): ft. Surface Material & Thickness: Existinaay stream channel Bottom width should match stream bottom width Fence Post Fencing ni um ineet Freak Aiva' � Wire Fence Construction ,' spec- fca ion o tna�•�5 1� Sloes .. .1 f n. 8" thief Fabric Fitter Clout f . Overexcavate to install mi Must meet NRCS Material Spec. 592 ! gravel layer over falinc filter cloth. Staples Gravel should be crusher run (road S fetal Lbond) or railroad ballast stone or a See Detaailil Combination of both. Stream Crossing Plan'Vie�v l'`� -�- Topofbank - - slope 3:1 Cut �, _ _ Pe � Stream bottom 3:1 Cut slope m _— - Stabilize al cut slopes r 1mmedinlety :;ftnr ennstrunfitin -- See Toe Trench Detail Caution R�rare beginning excai,ation clieck for undergm upid and averhood tftrlef es Call 811 Len. ramp See 1=abriG Lapping Detail ottom of crossing 3:1 Cut Slope 578 - Stream Crossing (Fold Type) i•nd�LSer cr Farm Name sp'ietl _ of I Refer NRCS CPS 578 for additional Standard Stream Crossing (Ford Type) s igltit ramp Scc Fabric Trenching Detail 3:1 Cut slope USDA-NRCS North Carolina Fidd affire ri Sheet C22 2.0' �M Caution fi,r under, r'orind and overheud wililies Call 811 1.01 Toe Trench Detaff Ramp Fabric Filter Cloth Earth backfill J Drive sharpened fence past -~� through trench Stream flow Staples shall be fabricated of Igo. 4 Re bar. Number of staples required for a 10 - 15 foot wide crossing can be estimated using this formula. 'SIaples required = (Length of crossing x 2,5) + (Length (?J crossing l 3) 578 - Stream Crossing Wni-d Tvpo) 4„ Is I I USDA NRCS North Carolina NodLiner c- Farm Nar^r: +"rh"• _ l FIald CNficc Refer NRCS CPS 578 for additional Standard Stream Crossing (Ford Type) specifications w Sheet C23 HIV � Sujti-00 Vanderpool Farms, LLC, Site Photosheets Photographed by BFEC 11/30 — 12/01/2023 Main Channel _�� •�• r.. ��f�► s � •�.. � �� ���. ��`r N � �py Nr�i,. ... -3. - � v. � � � �� . ! �r � V 71+ . Ae ZK �' �,."►' �[_ w- i�. �'a; „ ,�� Y'$t s • :i.' JA Iwo R tip-,_ �-� e=•..- i�. �'�' ' Wo Undercut Bank - . ycy_- ,fit'`" `�.. -'. �, �,• _ A ne Ids( 0 61 R Cattle access/tramplir ig Ek �j _" y � ; y�� �` T :yam• _ _ _a � � � • � '� � low ��le-_4`' ^�_"4 �:��`��r��.I• r 1 • .�. 5� ;��_JLYM� _ l��i'•��rf"�•-i�.� _ _ ,�ri XS 20 Facing Upstream (Sta 18+43) XS 24 Facing Downstream (Sta 21+96) XS 35 Facing Downstream (Sta 31+42) 0 342°NW (T) c- 36.264232,-81.756947 ±5 m ■ 838 m XS 37 Facing Left (Sta 34+90) 0 241 -SW (T) 0 36.264682,-81.757893 ±7 m ■ 826 m 'Jul XS 1 Facing Upstream (Sta 0+24) 0 11 TE (T) 36.263072,-81-755081 ±6 m ■ 840 m 14 -- . .. %F., . am XS 2 Facing Upstream (Sta 0+52.5) 0 133°SE (T) c 36.263146,-81.755109 ±5 m ■ 840 m UT2 757983 ±5 m 917 Charlie Thompson Rd, Vilas�NC 28kg2, USA 'k�{„N1 te a' •�., I 'Tz. Ilk Y = — _ —• - y Vanderpoc ;lJT2 XSP1 Strearr�Up;„ s` z 01 Dec 2023, 917 Charlie Thompson Rd, Vilas, NC 28692, U p a P. PIO J Erosion . , r top Vanderpool XS photos , UT2 XSR2 RR Up -01 Dec 2023, 8:42:31 AM 917 Charlie Thompson Rd, VElas, NC 28692, USA 77 a i ry y V Vanderpool GCS photos UT2 XSP4 Stream Down 01 Dec 2023, 8:56:36 AM •.i r 1083 Charlie Thompson Rd, Vilas, NC 28692, USA "tea"-s=z��- h , �'•+�a� ' • J � • f ..�_ `ter-. -._- � -- .. .�t'��� _t'"� - � � �T��al� •e`: _ _ 1 �.. { nderpool GCS photos [ 1T2 XSR9 L Rllp •'%' - ' __ r".'. 01 Dec 2023, 9; 29:47 AM Mutual Agreement for Stream Stabilization/Restoration Project Resource Institute, Inc. (RI) is a non-profit organization that assists organizations and individuals in carrying out projects to protect natural and human resources while promoting economic development. RI can assist with projects in a variety of ways, including, but not limited to, fund-raising, administering project funds, and contracting for services needed to complete a project. RI has recently adopted projects associated with the USDA-NRCS EQIP program such as the Western NC Stream Initiative and RCPP to help farmers and landowners address eroding stream banks that are negatively affecting them through loss of property, hazards for livestock, sediment transport into a stream and degraded aquatic habitat. The farmer/landowner has either initiated an application for assistance through USDA/NRCS's EQIP program or has already signed an agreement/contract for assistance with USDA/NRCS's EQIP program. RI's role is to help attain the funding for the design, construction oversight and unmet construction needs of the work for sites with current EQIP program agreements/contracts through USDA/NRCS. RI will assist the farmer/landowner by helping to address issues related to managing and contracting for the required design, planning, permitting and construction work for stream enhancement practices on the site, as well as necessary structure work, and bank stabilization. RI's objective is to help address current water quality degradation issues; however, work cannot be guaranteed for acts of nature related to flood events or beyond the one year work warranty given by the contractor. RI is working with NRCS, Conservation Districts, or other local unit of government and the farmers/landowners to help reduce those impacts as much as possible. In providing services to the farmer/landowner on this tract of land for stream restoration/stabilization activities to be performed we thereby mutually agree to the following items: 1. The farmer/landowner will allow ingress and egress for all activities related to the stream restoration/stabilization such as: surveys, engineering, construction, monitoring, etc. f or RI and its agents. 2. Farmer/landowner will follow the contractual guidance in the EQIP program with USDA, NRCS. This includes maintaining eligibility for individuals and/or entities if applicable. 3. Farmer/landowner will allow NRCS to provide RI with a copy of the associated NRCS EQIP, application, contract and/or contract modifications, and appendix for the purpose of allowing RI to share with RI's other funders in an effort to help obtain matching dollars. This is consistent with the 1619 policy and RI's role as a NRCS Conservation Cooperator assisting USDA-NRCS with technical and/or financial assistance through a cooperative agreement. This is also consistent with the Participant/Landowner Acknowledgement and/or the NRCS - Client Authorization for Release of Record form. 4. The farmer/landowner will assign payments for stream restoration/stabilization related items/practices in the federal contract to Resource Institute using form CCC-36 within 15 days of the completion of construction for these items/practices. 5. Farmer/landowner will sign the NRCS-CPA-1245 within 15 days of notification to sign this form to allow payment of the completed items/practices. (Initial/date) 6. RI will serve as the financial manager for all funds related to the stream restoration/stabilization activities received for the project. This includes providing the farmer/landowner (federal contract participant) with a receipt corresponding to the federal funds received related to the stream restoration/stabilization practices/items. Note: The federal funds received are based upon a payment schedule rate for the average cost. 7. RI will provide project management services such as, obtaining the technical resources, bidding and contracting of project elements, and project construction oversight. 8. RI will work with farmers/landowners to resolve differences between construction costs and payment schedule rates. 9. RI will also provide a local representative to assist with project management and to serve as a liaison with NRCS/SWCD personnel, RI and the contract participant. Your RI Representative contact info is listed below: RI Representative Name: Angela Gragg/Alan Walker Watauga Vanderpool Creek (Phone):. (828) 964-8266(828) 507-7686 4,915 ft County Stream Name Stream Length Marjorie Hrozencik/Vanderpool Farms LLC vct'�' °0 1 Participant/landowner Print Name & Title Partici t/landowner i nature g 0 -5-A)3)-0D.Qk Date '4-�r - 443 --0 (s Phone Number Chairman, Resource Institute RC&D, Inc. Email Address Date U.S. Department of Agriculture NRCS-CPA-52 A Client Name: Vanderpool Farms Natural Resources Conservation Service 11/2019 ENVIRONMENTAL EVALUATION WORKSHEET B. Conservation Plan ID # (as applicable): 74453222116 Program Authority (optional): EQIP D. Client's Objective(s) (purpose): C. Identification # (farm, tract, field #, etc. as required): Stabilize eroding stream banks and remove livestock access to the streams Farm: 4913 Tract 20032;1405 while providing alternative watering facilities. E. Need for Action: H. Alternatives El Erosion and sediment is ccuring on pasture banks No Action r if RMS ❑ Alternative 1 v if RMS ❑ Alternative 2 r if RMS allowing sediment to enter the stream. Stream banks are No Action will result in continued sediment Installation of the planned system will Increased benefits for water quality soil urrently eroding at very high rates with vertical banks in stream, continued loss of Prime eliminate animals along stream areas quality and plant quality sloughing off. Channel is farmland, continued degradation of reducing water quality degradation and unstable with unsuitable habitat streambanks and stream channel with stabilizing eroding areas eliminating or aquatic species. Riparian continued degradation of Aquatic Habitat. sediment from surface water. Channel orest areas are nonexisistent or Manure in streams. Bed Stabilization (584). Critical Area highly degraded. Planting (342); Spoil Spreading (572). Stream Crossing (578): Stream Habitat Improvement and Management (395), Streambank and Shoreline Protection (580). Tree & Shrub Establishment (612). Waste Storage Facility (313). Roofs and Covers (367). Fence (382): Livestock Pipeline (516). Roof Runoff Structure (558). Access Road (560); Heavy Use Area Protection (561). Feed Pad (561), Spring Development (574). Watering Facility (614). Underground Outlet (620) Rur r In Section "F" below, analyze, record, and address concerns identified through the Resources Inventory process. (See FOTG Section III - Resource Planning Criteria for guidance). F. Resource Concerns 1. Effects of Afternatives and Existing/ Benchmark No Action Alternative 1 Alternative 2 Conditions (Anal a and record the Amount, Status, Description • If Amount, Status, Description r If Amount, Status, Description + If existing/benchmark does NOT does NOT does NOT conditions for each (Document both short and meet (Document both short and meet (Document both short and meet identified concern) long term impacts) Pc long term impacts) Pc long term impacts) Pc OI ank arovon from streams Continued erosion on 395,584,580 Practices as a Increase in Soil Quality using a P- hwelines or water conveyance streambanks and channel ❑✓ combined stream restoration ❑ Graze system and Nut Mgt ❑ hamals movement creating erosion both short and long term system will stabilize the streambanks and channel Stream channel is in a very degraded condition. SVAP is NOT therefore reducing streambank NOT NOT poor. Animals have full access meet erosion. 578 Stream Crossing and meet meet o the stream PC 612 will help stabilize eroding PC PC streambanks. 572 allows the ❑ resource concem idendried n NOT ❑ NOT ❑ NOT meet meet meet PC PC PC ❑ resource concern identified ,. ❑ NOT ❑ NOT ❑ NOT meet meet meet PC PC PC o resource cbncem identified ❑ NOT ❑ NOT n NOT meet meet meet PC PC PC \RCS-CPA-52, November 2019 North Carolina Version: Nov 2019 uirrents t;arsported to surbce waffl Continued erosion on A livestock exclusion system No effect 1xcess streambanks and channel along with stream restoration will El movement creating erosion both reduce manure and sediment short and long term NOT meet depostion within the stream corridor Practices used will be NOT meet NOT meet urbidity in the water caused by sediment PC 342.382.561.516.533.578.642.614 PC PC 572 ai»nge as and ci3*rn:W train Continued animal use with the A livestock exclusion system along ❑ Placement of fence greater than ❑ !or>ip�ld4:Of 4sS . stream condor will continue to deposit manure and increase with stream restoration will reduce manure and sediment depostion 30 feet off the top of bank will help reduce the change of manure in anure is present in the stream. nimals accessing stream to get sediment from streambank NOT within the stream corridor NOT stream even more NOT alter causing them to deposit erosion meet Practices used will be meet meet anure in the stream. PC 342,382.561.560.558,367,578.620 PC PC 313, 516, 533, 642, 614, 572 ed to surface Cattle will continue to access stream areas and deposit manure ff L-] A stream protection system with conservation practices 342.382.561.560 558,367,578.620 Placement of fence greater than 30 feet off the top of bank will help reduce the change of manure in ❑ nimals accessing stream to get ater causing erosion issues NOT .313,516,533,642,614,572. These NOT stream even more NOT meet practices will help elimate the meet meet PC direct depost of manure directly in PC PC F. Resource Concerns I. (continued) No Action Alternative 1 Alternative 2 and Existing/ Benchmark Conditions (Analyze and record the Amount, Status, Description v If Amount, Status, Description V if Amount, Status, Description J It existing/benchmark does NOT does NOT does NOT conditions for each (Document both short and meet (Document both short and meet (Document both short and meet identified concern) long term impacts) Pc long term impacts) Pc long term impacts) Pc AIR o resource concern identified r j NOT ❑ NOT ❑ NOT meet meet meet PC PC PC o resource concern identified r C LNOT ❑ NOT r i NOT meet meet meet PC PC PC PLANTS ]ant productivity and health Lack of soil testing could result in 1 Soil samples collected and ❑ Nutrient Mgt may help increase poor growth of grass in pastures J NOT analyze the results to correct the poor growth areas which will lead NOT grass productiivity NOT Some areas of the farm have indicators of poor fertility such as meet to improving the plant quality and meet meet broomsedge PC health. PC PC io resource concern identified ❑ NOT ❑ NOT ❑ NOT meet meet meet PC PC PC AN MALS Aquatic habitat for fish and other Current SVAP rating of Poor. No SVAP score for Instream fish Practices will help improve overall organisms action will result in a lower SVAP U cover is currently (poor). After habitat conditions score and continued Degradation of the Channel/Streambanks and Stream Restoration and the installation of a livestock watering Aquatic habitat is limited due to streambank erosion and limited Habitat NOT system the SVAP rating should NOT NOT in stream features for habitat meet increase to a Rating of GOOD 395 meet meet PC Stream Habitat Improvement PC PC stock water quantity. Inadequate livestock water r Conservation practices 574, 516, r 1 No effect r� ribution continues around the farm. Water supply dries up in the summer l NOT 561,614,382 will provide adequate water supply and allows quality l J NOT LJccessing NOT the lower to get water. during a drought. meet distribution. meet meet PC PC PC Econcem ncem identified ❑ NOT ❑ NOT ❑ NOT meet meet meet PC PC PC \RCS-CPA-52, November 2019 North Carolina Version: Nov 2019 rvo resource concern iaentmeo Q NOT ❑ NOT ❑ NOT meet meet meet PC PC PC o resource concem identified ❑ NOT ❑ NOT ❑ NOT meet meet meet PC PC PC No capital required. I Extensive capital involved to complete a stream restoration on this scale Some capital involved in buying lime and fertilizer Stream restoration is very o labor needed lHeavy equipment needed in bection "u" complete ana attacn tnvironmentai rroceaures uume tineets Tor aocumentation as appucame. items wnn a ..•.• may require a federal permit or consultationicoordination between the lead agency and another government agency. In these cases, effects may need to be determined In consultation with another agency. Planning and practice implementation may proceed for practices not involved in consultation. The APE Mapping Webtool may be used to identify and analyze relevant SECs within an APE. G. Special Environmental J. Impacts to Spec a nvironmenta oncerns Concerns No Action I Alternative 1 Alternative 2 (Document existing/ Document all impacts if Document all impacts 4if Document all impacts 4if benchmark conditions) (Attach Guide Sheets as needs (Attach Guide Sheets as needs (Attach Guide Sheets as [No needs APE Mapping WebTool applicable) further action lNo applicable) further action applicable) further action No Effect Effect Effect •Clean AirAct Guide Sheet Fact Sheet Current activities do not cause an Pla increase in emission of a ❑ incr PLU not in a non -attainment regulated air pollutant and does Imat reg area not promote excessive not concentrations of particulate con matter in the air. eClean Water Act±Waters of he U.S. Guide Sheet Fact Sheet Stream and segments of ripans yeas likely under CWA urisdiction. •Coastal Zone Management Guide Sheet Fact Sheet PLU located in Mountains no u nned action will not cause an ease in emission of aulated air pollutant and does promote excessive centrations of particulate er in the air i Effect jam consultation and permits ❑ ded from Army Corp DWQ, FWS. Planned action will not cause an increase in emission of a [_ regulated air pollutant and does not promote excessive concentrations of particulate matter in the air. No Effect Effect No Effect No Effect coastal zones are located in ❑ No coastal zones are located in ❑ No coastal zones are located in ❑ Mountains of NC the Mountains of NC the Mountains of NC Effect No Effect No Effect Guide Sheet Fact Sheet No coastal reefs are located in the ❑No coastal reefs are located in the No coastal reefs are located in theNot present in the PLU Mountains of NC Mountains of NC Mountains of NC •Cultural Resources / Historic No Effect May Effect May Effect Properties CR's requested ❑ Alternative includes Group 1 & ❑ Alter Guide Sheet Fact Sheet Group 2 . Refer request to CR Grou There are no National Register Specialist. I 1"Spec federal action would occur Guide Sheet FactSheet Species on County T&E list. sed ICM to determine potential I ys Although the ICM sano criticalhabitats the FWS permit will be required and will review the potential for impacts to the appalachian elk toe and the native includes Group 1 &p 2 . Refer request to CR ialist. Effect ,ugh the ICM says no critical ❑ ats the FWS permit will be red and will review the itial for impacts to the lachian elk toe and the No Effect No Effect No Effect Environmental Justice Guide Sheet Fact Sheet No federal action would occur There would be no There would be no El disproportionately high and ❑ disproportionately high and ❑ 35% of households in census adverse environmental or human adverse environmental or human rea are low income, 5% of the health effect on low-income or health effect on low-income or population are minorities. minority populations. minority populations. \RCS-CPA-52. November 2019 North Carolina Version: Nov 2019 No Effect No Effect No Effect *Essential Fish Habitat Guide Sheet Fact Sheet No federal action would occur 0 Action will NOT result in short- ❑ Action will NOT result in short- ❑ term or long-term disruptions or term or long-term disruptions or Trout County but no Trout alterations that may result it a alterations that may result in an Waters in FLU "adverse effect" "adverse effect' No Effect No Effect No Effect Floodplain Management No federal action would occur Guide Sheet Fact Sheet ❑ The proposed action will NOT or El The proposed action will NOT or ❑ alternative likely result in an alternativelikely result in an Classification X but no data. increased flood hazard increased flood hazard Invasive Species No Effect No Effect No Effect Not present in PLU Guide Sheet Fact Sheet Planned action is not likely to ❑ ❑ Not present in FLU El invasive Species noticed cause or promote the introduction wring field visit. and spread of invasive species. *Migratory Birds/Bald and No Effect No Effect No Effect No federal action would occur The action(s) will NOT result in a The action(s) will NOT result in a Golden Eagle Protection Act ❑ ❑ ❑ Guide Sheet Fact Sheet take (intentionally or take (intentionally or Migratory Bird in County unintentionally) to any migratory unintentionally) to any migratory -bird- occupied nest or eau -bird. occupied nest or eau Natural Areas No Effect No Effect No Effect No federal action would occur Planned action will not impact Guide Sheet Fact Sheet ❑ Actions will not affect Natural ❑ ❑ Not present in PLU Areas officially or unofficially designated natural areas, Prime and Unique Farmlands No Effect No Effect No Effect No federal action would occur Planned action will not result in the Guide Sheet Fact Sheet f l LJ Present in the PLU but will not El ❑ Present in the PLU but will not result in permanent conversion to conversion of farmland to a non - result in permanent conversion non-ag purposes. agricultural use. o non-ag purposes. Riparian Area May Effect May Effect May Effect Will increase the size and protect Guide Sheet Fact Sheet There will be continued ❑ ❑ Will increase the size and protect ❑ There are Riparian areas in the degradation of the Riparian areas riparian areas riparian areas PLU without some stream stabilization Scenic Beauty May Effect May Effect May Effect Project will improve riparian and Planned action will help the quality Guido Sheet Fact Sheet Maintaining current activities will ❑ ❑ ❑ PLU not in Scenic area affect the quality of the general stream areas. of the general landscape eWetlands No Effect No Effect No Effect Guide Sheet Fact Sheet No Wetlands present within the ❑ No Wetlands present within the ❑ No Wetlands present within the ❑ Not present in the PLU planning unit. planning unit. planning unit. *Wild and Scenic Rivers No Effect No Effect No Effect No federal action would occur No Wild Scenic Rivers in PLU Guide Sheet Fact Shoot ❑ _ Non in PLU ❑ ❑ Not present in or near the FLU location K. Other Agencies and No Action Alternative 1 Alternative 2 Broad Public Concerns Easements. Permissions. Public No actions CR Review Required, Permits for FWS, None needed Review, or Permits Required DWQ, Army Corp of Engineer and Agencies Consulted. ie onz tion for Auth. for Release of Record Needed Auth. for Release of Record Received & Auth. for Release of Record Received & Release of Record Filed in Case File Filed in Case File Cumulative Effects Narrabve No Action will result in continued sediment Alternative 1 will increase Aquatic Habitat Alternative 2 would increase productivity o (Describe the cumulative in stream, continued loss of Prime while stabilizing the Stream Channel and the farm and improve water quality in the impacts considered, including farmland, continued degradation of banks preventing further sediment Watauga River. past, present and known future streambanks and stream channel with discharges to the water and increasing actions regardless of who continued degradation of Aquatic Habitat water quality at this location and performed the actions) downstream. \RCS-CPA-52, November 2019 North Carolina Version: Nov 2019 L. Mitigation None None needed None needed (Record actions to avoid, minimize, and compensate) M. Preferred Y preferredO kernative alternative Alternative addresses an resource concern and fitsreason QidentifiedSupporting limitations. N. Context (Record context of alternatives analysis) local local The significance of an action must be analyzed in several contexts such as society as a whole (human, national), the affected region, the affected interests, and the locality. O. To the best of my knowledge, the data shown on this form is accurate and complete: In the case where a non-NRCS person (e.g. TSP, Partner, Volunteer) or NRCS employee (non-CCP) assists with planning they are to sign the first signature block and then the NRCS CCP is to sign the second block to verify the information's accuracy. NO�e�w0� Soil Conservationist 2/25/2022 SI ure (P n r comple ng S coons A-N) Title ; "• �}' .� ate 2 2— S ture (NRCS CCP Title Daile If preferred alternative is not a federal action where NRCS has control or responsibility and this NRCS-CPA-521s shared with someone other than the client then indicate to whom this is being provided. The following sections are to be completed by the Responsi t F NRCS is the RFO if the action is subject to NRCS control and responsibility (e.g., actions financed, funded, assisted, conducted, regulated, or approved by NRCS). These actions do not include situations in which NRCS is only providing technical assistance because NRCS cannot control what the client ultimately does with that assistance and situations where NRCS is making a technical determination (such as Farm Bill HEL or wetland determinations) not associated with the planning process. P. Determination of Significance or Extraordinary Circumstances To answer the questions below, consider the severity (intensity) of impacts in the contexts identified above. Impacts may be both beneficial an adverse. A significant effect may exist even if the Federal agency believes that on balance the effect will be beneficial. Significance cannot be avoided by terming an action temporary or by breaking it down into small component parts. If you answer ANY of the below questions "yes" then contact the State Environmental Liaison as there may be extraordinary circumstances and significance Issues to consider and a site specific NEPA analysis may be required. Yes No ❑ 0 a Is the preferred alternative expected to cause significant effects on public health or safety? ❑ a Is the preferred alternative expected to significantly affect unique characteristics of the geographic area such as proximity to historic or cultural resources, park lands, prime farmlands, wetlands, wild and scenic rivers, or ecologically critical -areas? ❑ 0 •' Are the effects of the preferred alternative on the quality of the human environment likely to be highly controversial? ❑ l 1 • Does the preferred alternative have highly uncertain effects or involve unique or unknown risks on the human environment? ❑ ❑ Does the preferred alternative establish a precedent for future actions with significant impacts or represent a decision in principle about a future consideration? ❑ ❑ e Is the preferred alternative known or reasonably expected to have potentially significant environment impacts to the quality of the human environment either individually or cumulatively over time? ❑ ❑✓ • Will the preferred alternative likely have a significant adverse effect on ANY of the special environmental concerns? Use the Evaluation Procedure Guide Sheets to assist in this determination. This includes, but is not limited to, concerns such as cultural or historical resources, endangered and threatened species, environmental justice, wetlands, floodplains, coastal zones, coral reefs, essential fish habitat, wild and scenic rivers, clean air, riparian areas, natural areas, and invasive species. ❑ Q • Will the preferred alternative threaten a violation of Federal State, or local law or requirements for the protection of the environment? NRCS-CPA-52, November 2019 North Carolina Vernon. Nov 2019 Q. NEPA Compliance Finding (check one) The preferred alternative: Action required U 11 is not a federal action where the agency has control or responsibility document in 'R.1" below. No additional analysis is required 2) is a federal artirm ALL of which is categorically excluded from) fuililel ❑oCument in "R.2" below. �—� environmental analysis AND there are no extraordinarycircumstances as identified No additional analysis is required in Section " O", J) is a lederal action that has peen sufficiently analyzed in an existing Agency state IIcccrnent in "R.1" below. ❑ regional or national NEPA document and there are no predicted significant ariva(se_ No additional analysis is required environmental sifects or extraordinar• circumstances. a) is a federal action that has been sufficiently analyzed in another t7edernl ag.anr_y's Contact the State Environmental NEPA document IEA or EIS) that addresses the proposed NRCS ar_tion and its' effects far list s dcable ❑ and has been formally adopted by Iii NRCS is required to piepnre and publish dNEPA fo formally adopted and available for to its own Finning of too Significant Impact for an EA or Record of Deos}ori for an EIS ring. tiering. Document in "R.1' below. when adopting another agency's EA or EIS document. SNola: This box is not No additional analysis is required applicable to FSA) 5) ,s a federal action that has NOT been sufficiently analyzed or mly invoiva predicted Contact the State Environmental ❑ significant adverse environmental effects or extraordinary cirrums!anres and Fray Liaison. Further NEPA analysis require an EA or EIS. required. R. Rationale Supporting the Finding RA Environmental Quality Incentives Program, Natural Resources Conservation Service. Environmental Assessment December Findings Documentation 2019 R.2 Applicable Categorical Exclusion(s) (more than one may apply) 7 CFR Part 650 Compliance With NEPA, subpart 650.6 Categorical Exclusions states prior to determining that a proposed action is categorically excluded under paragraph (d) of this section. the proposed action must meet six sideboard criteria. See NECH 610.116. 1 have considered the effects of the alternatives on the Resource Concerns, Economic and Social Considerations, Special Environmental Concerns, and Extraordinary Circumstances as derined by Agency regulation and policy and based on that made the finding indicated above. North Carolina Policy- Only Certified Conservation Planners (CCP) have the delegated authority to act as the RFO. S. Signal of a on le Federal fficia �SC 2- 2 2d2 z ignature Title Date 2. MRCS-CPA-52, November 2019 North Carolina Version: Nov 2019 Wetland Determination Vanderpool Farms WNCSI Project Site Watauga County, North Carolina Date of Determination February 16, 2024 Prepared By: En Brushy Fork Environmental Consulting 10565 HWY 421 South Trade, Tennessee 37691 Vanderpool Farms WNCSI Wetland Determination Wataug County, NC 25/2024 U.S. Army Corps of Engineers OMB Control #: 0710-0024, Exp:1113012024 WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-12-9; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a) Project/Site: Vanderpool Farms City/County: VilasM/atauga Sampling Date: 2/16/24 Applicant/Owner: Brushy Fork Environmental Consulting, LLC./Vanderpool Farms LLC. State: NC Sampling Point: S1 Investigator(s): A. Williams, C. Crowell, D. Pedersen Section, Township, Range: Vilas, NC Landform (hillside, terrace, etc.): Cove Local relief (concave, convex, none): Slope (%): 8-15 Subregion (LRR or MLRA): LRR N, MLRA 130B Lat: 36.259454 Long:-81.752427 Datum: Soil Map Unit Name: Saunook Loam, Central Mountains NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes x No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes x No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required: check all that apply) —Surface Soil Cracks (136) —Surface Water (Al) —True Aquatic Plants (1314) —Sparsely Vegetated Concave Surface (138) _ High Water Table (A2) —Hydrogen Sulfide Odor (Cl) —Drainage Patterns (1310) —Saturation (A3) —Oxidized Rhizospheres on Living Roots (C3) —Moss Trim Lines (1316) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) —Sediment Deposits (132) —Recent Iron Reduction in Tilled Soils (C6) —Crayfish Burrows (C8) _ Drift Deposits (133) —Thin Muck Surface (C7) —Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) —Other (Explain in Remarks) —Stunted or Stressed Plants (D1) —Iron Deposits (135) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water-Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No x Depth (inches): Water Table Present? Yes No x Depth (inches): Saturation Present? Yes No x Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: Sample Point taken on low topo point in pasture. ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont — Version 2.0 VEGETATION (Four Strata)- Use scientific names of plants. Sampling Point: S1 Hosoiuie uominani inaicaior Tree Stratum (Plot size: 30x30 ) % Cover Species? Status Dominance Test worksheet: 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC: 0 (A) 3. Total Number of Dominant 4. Species Across All Strata: 1 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 0.0% (A/B) 7. Prevalence Index worksheet: =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20% of total cover: OBL species 0 x 1 = 0 Sapling/Shrub Stratum (Plot size: 30x30 ) FACW species 0 x 2 = 0 1. FAC species 10 x 3 = 30 2. FACU species 90 x 4 = 360 3. UP species 0 x 5 = 0 4. Column Totals: 100 (A) 390 (B) 5. Prevalence Index = B/A = 3.90 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. -2 - Dominance Test is >50% 9. 3 - Prevalence Index is :53.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 10x10 ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Festuca pratensis 60 Yes FACU 'Indicators of hydric soil and wetland hydrology must be 2. Trifolium pratense 10 No FACU present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Ranunculus sp. 10 No FAC 4. Solanum carolinense 10 No FACU Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. Digitaria sanguinalis 10 No FACU more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft (1 9 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless of 11. size, and woody plants less than 3.28 ft tall. 100 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 50 20% of total cover: 20 height. Woody Vine Stratum (Plot size: 30x30 ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: S1 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Type' Locz Texture Remarks 0-12 10YR 3/6 100 Loamy/Clayey RM=Reduced Matrix. MS=Masked Sand Grains Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) _ Hydrogen Sulfide (A4) _ Stratified Layers (A5) 2 cm Muck (A10) (LRR N) _ Depleted Below Dark Surface (A11) _Thick Dark Surface (Al 2) —Sandy Mucky Mineral (S1) _ Sandy Gleyed Matrix (S4) _ Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: Sandy Loam texture throughout sample. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) _ Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) _ Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 31ndicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No X ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont — Version 2.0