HomeMy WebLinkAbout20150705 Ver 2_More Info Received_20151027Homewood, Sue
From:
Sent:
To:
Subject:
Attachments:
Brad Luckey <bluckey @pilotenviro com>
Tuesday, October 27, 2015 3 07 PM
Homewood, Sue, Bailey, David E SAW
RE Minnie solar farm - request for more information
Minnie Wetland Impacts pdf, 09- 03 -03- Corrected PCN_minnie_ revised 10 2715 pdf
Revised PCN to reflect impact changes attached
Sincerely,
Bradley S. Luckey
336 708 4997 (c)
336 310 4527 (o)
PO Box 128
Kernersville, NC 27285
PILOT ENVIRONMENTAL INC
www pilotenviro corn
bluckey @pilotenviro corn
From: Homewood, Sue [mailto sue homewood @ncdenr gov]
Sent Monday, October 26, 2015 9 07 AM
To Brad Luckey <bluckey @pilotenviro com>
Subject RE Minnie solar farm -request for more information
So you're going to figure it out and send me something updated?
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue Homewood (a)ncdenr qov
450 W Hanes Mill Rd, Suite 300
Winston Salem NC 27105
-_`- ^Nothing Compares. ---,.
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From. Brad Luckey [mailto bluckey @pilotenviro com]
Sent. Friday, October 23, 2015 9 51 PM
To. Homewood, Sue <sue homewood @ncdenr Rov>
Subject: Re Minnie solar farm -request for more information
Different than PCN, geez
Sent from my Phone
On Oct 23, 2015, at 10 29 AM, "Homewood, Sue" <sue homewood @ncdenr Rov> wrote
That helps I'm not in the office, did they change the buffer impacts now that they are showing the
stream buffer correctly? Can you double check that and double check it with the PCN table please
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue Homewoodamcdenr ciov
450 W Hanes Mill Rd, Suite 300
Winston Salem NC 27105
<image001 png>
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From Brad Luckey fmailto bluckev @gilotenviro coml
Sent Friday, October 23, 2015 9 19 AM
To- Homewood, Sue <sue homewood @ncdenr Rov >, Bailey, David E SAW
< David E Bailev2 @usace army mil>
Subject* RE Minnie solar farm - request for more information
See attached updated drawing from the civil I think Kenny and you had a discussion about it Let me ,
know if this doesn't get it Thanks
Sincerely,
<image002lpg >Bradley S. Luckey
336 708 4997 (c)
336 310 4527 (o)
PO Box 128
Kernersville, NC 27285
www pilotenviro com
bluckev @pilotenviro com
From- Homewood, Sue fmailto sue homewood(Pncdenr Rovl
Sent. Monday, October 19, 2015 10 36 AM
To. Brad Luckey <bluckev @pilotenviro com >, Bailey, David E SAW < David E Bailev2 @usace armv mil>
Subject RE Minnie solar farm - request for more information
y
Brad,
I'm very sorry, but the drawing isn't clear enough for me to determine that you've responded to
questions 2 and 4
N
#► l
l
T1
^al
I 0
} ^ I
/ � I
^a
IMPACTS_
AREA OF STREAMS IN LEASED AREA 0 006 AC (275 SF)
AREA OF BUFFERS IN LEASED AREA 0124 AC (5,404 SF)
IMPACTED BUFFER ZONE 1 2,760 SF
IMPACTED BUFFER ZONE 2 2,664 SF
LENGTH OF PIPE 30 LF
LENGTH OF RIPRAP 10 LF
PERMANENT STREAM IMPACT 38 LF
TEMPORARY STREAM IMPACT 45 LF
v1V�KIMCR�ED
8020 Tower 11 111—
Charlotte, North Carolina 28227
Phone (704)841 -2588 Fax (704)841 -2567
F -1222
www mckimcreed cam
JURISDICTIONAL POND
CONERGY PROJECTS. Inc
3947 LENNANE DR NE SUITE 275
SACRAMENTO CA 95834
PHONE (916)692 7548
WWW CONERGY US
,,,� (•T � 4 � _ s
.e
Know what's below.
Call before you dig
,I I
T) I I
1 I I
I
� I
I
I I
I
I I
I
g I
I
A I
{ 70 I
A � I
II
A I
PROPOSED GRAVEL ROAD TO BE I
CONSTRUCTED PRIMARILY AT
EIBSTNG GRADE WITH A SLIGHT R
CROWN TO ALLOW STORMWATER
TO SHEET FLOW OVER GRASSED
SHOULDERS RESULTING IN
DIFFUSE FLOW A
{
�
NOTES. � -
- -
ARE
T
V APPROMM TTIE THEY HAVE BEEN DELJNEA70 BY CS�
— DOTTING SURFACE SHOWN HEREIN IS BASED OFF GIS DATA AND MAY
SCALE I "= 40'
REQUIRE FIELD ADJUSTMENTS AS NEEDED
—THE SOLE PURPOSE OF THIS MAR IS TO SNOW JURISDICTIONAL
BOUNDARIES AS DELINEATED BY ECS
—BASIS OF BEARING IS NORTH CAROLINA STATE PLANE COORDINATE
O 20 40 80
SYSTEM (NAB 83/4SRSZOHI)
JURISDICTIONAL WATERS OF THE U.S. DATE
ICE PROI
JUNE 2013 SCALE
Dean CE -102
IMPACT PLAN AND PROFILE DRAwN
0 -000e
TAN HORUONTAL.
DESIGNED
TAX 1'-40'
2
CHECKED
MINNIE SOLAR FARM PROJ MGR
DID) VERTICAL.
DID) NA
ALAMANCE COUNTY (STATUS
0OF 3
'�°°'
NORTH CAROLINA
PRELIMINARY DESIGN
l
FOR PERMITTING J
J
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ® Streams - tributaries
® Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question
for each wetland area impacted
2a 2b 2c
2d
2e 2f
Wetland impact
Type of jurisdiction
number — Type of impact Type of wetland Forested
(Corps - 404, 10 Area of impact
Permanent (P) or (if known)
DWQ — non -404, other)
(acres)
Temporary (T)
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
2h Comments Wetland impacts are not proposed
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts)
proposed on the site, then complete
this
question for all stream sites impacted
3a 3b 3c
3d
3e 3f
3g
Stream impact Type of impact Stream name
Perennial
Type of jurisdiction Average
Impact
number -
(PER) or
(Corps - 404, 10 stream
length
Permanent (P) or
intermittent
DWQ — non -404, width
(linear
Temporary (T)
(INT)?
other) (feet)
feet)
S1 ® P ® T Culvert/Pump Unnamed
Around
® PER
❑ INT
® Corps 4
❑ DWQ
I 38/45
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h Total stream and tributary impacts
I 38/45
31 Comments The proposed culvert replacement will permanently impact 38 linear feet of stream channel and temporarily
impact 45 linear feet of stream channel with the associated pump around Areas of temporary impact will be restored to
similar pre - construction conditions
Page 5 of 11
PCN Form —Version 1 3 December 10, 2008 Version
E
4 Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then individually list all open water impacts below
4a 4b 4c 4d 4e
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary (T)
01 ❑P ❑T
02 ❑P ❑T
03 ❑P ❑T
04 ❑P ❑T
4f. Total open water impacts
4g Comments Open water impacts are not being proposed
S. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a 5b 5c 5d 5e
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g Comments Construction of ponds /lakes are not being proposed
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below
If yes, then individually list all buffer impacts
below If any impacts require mitigation,
then you MUST fill out Section D
of this form
6a
❑ Neuse
❑ Tar - Pamlico ® Other Lake Jordan
Project is in which protected basin?
❑ Catawba
❑ Randleman
6b 6c 6d
6e
6f 6g
Buffer impact
number- Reason
Buffer
Zone 1 impact Zone 2 impact
Permanent (P) or for
Stream name mitigation
(square feet) (square feet)
Temporary (T) impact
required?
61 ®P ❑ T Road
Unnamed ® Yes s
2,760 2,664
B2 ❑P ❑T
F-1 Yes
❑ No
B3 ❑P ❑T
❑Yes
❑ No
6h Total buffer impacts
2,760 2,664
61 Comments The proposed culvert replacement and subsequent access road will permanently impact 2,760 SF of Zone 1
Page 6 of 11
PCN Form -Version 1 3 December 10, 2008 Version