Loading...
HomeMy WebLinkAbout20150705 Ver 2_More Info Received_20151027Homewood, Sue From: Sent: To: Subject: Attachments: Brad Luckey <bluckey @pilotenviro com> Tuesday, October 27, 2015 3 07 PM Homewood, Sue, Bailey, David E SAW RE Minnie solar farm - request for more information Minnie Wetland Impacts pdf, 09- 03 -03- Corrected PCN_minnie_ revised 10 2715 pdf Revised PCN to reflect impact changes attached Sincerely, Bradley S. Luckey 336 708 4997 (c) 336 310 4527 (o) PO Box 128 Kernersville, NC 27285 PILOT ENVIRONMENTAL INC www pilotenviro corn bluckey @pilotenviro corn From: Homewood, Sue [mailto sue homewood @ncdenr gov] Sent Monday, October 26, 2015 9 07 AM To Brad Luckey <bluckey @pilotenviro com> Subject RE Minnie solar farm -request for more information So you're going to figure it out and send me something updated? Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue Homewood (a)ncdenr qov 450 W Hanes Mill Rd, Suite 300 Winston Salem NC 27105 -_`- ^Nothing Compares. ---,. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From. Brad Luckey [mailto bluckey @pilotenviro com] Sent. Friday, October 23, 2015 9 51 PM To. Homewood, Sue <sue homewood @ncdenr Rov> Subject: Re Minnie solar farm -request for more information Different than PCN, geez Sent from my Phone On Oct 23, 2015, at 10 29 AM, "Homewood, Sue" <sue homewood @ncdenr Rov> wrote That helps I'm not in the office, did they change the buffer impacts now that they are showing the stream buffer correctly? Can you double check that and double check it with the PCN table please Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue Homewoodamcdenr ciov 450 W Hanes Mill Rd, Suite 300 Winston Salem NC 27105 <image001 png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From Brad Luckey fmailto bluckev @gilotenviro coml Sent Friday, October 23, 2015 9 19 AM To- Homewood, Sue <sue homewood @ncdenr Rov >, Bailey, David E SAW < David E Bailev2 @usace army mil> Subject* RE Minnie solar farm - request for more information See attached updated drawing from the civil I think Kenny and you had a discussion about it Let me , know if this doesn't get it Thanks Sincerely, <image002lpg >Bradley S. Luckey 336 708 4997 (c) 336 310 4527 (o) PO Box 128 Kernersville, NC 27285 www pilotenviro com bluckev @pilotenviro com From- Homewood, Sue fmailto sue homewood(Pncdenr Rovl Sent. Monday, October 19, 2015 10 36 AM To. Brad Luckey <bluckev @pilotenviro com >, Bailey, David E SAW < David E Bailev2 @usace armv mil> Subject RE Minnie solar farm - request for more information y Brad, I'm very sorry, but the drawing isn't clear enough for me to determine that you've responded to questions 2 and 4 N #► l l T1 ^al I 0 } ^ I / � I ^a IMPACTS_ AREA OF STREAMS IN LEASED AREA 0 006 AC (275 SF) AREA OF BUFFERS IN LEASED AREA 0124 AC (5,404 SF) IMPACTED BUFFER ZONE 1 2,760 SF IMPACTED BUFFER ZONE 2 2,664 SF LENGTH OF PIPE 30 LF LENGTH OF RIPRAP 10 LF PERMANENT STREAM IMPACT 38 LF TEMPORARY STREAM IMPACT 45 LF v1V�KIMCR�ED 8020 Tower 1­1 111— Charlotte, North Carolina 28227 Phone (704)841 -2588 Fax (704)841 -2567 F -1222 www mckimcreed cam JURISDICTIONAL POND CONERGY PROJECTS. Inc 3947 LENNANE DR NE SUITE 275 SACRAMENTO CA 95834 PHONE (916)692 7548 WWW CONERGY US ,,,� (•T � 4 � _ s .e Know what's below. Call before you dig ,I I T) I I 1 I I I � I I I I I I I I g I I A I { 70 I A � I II A I PROPOSED GRAVEL ROAD TO BE I CONSTRUCTED PRIMARILY AT EIBSTNG GRADE WITH A SLIGHT R CROWN TO ALLOW STORMWATER TO SHEET FLOW OVER GRASSED SHOULDERS RESULTING IN DIFFUSE FLOW A { � NOTES. � - - - ARE T V APPROMM TTIE THEY HAVE BEEN DELJNEA70 BY CS� — DOTTING SURFACE SHOWN HEREIN IS BASED OFF GIS DATA AND MAY SCALE I "= 40' REQUIRE FIELD ADJUSTMENTS AS NEEDED —THE SOLE PURPOSE OF THIS MAR IS TO SNOW JURISDICTIONAL BOUNDARIES AS DELINEATED BY ECS —BASIS OF BEARING IS NORTH CAROLINA STATE PLANE COORDINATE O 20 40 80 SYSTEM (NAB 83/4SRSZOHI) JURISDICTIONAL WATERS OF THE U.S. DATE ICE PROI JUNE 2013 SCALE Dean CE -102 IMPACT PLAN AND PROFILE DRAwN 0 -000e TAN HORUONTAL. DESIGNED TAX 1'-40' 2 CHECKED MINNIE SOLAR FARM PROJ MGR DID) VERTICAL. DID) NA ALAMANCE COUNTY (STATUS 0OF 3 '�°°' NORTH CAROLINA PRELIMINARY DESIGN l FOR PERMITTING J J C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary (T) W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments Wetland impacts are not proposed 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ® P ® T Culvert/Pump Unnamed Around ® PER ❑ INT ® Corps 4 ❑ DWQ I 38/45 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts I 38/45 31 Comments The proposed culvert replacement will permanently impact 38 linear feet of stream channel and temporarily impact 45 linear feet of stream channel with the associated pump around Areas of temporary impact will be restored to similar pre - construction conditions Page 5 of 11 PCN Form —Version 1 3 December 10, 2008 Version E 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary (T) 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments Open water impacts are not being proposed S. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments Construction of ponds /lakes are not being proposed 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar - Pamlico ® Other Lake Jordan Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary (T) impact required? 61 ®P ❑ T Road Unnamed ® Yes s 2,760 2,664 B2 ❑P ❑T F-1 Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 2,760 2,664 61 Comments The proposed culvert replacement and subsequent access road will permanently impact 2,760 SF of Zone 1 Page 6 of 11 PCN Form -Version 1 3 December 10, 2008 Version