Loading...
HomeMy WebLinkAbout20151019 Ver 1_Modifications_20151027 Homewood, Sue From: Williamson, Justin T Sent: Tuesday, October 27, 2015 8:58 AM To: Homewood, Sue Cc: Thomas, John T JR SAW Subject: Hanging Rock State Park Mountain Bike Trails Correction Attachments: HARO Moores Spring Trails PCN Amended.pdf Hi Sue and John, Attached is an amended section of the PCN for the Hanging Rock State Park Mountain Bike Trails that was already approved by DWR and USACE. Site 4 should actually be 8 linear feet of impacts and not 4 feet. Sorry it was a typo.The corrected amount of total linear disturbance would then equal 24 feet. Sorry again. Please let me know if you have any questions. Thank You. Justin Williamson IusfiIFr �/IIIIc�I7 son I IV I'0111I1Y1011tail -, 'VM '\N ( i.01 61 Ia'1ti.1'r IBC" 1)MsI oil o( Parks & I-,r''c;r(',afioi 1 161') Macy S(',rvlcr' Center 1, NC 2/699.....161" justin.williamson@ncparkslov i C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project(check all that apply): ❑ Wetlands ® Streams-tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps-404, 10 Area of impact Permanent(P)or (if known) DWQ—non-404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g.Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER)or (Corps-404, 10 stream length Permanent(P)or intermittent DWQ—non-404, width (linear Temporary(T) (INT)? other) (feet) feet) S1 ® P ❑ T Hardened UT1 to Cascade ® PER ® Corps 10 4 Crossing (Fill) Creek ❑ INT ® DWQ Hardened UT2 to Cascade [:1 PER ® Corps S2 ® P ❑ T Crossing (Fill) Creek ® INT ® DWQ 8 4 Hardened UT3 to Cascade ❑ PER ® Corps S3 ® P ❑ T Crossing (Fill) Creek ® INT ® DWQ 6 8 S4 ® P ❑ T Culvert(Fill) UT3 to Cascade ❑ PER ® Corps 5, $, Creek ® INT ® DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 24' 3i. Comments: Crossing will be installed below grade to allow for passage of aquatic organisms and stream flow. Page 5 of 11 PCN Form—Version 1.3 December 10, 2008 Version