Loading...
HomeMy WebLinkAbout20150620 Ver 1_Emails_20151026 (2)Burdette, Jennifer a From: Gregg Antemann <gregg @cws- inc.net> Sent: Monday, October 26, 2015 2:37 PM To: Johnson, Alan Cc: William Elliott - USACE (william.a.elliott @usace.army.mil); Burdette, Jennifer a; Aliisa Harjuniemi; Kelly Thames Subject: Re: UNCC Campus "Stormwater" Alan, As I understand it this will still be an IP for the Davis Lake project only. We are currently revising the drawings to only include this project and the non -jd conveyance just upstream from this pond. I believe we will be close to resubmitting this week or next. We do not have enough design information to permit the other projects at this time and there is not a plan in place currently to move these projects forward. Thanks, Gregg Gregg Antemann, PWS Sr. Vice President Carolina Wetland Services, Inc. 550 E. Westinghouse Boulevard Charlotte, NC 28273 Phone: 704 -527 -1177 xl Cell: 704 -408 -1683 Fax: 704 -527 -1133 www.ews- ine.net On Mon, Oct 26, 2015 at 2:26 PM, Johnson, Alan <alan.iohnsonamcdenr.�4ov> wrote: What is the status of this? It supposed to be an IP and was submitted back in June. Appeared pretty straightforward. Is UNCC still moving forward? I believe we asked for additional information for the overall master plan, as well as accumulated with the past impacts. Plus, where proposed impacts are over laid on an aerial. It was mentioned about possibly breaking out some projects, but for clarity keeping all under one permit appeared to be a better process. For now, it is still considered an IP. Thanks Alan Alan D 3ohnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of WaterResources - WaterQua|ity Regional Operations 61O East Center Ave, Suite ]O1,Mooresville, NC 28115 E-mail Phone: (704) 235-2200 Fax: (704) 663-6040 correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.