HomeMy WebLinkAbout20140727 Ver 1_More Info Letter_20151027North Carolina Department <]fEDVironr1enta| QOahfv
Fat McCrory
Governor
October 27,2OI5
Hanson Aggregates Southeast, LL[
Attn: Mr. Jack Garvey
21O1 Gateway Centre B|vd, Ste lOO
Morrisville, NC 27560
Subject: REQUEST FOR ADDITIONAL INFORMATION
Hanson Crabtree Quarry Expansion
Dear Mr. Garvey:
Secretary
DVVR#14-O727
Wake County
On August 27, 2015, the Division of Water Resources (Division) received your application dated
August 7, 2015, requesting an Individual Water Quality Certification from the Division for the
subject project. The Division has determined that your application is incomplete and cannot be
processed. The application is on-hold until all of the following information is received:
Please provide 8 schematic of the stream relocation showing how the turn at Station
0+00 and the tie-in at station 9+53.99 will be accomplished. [15A NCAC 02H .0506(b)(3)]
Please explain how the relocated stream will be protected from 51Ornnvvater runoff from
3. Title I54 NCACO2H .0505 requires that a proposed activity has no practical alternative by
demonstrating that, considering the potential for a reduction in size, configuration or
density Of the proposed activity and all alternative designs, the basic project purpose
cannot be practically accomplished in a manner which would avoid or result in less
adverse impact tUwetlands. Because the preferred alternative does not involve the least
amount of stream and wetland impacts, the Division cannot review this alternative until
the U.S. Army Corps of Engineers /US4CE\ determines that this alternative is the least
environmentally damaging practical alternative /LEDPA\. Please provide correspondence
from the US4CE indicating which alternative i3 selected as the LEDPA.
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested
information for the proper consideration Of the application. |f all of the requested information i6
481 8, Buffer PenmitingUnk
1817 Mail GewioeCeNer. Raleigh, North Carolina 276Q91017
Looainn�512NSe{iobury St, Raleigh, NnAh Carolina 276O4
Phum91S'01Q 707-90O0FAK818-887 64Q4\ Customer Semim1'877-623-6748
|n\omeLwwwommatarRmmuxma,nrg
Hanson Aggregates Southeast, LL[
DVVR#14'O727
Request for Additional Information
Page 2 of 2
not received in writing within 30 calendar days of receipt of this letter, the Division will be unable
tO approve the application and it will h2returned. The return Of this project vviUneCessitate
reapplication tO the Division for approval, including a complete application package and the
appropriate fee.
Please respond in writing within 30 calendar days of receipt of this letter by sending three copies
of all of the above requested information tOthe 4OI& Buffer Permitting Unit, 1hI7 Mail Service
Center, Raleigh, N[27O99-Ib17.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act
for this activity and any work done within waters of the state may bea violation ofNorth
Carolina General Statutes and Administrative Code.
Please contact me at 919-807-6360 or karen.Iiipgins��ncdeiir,kl(D\� or Jennifer Burclette at 919-
OO7-G354O[ie�'imfer.burcieU2(�PnCdenr.gg�/if you have any questions Orconcerns.
Sincerely,
Karen Higgins, SupervidD�^
4QI& Buffer Permitting Unit
cc: Bob Zarzecki, Soil & Environmental Consultants, Inc., 8412 Falls of Neuse Road, Ste
lO4, Raleigh, NC275I5
USA[E Raleigh Regulatory Field Office
DVVRRRD4OIfile
OVVR4OI & Buffer Permitting Unit file