Loading...
HomeMy WebLinkAbout20140727 Ver 1_More Info Letter_20151027North Carolina Department <]fEDVironr1enta| QOahfv Fat McCrory Governor October 27,2OI5 Hanson Aggregates Southeast, LL[ Attn: Mr. Jack Garvey 21O1 Gateway Centre B|vd, Ste lOO Morrisville, NC 27560 Subject: REQUEST FOR ADDITIONAL INFORMATION Hanson Crabtree Quarry Expansion Dear Mr. Garvey: Secretary DVVR#14-O727 Wake County On August 27, 2015, the Division of Water Resources (Division) received your application dated August 7, 2015, requesting an Individual Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on-hold until all of the following information is received: Please provide 8 schematic of the stream relocation showing how the turn at Station 0+00 and the tie-in at station 9+53.99 will be accomplished. [15A NCAC 02H .0506(b)(3)] Please explain how the relocated stream will be protected from 51Ornnvvater runoff from 3. Title I54 NCACO2H .0505 requires that a proposed activity has no practical alternative by demonstrating that, considering the potential for a reduction in size, configuration or density Of the proposed activity and all alternative designs, the basic project purpose cannot be practically accomplished in a manner which would avoid or result in less adverse impact tUwetlands. Because the preferred alternative does not involve the least amount of stream and wetland impacts, the Division cannot review this alternative until the U.S. Army Corps of Engineers /US4CE\ determines that this alternative is the least environmentally damaging practical alternative /LEDPA\. Please provide correspondence from the US4CE indicating which alternative i3 selected as the LEDPA. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration Of the application. |f all of the requested information i6 481 8, Buffer PenmitingUnk 1817 Mail GewioeCeNer. Raleigh, North Carolina 276Q91017 Looainn�512NSe{iobury St, Raleigh, NnAh Carolina 276O4 Phum91S'01Q 707-90O0FAK818-887 64Q4\ Customer Semim1'877-623-6748 |n\omeLwwwommatarRmmuxma,nrg Hanson Aggregates Southeast, LL[ DVVR#14'O727 Request for Additional Information Page 2 of 2 not received in writing within 30 calendar days of receipt of this letter, the Division will be unable tO approve the application and it will h2returned. The return Of this project vviUneCessitate reapplication tO the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information tOthe 4OI& Buffer Permitting Unit, 1hI7 Mail Service Center, Raleigh, N[27O99-Ib17. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may bea violation ofNorth Carolina General Statutes and Administrative Code. Please contact me at 919-807-6360 or karen.Iiipgins��ncdeiir,kl(D\� or Jennifer Burclette at 919- OO7-G354O[ie�'imfer.burcieU2(�PnCdenr.gg�/if you have any questions Orconcerns. Sincerely, Karen Higgins, SupervidD�^ 4QI& Buffer Permitting Unit cc: Bob Zarzecki, Soil & Environmental Consultants, Inc., 8412 Falls of Neuse Road, Ste lO4, Raleigh, NC275I5 USA[E Raleigh Regulatory Field Office DVVRRRD4OIfile OVVR4OI & Buffer Permitting Unit file