HomeMy WebLinkAbout20200887 Ver 2_ePCN Application_20240219DW R
DHlsloo of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20200887 2
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Mooresville Regional Office - (704) 663-1699
Information for Initial Review
la. Name of project:
Project URP
la. Who is the Primary Contact?*
Daniel Kuefler
1b. Primary Contact Email:*
daniel.kuefler@wetiands-epg.com
Date Submitted
2/19/2024
Nearest Body of Water
Mallard Creek
Basin
Yadkin-PeeDee
Water Classification
C
Site Coordinates
Latitude:
35.3276
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Mecklenburg
Is this a NCDMS Project
Yes No
Longitude:
-80.7690
What amount is owed?*
$240.00
$323.00
Select Project Reviewer*
Andrew Pitner:andrew.pitner
1c. Primary Contact Phone:*
(336)554-2728
$570.00
$767.00
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?
Yes
No
Please provide the date of the previous submission.'
7/7/2020
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
39 - Commercial/Institutional Developments
1e. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Centene Management Company LLC
2b. Deed book and page no.:
2c. Contact Person:
2d. Address
Street Address
7700 Forsyth Blvd
Address Line 2
City
Saint Louis
Postal / Zip Code
63105
401 Water Quality Certification - Express
Riparian Buffer Authorization
State / Province / Region
MO
Country
USA
Yes No
Yes No
2e. Telephone Number:
(312)718-9957
2g. Email Address:"
carlsonm@claycorp.com
3. Applicant Information (if different from owner)
3a. Name:
Matthew Browder
3b. Business Name:
Summit Avenue URP, LLP
3c.Address
Street Address
1440 South Tryon St. Suite 104
Address Line 2
city
Charlotte
Postal / Zip Code
29203
3d. Telephone Number:
(646)346-8871
3f. Email Address:"
matt@browdergroup.com
4. Agent/Consultant (if applicable)
4a. Name:
Daniel Kuefler
4b. Business Name:
Wetlands & Environmental Planning Group
4c.Address
Street Address
10612-D Providence Rd. PMB 550
Address Line 2
City
Charlotte
Postal / Zip Code
28277
4d. Telephone Number:
(336)554-2728
4f. Email Address:*
daniel.kuefler@wetiands-epg.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Charlotte
2. Project Identification
2a. Property Identification Number:
04741216,04741214,04741215,04741212,
04741213
2c. Project Address
Street Address
Address Line 2
city
Postal / Zip Code
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
80.9
State / Province / Region
Country
3. Surface Waters
3a. Name of the nearest body of water to proposed project: "
Mallard Creek
3b. Water Resources Classification of nearest receiving water:
C
3c. What river basin(s) is your project located in?*
Yadkin-PeeDee
3d. Please provide the 12-digit HUC in which the project is located.
030401050103
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The site has been developed as a commercial campus. General Land Use in the vicinity is a mixture of commercial and residential development.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
SAW-2020-00946
DWR#20-0887
4f. List the total estimated acreage of all existing wetlands on the property:
0.32
4g. List the total estimated linear feet of all existing streams on the property:
6756
4h. Explain the purpose of the proposed project:
The site is a large commercial campus.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: "
Fill and grading has been completed using standard equipment.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2020-00946
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company: WEPG
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
06/10/2020
6. Future Project Plans
6a. Is this a phased project?*
Yes J No
6b. If yes, explain.
Phase 1 — East Campus; Phase II — West Campus (all phases are now complete)
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries
Open Waters Pond Construction
2. Wetland Impacts
Buffers
2al Reason (?)
2b. Impact type* (?)]2c.
Type of W.
2d. W. name
2e. Forested"`
2f. Type of Jurisdicition*
(?)
2g. Impact
area
W1 77]
Fill
P
Headwater Forest
Wetland H
Yes77
Corps
0.030
acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.030
2i. Comments:
W1 was previously approved and has been installed
3. Stream Impacts
2g. Total Permanent Wetland Impact
0.030
H�
3a. Reason for impact (?)
3b.lmpact type "
3c. Type of impact"
3d. S. name*
3e. Stream Type
3f. Type of
3g. S. width
3h. Impact
(?)
Jurisdiction*
length*
St
Road Crossing
Permanent
Culvert :]Stream
Intermittent
Corps
152
Average (feet)
(linear feet)
S2
Construction Access
Temporary
Dewatering
Stream C
Intermittent
Corps
20
Averege (feet)
(linear feet)
S3
Construction Access
Temporary
Workpad/Causeway Jtream
Intermittent
Corps
20
Averege (feet)
(linear feet)
S4
Fill
Permanent
Fill
Stream G
Intermittent
Corps
76
Average (feet)
(linear feet)
S5
Retaining Wall
9
Permanent
Fill
Stream G
Intermittent
Corps
P
3
5
Averege (feet)
(linear feet)
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
233
31. Total stream and ditch impacts:
273
31. Total temporary stream impacts:
40
3j. Comments:
Impacts S1-S4 were previously approved. S5 is for additional after -the -fact impacts. All impacts are installed.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Overall impacts to site surface waters associated with the proposed development were limited through site selection, design and location/orientation of
proposed access routes. Bottomless culverts were proposed and were practicable to avoid impacts. Approximately 54 % of the site has remained as
undisturbed tree -save. Approximately 96 % of the 6,761 LF of streams and 97 % of the 0.32 ac of wetlands on site will be avoided
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Construction techniques will implement approved erosion control methods to avoid/minimize to onsite/adjacent offsite receiving conveyances. Crossings
have been minimized using headwalls and 2:1 slopes to avoid additional impacts Utility crossings have been bored wherever possible.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
D W R Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
0
V
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested:
(linear feet)
5
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non -riparian wetland mitigation requested:
(acres)
4h. Comments
4c. If using stream mitigation, what is the stream temperature:
warm
4e. Riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW LISMP Water Supply
Please identify which local government stormwater program you are using.
City of Charlotte
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
2b Provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
All work has been completed and no additional phases are anticipated.
O
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Wastewater generated on the site will be transported to the nearest treatment facility via sewer lines.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved? *
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
A threatened/Endangered species assessment was conducted prior to site development in which no species were identified.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
No essential fish habitat in this region
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Report by R.S. Webb is attached. State Historic Preservation Office's (SHPO) database http://gis.ncdnr.gov/hpoweb/
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
Yes No
8b. If yes, explain how project meets FEMA requirements:
Impacts are allowed by FEMA and are permitted locally through Mecklenburg County's Floodplain Development Permit process
8c. What source(s) did you use to make the floodplain determination? *
www.fema.gov; FEMA's Community Floodway Map #3710457700K and as surveyed and represented on project survey.
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Project_URP PCN_Update_Submitted.pdf 14.38MB
File must be PDF or KMZ
Comments
Please see attached for a full PCN Binder including Maps, Plans, Cover Letter, Previous Approvals, and latest PCN Form.
Signature
0
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Daniel Kuefler
Signature
Date
2/19/2024