Loading...
HomeMy WebLinkAboutNCC202039_NOT Closeout Documents (5)_20240223 Sedimentation/Constructionp' Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Craven Project: Lake Tyler Subdivision Phase 10& 14 River basin: Neuse Person financially responsible:D.R.Horton,Inc.-Jessica Meyer,Assistant Project#: CRAVE-2021-033 Secretary Address: 2000 Aerial Center Parkway,Suite 110A,Morrisville, 1. Project Location: Ginger Dr.&Dakota Rd.,New Bern Pictures: No 2. Weather and soil conditions: Sunny/Cool/Wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: February 21,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the 10. Comments: SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https:Hedocs.deg.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Amber Rights Others present: Date of inspection: February 19,2023 Time arriving on site: 10:15 AM Time leaving site: 10:30 AM cc: