Loading...
HomeMy WebLinkAboutNCC202039_NOT Closeout Documents (2)_20240104 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Craven Project: Lake Tyler Subdivision Lots River basin: Neuse Person financially responsible:DR Horton-Jessica Meyer,NPDES Technical Project#: CRAVE-2019-019 Compliance Administrator Address: 2000 Aerial Center Parkway,Suite 100,Morrisville,NC 1. Project Location: HWY 43,New Bern Pictures: No 2. Weather and soil conditions: Sunny/Warm/Dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: November 13,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self- monitoring or self-inspection are required.Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Reported by: Amber Rights Others present: Date of inspection: November 09,2023 Time arriving on site: 2:00 PM Time leaving site: 2:15 PM cc: