HomeMy WebLinkAboutNCG020179 DMR SWII ANNUAL SUMMARY DMR - WASTEWATER
SEND TO CENTRAL OFFICE* I RECEIVED
PROCESS MINE/DEWATERING WASTEWATER JAN 21 2015
C;'PMP1? AT PPI? XATT ATC) ATrr))A()011
*Report Al/ Wastewater discharge monitoring data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH l of each year. If QWR SE (C'TiON
you have limit violations, you must also have turned in a Limit Violation DMR to your local Regional Office within 30 days of receiving sample results from a lab.
CERTIFICATE OF COVERAGE NO. NCG020179
FACILITY NAME: Haw River Quarry
PERSON COLLECTING SAMPLES: Josh Turner
CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12
LIMITS VIOLATIONS? YES NO
Part A- Wastewater Mnnitnrina RonnirPmPnfe
SAMPLE COLLECTION YEAR: 2014
COUNTY: Alamance
PHONE NO. 336-578-5420
ADD TO LISTERVE? YES NO EMAIL:
INDUSTRIAL SAND'? DISCHARGE TO SA WATERS49
Outfall No.
Date Sample
Collected'
Total Flow
Total Suspended
Solids'
Turbidity3
Settleable Solids
pH Fecal Coliforms
-
mm/dd/
MG
mg/1 1,2
NTU2,3
ml/12
Standard col/m12,4
Pit Discharge
3/31/14
0.102
4.2
7.5
ND
8.3
Pit Discharge
6/18/14
0.204
ND
1.7
ND
7.6
Pit Discharge
No Dischar e
Pit Discharge
No Discharge
Hu mines must monitor w w mscnarges for i bb. vmy maustnai sand mine utscharges are subject to "I'55 limts.
2 i an effluent limit is exceeded, the permittee is required to institute monthly monitoring for that parameter for the remaining permit term.
3The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs
designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the
Stormwater Discharge Outfall. Alternatively, the permittee may choose to monitor turbidity in the receivemg water, directly upstream and downstream of the discharge.
4Only facilities discharging to SA waters are required to monitor for Fecal coliforms.
Permit Date: 1/1/2010-12/31/2014 Last Revised 0 1 -21 -11
Page 1 of 2
Past A: Continued: Wastewater Monitoring Requirements
Outfall No. Date Sample Total Flow
Collected'
Total Suspended Turbidity3 Settleable Solids pH Fecal Coliforms
Solids'
- mm/dd/yr MG
mg/l1'2 NTUz'3 ml/lz Standard col/m12,4
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH 1 OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing violations."
1A, -//S
(Date)
Permit Date: 1/1/2010-12/31/2014 Last Revised 0 1 -21 -11
Page 2 of 2