Loading...
HomeMy WebLinkAbout20240293 Ver 1_Site Plan_20240222Alater kles("nif, E�IVHRONR`MNTAL QU State of North Carolina f14�atment of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM. SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the app ication (including attachments) and the ARRU991jgn_fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins ,ns Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 5�2 N. Salisbury Street Ralelgh,NC 276p9-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC Q?h -0�502 a I I. Owner information Name: Mailing Address: CA J-1 it Telephone NumbE?r: 3M, o Fax Number: E-mail Address: i tw evo'? LJ 2. Agent/ contact P rson information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed: this application form. (A form can be downloaded here: Name: Company Affiliati n: Mailing Address: Telephone Number: Fax Number: E-mail Address: Project Information 1;5A NCAC 02H.050a & b U I. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. " /4 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below !Full Pond/ Normal Water Level elevations, and construction access corridors. You ma� use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Nearest Town: Lake/ river/ ocean adjacent to property: �Llt Property size (acres): —I, -3 J"- _Q _CrYS Subdivision name or site address (include phase/lot number): Directions to site - please include road names and numbers, landmarks, etc.: -1 t 7 W, 5 . Alor, 4�7 /_ U, t Latitude (ire dec7 al degrees)— 24. 0 21 Longitude (decimal degrees) 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): t,e 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided', or why itis necessary)- J11( a7 7. Will work be conducted from land? o water? F� r? F S. Total amount of impacts below the normal pool lake level / Normal Water Level Permpe Ompacts incl di all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 11 � _=11 X — ='d Temporary impac s in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temp 7ra�yimpakc(tepor,�y clearing, (temporary �ang, construction corridor) in square feet: V1 I 10. Please describe th vegetation above the normal' pool lake level/ Normal Water Level and 50 feet landward to bimpacted (number of trees, for instance): FORK SSGP 02-2017 Page 2 of 5 In 12. Please each it a. A b. U c. L( d. Lc e. Lc KV Ammw- FORM: SSGP 02-2017 ild R bompton f7 Agent's Signature' v k_N.OM UDatsignatureis valid onif an Outhorization letterfrom the owner is provided, proximately sketch the following information on this plan and provide dimensions for 7: roposed vegetation clearing wtion of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation tion of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation tion of any proposed structures such as buildings, retaining walls, docks, etc. tion of any excavation or dredging below the Full Pond/ Normal Water Level elevation Page 3 of 5 c.: ,� r� o it � � �� r1 Side View m FuH Pon NqrmalWaterLeve � ore ine 2kxi5aft. iprap j Alb additional if E A.: 1,\4 Liu. E Plan View P.,J/ NWI. p FORM: SSGP 02-20,17 Page 4 of 5 ft. bank MR 3 ft. below full pond water level Existing bank 4 ft. above full pond water level 0 2 ft. additional clearing - If necessary FORM: SSGP 02-2017 Page 5 of 5 Alater kles("nif, E�IVHRONR`MNTAL QU State of North Carolina f14�atment of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM. SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the app ication (including attachments) and the ARRU991jgn_fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins ,ns Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 5�2 N. Salisbury Street Ralelgh,NC 276p9-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC Q?h -0�502 a I I. Owner information Name: Mailing Address: CA J-1 it Telephone NumbE?r: 3M, o Fax Number: E-mail Address: i tw evo'? LJ 2. Agent/ contact P rson information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed: this application form. (A form can be downloaded here: Name: Company Affiliati n: Mailing Address: Telephone Number: Fax Number: E-mail Address: Project Information 1;5A NCAC 02H.050a & b U I. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. " /4 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below !Full Pond/ Normal Water Level elevations, and construction access corridors. You ma� use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Nearest Town: Lake/ river/ ocean adjacent to property: �Llt Property size (acres): —I, -3 J"- _Q _CrYS Subdivision name or site address (include phase/lot number): Directions to site - please include road names and numbers, landmarks, etc.: -1 t 7 W, 5 . Alor, 4�7 /_ U, t Latitude (ire dec7 al degrees)— 24. 0 21 Longitude (decimal degrees) 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): t,e 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided', or why itis necessary)- J11( a7 7. Will work be conducted from land? o water? F� r? F S. Total amount of impacts below the normal pool lake level / Normal Water Level Permpe Ompacts incl di all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 11 � _=11 X — ='d Temporary impac s in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temp 7ra�yimpakc(tepor,�y clearing, (temporary �ang, construction corridor) in square feet: V1 I 10. Please describe th vegetation above the normal' pool lake level/ Normal Water Level and 50 feet landward to bimpacted (number of trees, for instance): FORK SSGP 02-2017 Page 2 of 5 In 12. Please each it a. A b. U c. L( d. Lc e. Lc KV Ammw- FORM: SSGP 02-2017 ild R bompton f7 Agent's Signature' v k_N.OM UDatsignatureis valid onif an Outhorization letterfrom the owner is provided, proximately sketch the following information on this plan and provide dimensions for 7: roposed vegetation clearing wtion of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation tion of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation tion of any proposed structures such as buildings, retaining walls, docks, etc. tion of any excavation or dredging below the Full Pond/ Normal Water Level elevation Page 3 of 5 c.: ,� r� o it � � �� r1 Side View m FuH Pon NqrmalWaterLeve � ore ine 2kxi5aft. iprap j Alb additional if E A.: 1,\4 Liu. E Plan View P.,J/ NWI. p FORM: SSGP 02-20,17 Page 4 of 5 ft. bank MR 3 ft. below full pond water level Existing bank 4 ft. above full pond water level 0 2 ft. additional clearing - If necessary FORM: SSGP 02-2017 Page 5 of 5 51 Zws Ow, 4-- -,--�'4 4", 1 1 e-� yp"Aa., rl Sk 00ew $ - 0 to, AM -i;UV .01�,-.,,��, lmwm 77� w r� 1Y.INN A PORT TAY t " son �S' m ■ x F CL ib cn co co M 04 m CL z 0 0 m G) 'IV N u