Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20070208 Ver 2_More Info Letter_20071029
O~ W A jFR ~ Michael F. Easley, Governor Q~ QG William G. Ross Jr., Secretary ~ ~, North Carolina Department of Environment and Natural Resources ~ -i Coleen H. Sullins, Director © `C Division of Water Quality October 29, 2007 Wake County EXP# 07-0566v2 EXPRESS REVIEW NOTIFICATION LETTER Wake County Public School System Attn: Mr. Michael Burriss 1551 Rock Quarry Rd Raleigh, NC 27610 Project Name: Heritage High School Dear Mr. Burris: On October 29, 2007, the Express Review Program of the Division of Water Quality (DWQ) received your application for the above referenced project. The DWQ has determined that your application will require additional information. Please provide the following information so that we may continue to review your project and prevent denial of your application as required by 15A NCAC 2H .0506: 1. Please provide full size plans at a scale of 1" = 50' or larger that detail the entire site including drainage area boundaries, impacts to waters of the state, and stormwater drainage system. 2. Please label and identify the types of BMPs on the Plans. 3. Where applicable on the plans, please include BMP system component details such as Inflow and Outflow Structures, High Flow Bypass Structures, Pretreatment Systems (Forebays), Overflow and Emergency Spillway, Erosion and Sediment Control and Monitoring devices such as Energy Dissipators and Sediment Accumulation/Depth Markers. 4. The drainage area where the new High School and Student Parking are located is considered a pocket of high density. Therefore the Division of Water Quality requires that the BMP in Area 4 meet both 85% TSS and 30% TN removal efficiencies such as bioretention structures, stormwater wetlands or ponds followed by forested filter strips designed according to the latest version of the NCDENR Stormwater Best Management Practices Manual. 5. Since the project is located in a NSW watershed, all stormwater outflow through the riparian buffer shall meet diffuse flow provisions such as discharging over a level spreader located outside the riparian buffer with a downslope not to exceed 6% or 8% for grass or forest filter strip respectively. On the other hand, BMPs that meet conditions specified in item 4 above may substitute for diffuse flow provisions that will allow direct discharge into stream channels. -_' t' 6. Please provide BMP supplemehts for each' proposed BMPs along with all items in the corresponding Required Items Checklist. Detail design, installation, and maintenance http•//h2o.enrstate.nc.us/su/bmp forms.htm requirements of all BMPs be found at: Please respond within five (5) days of the date of this letter by sending three (3) copies of this information. The Express Review Program is a process that requires all parties to participate in a timely manner. 401 Oversight I Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http~//h2o enr state nc us/ncwetlands can Noe Carolina ~aturally An Equal OpportunitylAffirmativeRction Employer - 50% Recycled110% Post Consumer Paper Heritage High School Page 2 October 29, 2007 This letter only addresses the application review and does' riot authorize any impacts to wetlands, waters or protected buffers. Please contact Lia Myott at (919) 733-9502 or Joseph Gyamfi at (919) 715-347 if you have any questions. Sincer , CBK/jg Cyndi Karoly, Supervisor 401/Express Review Oversite Unit cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office USACE Raleigh Field Office Central Files File copy Mrs. Debbie Edwards, Soil & Environmental Consultants, P.A., 11010 Raven Ridge Rd., Raleigh, NC 27614 >',~:,