Loading...
HomeMy WebLinkAbout20240292 Ver 1_Site Plan_20240222state of North Carolina 'es Oelurbrent Of InAtOnrnt"t and NStU'"' Resoun ion of water Resoumes i5A NCAC 02H . Water Quahty Cerfificadon, Shoreline Stabilization FORM: SSGP 02-2017 Shoreline Stabilization Application Form fi-_g should be sent to. iL-4--ttachments' if sending via US Postal service if sending via delivery service (UPS, FedEx, eto� Paul Wojoski Pauil;Wojoski DWR - 401 & Buffer Permitting Branch DWR - 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Sallsbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information' U—a'; L21'14"2%021` flame: WLe-wdr. Mailing Addi,ress' Telephone Number Fax Number- .-NIA ..... . .. . 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: J ATION FOV,4.�Vd—f Name: ---�—harlie —Washburn Company Affiliation. Mailing Address: PO Hick 49 Telephone Number, �q g5� 0 Fax Number; NIA �q4_ E mail Address, 8. Project Information !L�Q' ?12LED,Y 1, Attach a Vicinity Map O.e- Street map) clearly showing the location of the property with 2, Provide a detailed site plan 5howing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, f ip rap, excavation or diredging below Full Pond/ Normal Water Level elevations, and construction access corridors, You may use the diagram provided at the end of this application form. FORK SSGF 02-2017 Page I of 3 3, Attach a photograph of the shorelinel buffet proposed to be stabilized. (include a scale Of sorne sort., a yard stick, shovel handle, 4, Location of the property (where work is to be conducted) County" _2ULKc_. Nearest Town, _UjOwv_� Lake/ river/ ocean adjacent to ptopertY. Property size (acres�: Subdivision name or site: address (include phase/lot number): Directions to site - Please include road names and numbers, landmarks, etc.: Included, i oacket Latitude (in decimal degrees)_A5,7§�!�_,__ Longitude (decimal degrees)—aJAIL— S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped;, etc.)' 6. Describe proposed work (include discussionasto how hattlening of shoreline has been I avoided, or why it is necessary;): MW pl nfflmaLAtdWMgm=n._ 7, Will work be conducted from land? _ From water? _x 8. Total amount of impacts below the normal pool lake level/ Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet- 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Irl C ft Temporary impacts (temporary clearing, construction corridor) in square feet: lConJrgction corridor= _sQ!II_ P 10. Please describe the vegetation above the normal pool take level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance)., 11. Signature Owner/Agge, Vs signature* Da ,Agent,,$ signature is valid only if on authorization letterfroamp the owner is provided'. FORM, SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation, c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location, of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full, Pond/ Normal Water Level elevation Lake (At FuH Pond/ INormal Water Level) (woo �4A Q64 11 N W Full Pond/ Normal Wa,t�er LeyelMMM,,O����,, Im 9=11 0101111 22111,11m am IIHINHI, la�)1)1119 Suffil VIM IIII&I U10 S,horeline r�l )� LW I &W �AMYOCAINVJL- I I MIMA M_, �1= Lake Usting Dock FtGA Pon d/ Norm ail Water Level n"z -(2"?":Ab— 9,41 pnV NWL ft. Uxax zx'x., rl„", K EMi XAPvill P 1hum Plan View FORM: SSGP 02-2017 Page 3 of 4 3 ft, below full pond water level 4 ft. above full pond water level 2 ft, additional clearing of necessary Existing bank 10 ft. back A FORM: SSGP 02-2017 Page 4 of 4 U9114 .I MI I I I [11FTAIL01 I Mm project Name/address: dWEL—County: Burke Ownen Print Signature t: Charli Washburn-marinCon �trcfio�n. Contractor/agent-Charli Washburn-, Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule, Site specific work should be provided in the application. (JSA NCAC 021-1 01506 and ISA NCAC 02B .0243(8)) Trees are not allowed to be removed from Zone I of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can: be removed. Minimal shaping and sloping along the immediate shoreline is allowed. (15A NCAC 028 024,3(6)) Benching and grading in the buffer is not allowed, Excessive disturbance of ground cover. 11SA NCAC 028.0243 (6)] Beaches, impervious patios, impervious walkways, etc, are not allowed in the buffer unless specifically approved by the Division, There are limitation on size for decks, 115A NCAC 02B -0243(4) and (6)) Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored- Staging, spoil, construction material must be outside the buffer, [15A NCAC 02H .0502 and 15A NCAC 028.0243 (4),(6), (8)11 Storm titer cannot be piped or channeled for direct discharge to the take. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02 B, .0243(5), (6)] Acknowledgement of Notification 1,, 1uljand _MjCh lKgrr __ hereby state that I have been informed of the Catawba Riparian Buffer Rule. Ag_ , Any work conducted in the buffer, not specjncally stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be to such that the construction will be built within substantial compliance and intent of the 401 Water Quality CertffiCaWrl and Buffer Rules, the approved plan(s) and specificatian(s), and other supporting materials. Signature (owner). Date: Lei �4 I/ oil 0 w4r, PI v ? qW51 � td, qp TIR il,e III I0. Go �� gle Maps Hickory, North Carolina to 1911; Lake ► Dr, Drive 5.8 miles, 12 min Hickory, NC 28601 Imagery 02024 Alexander County, Burke County, COMES / Airbus, Landsat / Copernicus, Maxar Technologies, Orbis Inc, U.S. 2000 ft Geological Survey, USDA/FPAC/GEQ Map data 02024 Take 3rd Ave NW, Clement Blvd NW, 9 t h Ave Dr NW and Airport Rhoidihiss Rd to Lake Acres Dr in Burke County 11 min (5.2 mi) 1 . Head north on 4th St NW toward 3rd Ave NW EMP 0.9 mi 3. Continue onto 11th St NW/Old Lenoir Rd NW Continue to f6low Oid Lenoir Rd NW 0.7 mi 4. Continue straight onto Clement Blvd' N:W 0.91 Mi 5. Continue straight to stay on Clement Blvd NW 0.1 mi 6. Clement Blvd NW turns slightly right and becomes 9th Ave Dr NW 1,6 mi T 7, Continue onto Airport Rhodhiss Rd 1.01 Mi right onto Lake Acres Dr 0 Destination wffl be on the right EU Ln, Ln Ln 4v cm In Lu Ln 0): t to FM 0 4s cn ;& . ...... Y" kh V co w xxTn cr D LU U) WW LU w < ol Ul Z LIJ 04 < OY a. C'4 VO- 0 0 06 =F ? U� L 0:8 it < FORM AGENT AUTHORIZATION -I 4« +,' w, « s wow R, • r. 11 Lake AcresN 8W r Property Owner Property Owner. Michael WashburnCharlie LLC #' of (Conb-aC0rjAqMt) (Nam of of thAS pi or cerhfKation andany and all standard and special cmdil attached bw . « a: M� ar w,4239-1074 Property OTelephone: w11111111111111111,11 , • �r111 Jilla r • best ot A f', Aubhomed Signature Date