Loading...
HomeMy WebLinkAboutProvisional NWP-29 Verification and 401 RPOT for SAW-2022-02066 / 3851 Hope Valley Rd / Durham Baker, Caroline D From:Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil> Sent:Thursday, June 15, 2023 11:53 AM To:Ashley Steele Bentz; bryson@powelldevelopmentco.com Cc:Thomas, Zachary T Subject:Provisional NWP-29 Verification and 401 RPOT for SAW-2022-02066 / 3851 Hope Valley Rd / Durham This message originated outside of S&ME. Please report this as phishing if it implies it is from an S&ME employee. All, This is a provisional notification that your proposed work may be authorized by the Nationwide Permit 29 Residential Developments provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. As stated above, this is a provisional notification. This email does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a permit from the state (e.g., NCDWR) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. For NCDWR: Within 14 days, please notify me if the certification request does not contain the nine (9) components listed in Section 121.5(b) of the 2020 Clean Water Act Section 401 Certification Rule; otherwise, we will consider our receipt date (23-May-2023) as accurate. As specified in the 9/16/2022, Programmatic Agreement (PA) between the USACE and the NCDWR, the reasonable period of time (RPOT) for DWR to act on a Section 401 certification request is 120 days unless the RPOT is extended per the terms of this PA. As such, unless we receive an email request for an extension of the RPOT, the USACE will consider the Section 401 certification for this project to be waived on 20-Sep-2023. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Respectfully, Julia Tillery (she/her) Regulatory Specialist, Raleigh Field Office CE-SAW-RG-R U.S. Army Corps of Engineers – Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 1 Phone: 919.440.1951 Email: julia.a.tillery@usace.army.mil From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Tuesday, May 23, 2023 10:48 AM To: Ashley Steele Bentz <abentz@smeinc.com> Cc: Tillery, Julia A CIV (USA) <Julia.A.Tillery@usace.army.mil> Subject: SAW-2022-02066 (3851 Hope Valley Road / Durham NC / Durham County) Good Morning, We have received your Pre-Construction Notification (PCN) NWP request for the above project and forwarded it to Julia Tillery for further processing. Thank you, Josephine Schaffer From: laserfiche.ncdenr.gov@mccicloud.io <laserfiche.ncdenr.gov@mccicloud.io> Sent: Monday, May 22, 2023 7:54 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: \[Non-DoD Source\] PCN - Durham - Non-DOT A new project has been received on 5/22/2023 7:52 PM for Oldfourth Residential Development. The link below will take you to the project folder. https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2805204;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren’t monitored. 2