Loading...
HomeMy WebLinkAbout090006_Routine Inspection_20240130,Q�n�S 113 �I aN I) Yi es n :a t7 HS) t' ts?, <i(4l i 'v'Ytj t It ti V �11111i i4 110 an;�,d4 SE 4t;r ,i t,Si a�S Type of Visit: ompliance Inspection Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: "Routine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access Date of Visit: D 3 Arrival Time: Departure Time: County: Farm Name: 'ya'7'�47' Owner Email: Owner Name: ��,t, plp ZG Phone: Mailing Address: Physical Address: Facility Contact: l Title: Onsite Representative: t/ li Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Region: %L'D Phone: Certification Number: / D L r/3 E Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Yes _E�No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Yes ❑ No NA NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes El No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes -E7—No ❑ NA ❑ NE Yes _[] No NA NE Page I of 3 511212020 Continued Facility Number: 02 jDate of Inspection: e d Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes .❑'No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [-]No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: l Spillway?: q Designed Freeboard (in): / Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes � o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 12IVo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? _21'es ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [2-No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes EfrNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C=�J� E�1�'vrucci ('./CftiQ�% 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes _[ErNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E-No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Jallo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ,E3-1qo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes xo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes _EiVo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑LeaseAgreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [2-No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes . E]'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes QNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: 7A - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes -ErNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes .,�io ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List date first indicating % 9e) ) /� ✓ structure(s) and of survey non-compliance: / 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Q�No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [?� No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes .[D"No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes allo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes E3"No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes allo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Ej`No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [D,'No ❑ NA ❑ NE Reviewer/Inspector Name: Reviewer/Inspector Signal Page 3 of 3 Phone: 00 g3J — 979,S - Date: Z 36 /aZ 511212020 FACILITY#: FARM NAME: 5_P/!l LAGOON PERMIT (ns) - DUE EVERY 5 YEARS EXPERIATION DATE NUMBER OF ANIMALS - CURRENT NUMBER OF ANIMAL - OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD FOR 60 DAYS BEFORE OR AFTER r DATE f0/%b3 NITROGEN LEVEL�J DATE-? % NITROGEN LEVEL DATE `3/ a d NITROGEN LEVEL_�2, &Z -- SOIL REPPPORT(u ii - EVERY 3 YEARS: DATE - P-1 (NO MORETHEN 400) - PH (Note if4orleee) - Cu/ZN (NO MORE THEN 3000) CU ZN (IF PEANUTS NO MORE THEN 300) IRR2 (n21) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES N e(N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION (x 4) EACH REEL SHOULD BE CA ATED EVERY OTHER YEAR DATE OF CALIBRATION 1 FLOW RATES l a i0�� /$ I3-) 33-V--71 RAIN FALL (#21) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED. SLUDGE (#21 ass) -DUE EVERY YEAR: DATE �� ��a� O: �/ 7l P: - , % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE _ O: P: % RATIO OF SLUDGE _ 0: P: % RATIO OF SLUDGE OTHER FORMS (n22AND u21) RAIN BREAKER FORM CROP YEILDS_ A MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE Bermuda grass: Opens March I A- Ends September 302 Small Grain Over seed: Opens October 1 st- Ends March 31st Corn: Opens February 152 - Ends June 302 Cotton: Opens March 152 - Ends August 1-t Rye: Opens September 1 st- Ends March 31 st Oats: Opens September 1-�-Ends April 152 Wheat: Opens September 1 e - Ends April 30n .Soybeans: Opens April 1st -Ends September 152 Fescue: Opens August 1st- Ends July 31 � Sorghum Hay: Opens March 15u - Ends August 31 st