Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820002_Routine Inspection_20240129
IType of visit: L Mompliance inspection U Operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: (:)-Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: aU Departure Time: ; )6 County:r 7 Region: id Farm Name:�nn //ll � "' Owner Name: Mailing Address: Physical Address: Facility Contact: Q _ �y� �y[� Title: Onsite Representative: rT Certified Operator: Back-up Operator: Location of Farm: Latitude: Owner Email: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: 105s (€} Wean to Finish ILayer Cow Wean to Feeder Non -Layer _�Dairy Dairy Calf Feeder to Finish ` �1 DairyHeifer i Farrow to Wean jFarrow • I I a � Dry Cow to Feeder { Non -Dairy Farrow to Finish Layers Beef Stocker r3 =°s Gilts Non -Layers Beef Feeder Boars Pullets lBeef Brood Cow ;ji' �1���,�,�;`I " ��11 Turkeys I IS M ",ii 6 Turke Poults zz Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes E244o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes fjNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes f�No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: jDate of Inspection: 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: ❑ Yes 2-No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE Structure 5 Structure 6 Spillway?: Designed Freeboard (in): C Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ,, 7Mo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes e12"go ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ,®_1es ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ Ro ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes E2,No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): X)/A Ee.. /'>&h 14. Do the receiving crops differ fromthosedesignated in the CAWMP? ❑ Yes ZrNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [allo ❑ NA ❑ NE 16. Did ,t4e facility fail to secure and/or operate per the irrigation design ox wettable ❑Yes , o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes E2 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [Po ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ©-No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑-No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes ZpNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [3"Ko ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑' o ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facili Number: Date of Ins ectionC a 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes -ErNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes .❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon y List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Q'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes NNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E�LNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes -QNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes -El No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes -RNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 'K] No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes NQ No ❑ NA ❑ NE Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ,17 Phone: (Flo FjS -9 iSi Date: / `a-9� C/ 511212020 FACILITY#: FARM NAME: LAGOON LEVEL PERMIT(ne) - DUE EVERY 5 YEARS - - EXPERIATION DATE NUMBER OF ANIMALS . - CURRENT NUMBER OF ANIMAL - OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECK LIS E OR NO - Irrigation Plan Maps YES OR WASTE REPORT (#2+) -GOOD FOR 60 /DAYS BEFORE OR AFTER _ DATE�j7/a 6 �f� NITROGEN LEVEL 2 /��/ �a3 3, ?S' DATE J l d7 / �3 NITROGEN LEVEL J 1 DATE NITROGEN LEVEL SOIL REPORT (#2i) EVERY 3YEARS: DATE lDI�UIa% P-1 (NO MORE THEN 400) PH (Note if4 or less) �� Cu1ZN (NO MORE THEN 8000) CU. ZN (IF PEANUTS NO MORE THEN 300) IRR2 (#21) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP T PES FLOW RATES NITROGEN (N) _ Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION (mal EACH REEL SHOULD BE CAL R T D EVERY OTHER YEAR DATE OF CALIBRATION Q FLOW RATES 1� I S� RAIN FALL Imtl -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS IS THEN THE DESIGNED FREEBORED PDA NEEDED. SLUDGE (mt a2s) -DUE EVERY YEAR: DATE �r �� 2- O; P; % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE S- f4�,t- u/f;_0 aoa / OTHER FORMS (u22 AND #21) RAIN BREAKER FORM 4— CROP YEILDS_X__MORTALITY_ "If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS _ PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREASTREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE Bermuda grass: Opens March 1st- Ends September 30t Small Grain Over seed: Opens October 1st- Ends March 31st Corn: Opens February 15t - Ends June 30t Cotton: Opens March 15t^ - Ends August 1st Rye: Opens September 1s<-Ends March 31st Oats: Opens September 1st -Ends April 15t Wheat: Opens September 1st- Ends April 30t Soybeans: Opens April 1st -Ends September 15t - Fescue: Opens August 1st- Ends July 31 st Sorghum Hay: Opens March 15* - Ends August 31 st l