Loading...
HomeMy WebLinkAboutNCG021016_Updated NOI Page 3_20240221 6. Wastewater Treatment N/A Will this facility wash mined materials? ❑ Yes 0 No Will discharges of process wastewater treatment systems occur(including possible recycle system overflows) ❑ Yes(please describe) A No Will this facility employ chemical additives to flocculate suspended solids? ❑ Yes(specify name/manufacturer/quantity of daily use) M No Note: please visit: https://files.nc.gov/ncdeg/Water+Quality/Environmental+Sciences/ATU/PAM8 30 18.pdf for list of approved PAMS Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that exceed the 10-yr, 24-hr rainfall event? ❑ Yes(specify which systems) ❑ No Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? ❑ Yes ❑■ No Wastewater Treatment Alternative Review as required by 15A NCAC 2H.0105(c)(2) N/A Types of wastewater this mine site will discharge: 0 Mine Dewatering ❑ Process Wastewater Types of wastewater considered for this alternative review: Mine Dewatering ❑ Process Wastewater Are there existing sewer lines within a one-mile radius? ❑ Yes ❑ Wastewater treatment plant will accept wastewater ❑ Is feasible to connect(explain) ❑ Is not feasible to connect(explain) ❑ Wastewater treatment plant will not accept wastewater(please attach letter documenting this) ❑■ No Are you already proposing a closed-loop recycle system (CLRS)that meets design requirements of 15A NCAC 2T.10000? ❑ Yes,for dewatering ❑ Yes,for process wastewater ❑ Yes,for both ❑ No,this option is technologically feasible(explain) Direct surface water discharge is only option to No,this option is not technologically feasible(explain) effectively lower the water level in the pit. ❑ No,this option is otherwise feasible(explain) Direct surface water discharge is only option to *No,this option is otherwise not feasible (explain) effectively lower the water level in the pit. What is the feasibility of building a CLRS compared to direct surface water discharge? Page 3of10