Loading...
HomeMy WebLinkAboutFW_ _External_ SAW-2017-01947 (NCDOT_U-5711_SR1712 (Pineview Street)_Division8)Carpenter, Kristi From: Sent: To: Cc: Subject: Attachments: Art C. King Division Environmental Supervisor NCDOT Highway Division 8 910 621-6100 office 910 690-6581 cell acking .ncdot.gov 121 Dot Drive Carthage, NC 28327 King, Art C Thursday, February 22, 2024 9:20 AM Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) Conchilla, Ryan FW: [External] SAW-2017-01947 (NCDOT/U-571 1/SR1 712 (Pineview Street)/Division8) U-5711_hyd_ec_construction sequence.pdf From: Paddy Jordan <Patricia.Jordan@mottmac.com> Sent: Thursday, February 22, 2024 6:46 AM To: Stroder, Jeffrey A <jstroder@ncdot.gov> Cc: Teague, Jeff L <jlteague@ncdot.gov>; King, Art C <acking@ncdot.gov>; Tim Jordan <Tim.Jordan@mottmac.com>; Stoffer, Kyle <Kyle.Stoffer@hdrinc.com> Subject: [External] SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sorry for the delay, I did receive some comments from our Hydraulic firm: There was a question about what permit package the core received as the permit package available on the NCDOT Connect site (dated 20190523) shows all of what the reviewer has commented on and is asking to show. https://connect.ncdot.gov/site/Preconstruction/division/div08/U- 5711/ layouts/15/DocldRed ir.aspx?ID=7DCQHCPWEPMV-1357394009-11 Hydro responses are in RED. First, I need to know the dimensions of the existing culverts at Sites #1 & #3, specifically, total culvert lengths. Site 1- 36"RCP length= 48'; Site 2- 3@103"x71" CMAP length= 60'. 1 cannot tell from the permit drawings if the impact totals provided on the Impact Summary Sheet include the total length of impacts in the jurisdictional waters from the project with consideration (subtraction) of the lengths of the existing culverts or not. This is important because the NWP authorization would be for impacts to jurisdictional waters beyond the existing structures and likewise the mitigation required for your project should include the impacted jurisdictional features beyond the existing structure. Existing transportation facilities (ETF) was not in included in the impacts. Impacts only include those areas beyond the existing structures. (See snips below for clarification). In addition, the site plans indicate at Site #3 that the project will include 35 linear feet (inlet end) and 40 linear feet (outlet end) of channel improvement. I cannot tell from the application or drawings what the channel improvement will include. Is this channel realignment, sediment removal, bank stabilization, channel armor, etc.? If this channel improvement will include relocation, excavation/fill and/or placement of rock in the channel, these activities should be specified, and the permit plans should include a typical or actual cross -sectional view of what these improvements will be. Yes, Channel improvements include all of what is mentioned and shown in the cross-section detail at the bottom of PSH 6 (cross section from plans shown below). The project Plans provided to the Corps should clearly show both the existing and proposed structures with call outs for impact areas and the activities/structures that are impacting these waters. The provided drawings are a bit busy and do not clearly show/call out the impacts. Channel improvements description and cross -sectional view is shown at the bottom of the permit PSH 6 and a zoomed in view of the sites are shown on PSH 6A. Finally, once it is determined/quantified what impacts to jurisdictional waters this project will have, NCDOT should propose mitigation for the waters that will be lost from the impacts. Below is channel improvements cross-section shown on PSH 6. CLASS II RIP RAP /GEOTEkITLE ON FLOOD BENCH .2, CLASS II R1 P RAP '2' 7m1CK wr GEOTEXTILE (TYP.1 2' SILLS BACKFILL WITH CLASS B RIP RAP AND NATIVE MATERIAL PER SPEC. EXCAVATION .40 CY CLASS 11 RIP RAP Wf GEOTEXALE ON FLOOD BENCH BORDER W/ 2.1 SLOPE (TYP,) 1' INLET CHANNEL (LOOKING DOWNSTREAM) (SCALE V = 51) CULVERT BURIED 1' BACKFILL WFTH NATIVE MATERIAL PER SPEC. (TYP_] 1' SILL NOTE; FOR CUT CONDMON, LF FLOOD BENCH 6ORPER wiTH COVERED WITH COIR FIBER W FILL CONDITION, USE CLASS 11 F WITH NATIVE BED MATERIAL FII Highlighted areas below represent the limits of impact and the exiting CMAP to clarify how impacts were quantified. Orange shading indicate existing crossing (ETF), blue represents stream impacts, red line work is proposed condition. Upstream: CUSS II RIP RPP WGEpiPAE CLASS II PIP M➢ W GEOIF%DLE ON ROOD L0.4S IIWP RN W/ OXILL ON FLOOD ON FLWD BENCH W CqMi SERIMI PIPD MBEPNWCXGEOIF4lILE SENCNBBORDER W x:INSLOR mP.) TYR C45S II RIP MP x'THICK W CLASS II RIP MP GECTMLE MP I 4EORKEIIE mP) 1' SILLS BLCKflLL W11N R'Sl4E CVLYE0.i BVRl®NI^' CLASS B PIP MP .WO CULVERT IBACKIRILL ' MIIXFILL SOH ry_13 6_13 B'-13' 13'_IS WITH VE PE µ0.iER14 R0. SRC.IEYI.1 R0.i5YEG.hwL MATEPUL SRCnWI 1' SILL YS GGNDIIMN«E UASE II RIP MP 1SILL INLET CHANNEL a000P eiNol BOPDea wnn Nnnvu «ounD OURET CHANNEL ®PExcnvnnoN-m a (LOOKING DOWNSTREAM covert® vnm cov PIR0. rwi INSIDE B«DER.In CONORIOµ YSE CVSS 11 PIP PM FILL M0.0UGXON (LOOKING DOWNSTREAM) ® ExuvAnON-BO a ISCALE 1" =5') WLL Rn wmE BED wiEwnL flwxc TIE vows oN i« ISCALE 1° =5') Downstream: Kyle Stoffer with HDR produced the permit package and assure us the permit was developed following what you have described above. He reviewed the crossings again and was confident the permit accurately reflects and shows most of the comments. If the core would like to discuss anything further, please feel free to reach out to Kyle Stoffer [kyle.stoffer@hdrinc.com - 910-398-9024]. Al Paddy Jordan Senior Designer - Roadway D (919) 629-2141 C (919) 740-3420 paddy.jordan@mottmac.com From: Stroder, Jeffrey A <jstroder@ncdot.gov> Sent: Wednesday, February 21, 2024 9:36 AM To: Paddy Jordan <Patricia.Jordan@mottmac.com> Cc: Teague, Jeff L <jlteague@ncdot.gov>; King, Art C <acking@ncdot.gov> Subject: RE: [External] FW: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) Paddy, Just checking back on this... Can you provide the information needed for the permit drawings? Thanks, Jeff Jeffrey A. Stroder, PE Division Project Engineer Project Development Unit Division of Highways, Division 8 North Carolina Department of Transportation 910 773-8000 office 910 773-8024 direct 910 947-3873 fax 0stroder ncdot.gov 121 DOT Drive Carthage, NC 28327 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Stroder, Jeffrey A Sent: Friday, February 2, 2024 8:54 AM To: Paddy Jordan <Patricia.Jordan@mottmac.com> Cc: Teague, Jeff L <jlteague@ncdot.gov>; King, Art C <acking@ncdot.gov> Subject: RE: [External] FW: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) Paddy, I spoke to you on the phone about this yesterday but see Art's message below. Can you provide what he needs for the permit drawings? Thanks, Jeff Jeffrey A. Stroder, PE Division Project Engineer Project Development Unit Division of Highways, Division 8 North Carolina Department of Transportation 910 773-8000 office 910 773-8024 direct 910 947-3873 fax istroderancdot.aov 121 DOT Drive Carthage, NC 28327 �x Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: King, Art C <acking@ncdot.gov> Sent: Friday, February 2, 2024 8:20 AM To: Stroder, Jeffrey A <jstroder@ncdot.gov> Cc: Teague, Jeff L <jlteague@ncdot.gov> Subject: FW: [External] FW: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) Jeffrey, Please see the email below from Steve Brumagin. I have spoken to Steve, and he said that he needed clarification on several issues concerning the permit drawings and the listed impacts. His email lays out specifically what he will need in order to complete his review of the permit application. Steve has indicated that once he gets the information he needs, he will process and issue the permit as soon as possible. Art C. King Division Environmental Supervisor NCDOT Highway Division 8 910 621-6100 office 910 690-6581 cell acking ncdot.gov 121 Dot Drive Carthage, NC 28327 From: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil> Sent: Thursday, February 1, 2024 2:09 PM To: King, Art C <acking@ncdot.gov> Subject: [External] FW: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Art, As a follow up to our conversation today I wanted to send you an e-mail and briefly outline the information that I need for the permit application for NCDOT U-5711, Pineview Street in Randolph County. First, I need to know the dimensions of the existing culverts at Sites #1 & #3, specifically, total culvert lengths. I cannot tell from the permit drawings if the impact totals provided on the Impact Summary Sheet include the total length of impacts in the jurisdictional waters from the project with consideration (subtraction) of the lengths of the existing culverts or not. This is important because the NWP authorization would be for impacts to jurisdictional waters beyond the existing structures and likewise the mitigation required for your project should include the impacted jurisdictional features beyond the existing structure. In addition, the site plans indicate at Site #3 that the project will include 35 linear feet (inlet end) and 40 linear feet (outlet end) of channel improvement. I cannot tell from the application or drawings what the channel improvement will include. Is this channel realignment, sediment removal, bank stabilization, channel armor, etc.? If this channel improvement will include relocation, excavation/fill and/or placement of rock in the channel, these activities should be specified, and the permit plans should include a typical or actual cross -sectional view of what these improvements will be. The project Plans provided to the Corps should clearly show both the existing and proposed structures with call outs for impact areas and the activities/structures that are impacting these waters. The provided drawings are a bit busy and do not clearly show/call out the impacts. Finally, once it is determined/quantified what impacts to jurisdictional waters this project will have, NCDOT should propose mitigation for the waters that will be lost from the impacts. Also, since the application included a mussel survey dated November 2023 that recommended a may affect but not likely to adversely affect the Atlantic Pigtoe, I will need to coordinate/consult with USFWS to ask for their concurrence on this determination. Please let me know if you have any questions. Thanks. Stephen A. Brumagin NCDOT Project Manager U.S. Army Corps of Engineers, Charlotte Field Office, Wilmington District Work cell 704 798-6471 From: NCDOT REG <NCDOT REG@usace.army.mil> Sent: Monday, January 29, 2024 3:03 PM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; NCDOT _REG <NCDOT REG@usace.army.mil>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil> Cc: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Subject: RE: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) Oops, sorry. Steve, I'll forward the docs to your folder. Thanks, Jho From: Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmever@usace.army.mil> Sent: Monday, January 29, 2024 2:53 PM To: NCDOT_REG <NCDOT REG@usace.army.mil>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil> Cc: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Subject: RE: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) Jho: This should have gone to Steve B. Thanks! Eric Work Cell: 919.817.1570 In Office: Most Thursdays From: NCDOT_REG <NCDOT REG@usace.army.mil> Sent: Monday, January 29, 2024 2:06 PM To: Art, King <acking@ncdot.gov> Cc: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmever@usace.army.mil>; Colwell, Kaleigh E CIV USARMY CESAW (USA)<Kaleigh.E.Colwell@usace.army.mil>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte. K. Matthews@ usace.a rmy. mi 1> Subject: SAW-2017-01947 (NCDOT/U-5711/SR1712 (Pineview Street)/Division8) Good afternoon, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Eric Alsmeyer for further processing. Thank you, Josephine Schaffer From: laserfiche.ncdenr.gov@mccicloud.io <laserfiche.ncdenr.gov@mccicloud.io> Sent: Monday, January 29, 2024 11:56 AM To: NCDOT_REG <NCDOT REG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Randolph - DOT A new project has been received on 1/29/2024 11:54 AM for U-5711 (Pineview St.). The link below will take you to the project folder. httos://edocs.dea.nc.iaov/laserfiche/index.asox?db=WaterResources#id=3123994:view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.