Loading...
HomeMy WebLinkAbout20070208 Ver 2_More Info Letter_20071109O vv n ~'9Q G Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources November 9, 2007 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Wake County Public School System Attn: Mr. Michael Burriss 1551. Rock Quarry Rd Raleigh, NC 27610 Project Name: Heritage High School REQUEST FOR MORE INFORMATION-EXPRESS REVIEW PROGRAM Dear Mr. Burriss: Coleen H. Sullins, Director Division of Water Quality Wake County EXP# 07-0208v2 On November 7, 2007, the Division of Water Quality tDWQ) received your response to our request for additional information. The DWQ has determined that. this information is incomplete. Please provide the additional information requested below in order to continue review of your project and to prevent denial of your application as required by 15A NCAC 2H .0506: 1. General Information: a. In order to achieve diffuse flow provisions, you have proposed a number of dissipater pads at the. end of the .outflow pipes from all BMPs without. providing the outlet velocities of your dissipater pads. Please provide information on the outlet velocities, including pipe sizes, slopes, and flow rates used for sizing the aprons. Additionally, please provide elevations and invert levels necessary for construction purposes on the appropriate site. plans and/or in the supporting documents. b. Please provide Figure 8.06.b.2 used for sizing the aprons. Only Figure 8.06.b.1 is provided on page 4 of the supporting documents. Level Spreader a. The length of the proposed level spreader is too short. Please provide a length adequate for a design flow of 1.269 cfs, and a forest filter strip. Please see Table 8.1 in the North Carolina Division of Water Quality Stormwater Best Management Practices Manual. The length (ft) of level spreader lip needed per cfs is missing on the Supplement Form. b. Please sign and notarize the Inspection and Maintenance Agreement for the Filter Strip and Level Spreader. c. Please provide adate-stamped photo of the filter strip and the appropriate response as required in Items 4 and 5 of the Required Items Checklist. d. Please provide site plans that meet specified requirements in the Required Items Checklist. For example, plan sheets C3.0, C3.2 and C 8.2 do not show the entire site and/or are not at the appropriate scale. 3. Wet Detention Pond G a. Flow from outlet structure associated with Wet Detention Pond G would not be diffused, but rather channelize in the draw down slope of the. dissipater pad. Please relocate the outlet structure. 401 Oversight /Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861FAX 919-733-68931Intemet: http:/lh2o.enr.state.nc.us/ncwetlands Noe Carolina ~tura!!y An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper Heritage High School Page 2 of 4 November 9, 2007 Please respond within five (5) days of the date of this letter by sending three (3) copies of this information. The Express Review Program is a process that requires all parties to participate in a timely manner. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please contact Joseph Gyamfi or Lia Myott at 919-733-J~186 if you have any questions regarding or would like to set up a meeting to discuss this matter. // Sincere y, yndi Karoly, Supe isor 401 Oversight/Express Review Permitting Unit CBK/Jg cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office USAGE Raleigh Field Office Central Files File copy Ms. Debbie Edwards, Soil & Environmental Consultants, P.A., 11010 Raven Ridge Rd., Raleigh, NC 27614