Kirstein Road
Stream Stabilization Project
GarrenCreek
Specifications, Drawings, and Details
BuncombeCounty, North Carolina
August2022
Approved by:_______________ Date:________
8/5/2022
Landowner Guidance for Contracting Stream Projects
Certain issues can arise when contracting a stream stabilization project that normally do
not arise with more common construction contracts such as building construction or
earth moving projects. With most common projects, there is a high degree of certainty
that the project will be installed exactly as shown on the drawings and with the quantity
of materials estimated. This means that contractors can bid on the job with a fixed dollar
amount and should not be surprised by unforeseen changes, difficulties, or additional
materials required to complete the job properly. If a contract awarded at a fixed amount
encounters unforeseen issues during construction, problems with the contractor can
occur since these issues can cost the contractor large amounts of money which will
lower their profit margin.
While engineering plans are carefully prepared to show the expected extent of work,
stream stabilization projects are sometimes not installed exactly as shown on the plans.
Constructing stream projects is unique in that work is being done on a dynamic system
where previously unknown complications are commonly found only after construction
has begun. It is not uncommon during construction for the construction supervisor
(NRCS or SWCD personnel) to determine the need to deviate slightly from the
engineering plans. Other factors can impact the time it takes or the amount of materials
required to complete a project. A few examples follow:
In-stream structure installation has a downstream effect causing a need for an
additional structure not shown in the plans, or making it possible to omit a
downstream structure
Availability of suitable construction materials may necessitate a change of plans
Equipment operator inexperience or equipment inadequacies can greatly
increase the time required to finish a project
Stream bed properties such as previously unidentified bedrock seams or deep
unconsolidated stream bed material may decrease or increase required materials
Large storm events and high flows that happen during construction can have
negative effects that must be repaired
All deviations from the plans affect the installation cost of the project making it either
more or less expensive. Material quantities, such as boulders for in-stream structures,
are very difficult to estimate accurately. The relative time required to complete a project
varies greatly from project to project. These factors make it difficult for both the
contractor and the engineer to predict the cost of installation. Also, there are only a
limited number of contractors that have experience with multiple stream projects so
many may underbid a project when bidding total cost. When the cost of installation turns
out to be more than a contractor expects, problems can occur especially if the contractor
is being paid a fixed amount for project completion.
For stream stabilization projects several hundred feet or more long and requiring multiple
in-stream structures, it is recommended that the landowner contract the job with
provisions to accommodate payment for changes to the plans or unexpected material
expenses. It can be problematic to try to work out costs for these issues once
construction is underway. There are various ways to set up your contract to avoid
problems during construction. Work with your contractor to come to good terms on how
to set up the contract so that unexpected issues can be easily resolved. And contact
your NRCS or SWCD representative for advice.
KblfTuplft
903133BsfbFohjoffs
KET0KXX
903133
KET
90603133
Spbe
y
Btifwjmmf
CONSTRUCTION SPECIFICATION
IN-STREAM STRUCTURES CONSTRUCTED OF ROCK
1)SCOPE
Uijt!tqfdjgjdbujpo!dpwfst!uif!jotubmmbujpo!pg!Spdl!Wboft-!K.Ipplt-!boe!Dsptt!Wboft!bu!mpdbujpot!
bt!tipxo!po!uif!dpotusvdujpo!qmbot!boe!bt!ejsfdufe!cz!uif!fohjoffs/
2)PURPOSE
Sfejsfdu!fsptjwf!wfmpdjujft!bxbz!gspn!tusfbncbolt
Qspwjef!brvbujd!ibcjubu
Dsptt!Wboft!nbz!cf!vtfe!gps!hsbef!dpouspm
3)DEFINITIONS
SPDL!WBOF!.!B!efgmfdujwf!tusvduvsf!jotubmmfe!qpjoujoh!vqtusfbn-!cfhjoojoh!bu!cbolgvmm!tmpqjoh!
epxo!up!uif!tusfbncfe/!!Uif!bohmf!bu!xijdi!uif!wbof!qpjout!vqtusfbn!gspn!uif!
cbol!tibmm!cf!31.41!efhsfft/!Uif!tmpqf!pg!uif!upq!tvsgbdf!pg!uif!wbof!xjmm!cf!6.8!
2
qfsdfou/!!Uif!wbof!tipvme!fyufoe!gspn!uif!cbol!up!bqqspyjnbufmz!0pg!diboofm!
4
xjeui/!)Tff!gjh/!2*
K.IPPL!.!!B!spdl!wbof!xjui!b!ipplfe!qpsujpo!po!uif!tusfbncfe/!!Uif!ippl!qspwjeft!
beejujpobm!ibcjubu/!!)Tff!gjh/!3*!!Nbz!jodmvefe!b!tjmm!)Tff!gjh/!4*!xijdi!dpoujovft!
bdsptt!uif!tusfbn!cfe!gspn!uif!ippl!qpsujpo!pg!uif!tusvduvsf-!qfsqfoejdvmbs!up!
uif!gmpx!boe!gpmmpxt!uif!tibqf!boe!fmfwbujpo!pg!uif!tusfbn!cfe!boe!tusfbn!cbol!
vq!up!joufscfsn!ps!bt!ejsfdufe!cz!uif!fohjoffs/
DSPTT!WBOF!.!B!spdl!wbof!gspn!cpui!tjeft!pg!uif!tusfbn!xjui!b!dpoofdujoh!cbs!po!uif!
tusfbncfe/!!Jg!uijt!tusvduvsf!jt!vtfe!gps!hsbef!dpouspm-!uif!fyjtujoh!tusfbncfe!
fmfwbujpo!nbz!cf!jodsfbtfe!cz!op!npsf!uibo!21!qfsdfou!pg!cbolgvmm-!vomftt!b!
hsfbufs!jodsfbtf!jt!qspwjefe!gps!jo!uif!bqqspwfe!eftjho/!!)Tff!gjh/!5*
XJOH!
EFGMFDUPS!.!B!efgmfdujwf!tusvduvsf!jotubmmfe!xjui!tmpqjoh!bsnt!uif!tmpqf!epxoxbse!joup!uif!
tusfbn!cfe/!!Uif!bohmf!uif!bsnt!qpjou!epxotusfbnboe!vqtusfbn!gspn!uif!cbol!
jt!31!41!efhsfft/!!Uif!tmpqf!pg!uif!upq!tvsgbdf!pg!uif!epxotusfbn!bsn!xjmm!cf!
3!!5!qfsdfou/!!Uif!wbof!tipvme!fyufoe!gspn!uif!cbol!boe!ifmq!jefoujgz!uif!mpx!
gmpx!diboofm/!)Tff!Dpotusvdujpo!Esbxjoht!.!Fohjoffs!xjmm!ejsfdu!dpotusvdujpo*
VTEB.OSDTqbhf!2!pg!7!Spdl!Tusvduvsft
Opsui!DbspmjobBvhvtu!2:::
FOHJOFFS!.!!!Uif!VTEB.OSDT!boe0ps!TXDE!qfstpo)t*!xip!ibwf!bqqspqsjbuf!dpotusvdujpo!
bqqspwbm!bvuipsjuz!gps!Qsbdujdf!Tuboebse!691-!Tusfbncbol!boe!Tipsfmjof!
Qspufdujpo!gps!uif!tqfdjgjd!tj{f!boe!uzqf!pg!tusvduvsf/
TUSFBNCBOL!!!qpsujpot!pg!joufsnjuufou!ps!qfsfoojbm!tusfbncbolt!xijdi!bsf!fspejoh!bu!bo!
bddfmfsbufe!sbuf!evf!up!uif!fggfdut!pg!tusfbn!gmpx!ofbs!cbolt!xjuipvu!befrvbuf!
wfhfubujwf!dpwfs!boe!tvqqpsujoh!sjqbsjbo!bsfb/
CBOLGVMM!!!Uif!tusfbn!gmpx!mfwfm!bu!xijdi!uif!tusfbn!diboofm!jt!gpsnfe!boe!nbjoubjofe/!!
Uif!ufsn!cbolgvmm!tipvme!opu!cf!dpogvtfe!xjui!uif!upq!pg!uif!cbol/!!Qfstpot!
xip!ibwf!sfdfjwfe!usbjojoh!jo!Obuvsbm!Tusfbn!Diboofm!fwbmvbujpo!tibmm!jefoujgz!
uif!cbolgvmm!fmfwbujpo/
UIBMXFH!.!!Uif!effqftu!qbsu!pg!uif!diboofm!xifsf!uif!ijhiftu!diboofm!wfmpdjujft!pddvs/
4)PLANNING CONSIDERATIONS
Uijt!qsbdujdf!tipvme!cf!bqqmjfe!bt!b!qbsu!pg!b!upubm!Obuvsbm!Tusfbn!Diboofm!Sftupsbujpo!eftjho/!!
Uiftf!tusvduvsft!bsf!opu!joufoefe!up!cf!b!upubm!tpmvujpo!up!uif!tusfbncbol!fsptjpo!qspcmfn!jo!
uifntfmwft/!!Uifz!bsf!up!cf!vtfe!bt!b!dpnqpofou!pg!b!upubm!tusfbncbol!nbobhfnfou!qmbo-!xijdi!
nbz!sfrvjsf!b!ovncfs!pg!bttpdjbufe!qsbdujdft/!!Jo!tpnf!dbtft!npejgjdbujpo!pg!uif!tusfbn!
ejnfotjpo-!qbuufso!boe!qspgjmf!nbz!cf!sfrvjsfe!cfgpsf!tusvduvsft!bsf!jotubmmfe/!!Uif!vtf!pg!spdl!
tusvduvsft!xjuipvu!dpotjefsjoh!uif!tubcmf!ejnfotjpo-!qbuufso-!boe!qspgjmf!pg!uif!tusfbn!xjmm!nptu!
mjlfmz!sftvmu!jo!gbjmvsf/
5)PERMITTING
Op!xpsl-!xijdi!jt!dpwfsfe!cz!uijt!tqfdjgjdbujpo-!tibmm!cf!qfsgpsnfe!voujm!uif!Bsnz!Dpsq!pg!
Fohjoffst!ibt!jttvfe!b!Tfdujpo!515!qfsnju!boe!uif!Ejwjtjpo!pg!Xbufs!Rvbmjuz!ibt!jttvfe!b!
Tfdujpo!512!dfsujgjdbujpo!)jg!sfrvjsfe*/!!Uif!gjobm!dpotusvdujpo!qmbot!boe!tqfdjgjdbujpot!nvtu!cf!
qsfqbsfe!boe!bqqspwfe!qsjps!up!uif!cfhjoojoh!pg!dpotusvdujpo/!
6)EQUIPMENT
B!izesbvmjd!fydbwbups!)usbdlipf*!xjui!b!izesbvmjd!uivnc!tibmm!cf!vtfe!up!iboemf!boe!jotubmm!
uif!spdlt
Bmm!sfrvjsfe!tbgfuz!frvjqnfou!tibmm!cf!bwbjmbcmf!evsjoh!dpotusvdujpo/!!Tbgfuz!frvjqnfou!
jodmveft!cvu!jt!opu!mjnjufe!up!ibse!ibut-!hmpwft-!boe!fzf!boe!ifbsjoh!qspufdujpo/
7)SUPERVISION
Uif!fohjoffs!nvtu!cf!po.tjuf!up!tvqfswjtf!boe!jotqfdu!fbdi!pqfsbujpo!bt!ju!jt!qfsgpsnfe/!!Op!
xpsl-!xijdi!jt!dpwfsfe!cz!uijt!tqfdjgjdbujpo-!tibmm!cf!qfsgpsnfe!jo!uif!bctfodf!pg!uif!fohjoffs!
fydfqu!bt!bqqspwfe!cz!uif!fohjoffs/!!Uif!xpsl!tibmm!cf!dpoevdufe!bt!ejsfdufe!cz!uif!fohjoffs/!!
Uif!fohjoffs!tibmm!cf!opujgjfe!b!njojnvn!pg!35!ipvst!cfgpsf!jotubmmbujpo!jt!qfsgpsnfe/
VTEB.OSDTqbhf!3!pg!7!Spdl!Tusvduvsft
Opsui!DbspmjobBvhvtu!2:::
8)INSTALLATION
Uif!fohjoffs!tibmm!qmbdf!b!nbslfs!bu!uif!qpjou!xifsf!uif!mbtu!spdl!pguif!tusvduvsf!xjmm!nffu!
uif!tusfbncfe/!!Uijt!nbslfs!tibmm!cf!tfu!bu!b!qpjou-!xijdi!sfqsftfout!uif!qmboofe!bohmf!gspn!
cbolgvmm!boe!uif!qmboofe!tmpqf!pg!uif!tusvduvsf/!!Uif!fohjoffs!tipvme!difdl!up!tff!jg!uijt!qpjou!
2
jt!bqqspyjnbufmz!0pg!uif!upubm!diboofmxjeui/
4
Ipmft!gps!gppufs!spdlt!tibmm!cf!fydbwbufe!jo!uif!tusfbncfe!bu!uif!mpdbujpo-!fmfwbujpo!boe!
psjfoubujpo!bt!ejsfdufe!cz!uif!fohjoffs/!
B!gppufs!spdl!pg!uif!tj{f!boe!tibqf!bt!ejsfdufe!cz!uif!fohjoffs!tibmm!cf!jotubmmfe!jo!uif!ipmf/!!
Nvmujqmf!gppufs!spdlt!nbz!cf!sfrvjsfe-!bu!uif!ejtdsfujpo!pg!uif!fohjoffs!ps!bt!qspwjefe!gps!jo!
uif!bqqspwfe!qmbo/!
B!tusvduvsf!spdl!pg!uif!tj{f!boe!tibqf!bt!ejsfdufe!cz!uif!fohjoffs!tibmm!cf!jotubmmfe!po!upq!pg!
uif!gppufs!spdl/
Tusfbncfe!nbufsjbm!xjmm!cf!sfnpwfe!bt!ejsfdufe!cz!uif!fohjoffs!jg!ju!jt!sfrvjsfe!up!npwf!uif!
uibmxfh!pg!uif!tusfbn!up!uif!qpjou!pg!uif!tusvduvsf/
Tusfbncfe!nbufsjbm!tibmm!cf!qmbdfe!po!uif!vqtusfbn!tjef!pg!uif!tusvduvsf!ofbs!uif!cbol/
Frvjqnfou!tibmm!cf!pqfsbufe!gspn!uif!tusfbncbol!xifofwfs!qpttjcmf/
Frvjqnfou!xijdi!bqqfbst!up!cf!mfbljoh!gmvjet!tibmm!cf!sfnpwfe!up!b!tbgf!tjuf!bxbz!gspn!uif!
tusfbn!dpssjeps!voujm!ju!jt!sfqbjsfe!boe!dpogjsnfe!uibu!op!mfblt!fyjtu/
9)ASSOCIATED PRACTICES
SPPU!XBETboe!sfmbufe!jotusfbn!tusvduvsft!qmboofe!bt!bo!joufhsbm!dpnqpofou!pg!uif!
obuvsbm!tusfbn!diboofm!sftupsbujpo!eftjho/
DSJUJDBM!BSFB!TFFEJOH!tibmm!cf!bqqmjfe!po!bmm!ejtuvscfe!bsfbt/
XPPEZ!WFHFUBUJPOtibmm!cf!ftubcmjtife!po!uif!tmpqfe!cbol!above bankfull boe!po!upq!
pg!uif!cbol/
SJQBSJBO!GPSFTU!CVGGFS!tipvme!cf!dpotjefsfe/!
MJWFTUPDL!FYDMVTJPO!tibmm!cf!jotubmmfe!jg!mjwftupdl!bsf!qbtuvsfe!jo!uif!bsfb/
10)FIGURES
Gjhvsft!buubdife!up!uijt!tqfdjgjdbujpo!jmmvtusbuf!uif!qmbdfnfou!boe!psjfoubujpo!pg!uif!wbsjpvt!
jotusfbn!spdl!tusvduvsft!xijdi!nbz!cf!jodmvefe!jo!uif!qmbo/!!Gjhvsft!bsf!bt!gpmmpxt;
Gjhvsf!2!!Spdl!Wbof
Gjhvsf!3!!K!Ippl
Gjhvsf!4!!K!Ippl!xjui!tjmm
Gjhvsf!5!!Dsptt!Wbof
VTEB.OSDTqbhf!4!pg!7!Spdl!Tusvduvsft
Opsui!DbspmjobBvhvtu!2:::
11)ITEMS OF WORK
Jufnt!pg!xpsl!up!cf!qfsgpsnfe!jo!dpogpsnbodf!xjui!uijt!tqfdjgjdbujpo!boe!uif!dpotusvdujpo!
efubjmt!bsf;
b/Dpotusvdu!tusfbn!tubcjmj{bujpo!nfbtvsft!bu!uif!Ljstufjo!Spbetjuf!jo!Cvodpncf!Dpvouz!bu!uif!
mpdbujpo)t*!bt!tipxo!po!uif!dpotusvdujpo!esbxjoht!boe!bt!ejsfdufe!cz!uif!po.tjuf!Fohjoffs/
c/Johsftt!boe!fhsftt!pg!frvjqnfou!boe!nbufsjbmt!tibmm!cf!pomz!bu!mpdbujpot!boe!uispvhi!spvuft!
bt!bqqspwfecz!uif!Fohjoffs/
d/Qspwjef!bmm!frvjqnfou-!uppmt-!nbufsjbmt-!boe!mbcps!sfrvjsfe!up!jotubmm!uif!gpmmpxjoh/!!
NJOJNVNspdl!tj{f!tibmm!cf!bqqspyjnbufmz 3’ x1.5’ x1.5’ps!2-111!mct!fbdi!spdl/!!Tnbmmfs!
spdlt!nbz!cf!vtfe!bt!cbdlfs!spdlt/
j*)2*!Spdl!K.ippl!tusvduvsfxijdi!xjmm!sfrvjsf!bqqspyjnbufmz!24total rocks.
jj*)2*!Spdl!Npejgjfe!K.ippl!tusvduvsfxijdi!xjmm!sfrvjsf!bqqspyjnbufmz!50total rocks.
e/A total of approximately 37 tons of rock will be required for therock structures.
f/Approximately 100 linear feet of geotextile fabric filter cloth from a minimum 12 foot
wide roll is required for theJ-hook structures.Fabric shallbe non-woven needle
punched.
g/Sfnpwf!bmm!dpotusvdujpo!efcsjt!bttpdjbufe!xjui!jotubmmbujpo!pg!uiftf!tusvduvsft!up!bo!bqqspwfe!
mpdbujpo/!
+!Gjhvsft!bcpwf!up!opu!jodmvef!spdlt!offefe!gps!cpvmefs!upf
VTEB.OSDTqbhf!5!pg!7!Spdl!Tusvduvsft
Opsui!DbspmjobBvhvtu!2:::
33/6±
!!Bohmf
)jo!efhsfft*
6.8!&
!!Tmpqf
)jo!qfsdfou*
K!Ippl!xjui!Tjmm
Dsptt!Tfdujpo
K!Ippl!xjui!Tjmm
Qmbo!Wjfx
Gjhvsf!4
)bgufs!Spthfo*
33/6±
!!Bohmf
)jo!efhsfft*
6.8!&
!!Tmpqf
)jo!qfsdfou*
Dsptt!Wbof
Dsptt!Tfdujpo
Dsptt!Wbof
Qmbo!Wjfx
Gjhvsf!5
)bgufs!Spthfo*
VTEB.OSDTqbhf!7!pg!7!Spdl!Tusvduvsft
Opsui!DbspmjobBvhvtu!2:::
Tusfbntjef!Ifscbdfpvt!Wfhfubujpo!Tqfdjgjdbujpot
Uif!xpsl!tibmm!dpotjtu!pg!qsfqbsjoh!uif!bsfb-!gvsojtijoh!boe!qmbdjoh!tffe-!tqsjht-!tpe!nbut-!nvmdi-!
gfsujmj{fs-!jopdvmbuf-!tpjm!bnfoenfout!boe!bodipsjoh!nvmdi!jo!uif!eftjhobufe!bsfbt!bt!tqfdjgjfe<!
tusfbncbolt-!bddftt!bsfbt!boe!puifs!bsfbt!ejtuvscfe!cz!dpotusvdujpo!bdujwjujft/
Tffecfe!Qsfqbsbujpo
Po!tjuft!xifsf!frvjqnfou!dbo!cf!pqfsbufe!tbgfmz!uif!tffecfe!tibmm!cf!befrvbufmz!mpptfofe!boe!tnppuife/!!
Ejtljoh!ps!dvmujqbdljoh!ps!cpui!nbz!cf!ofdfttbsz/!!Po!tjuft!xifsf!frvjqnfou!dboopu!pqfsbuf!tbgfmz-!uif!
tffecfe!tibmm!cf!qsfqbsfe!cz!iboe!tdbsjgzjoh!up!qspwjef!b!spvhifofe!tvsgbdf!tp!uibu!tffe!xjmm!tubz!jo!qmbdf/!!
Jg!tffejoh!jt!epof!jnnfejbufmz!gpmmpxjoh!dpotusvdujpo-!tffecfe!qsfqbsbujpo!nbz!opu!cf!sfrvjsfe!fydfqu!po
dpnqbdufe-!qpmjtife!ps!gsftimz!dvu!bsfbt/
Gfsujmj{joh
Fwfomz!ejtusjcvuf!mjnf!boe!gfsujmj{fs!pwfs!uif!bsfb!up!cf!tffefe/!!Vojgpsnmz!njy!mjnf!boe!gfsujmj{fs!joup!uif!
upq!4!jodift!pg!uif!tpjm/!!Xifsf!tvsgbdf!nbufsjbmt!bsf!qsfepnjobufmz!hsbwfm!boe0ps!dpccmf-!op!jodpsqpsbujpo!
jt!sfrvjsfe/!!Bqqmz!mjnf!boe!gfsujmj{fs!bddpsejoh!up!tpjm!uftu!sftvmut!ps!bu!uif!gpmmpxjoh!sbuft/
Qfs!2111!tr/!gu/!!!Qfs!Bdsf
Mjnf!!!!!61.211!mct/!!!2.3!upot
21.21.21!Gfsujmj{fs!!!:.23!mct/!!!!5.611!mct/
Tpe!Nbut
Tusjq!boe!tupdlqjmf!nbut!pg!fyjtujoh!eftjsbcmf!ifscbdfpvt!wfhfubujpo/!!Jotvsf!uibu!tfwfsbm!jodift!pg!tpe!
sfnbjot!buubdife!up!uif!wfhfubujpo/!!Uif!sppu!tztufnt!nvtu!sfnbjo!npjtu!xijmf!uif!wfhfubujpo!jt!tupdlqjmfe/!!
Qmbdf!uif!nbut!po!uif!mpxfs!cbol!tmpqft!boe!bodips!jo!qmbdf/
Tffejoh!
Ufnqpsbsz!Tffejoh!!.!Vtf!xifsf!offefe!gps!fsptjpo!boe!qpmmvujpo!dpouspm-!xifo!qfsnbofou!
wfhfubujpo!dboopu!cf!ftubcmjtife!evf!up!qmboujoh!tfbtpo!boe!xifsf!ufnqpsbsz!hspvoe!dpwfs!jt!offefe!up!
bmmpx!obujwf!ps!xppez!wfhfubujpo!up!cfdpnf!ftubcmjtife/
Gbmm-!Xjoufs-!Tqsjoh!Tffejoh!!Qfs!2111!tr/!gu/!!!Qfs!Bdsf
Pbut!!!!!3!mct/!!!!4!cv/
Xifbu!!!!!3!mct/!!!!4!cv/
!!
Tvnnfs!Tffejoh
Tvebohsbtt!!!!2!mc/!!!!46.56!mct/
Cspxoupq!Njmmfu!!!!2!mc/!!!!41.51!mct/
Qfsnbofou!Tffejoh!!Vtf!jo!dpncjobujpo!xjuixppez!qmboujoht!po!uif!vqtmpqf!tjef!pg!uif!sjqbsjbo!
qmboujoh/!!Tqsjoh!qmboujoh!ujnf!jt!jefbm!gps!obujwf!qfsfoojbm!xbsn!tfbtpo!hsbttft/!!Uiftf!hsbttft!tipvme!cf!
vtfe!xifo!foibodjoh!xjmemjgf!ibcjubu!jt!b!hpbm!pg!uif!sjqbsjbo!qmboujoh/!!!Tqsjoh!qmboufe!tffe!tipvme!cf!
usfbufe!xjui!b!dpme!xfu!dijmm!qspdftt!up!nbyjnj{f!hfsnjobujpo/!!Gbmm!qmboujoht!tipvme!cf!qmboufe!xjui!b!
mjhiumz!tpxfe!dppm!tfbtpo!boovbm!up!ipme!uif!tpjm!boe!ep!opu!offe!uif!xfu!dijmm!qspdftt/!Up!jnqspwf!xjmemjgf!
ibcjubu!fyjtujoh!tuboet!pg!gftdvfdbo!cf!ljmmfe!vtjoh!bo!bqqspqsjbuf!ifscjdjef!boe!xbsn!tfbtpo!hsbttft!dbo!
cf!op.ujmm!qmboufe!joup!uif!tpe/!!Pnju!gfsujmj{fs!xifo!ftubcmjtijoh!obujwf!hsbttft-!gfsujmj{fs!dbo!cf!bqqmjfe!uif!
tfdpoe!zfbs!up!jnqspwf!uif!tuboe/
Gbmm-!Tqsjoh!Tffejoh!!!Qfs!2111!tr/!gu/!!!Qfs!Bdsf
Szf!Hsbjo!!!!2!mc/!!!!61!mct/!!!
Sfe!Dmpwfs!!!!205mc/!!!!21mct/!!
Cmbdl!Fzfe!Tvtbo!!!!!!!2.3!mct/!!
!.Obujwf!xbsn!tfbtpo!hsbttft.!
Cjh-!Mjuumf!ps!Csppntfehf!Cmvftufn1/3!mct/!QMT!)qvsf!mjwf!tffe*6!mct/!QMT
Fbtufso!Hbnnb!Hsbtt!ps!Txjudihsbtt1/6!mc/!QMT!!!21!mct/!QMT
Nvmdijoh
Nvmdijoh!tipvme!cf!qfsgpsnfe!xjuijo!59!ipvst!pg!tffejoh/!!Hsbjo!tusbx!nvmdi!tipvme!cf!bqqmjfe!po!tffefe!
bsfbt!bu!b!sbuf!pg!4!cbmft!qfs!2111!trvbsf!gffu!ps!2/6!upot!qfs!bdsf/!!Bqqmz!nvmdi!vojgpsnmz/!!Bodips!nvmdi!
xjui!b!nvmdi!dsjnqfs-!btqibmu!ubdljgjfs!ps!bqqspqsjbuf!nvmdi!ofuujoh/
Streamside Woody Vegetation Establishment
This work consist of securing and planting permanent woody vegetation using rooted stock, unrooted stock and
on site transplants.
Care and Handling
Planting stock should be stored in a cool moist environment or heeled in. Roots of bareroot stock shall be kept
moist during planting operations. Container or potted stock shall be kept moist at all times. The root balls of
transplanted stock must be kept moist.
Site Preparation
Desirable trees and shrubs on the construction site should be dug and stored. On recently graded sites use
temporary seedings, anchored mulch or erosion control fabrics to provide surface protection until woody
vegetation becomes established. Sod may be killed by non-selective herbicides the year previous to planting
stock (follow all federal, state and local regulations in the use of herbicides). When hand planting; scalp an area
at least 3 feet in diameter and 2-4 inches deep. Place plant in the center of the scalped area. On sites where
equipment cannot be operated safely and there are concerns about potential erosion use a non-selective herbicide
to kill vegetation in a 36 inch wide circle or 36 inch wide strip and plant in the center of the killed vegetation. If
the site is a row crop site, reasonably free of weeds, plant stock in the stubble without prior preparation. Sites
with undesirable brush will need initial treatments to facilitate planting and follow-up treatments to prevent
reencroachment.
Planting
Transplants should be replanted to the same depth they were originally growing. Plant rooted stock in a vertical
position with the root collar approximately ½ inch below the soil surface. The planting trench or hole must be
deep enough and wide enough to permit roots to spread out and down without J-rooting. Insert dormant cuttings
to the depth required to reach adequate soil moisture, leaving 2 to 3 buds above ground. After planting pack soil
around each plant firmly to remove air pockets.
Plant List
Plant Types/ Plant to Plant Spacing Plant List
Mature Height # Per Acre
#Per 1000 Sq. Ft.
Shrubs, less than 10 3 to 6 feet *Buttonbush, *#‘Bankers’ Dwarf Willow
Feet in height 1210-4840 *Elderberry,Highbush Blueberry,
28-110 Hazelnut
Shrubs and trees from 6 to 8 feet Alder, Deciduous Holly,Crabapple,
10 to 25 feet in height 680-1742 Red Chokeberry, *Silky Dogwood,
15-28 *Silky Willow, Spicebush,
*#‘Streamco’ Willow, Serviceberry,
Washington Hawthorne, Witch Hazel
Trees greater than 25 8 to 12 feet Black Cherry, *Black Willow,
Feet in height 302-680 Green Ash, Red Maple, River Birch
7-15Sycamore, Yellow Poplar, Black Walnut
Persimmon
NOTES: * = Plants suitable for use as dormant cuttings, space cuttings 1.5-2.5 feet apart, 160-
445 cuttings per 1000 sq. ft. or 6970-19360 cuttings per acre;
# = Non-native plants; Plants listed in bold have wildlife value