Loading...
HomeMy WebLinkAboutWQ0003090_Annual Report_20230221P GREAT PLACE 7,0 ;/teE Aq �JV •owH or • OPTN CA NOIiHA Town of Liberty, XC Wastewater Treatment r1'Cant and CoCCection System 2023 Annuaf Xeport Table of Contents I. General Information Name of Regulated Facilitv Responsible Persons Permit Number II. Perfonnance Permit Limit Violations 2021 Monitoring and Reporting Violations Overflows at the Wastewater Treatment Plant Overflows in the Collection System Description of Corrective Measures M. Notification IV. Certification I. General Information Name of Regulated Facility Town of Liberty The Town of Liberty is permitted through the State of North Carolina to operate a spray irrigation wastewater treatment facility and operate the wastewater collection system. Responsible Persons Elix T. Fike is the treatment plant operator responsible in charge (ORC). Kevin Coble is the collection system operator responsible in charge (ORC). Scott Kidd, Town Manager is the responsible person for the Town of Liberty facilities and can be contacted at (336) 622-4276. Permit Number Wastewater Treatment Facility Permit Number: WQ0003090 Wastewater Collection System Permit Number: WQCS00280. The wastewater treatment facility is a spray irrigation system located at 7178 East Highflll Avenue. The treatment process consists of a manual bar screen, a lagoon, chemical treatment, and effluent pump station. The Town is permitted for 550,000 gallons per day of sewage. The sewage enters the plant and goes through the bar screen which removes all solids. The solids are removed and disposed of by Allied Waste. The flow then proceeds to a three (3) pump influent station that pumps the sewage to the lagoon. The lagoon is a natural occurrence system that separates the remaining solids from the liquid. The solids settle to the bottom of the lagoon with the water staying to the top. After a 88 day detention time, the water is then treated with chlorine to remove all fecal coliform bacteria. The next process is to spray the effluent onto the spray fields. We maintain one hundred eighty (180) acres of spray fields. The spray fields are broken down into eight (8) zones. The Town of Liberty contracts the cutting and removal of the fields for hay. The Town of Liberty collection system consists of approximately 23 miles of sewer lines. The lines vary in size from four (4") inch to twenty four (24") inch in diameter. The collection system also consists of eight (8) lift stations that carry the wastewater to the treatment facility. Operators make daily checks on the outfall lines and lift stations. The public works crew along with contracted maintenance is responsible for the mowing and clearing of the outfall lines for easy access in case of any emergencies. 3 II. Performance The Town's most recent Compliance Evaluation Inspection of the Wastewater Treatment Plant was July 20, 2023. The inspection mostly reflects compliance with Permit No. WQ0003090. All items continue to be monitored by the ORC. It is our goal to continue to find ways to improve the operations of the Wastewater Treatment Facility and Collection System as we go forward. Overflows at the Wastewater Treatment Plant Date Amount(gallon) Cause 01/26-27/2023 99,000 1/I due to rainfall of 1.2" in 1 day 02/01-06/2023 659,000 I/I due to rainfall of 1.2" in 1 day 02/13-15/2023 201,000 I/I due to rainfall of 2.0" in 1 day 03/02/2023 500 I/I due to rainfall of 1.3" in 1 day Pump failure on pump 1 04/07/2023 1,000 I/1 due to rainfall of 4.2" in I day Pump failure on pump 2 04/10-13/2023 216,000 1/1 due to rainfall of 4.2" in I day 07/20/2023 9,000 Broken Spray Head 12/17/2023 2,000 1/1 due to rainfall of 2.5" in 1 day Pump Failure on pump 1 12/27/2023 15,000 I/1 due to rainfall of 2.0" in 1 day Gl Overflows in the Collection System Date Amount (gallons) Location Cause 1/25/2023 1,200 Kim-o Rd. Manhole #500B 1/1 3/2/2023 310 Kinro Rd. Manhole #50013 1/1 4/7/2023 3,150 Kinro Rd Manhole #500B I/I 4/7/2023 1,200 W. Kime Ave. Lift Station Manhole #400 I/1 4/7/2023 1,200 W. Kime Ave. Manhole #400A I/1 12/17/2023 8,400 Kinro Rd Manhole #500B I/I 12/27/2023 1,800 Johnson Lift Station Manhole #300 I/1 12/27/2023 2,400 W. Kime Ave. Lift Station Manhole #400 I/I Pump Station Equipment Failure 12/27/2023 2,400 W. Kime Ave. Manhole #400A 1/1 Pump Station Equipment Failure 12/27/2023 4,800 Kinro Rd Manhole #500B 1/1 Description of Corrective Measures See Special Order By Consent Liberty: A Great Place to Live III. Notification The Town of Liberty will add a notation on the next water bill about the availability of this report. The report will be at Liberty Town Hall for viewing at 128 South Fayetteville St. The report will also be posted on the Town Website at hlM://www.liberty-nc.com, under Departments, Public Works, Wastewater Department. 3 IV. Certification 2023 Annual Report Certification Form System Name: Town of Liberty Wastewater Permit # WQ0003090 Collection Permit # WQCS00280 Report Year: 2023 Population Served: _2,665� The wastewater system operator named above hereby confirms that all provisions under the House Bill 1160 requiring the development of, distribution of, and notification of an annual report have been executed. Further, the system operator certifies the information contained in the report is correct and consistent with the compliance monitoring data previously submitted to the primacy agency by their NC certified laboratory. Certified by: Name: Scott Kidd Title: _Town Manager Signature: Phone #: (336) 622-4276 Date: February 19, 2024_ 7