Loading...
HomeMy WebLinkAbout20210778 Ver 2_Stormwater Approval_20230619ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL Interim Director June 6', 2023 Phillip and Jamie Lanzi, Property Owners 3210 Gralyn Terrace Wilmington, NC 28411 NORTH CAROLINA Environmental Quality Subject: Post -Construction Stormwater Management Permit No. SW8 230502 6600 Carmel Trail High Density Project New Hanover County Dear Mr. and Ms. Lanzi: The Division of Energy, Mineral and Land Resources received a complete Post -Construction Stormwater Management Permit Application for the subject project on May 311, 2023. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit No. SW8 230502 dated June 6', 2023, for the construction, operation and maintenance of the built -upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until June 6th, 2031 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Kellie Beth Norris in the Wilmington Regional Office, at (910) 796-7215 or kellie.norris@deq.nc.gov. Sincerely, CRC Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Application Documents DES/kbn: \\\Stormwater\Permits & Projects\2023\230502 HD\2023 06 permit 230502 cc: Howard Resnik, PE; CSD Engineering New Hanover County Engineering Division of Coastal Management Wilmington Regional Office Stormwater File D_E Q� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ./ Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 230502 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Phillip & Jamie Lanzi 6600 Caramel Trail 6600 Caramel Trail, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built -upon area (BUA) draining to one (1) Contech Stormfilter and one (1) area of permeable pavement ("stormwater control measures" or "SCMs") discharging to Class SA-ORW waters as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until June 61", 2031 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 5,215 square feet. The runoff from all BUA within the permitted high density drainage areas of this project must be directed into the permitted SCMs. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCMs labeled DA 1 (Contech Stormfilter) and DA 2 (Infiltrating Permeable Pavement) have been designed to handle the runoff from 5,215 and 1,068 square feet of BUA, respectively, within the delineated drainage areas. This permit does not provide any allocation of BUA for future development within the delineated drainage area(s) for the SCMs labeled DA 1 and DA 2. HIGH DENSITY SA-ORW WATER BUA LIMITS (DA 1 and DA 2). The overall percent of BUA permitted for the portion of project within 575 feet of SA-ORW waters must not exceed 25%. Within 575 feet of SA-ORW waters, this permit approves a percent BUA of 23% and the construction of a total of 5,215 square feet of BUA. This permit does not provide any allocation of BUA for future development within 575 feet of SA-ORW waters. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 230502 c. CAMA AECs. Where a project or lot is located within CAMA's Area of Environmental Concern (AEC), the Division of Coastal Management (DCM) may calculate a different maximum BUA based on CAMA regulations. The more restrictive BUA limit will apply to the project. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. SCM DESIGN FOR SA WATER. The Contech Stormfilter (SCM) provides runoff treatment for the difference between the pre- and post -development runoff volumes for the one-year, 24-hour storm event and have demonstrated that it is not feasible to meet the minimum design criteria for an infiltration system. The stormwater is filtered through a minimum of 18 inches of sand prior to discharge. The discharge is directed to a level spreader — filter strip and the excess runoff is released at a non -erosive velocity at the edge of the vegetated setback or to an existing stormwater drainage system. c. SCM DESIGN FOR SA WATER. The infiltrating permeable pavement (SCM) provides runoff treatment without discharging in excess of the pre -development conditions during the one- year, 24-hour storm event. The excess runoff is released at a non -erosive velocity at the edge of the vegetated setback or to an existing stormwater drainage system. PERMEABLE PAVEMENT. The following considerations pertain to the proposed infiltrating permeable pavement: i. Except for the incidental, unavoidable runoff from the stable vegetated areas shown on the approved plans, runoff from adjacent pervious areas shall be prevented from reaching the permeable pavement. ii. It is recommended that during the installation of the permeable pavement, care is taken to avoid compaction of the underlying subgrade soils. To confirm compaction has not occurred, it is recommended that a direct measurement of the soil's infiltration rate be conducted after excavation and before the aggregate is placed. If the infiltration rate has diminished, it is recommended to scarify, rip, or trench the subgrade to restore the infiltration rate. iii. After installation, the permeable pavement shall be protected from sediment deposition until the site is completed and stabilized. iv. Concentrations of oils, grease, heavy metals, and toxic chemicals shall not be stored or handled where they may enter the permeable pavement. V. At no time shall the approved permeable pavement be paved over or repaired with any type of conventional paving material. 4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 230502 RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and maintenance access located on property owned by other persons or entities must be located in permanent recorded easements or drainage easements as shown on the approved plans. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. If a final plat is recorded, it must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. UNDERGROUND SCMs. It is recommended that during the installation of the underground SCM, photos be taken documenting the construction and demonstrating that the constructed SCM meets the approved design. It is further recommended that these photos be submitted with the required Designer's Certification. b. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. c. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any infiltrating permeable pavement, #57 stone area, public trails, or landscaping material to be considered a pervious surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 230502 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division, ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on - site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division- within 30 days to making any one of these changes. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 230502 b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated conveyances must be accessible for inspection, operation, maintenance and repair as shown on the approved plans. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions. g. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. h. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 6th day of June 2023. NORTH CAR.�� l0OLINA ENVIRONMENTAL MANAGEMENT COMMISSION C45 Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 230502 Page 5 of 5 Post -Construction Stormwater Management Permit No. SW8 230502 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification • As -Built Designer's Certification General MDC • As -Built Designer's Certification for Permeable Pavement Project • As -Built Designer's Certification for Contech Stormfilter Project • As -Built Designer's Certification for Level Spreader and Vegetated Filter Strip MDC A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 Post -Construction Stormwater Management Permit No. SW8 230502 AS -BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As -built Package Submittal. Printed N County of personally appeared before me this Signature a Notary Public in the State of do hereby certify that day of , 20 and acknowledge the due execution of this as -built certification. Wtness my hand and official seal My commission expires (SEAL) �k SC�t28t ���T f5 l4 S xt�Iet� M�fi J x#Rx �P�. �a n zz x • x bxi) u v3: wear »'�e`�sz �a..ese ux x vi v.eSi u iv . w ` A. DEED �STRI ?�O. $1 ILIA ItECOF;R$ ; 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1 - 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C.'.EASEI $ 1. The SCMs and the components of the runoff collection / conveyance Y N system are located in recorded drainage easements. or 2. A copy of the recorded plat(s) is provided. Y or N h'Ttforrgider�) lsts that Yor N 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y N NCGS 143 Article 21 if the SCM is removed, relocated or altered or without prior approval. E,= QP T .NfA P<_ ., INTJ,=-,NA, 0 ..-AQ C X,. . '.... r Y; or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y N appears in the chain of title. or IUD i�[ ��is;are t ' C'�f � t,jfI fb Y�or NJ *jr3;��� Page 1 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 Y!' Note 1- Acceptable records include ARC approvals, as -built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 2 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number SEAL: Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: i0 Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this SCM or project. t1t 4"x6 j "� V'k q�VG 1 �$��#£ x s ¢ x... h .[Ft a:.-L- `d' s. . : 1 x ^ 9R " kvi: ii. x 'Y.. a3'� ewk :1R5�.x'1 Yxxt x1 ,�ev`Oj i , i'. 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. B. NE00ATBD $ATBACK$'/,BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N b2 2 is located in the setback. Page 3 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 Y or N 4. BUA that does not meet the requirements of NCGS 143- 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water -dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. Y 1. A variation (alternative) from the stormwater rule provisions has been implemented. Y or N 2. The variation provides equal or better stormwater control and equal or better protection of surface waters. Y or N i' .t Irl S 4' . pusi k%.v'iuw.=.,77 Fn .E14792f33. vg� 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V (provide Y or N su ortin documents for soils and ve etation . 11- A O, � ° N PRO�E(5T,1 N r 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 10 year storm. a (5 ..R(XFi _ N ai >PWi`v' 34L>dayA'12. IeH-1+.M-: ai W BMW MMUMMEMONSKOM {t air MMODOMMIA ti $� , ,,Ran �t ON ._ - _ 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >3:1. N,,., i Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "ME", below. Attach additional pages as needed: Page 4 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 AS -BUILT DESIGNER'S CERTIFICATION FOR PERMEABLE PAVEMENT PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1055 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per. 1044(4). Check here if the Designer did not observe the construction, but is certifying the project. EJ Check here if pictures of the SCM are provided. Printed Name NC Registration Number Date SEAL: Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: OO Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this project or SCM This Certification must be completed in coniunction with the General MDC certification under NCAC 02H.1050 G8[t3Uhfft 8 Certtficattort (I)IID� 105); OAs built ®N,/E ®NfA ", r " i A:' DESI(`aN IDO ,` ;` ,DR%► . .. 1. Washed aggregate base material has been used. Y or N 2. The provided amount of permeable pavement surface area Y N is consistent with the approved plans. or 3. The amount of non -roof adjacent built -upon area is consistent with the approved plans and is directed onto the Y N permeable pavement surface and does not exceed the or required 1:1 ratio Aa/A 4. The runoff from adjacent pervious areas is prevented from reaching the permeable pavement except for incidental, Y or N unavoidable runoff from stable vegetated areas. 5. The permeable pavement infiltrates the design volume to the Y N bottom of the subgrade within 72 hours. or 6. If the permeable pavement was installed as a detention system, the drawdown assembly releases the stormwater Y or N stor/ed in�t�hne a re ate in 2-5 days. S B. Oi 1. The hydraulic properties and characteristics of the in -situ Y N soils conform to the soils report. or 2. For infiltrating permeable pavement, the lowest point of the Y N system is a minimum of 2 feet above the SHWT. or 3. For infiltrating permeable pavement, if the lowest point of the system is less than 2 feet above the SHWT, the soils have Y or N been modified to assure drawdown within 72 hours. Page 5 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 r r ', i�i/�S_jjtitn° �N/;' ; �Nla 4� The in -situ soils have been removed and replaced with Y N infiltration media in accordance with the approved Ian. or 5. Infiltration media has been placed on to of in -situ sails. Y or N - 1. At least one capped observation well has been provided at Y N the low point of each permeable pavement area? or 2. The subgrade is terraced in accordance with the approved plans and has at least one capped observation well within Y or N each terrace section. 3. For PICP and concrete grid pavers, an edge restraint has been used around the perimeter of the permeable Y or N pavement . 4. The subgrade for infiltrating permeable pavement was graded when it was d and there was no reci itation. Y or N 1. The infiltration rate of the pavement surface is at least 50 inches per hour using a head less than or equal to four Y or N inches. 2. After installation, the permeable pavement was protected Y N from sediment deposition. or 3. The site is complete and stabilized. Y or N Provide an explanation for every MDC that was not met, or for every item marked "N/E" or "N/A" below. Attach additional pages as needed: Page 6 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 AS -BUILT DESIGNER'S CERTIFICATION FOR CONTECH STORMFILTER PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the requirements of NCAC 02H.1050(15), has been approved by the Division under the New Stormwater Technology MDC, meets the recommended MDC listed in Chapter D-1 of the Stormwater Design Manual, and has been constructed in accordance with the permit documents, plans and specifications on file with and provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number SEAL: Date Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address OO Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 OO N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this project or SCM. This Certification must be completed in coniunction with the General MDC certification under NCAC 02H.1050 io RE'n x�,K n.,�.. W d P Tr .as. aF .. r . �:. t t 1. Inlets are located per the approved plans. Y or N 2. A minimum 4' diameter by 2' deep sump is provided. Y or N B. ,Volume,7.Elevgtio,,,s'/,�otlstcuctiorf , 1. The provided width, length and height of the detention area, including the piped storage, are consistent with the approved Y or N Ian. 2. The bottom elevation of the detention area is consistent with Y N the approved plans. or 3. The bypass elevation is consistent with the approved plan. Y or N 4. The overflow elevation is consistent with the approved plan. Y or N 5. The volume of water stored in the detention area is at least Y N 0.75 times the treatment volume. or C. StotmFi11terfe -ia d $ stgit, :• 1 The as -built system meets the manufacturers specifications. Y or N 2. The number of cartridges provided is consistent with the Y or N approved plans. 3. The Perlite Media has been used. Y or N 4. In Nutrient Sensitive Waters (NSW) and for nutrient removal Y or N credit, the Phos hosorb Media has been used. 5. The StormFilter Media has a flow rate of 1 GPM/ft of media Y or N surface. Provide an explanation for every MDC that was not met, or for every deviation from the permitted condition below: Page 7 of 9 Post -Construction Stormwater Management Permit No. SW8 230502 AS -BUILT DESIGNER'S CERTIFICATION LEVEL SPREADER AND VEGETATED FILTER STRIPS MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed Level Spreader and Vegetated Filter Strip MDC found in NCAC 02H.1059 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT' drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number Date SEAL: Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: OO Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on paqe 2) OO N/A = not applicable to this SCM or project. Consultant's' Certification NCAC 02H:1,059 „ .. OAs-built ON/E," ON/A t A. SIZING 1. The length of the Level Spreader is a minimum of 10 feet Y or N per 1 cfs. 2. The Level Spreader receives flow directly from the Y or N Drainage Area, and is sized based on the flowrate for a design storm of 0.75 inches per hour. 3. The Level Spreader receives flow from an SCM and is Y or N sized based on the drawdown rate of the design volume. 4. The Level Spreader has a flow bypass system for larger Y or N storm events. 5. The Level Spreader is sized to handle the 10 year storm Y or N flow and does not provide a flow bypass system. 6. The minimum width of the Vegetated Filter Strip is 30 Y or N feet measured perpendicular to the level lip. 7. A blind swale or other means of ponding water is Y or N provided u slo a of the Level Spreader. 8. The blind swale provides for uniform overtopping into the Level Spreader. B. LEVEL SPREADER SPECIFICATIONS 1. The lip of the Level Spreader is at a uniform elevation Y or N and has a construction tolerance of ±0.25 inches at any point along its length. 2. The Level Spreader is constructed of concrete or other Y or N stable material. Page 8 of 9 Pust'ConntmctionStormwaiorManagement Permit No. SW8 230502 3. The shape of the Level Sp eader is straight or convex in Y or N plan view. 4. Downslope of the Level Spreader, there is a 1-3 inch Y or N drop followed by a Transition Zone at least 12 inches wide that is protected from erosion by aggregate or high performance turf reinforcement matting. C. FILTER STRIP SPECIFICATIONS 1 . The filter strip does not contain any draws or channels. Y or N 2. The filter strip has been graded with a uniform transvers slope of eight percent or less. Y or N 3. The pH, compaction and other attributes of the first 12" of soil within the filter strip have been adjusted to promote plant establishment and growth. 4. The filter strip and side slopes have been planted with non -clumping deep-rooted grass sod. 5. During construction, the soil was stabilized with temporary measures until the permanent vegetation took root, or the runoff was directed elsewhere until the vegetation established. Provide an explanation for every MDC that was not met, and for every item marked "N/K or "N/E", below. Attach additional pages aSneeded: Page 9 of 9 LOCA TION MAP "SITE & BUILDING DATA: HOUSE IMPERVIOUS BREAKDOWN: 4,416 SF T 14 LF OF TRENCHIDRAIN 18.48EP 71 jjTVgVj187 EP) DRIVEWAY/SIDEWALK = 799 SF (18.50 EP) (� (18.34 EP) `1iNo� TOTAL = 5,512 SF TG 18.4 ° 5,215 / 22,758 = 0.229 OR 237/ (18.51 EP) - ° CN - - a E= 17.0 ° TG= 18.49°27, PERVIOUS BREAKDOWN: R 2 � E (s) ° ° \ 18.9FS ��--� `F yo Cw$*SaD DRIVEWAY = 1, 068 SF - J82 D � U S. 12 oo q °°, `� TOTAL = 1068 SF ° TO = 18.4 2 EXISIIN"IPE ENGINEERING °S� o 18.9 FS ONITORING WELL 6" IE = 16.9 SITE FT Qe T E GENERAL NOTES. BOX OTTOM = 14.9 LICENSE # C-2710 1. NEW HANOVER COUNTY PARCEL NUMBERS.: , n�BORING 1-1 ENGINEERING - PIN = R04419-001-027-000 GROUND ELEV. = 18.0 LAND PLANNING NOT TO SCALE Z SHWT DEPTH = 28 INCHES COMMERCIAL RESIDENTIAL 2. TOTAL PROJECT AREA: 22, 758 SF (0.52 AC.) � IE = 14.0 I � J. EXISTING ZONING DISTRICT- R-20 \ SHWT ELEV. = 15.7 19.0 FS IE = 12.0 _ - 4. SITE ADDRESS: 6600 CARMEL TRAIL. P.O. BOX 4041 FINISHED GROUND ` 19.1 FS \\\\\\\\\\\\\\ I WILMINGTON, NC 28406 5. ASBUILT, BOUNDARY AND TOPOGRAPHIC SURVEY WETLANDS LINE EDGE RESTRAINT TO BE INSTALLED ALONG ALL EXTERNAL EDGES OF PERFORMED AND PROVIDED TO CSD ENGINEERING BY \\\� \11 \\\\I WETLANDS LINE 910 791-4441 PAVERS AT TRANSITION TO FINISHED GROUND. GEOINNOVATION, PC C-2881 191 FS N 48" STORAGE PIS LAFLAT V. 12.0 6. VERTICAL DATUM = 88 50 19.2 FS ��\\\\\\\\\\\\ / " A i \\\\\\\\\\\\\\\ 7. DEEDBOOK 6514 PG 1561 INSTALL 2 C IE - 14.0� a a a a a' a a a SEGMENTAL PERVIOUS PAVERS 8. STORMWATER DRAINS TO HOWE CREEK SA;ORW 6 " SDR-3� TTER : I ems$ G a (18-87-23) IN THE WHITE OAK RIVER BASIN. a, B 9. ENTIRE SITE IS LOCATED WITHIN 575 FT OF SA-ORW JB pO pO pO pO pO pO pO MIN 9 INCHES WASHED GRATE TOP 19.2 FS 19.1 FS i " Q Q WATERS. 2 FORCEMAIN E O �D �0 �0 0� �0 �� � CSTONE (#57 OR EQUIVALENT) "TG _ 16.8 � \\\\ � O � � -0, � 10. NO SURFACE WATERS ARE LOCATED ONSITE. A 50 12 IE = 12.0 qeS}°°° 5Z6�0 " IE = 14.0 I °0 -0 FT SETBACK FROM NHW LINE IS LOCATED WITHIN THE \ \ 6 SDR-35 GUTTER W q -----�-�-� PROPERTY BOUNDARY AND SHOWN. III -III -III -III -III -III -III PREPARED SUBGRADE IE = 15.0 P VERS W2 � P , SE W W o PERVIOUS PAVER DETAIL 19.4 FS NTS 19.4 FS Qe$,° I Ceps 23 LF 12" DW- PE� \ I EXISTING PIPE CONTECH STORMFILTER I� �y.aa 6 FT 1 FT 1 FT RIM = 16.0 i a F�-0-)IE IN = 11.5 E s d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NN�pL \ s,at'"l°doi05 \ B 5. maxim NOT LESS THAN 6". IE OUT = 11.0 00 °/ �NE'X' , Ue\S%°'Qaap56° A ti \ W z FORCE MAIN LINE Q 18" OF SAND \\i�\\j\\j\\j\\j\\/�� \ 0 Q \ e odolo96l / CL U FILTER FABRIC UNDER GRAVEL\�\\��\\��\\�� N °Ln CONCRETE LIP AND FOOTER p z " TOP OF LIP TO BE 3" ABOVE �, � EXISTING GROUND °ip56° I 00 p TOP ELEVATION OF STRIP ON SAME ELEVATION AND DIRECTLY ABUTS LEVEL SPREADER \ \\ o o J �\ °�k.��0 Q W z Z 4" PIPE FROM STORMFILTER N \ _ o \ \ °p�" �P�' Q v Q �cl�o BLIND SWALE �, �, �, �, �, �, �, \ \ (\ Q� ° �° ad z 0 = o 0 oOLU o Q L z q/ A/ A/ A/ oO 66 LF 4 DW- PE ��\ \���\` N CAROB 4" CLEANOUI` \ O _ SEAL 00 4" IE = 1a7 \ y�� _ 025483 0 I 5-4-23 ` A/ 8.0 FT 50.0 FT VEG. FILTER \ / SE ET 0 LEVEL SPREADER/VEG. FI L TER DETAIL AE FL E J �w NOT TO SCALE LEVEL SPREADER/VEG. FILTER AN LO (SEE DETAIL THIS SHEET) 0 UN I � I ` D N MATCHLINE A -A U) SOP LEGEND i O "Z� SU CE WATER SETBACK fr► _ 50 FT RFA EXISTING BOUNDARY r i ADJACENT PROPERTY LINES - EXISTING/PROPOSED EASEMENT CONTOURS��C1E PROP STORM DRAIN i ���� �`( �� MATCHLINE A -A DA TE.• 4-28-23 HORZ. SCALE.- 1' = 10' PERT. SCALE. • N/A PROP PERVIOUS PAVERS DRAWN BY- RL W CHECKED BY- HSR PROP PAVERS ° \ PROJECT NO.: 22-0622 10 5 0 10 20 30 NNw Sheet No. Of 2 / SCALE IN FEET.- 1 "= 10' LS W A 8 C 1 10 10.7 10.9 10.9 N 3 >- m W o � Q m � x W W a 0 0 z W FRAME AI` CAST -IN TOP SLAB BY INLET TOP SLAB PLAN VIEW CARTRIDGES AND FLOW KIT NOT SHOWN CONTECH TO CAST -IN FRAME AND COVER FLOW INLET 1 PIPE 6"0 PVC (12"0 OPENING) 6" EXTENDED BASE 180' �1�►�II]�I):]�jq LADDER i OUTLET 1 FLOW -- -ll - IV_ _ 6" EXTENDED BASE OUTLET UMP ONSTRUCTION L� LOW BYPASS I, (SEE INSTALLATION NOTE G) D. V SYSTEM ACTIVATION DISK INSTALLED HERE. SLIP PLUG SEE INSTALLATION INSTRUCTIONS. PLAN VIEW TOP SLAB NOT SHOWN FOR CLARITY *EOR TO CONFIRM ALL ELEVATIONS *18" CARTRIDGE REQUIRES 2.3' OF HEAD FROM OUTLET INVERT TO WQ WATER SURFACE ELEVATION IN UPSTREAM DETENTION rT-----------1--T\ I I I I� III I I I I II III I I I I I III - 11 I 1 F -- ALL-�-J LOW KIT 4'-10"0 ELEVATION VIEW RIM ELEV. 16.00' TOP OF SYSTEM ELEV. 16.00, OUTLET STUB q iD INLET 1 INVERT ELEV. 1 1.50' OUTLET 1 INVERT �6" EXTENDED OUTSIDE BOTTOM BASE ELEV.10.35' SEE OUTLET DETAIL (THIS SHEET) SEALED OUTLET RISER BALLASVANTI-FLOTATION NOTE 6" EXTENDED BASE WAS ADDED TO THE DESIGN BY CSD ENGINEERING. IF CONTECH CANNOT FORM AN EXTENDED BASE, ADDITIONAL PROVISIONS SHALL BE MADE SUCH THAT THE TOTAL WEIGHT OF THE STORMFILTER STRUCTURE IS NO LESS THAN 11,700 POUNDS BAND, TYPICAL SEE DETAIL SHEET P3 SITE DESIGN DATA FILTER MEDIA TYPE PERLITE OUTLET DETAIL (ILLUSTRATION ONLY) MATERIAL LIST (PROVIDED BY CONTECH) RISER ND COLLAR OR BOOT ?"0 STUB 8" 0 STUB 6" EXTENDED BASE MOLDED -IN CUT LINE (SEE INSTALLATION NOTE E) ROUT (BY CONTECH) COUNT DESCRIPTION INSTALLED BY 2 18" PERLITE CARTRIDGE CONTECH 3 7.5 GPM RESTRICTOR DISK (PURPLE POLY DISK) CONTECH 1 2" PVC SLIP PLUG CONTECH 1 40A FLOWKIT CONTECH 1 SF ACTIVATION DISK CONTECH 1 18" SEALED OUTLET RISER CONTECH 1 STEPS, P10CTS, LANE LADDER, OR EQUIV. CONTECH 1 SEALANT FOR JOINTS CONTRACTOR 1 36"0 x 4" FRAME AND COVER, EJ001580008A01 CAST -IN CONTECH z 0 0 U w 0 z 0 Lu O co 00 CV J co ILL 2Jz(n LU LLL�~UI W Q z PERFORMANCE SPECIFICATION U 2UJI } FILTER CARTRIDGES SHALL BE MEDIA -FILLED, PASSIVE, SIPHON ACTUATED, RADIAL FLOW, AND SELF CLEANING. RADIAL MEDIA DEPTH SHALL BE 7-INCHES. FILTER MEDIA CONTACT TIME SHALL BE AT LEAST 38 SECONDS. C:)J SPECIFIC FLOW RATE SHALL BE 1 GPM/SF (MAXIMUM). SPECIFIC FLOW RATE IS THE MEASURE OF THE FLOW (GPM) DIVIDED BY THE MEDIA J c O SURFACE CONTACT AREA (SF). MEDIA VOLUMETRIC FLOW RATE SHALL BE 6 GPM/CF OF MEDIA (MAXIMUM). O � 2 GENERAL NOTES 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. ry 2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED O SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com I- 3. STORMFILTER WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS cf) DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF PROJECT. U 4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0'- 5', AND GROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 LOAD RATING AND BE CAST WITH THE CONTECH LOGO. Z N q 5. STORMFILTER STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 AND AASHTO LOAD FACTOR DESIGN METHOD. O INSTALLATION NOTES ±'aug A. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS ARE SITE -SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE y SPECIFIED BY ENGINEER OF RECORD. 93 z `U E O� € B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STORMFILTER STRUCTURE. �J111I W C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND ASSEMBLE STRUCTURE. A015� D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET PIPE(S). ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES. E. CONTRACTOR TO PROVIDE AND INSTALL CONNECTOR TO THE OUTLET RISER STUB. STORMFILTER EQUIPPED WITH A DUAL DIAMETER 0 - HDPE OUTLET STUB. IF OUTLET PIPE IS LARGER THAN 8 INCHES, CONTRACTOR TO REMOVE THE 8 INCH OUTLET STUB AT MOLDED IN DATE: SCALE CUT LINE. COUPLING BY FERNCO OR EQUAL AND PROVIDED BY CONTRACTOR. 04/25/23 3/8" = 1'-01, F. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT CARTRIDGES FROM CONSTRUCTION -RELATED EROSION RUNOFF. DESIGNED DRAWN G. CONTRACTOR TO INSTALL SUPPLIED PLUG IN CONSTRUCTION FLOW BYPASS WHEN SYSTEM IS BROUGHT ON LINE (PRESSURE FIT ONLY, BY BY DO NOT GLUE)' CHECKED: APPROVED: STRUCTURE WEIGHT CONTECH PROJECT No.: SEQUENCE No.: APPROXIMATE HEAVIEST PICK = 6000 LBS. OF 2 PIECES BARG 742863 10 BASE SECTION SHIPPED WITH CARTRIDGES INSTALLED PROPOSAL LAYOUT 1A SHEET: 1 MAX FOOTPRINT = 04'-10" DRAWING 5761 / 452888 1 of FINISHED GROUND EDGE RESTRAINT TO BE INSTALLED ALONG ALL EXTERNAL EDGES OF PAVERS AT TRANSITION TO FINISHED GROUND. d d a ° SEGMENTAL PERVIOUS PAVERS e d d ° d d ° Q d ° ° d ° d ° d° dd °d dd d d °d d MIN 9 INCHES WASHED STONE (#57 OR EQUIVALENT) -III I � IIIII � IIIII � II III-III-III-1 I - III -III -III PREPARED SUBGRADE PERVIOUS PA VER DETAIL NTS CONSTRUCTION SEQUENCE FOR PERVIOUS CONCRETE/PAVERS: STEP 1 - ENSURE ACCEPTABLE CONDITIONS FOR CONSTRUCTION STEP 2 - UNDERCUT AREAS AND REPLACE WITH SAND, INSTALL MONITORING WELL STEP 3 - PLACE AND COMPACT AGGREGATE BASE STEP 4 - INSTALL PAVER COURSE STEP 5 - PROTECT THE PAVERS THROUGH PROJECT COMPLETION * SEQUENCE ABOVE SHOULD BE UTILIZED AFTER OTHER SITE IMPROVEMENTS IN AREA WHERE PERVIOUS CONCRETE/PAVERS WILL BE INSTALLED HAVE BEEN COMPLETED AND WHEN HEAVY EQUIPMENT WILL NO LONGER BE MOVING ONTO THE AREA WHERE THE PERVIOUS MATERIAL WILL BE INSTALLED. ** REFERENCE NCDENR STORMWATER BMP MANUAL PART C. SECTION C-5 FOR EXPANDED PROCEDURES UNDER EACH STEP LISTED ABOVE. 6" SDR-35 INV = 9.0 2" SDR-21 INV = 9.0 CmSD ENGINEERING LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. 80X 4041 WILMINGTON, NC 28406 (910) 791-4441 Z J 0 J z 0 r � E =o � goy � E'E � E c aa� as 2 d�eW E a-- z a di:F; aaa a ��a &33a _€ _ -; s a o - d- J �00 W � (J Z �LUz Q p �UZ J � J O _J QL Z W O STUB INFORMATION PLAN VIEW \\\\.��N C.... ��` O� 'F E S S % O''• '�/ 'ii SEAL PIECE STUB INVERT SYSTEM INVERT 6"0 STUB Al 12.00 12.00 3 FT x 5 FT PRECAST CONCRETE BOX _ = 025483 = 6"0 STUB A3 14.00 12.00 %z 1'-7" 6 6"0 STUB 61 5- 31- 23 llllllllsllllll\\\\`\\``\\\ 6"0 STUB B1 15.50 12.00 8" 0 STUB B3 14.00 12.00 6"0 STUB C1 14.00 12.00 D D C o N 28'-0° 15'-9Yz' 6"0 STUB C1 m m o D c� iD U) m 0 co co m CDo� �m m 00 RISER INFORMATION PIECE RIM ELEV. SYSTEM INVERT 30" 0 RISER A2 18.00 12.00 30" 0 RISER B2 18.00 12.00 *EOR TO CONFIRM ALL ELEVATIONS NOTES • ALL RISER AND STUB DIMENSIONS ARE TO CENTERLINE. • ALL ELEVATIONS, DIMENSIONS, AND LOCATIONS OF RISERS AND INLETS, SHALL BE VERIFIED THE UNDERSIGNED HEREBY APPROVES THE ATTACHED BY THE ENGINEER OF RECORD (EOR) PRIOR TO RELEASING FOR FABRICATION. (P5) PAGES INCLUDING THE FOLLOWING: ASSEMBLY • ALL FITTINGS AND REINFORCEMENT COMPLY WITH ASTM A998. • PIPE STORAGE = 1,558 CF SCALE: 1" = 10' • MAINLINE PIPE GAGE = 14 • ALL RISERS AND STUBS ARE 23/3" xy" CORRUGATION AND 16 GAGE UNLESS OTHERWISE • WALL TYPE =SOLID LOADING: H2O NOTED. • DIAMETER = 48" PIPE INV. = 12'± • RISERS TO BE FIELD TRIMMED TO GRADE AS REQUIRED, BY CONTRACTOR. • FINISH = ALT2 • CORRUGATION = 2 2/3x1/2 • QUANTITY OF PIPE SHOWN DOES NOT PROVIDE EXTRA PIPE FOR CONNECTING THE SYSTEM TO EXISTING PIPE OR DRAINAGE STRUCTURES. OUR SYSTEM AS DETAILED PROVIDES NOMINAL INLET AND/OR OUTLET PIPE STUB FOR CONNECTION TO EXISTING DRAINAGE FACILITIES. IF ADDITIONAL PIPE IS NEEDED IT IS THE RESPONSIBILITY OF THE CONTRACTOR. CUSTOMER DATE • ALL ACCESS CASTINGS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ARE NOT SUPPLIED BY CONTECH. me design ana information shown on this drawing is p,o,ided n eng'Ineered sownons uc p•conreoh•I. Neuher m'Is comecetothep,o;e"owner engineerandcon(re-hi, tlrawing.norry thereof repreduedo, OP21IONTECH A, &\IVIE~A _``�'' - �-- "- 48" O UNDERGROUND DETENTION SYSTEM - 742863-015 PROJECT No 742863 SEQ, No.' 015 DATE: 4/24/2023 DESIGNED DRAWN: .. th,puaed modified in any mannerwimoutme priorwrinemm�sentor��40 `fir• Comeoh. Failureto oomply'Is done oohs uses own nsKand Contech expressly disclaims any liability or responsibility for ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS 6600 CARMEL TRAIL BY BY ouch uae If dlscre beN+ the Iled Information which panaes s°pp upon www.ContechES.com CONTECH W I L M I N G TO N N C CHECKED: APPROVED: the tlrawing Is basetl and actual veld conditions are encountered s -work progresses. these discrepanaes must be reposed � Contech immediately for re-evaluation of the design. Contech 7037 Ridge Road, Hanover, MD 21076 PROPOSAL , SITE DESIGNATION: CMP BY SHEET NO.. cceptanoliabilityro,designsbaaedonmiaaingincompleteor 443-457-1500 410-740-8490 410-740-8492EAx DRAWING QE P5 AR DATE REVISION DESCRIPTION BY atelnfmmanonsuppfiled byothera TRAFFIC RATED CAP FLUSH WITH FINISHED SURFACE d d d O ° d ° d ° d O a d d °d d d °d 10 0 O0 0 0O O O OOOOOOOO O O O O O OIr r� x 2 FT BELOW BASE 4" PERFORATED PVC BOTTOM O O MONI TORING WELL NTS GRATE TOP ELEV. = 12.0 GROUND ELEV. ELEV. = 11.5 6" SDR-35 6" SDR-35 INV=9.0 INV = 9.0 o 2 FT SUMP FOR CLEANOUT BOX /E= 70 0 O 0000 0000 00( SECT/ON VIEW FLOAT ELEV. = 9.0 2" SDR-21 INV = 9.0 1 FT MIN OFF BOTTOM BOTTOM OF BOX = 6.5 000 ont 6" ABC STONE MIN MIN (4) 4" HOLES CORED' THROUGH BOTTOM OF BOX PUMP MODEL: TSURUMI NK2-15 110 V, WITH TS-304 FLOAT SEMI -VORTEX DEWATERING PUMP PUMP STRUCTURE NOT TO SCALE 10 5 0 10 20 30 SCALE IN FEET.• 1 "= 10' N N I�- p 3 3 >- m W o � Y Q m ZE m W o_ J W W ci a S S O N Z W DA TE.• 4-28-23 HORZ. SCALE.- 1 " = 10' VERT. SCALE.- N/A DRAWN BY' RL W CHECKED BY' HSR PROJECT NO.: 22-0622 Sheet No. 2 Of 2