HomeMy WebLinkAboutNCG030098 DMR SW (4)Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COVERAGE NO. NCG03 O 013 J6
FACILITY NAME
COUNTY fflle
PERSON COLLECTING SAMPLES ov�e
LABORATORY A -r L A b Lab Cert. # 2a
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 201
SAMPLE PERIOD ❑,Jan -June ❑ July -Dec
or P&Monthlyl r i*month
R/B YWOTO CLASS ❑ORW HQW ❑Trout ❑PNA
EC ❑Zero -flow [:]Watersupply [:]SA
MAY 0 7 2015 40ther GIkss G
u�NTRAL FIL EASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -i
DWR S _CTI
❑ No discharge this period?z
Date Sample
Outfall No. Collected'
(mo/dd/yr)
24-hour rainfall pH,
amount, Total Suspended Solids Standard units Copper
Inches3
Lead
Non -Polar O&G/Total Toxic
Zinc Total Petroleum Organicss
Hydrocarbons
Benchmarks =__> _
- 100 mg/L or 50 mg/L° 6.0-9.0 0.007 mg/L
0.03 mg/L
0.067 mg/L 15 mg/L 1 mg/L
a1 C, ly i17
7,i2
.dal
.Z 17
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic
crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent
Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use
the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use
the definition found in 40 CFR 469.31).
PERMIT DATE: 11/1/2012-10/31/2017 SWU-245, LAST REVISED 10/25/2012
PAGE 1 OF 3
. Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan, may so certify, and the requirement for TTO monitoring may
be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For
those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I
certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater
runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan
included in the Stormwater Pollution Prevention Plan."
Name (Print na e)
Title (Print title)
r
s l �
(Si ature) fbatei
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format.
When results are below the applicable limits, they must be reported in the format. "<XX mg/L!' where XX is the numerical value of the detection limit, reporting
limit, etc. in mg/L. ,
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT -HEM) Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L 100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
PERMIT DATE: 11/1/2012-10/31/2017 SWU-245, LAST REVISED 10/25/2012
PAGE 2OF3
L -
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN S FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES NO ❑
IF YES, HAVE YOU CONTACTED,14E DWQ RE IONAL OFFICE? YESNO ❑
REGIONAL OFFICE CONTACT NAME:O ✓1�l��7 /y
Mail an oriainal and one copv of this DMR, includina all "No Discharae" reports, within 30 days of receipt of the lab results (or at end of monitorina period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
of
(D te)
PERMIT DATE: 11/1/2012-10/31/2017 SWU-245, LAST REVISED 10/25/2012
PAGE 30F3