HomeMy WebLinkAboutNC0036269_LRR Pump Station_20240123ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
Environmental Quality
January 24, 2024
Mr. T. Mark Fowler, Director
Water and Sewer Authority of Cabarrus County
232 Davidson Highway
Concord, NC 28027
SUBJECT: Project Review for Authorization to Construct #036269A03
Lower Rocky River Pump Station
Permit WQCS00009
Cabarrus County
Mr. Fowler:
On January 17, 2024, Roberto Scheller of this Office conducted an on -site inspection at the subject
facility. This inspection was conducted to ensure compliance with A to C #036269A03. A
Certification of Completion dated January 11, 2024, was received in the Mooresville Regional
Office. At the time of inspection, the Lower Rocky River Pump Station was operational. The
following items were noted to have been installed:
Two (2) 6,944 GPM submersible influent pumps with VFDs and one (1) 2,500-gallon bladder
sewage surge tank, in -kind replacement of four (4) 6,944 GPM submersible influent pumps,
replace of existing vacuum breakers, replacement of HVAC systems in electrical room and all
related piping and controls. It was noted that electricians were working on -site at the time of
inspection.
We wish to thank the operating staff for their assistance regarding this inspection. If you should
have any questions, please do not hesitate to contact myself or Roberto Scheller at (704) 235-
2204 or roberto.scheller@ncdenr.gov.
Sincerely,
DocuSigned by:
E
w u N P44-t4
F161 FB69A2D84A3...
Andrew H. Pitner, P.G., Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORTH CARCLINA
919.707.9000