Loading...
HomeMy WebLinkAboutNC0036269_LRR Pump Station_20240123ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality January 24, 2024 Mr. T. Mark Fowler, Director Water and Sewer Authority of Cabarrus County 232 Davidson Highway Concord, NC 28027 SUBJECT: Project Review for Authorization to Construct #036269A03 Lower Rocky River Pump Station Permit WQCS00009 Cabarrus County Mr. Fowler: On January 17, 2024, Roberto Scheller of this Office conducted an on -site inspection at the subject facility. This inspection was conducted to ensure compliance with A to C #036269A03. A Certification of Completion dated January 11, 2024, was received in the Mooresville Regional Office. At the time of inspection, the Lower Rocky River Pump Station was operational. The following items were noted to have been installed: Two (2) 6,944 GPM submersible influent pumps with VFDs and one (1) 2,500-gallon bladder sewage surge tank, in -kind replacement of four (4) 6,944 GPM submersible influent pumps, replace of existing vacuum breakers, replacement of HVAC systems in electrical room and all related piping and controls. It was noted that electricians were working on -site at the time of inspection. We wish to thank the operating staff for their assistance regarding this inspection. If you should have any questions, please do not hesitate to contact myself or Roberto Scheller at (704) 235- 2204 or roberto.scheller@ncdenr.gov. Sincerely, DocuSigned by: E w u N P44-t4 F161 FB69A2D84A3... Andrew H. Pitner, P.G., Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CARCLINA 919.707.9000