Loading...
HomeMy WebLinkAbout20071441 Ver 2_Modifications_20071102October 31, 2007 CHARTER PROPERTIES INC. NC Division of Water Quality 401 Oversight and Express Permits Unit Attn: Mrs. Cyndi Karoly / Mr. Ian McMillan 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 Re: 401 Certification for Prosperity Village Mecklenburg County IivVQ#0'7-i441VZ Dear Sir, ~i~; ~ti..r ,, ~~, 1--~'- kra~ +";lii G L~l~l tt r.4:.': y, i!li.l.:i ~.ire~~'~if~;C1?.41.:1'1 Charter Properties, Inc is the developer of this proposed site located oft Ridge Road, just east of Prosperity Village Road in Charlotte, NC. Your department recently issued an "Approval of 401 Water Quality Certification with Additional Conditions" for this property. One of the additional conditions required mitigation for the stream impacts and we are in the process of making arrangements with the Ecosystem Enhancement Program to allow for the proper payment to that program for the required mitigation. Another condition i)f your certification approval (Condition # 7) was that we submit a "... Final, written storm watel- management plan..." which is to include our project construction plans, specifications, BMP worksheets, associated calculations and the project Operations .and Maintenance Agreement within 60 days of the issuance of the certification, which was dated October 22, 2007. Because of the complexity of the overall project (which will include three separate, public roads that must be built for the City of Charlotte and NCDOT) and the time needed to obtain proper City and NCDOT plan approvals, it is not possible for the final plans and specifications to be available within this requested time frame. We therefore request an extension of the deadline to submit the project storm water management plan until approximately June. 15`x', of 2009. This extension would allow our land planners and civil engineers to properly complete the full and detailed design of the required public roads and the proposed apartment site, as well as obtain needed design input and approvals from the NCDOT, the City of Charlotte DOT, and the City Planning and Engineering staffs for the roads and apartment site. This extension would help avoid potential re-submittal(s) of future modifications to the stone water management plan which may result if our management plan is submitted prior to review/approval by the City and/or NCDOT. Please confirm your approval of this deadline extension request by signing and returning a copy of this letter to our office. Sincerely, //' ~~,~,t e~ L. H t ~anL~vvY .P. Construction Services Charter Properties, Inc. The requested extension to the deadline for submittal of the final stone water management plan for this Ridge Road project, from December 21,.2007 to June 15`x, 2009, is approved. North Carolina Division of Water Quality SUITE 215 • 1520 SOUTH BOULEVARD, CHARLOTTE, NC 28203-4724 MAIL ADDRESS: P.O. BOX 37166, ZIP 28237-7166 (704) 377-4172 FAX: (704) 333-4532