HomeMy WebLinkAboutVer _DCM Permit_20141218 (2)Permit Class
RENEWAL
i
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
ikrmit
Permit Number
169 -08
oL9 @�Q��
JUL
5 2015 '
DENR Wp fER kk '---
401 RUF ' �4U�
EFt FER.; � DES
_ TTI� NW .
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A -118
X Excavation and /or filling pursuant to NCGS 113 -229
Issued to Cape Lookout Ferry Service, Inc., 151 A HWY 24, Morehead City, NC 28557
Authorizing development in Carteret County at adi. to Back Sound. at 1698 Island
Road. in Harkers Island , as requested in the permittee's letter dated 5/19/15
This permit, issued on Julv 6. 2015 ., is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original Permit No. 169 -08, which was transferred on 2/22/11, as
well as all subsequent modifications, refinements and renewals, and copies of all documents shall be
readily available on site when Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
IT
-D Braxton C. Davis, Director
vision of Coastal Management
This permit and its conditions are hereby accepted.
March 3, 2017
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
x
x