Loading...
HomeMy WebLinkAboutNCC240475_ESC Approval Submitted_20240220 e-ak.4 Planning & Development Department Er �.:-' William Jason Guess i PEOPLE TO MATCH j Erosion Control Officer OUR MOUNTAINS 4,ORTH CARO�'�aP LETTER OF APPROVAL November 21, 2023 NOTICE— This is not a permit 7 Mountain Estate, LLC Mr. Dominik Goertz 1323 Cordova Avenue Fort Meyers, FL 33901 RE: Project Name: 7 MOUNTAIN Acres Approved: 16.0 AC Project#: ER02023-00028 County: BUNCOMBE City: BARNDARDSVILLE Address: NORTH FORK ROAD River Basin: FRENCH BROAD Stream Classification: WS-II, HQW, TR Submitted By: DOMINIK GOERTZ Date Received by: NOVEMBER 13, 2023 Plan Type: RESIDENTIAL Dear Sir/Madam, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A one-time six-month extension can be granted for good cause shown upon receiving a written request from you before the expiration of the approved plan. This letter of approval is being issued prior to the issuance of the stormwater permit due to concurrent reviews, but any land disturbing activity associated with this project shall not begin prior to issuance off all required permits including the stormwater permit and the land disturbing permit. , F 411 -.W 46 Valley Street—Asheville, NC 28801 p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org J�GoMBE coGti� m ,� Planning & Development Department t v40. ,:-- , William Jason Guess 1 PEOPLE TO MATCH j Erosion Control Officer OUR MOUNTAINS NORTH CAR''-��P "As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC.:" Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. .0... "al 46 Valley Street—Asheville, NC 28801 p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org ., ,� Planning & Development Department 'y� William Jason Guess PEOPLE TO MATCH]tio- 3. Erosion Control Officer OUR MOUNTAINS NO'`'TH CAROB-��P Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, • `,..\ahismovib W. Jason Guess Erosion Control Officer Enclosures: NPDES NCGO1 Fact Sheet Cc: Civil Design Concepts, PA MODIFICATIONS FOR APPROVAL Project name: 7 MOUNTAIN Project No. ER02023-00028 Location: NORTH FORK ROAD Date Approved: NOVEMBER 21, 2023 Person financially responsible: MR. DOMINIK GOERTZ 1. Please submit to this office a copy of the Buncombe County Watershed Permit and the Buncombe County Stormwater Management Permit prior to issuance of the Buncombe County Soil Erosion and Sedimentation Control Permit. F 411 ...W 46 Valley Street—Asheville, NC 28801 p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org