HomeMy WebLinkAboutNCC202505_NOT Closeout Documents_20240216 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
County: Nash Project: Cash Solar,LLC River basin: Tar-Pamlico
Person financially responsible:Pine Gate Renewables,LLC-Ray Shem,Chief Project#: NASH-2020-010
Financial Officer
Address: 130 Roberts Street,Asheville,NC 28801
1. Project Location: Hoke Lane,Town of Red Oak
Pictures: No
2. Weather and soil conditions: warm dry workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Joe Deweese Title: SWPPP Inspector
Inspection report: Sent Report Date given/sent: November 16,2022
9. Corrective action needed:
10. Comments: This site will be closed in our office and Permanent ground cover sufficient to restrain erosion
has been established.No additional self-monitoring or self-inspections are required.Project is
in compliance and released under the SPCA.Termination of coverage under the NPDES
General Stormwater Permit for Construction Activities(NCG01)must be requested by the
permittee via a Notice of Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Thaddeus Valentine Others present: Lauren Garcia
Date of inspection: November 08,2022 Time arriving on site: 1 1:40 AM Time leaving site: 12:25 PM
CC: