HomeMy WebLinkAboutNCC211874_MODIFICATION Supporting Doc CLOSEOUT LOTS 7 9 175 176_20240220 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
County: Harnett Project: Coble Farms-7,9, 175, 176 River basin: Cape Fear
Person financially responsible:NVR,Inc.-Joe Schmidtke,VP Project#: HARNE-2022-095
Address: 5734 Trinity Road,Suite 200,Raleigh,NC 27607
1. Project Location: SR 1415,Angier
Pictures: No
2. Weather and soil conditions: mostly sunny,workable soils Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: August 22,2022
9. Corrective action needed:
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGO 1)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https:Hedocs.deq.nc.gov/Fonns/NCGO1-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Lori Britt Others present:
Date of inspection: August 18,2022 Time arriving on site: 10:19 AM Time leaving site: 10:35 AM
cc: