Loading...
HomeMy WebLinkAbout20140097 Ver 2_DCM Permit_20151021417 -A BROAD ST. P.O. BOX 3496 NEW BERN, NORTH CAROLINA 28564 -3496 ROBERT M. CHILES, P.E. ENGINEERS, CONSULTANTS & MARINE SURVEYORS Bridgeton Boatworks Project Narrative CAMA Major Permit Application for Bridgeton Marine, LLC ME EA BUSINESS: 252 -637 -4702 FAX 252- 637 -3100 office@robertmchilesne.com The Bridgeton Boatworks site is located at 103 D Street in the town of Bridgeton, NC and is immediately north of the property where the previous Neuse River Bridge met the shoreline and on the east bank of the Neuse River. The primary Neuse River channel is located approximately 4,900 feet south and across the river. The project site is developed with buildings and paved areas that are used as a boat repair facility. There are recently reconstructed boat travel lift piers, docks, boat ramp, and bulkheaded shoreline stabilization onsite. This project proposes to remove a derelict existing dock, extend the bulkhead along the waterfront of the recently acquired adjoining parcel, and add a second set of travel lift piers with a 12 by 12 platform attached to the river end of the upstream pier. The proposed travel lift piers will be constructed so that they are approximately 90 feet away from the nearest riparian property line. The proposed bulkhead will replace an existing and failing concrete block bulkhead and tie it to the bulkhead on the other portion of the property. Minor grading behind the proposed bulkhead and construction of a paved apron is proposed immediately inland from the proposed travel lift pier. Additionally, two finger piers of the recently constructed docks will be extended to a length of 60 feet, for mooring longer vessels. MECHANICAL, CIVIL, AND MARINE ENGINEERING COMMERCIAL. INDUSTRIAL. MARINE, AND RAILROAD FACILITIES DESIGN FORENSIC ENGINEERING AND FAILURE ANALYSIS MARINE HYDROGRAPHIC AND LAND SURVEYS BOUNDARY SURVEYS AND MAPPING SERVICE DCM MP -1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name Project Name (if applicable) BRIDGETON MARINE, LLC BRIDGETON BOATWORKS Applicant 1: First Name MI Last Name CHARLES E DOUTHIT Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed Mailing Address PO Box City 1200 TRILLIUM CIRCLE Raleigh ZIP Country Phone No. 27606 USA 919 - 816 -0010 ext. N/A Street Address (if different from above) City State 103 D STREET Bridgeton NC Email cdouthit@bridgetonboatworks.com 2. AgentlContractor Information Business Name Robert M. Chiles, P.E. Agent/ Contractor 1: First Name MI Last Name ROBERT M. CHILES Agent/ Contractor 2: First Name MI Last Name Mailing Address ZIP 28564 3496 FAX No. 252 637 3100 Street Address (if different fmm above) 417 -A BROAD STREET Email bob@robertmchilespe.com PO Box 3496 Phone No. 1 252 - 637 -4702 ext. N/A Contractor If City New Bern <Form continues on back> FAX No. City New Bern Phone No. 2 State NC State NC 27606 ZIP 28519- State NC ext. ZIP 28560- 282- 806 -28U8 ., 1.888.4r"{CfUAZT ., tv av �,v.nccaastalmanage ,ient.ne# Form DCM MP -1 (Page 2 of 4) 3. Project Location County (can be multiple) CRAVEN Street Address 103 D STREET (ALSO INCLUDES LOT AT 101 A ST) APPLICATION for e Major Development Permit State Rd. # N/A Subdivision Name City State Zip D ST: NONE LISTED & A ST: 9 -10 DOWDY SUB BRIDGETON NC 28519- Phone No. Lot No. (s) (if many, attach additional page with list) 252 - 633 - 1090 ext. N/A CRAVEN CO TX ID #'S: 2- 004 -113, &, 2- 001 -114 a. In which NC river basin is the project located? NEUSE c. Is the water body identified in (b) above, natural or manmade? ®Natural ❑Manmade ❑Unknown e. Is proposed work within city limits or planning jurisdiction? ®Yes ❑No 4. Site Description a. Total length of shoreline on the tract (ft.) 444 FT. c. Size of individual lot(s) N /A, (If many lot sizes, please attach additional page with a list) e. Vegetation on tract GRASS b. Name of body of water nearest to proposed project NEUSE RIVER d. Name the closest major water body to the proposed project site. NEUSE RIVER L If applicable, list the planning jurisdiction or city limit the proposed work falls within. BRIDGETON, NC b. Size of entire tract (sq.ft.) 156,696 +/- SO FT d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 5 FEET PLUS ®NHW or ❑NWL f. Man -made features and uses now on tract BUILDINGS, COMPACTED GRAVEL, AND PAVEMENT, BOAT REPAIR YARD, TRAVEL LIFT, BOAT RAMP, AND DOCKS. g. Identify and describe the existing land uses adjacent to the proposed project site. ABANDONED US HWY 17 / NC HWY 55 RIGHT -OF -WAY ADJOINING PROPERTY TO THE SOUTH, RESIDENTIAL LOT ADJOINING PROPERTY TO THE NORTH, "A" STREET ON THE EAST, AND NEUSE RIVER ON THE WEST h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? WATERFRONT COMMERCIAL (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> �57- ED2 -2 &Utt •J- 88R•7RC*.3 r1S'f .. �ni �nr w.nccoasta!vn ci rragem ^nt.r:et -Form DCM MP -1 (Page 3 of 4) m. (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (iii) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) n. Describe existing wastewater treatment facilities. PUBLIC SANITARY SEWER o. Describe existing drinking water supply source. PUBLIC WATER SUPPLY p. Describe existing storm water management or treatment systems. NONE 5. Activities and Impacts a. Will the project be for commercial, public, or private use? APPLICATION for Major Development Permit ❑Yes SNo []Yes SNo ❑Yes ❑No ®Commercial ❑Public/Government ❑Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. PURPOSE IS TO RE- ESTABLISH THE USE OF THE LOCATION AS A BOAT REPAIR FACILITY WITH TRAVEL -LIFT AND DOCKS. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. EXCAVATOR, DUMP TRUCK, AND COMPACTOR USED FOR UPLAND DEVELOPMENT. PILES FOR TRAVEL -LIFT PIER & BULKHEAD INSTALLED FROM BARGE MOUNTED AND LAND BASED EQUIPMENT. d. List all development activities you propose. CONSTRUCT NEW TRAVEL -LIFT PIER, AND REPLACE FAILING BULKHEAD, EXTEND (2) FINGER PIERS TO PROVIDE MOORING FOR LONGER VESSELS. e. Are the proposed activities maintenance of an existing project, new work, or both? NEW WORK f. What is the approximate total disturbed land area resulting from the proposed project? g. Will the proposed project encroach on any public easement, public accessway or other area that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. STORMWATER RUNOFF EXISTING, AND PROPOSED. i. Will wastewater or stormwater be discharged into a wetland? If yes, will this discharged water be of the same salinity as the receiving water? j. Is there any mitigation proposed? If yes, attach a mitigation proposal. <Form continues on back> 3/4 ❑Sq.Pt or ®Acres ❑Yes SNo ❑NA []Yes SNo ❑NA ❑Yes ❑No SNA ❑Yes SNo ❑NA 252- 808 -2808 .. 1- 888- 41l .. u'✓ww.nccoaslalmanagernen4.ne: Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6, Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application Instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such - owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name LANDFALL, LLC Phone No. 252- 637 -2958 CATHERINE W. TRABACCO, MANAGER Address 3714 BUTLER ROAD NEW BERN, NO 28560 -7008 Name NC DOT Phone No. 252- 514 -4716 MR. REED SMITH, P.E. DISTRICT ENGINEER Address 209 S. GLENBURNIE RD NEW BERN, NO 28560 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NC DIVISION OF COASTAL MANAGEMENT MAJOR PERMIT NO.: 17 -14 DEV. PERMIT SUBMITTED JAN. 2014 ISSUE DATE; FEBRUARY 24, 2014 h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed byproperty owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act, 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. 1 certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 7/Z-7 //.5 PrintNamefi?/ .0.,�, Signature e2u, Please indicate application attachments pertaining to your propose4project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts DCM MP -3 Upland Development ®DCM MP -4 Structures Information 252 - 808 -2308 .. 9- 888.4RCGA3ST ., www.nccoastalrnanageenent.ri Parcel ID Owner: Mailing Address Property Address Description : Lot Description Assessed Acreage Deed Reference : Recorded Survey Estate Number : Land Value : Improvement Value Total Value : City Name : Drainage District Land use Craven County Geographic Information System Craven County does NOT warrant the information shown on this page and should be used ONLY for tax assessment purposes. This report was created by Craven County GIS reporting services on 7/20/2015 10:40:24 AM 2 -004 -114 BRIDGETON MARINE LLC 1200 TRILLIUM CIR RALEIGH NC 27606 " 103 D ST HVVY17 &55 7712 1.343 Calculated Acreage : 1.350 2683 -0595 Recorded Date: 1 182008 $178,460 Tax Exempt: No $93,400 # of Improvements : 4 $271,860 BRIDGETON Fire tax District Special District: COMM -AUTO SERVICE /REPAIR Recent Sales Information SALE DATE Sellers Name Buyers Name Sale Type 1/18/2008 HARVEY BROTHERS BRIDGETON MARINE LLC STRAIGHT TRUCK STOP INC TRANSFER List of Improvements to Site Type of Structure Year Built 1950 1950 2010 2014 Sale Price $850,000 Base Area 1st Floor Value 2388 $45,700 888 $19,700 0 $23,900 0 $4,100 enba uoui. � }aa} 6b� 51 Via, P �5 rtL Ltl ti 4�3 r J v? f �x tf L� s io} ,��NO Pass �9 Pond uaQe 0 :•' . sasodmd qua sse a411 l usrn IVA saOP dew si4l uO uM °ils UO1 }ew�o} _- �aa�1�l� 4 rr '� a `V. ,ljfj \ a�� S b u� Y /5 � tb \w I;. Parcel ID Owner: Mailing Address Property Address Description : Lot Description : Craven County Geographic Information System Craven County does NOT warrant the information shown on this page and should be used ONLY for tax assessment purposes. This report was created by Craven County CIS reporting services on 7/20/2015 10:31:25 AM 2 -004 -113 A& BRIDGETON MARINE LLC 1200 TRILLIUM CIR RALEIGH NC 27606 101 AST TRACT 1 & 2 COMBINATION SURVEY FOR BRIDGETON 1712 MARINE LLC Assessed Acreage : 0.000 Calculated Acreage : 2.350 Value Deed Reference : 3203 -0286 Recorded Date : 6 11 2013 1959 Recorded Survey : 1 -59 -H $55,600 1975 1600 Estate Number : 2014 0 $36,400 Land Value : $312,000 Tax Exempt : No $15,300 2014 Improvement Value : $218,000 # of Improvements : 7 2014 0 Total Value : $530,000 City Name : BRIDGETON Fire tax District : Drainage District : Special District : Land use : COMM -AUTO SERVICE /REPAIR Recent Sales Information SALE DATE Sellers Name Buyers Name Sale Type Sale Price 6/11/2013 MOFFAT, DAVID W BRIDGETON MARINE LLC STRAIGHT $340,000 TRANSFER 6/28/2000 WALSH, JOHN VINCENT MOFFAT, DAVID W STRAIGHT $450,000 TRANSFER 9/7/1993 WALSH, JOHN VINCENT WALSH, JOHN VINCENT STRAIGHT $80,000 & KENDALL, TRANSFER 11/6/1986 BERNABI, LESLIE WALSH, JOHN VINCENT & LAND SALE $50,000 THOMAS & BARBARA K KENDALL, List of Improvements to Site Type of Structure Year Built Base Area 1st Floor Value 1988 6000 $96,800 1959 1950 $55,600 1975 1600 $5,100 2014 0 $36,400 2000 0 $15,300 2014 0 $5,500 2014 0 $3,300 t Gard h U d be Used u Form ®CM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline N W L) stabilization) Length N/A N/A N/A N/A N/A N/A N/A Width N/A N/A N/A Avg. Existing NIA N/A NIA Depth Final Project N/A N/A NIA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. c. (i) Does the area to be excavated include coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: 12. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. C. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner NIA N/A N/A N/A N/A NA NA N/A N/A NA NA N/A ®This section not applicable b. Type of material to be excavated. d. High - ground excavation in cubic yards. ®This section not applicable b. Dimensions of disposal area. d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands /marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB _ ❑WL ❑None (ii) Describe the purpose of disposal in these areas: 252- 808.2808 :: 1.8884RCUA,57 :: wvvvv.nccoastalrnanagemenLnet revised: 32/28/06 ro'u'te 1IBCM TIP-2 are welt, Wane ? 01' J) 3. SHORELINE STABILIZATION (If development is a wood groin, use MP -4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other: _ G. Average distance waterward of NHW or NWL V TO 2' e. Type of stabilization material: VINYL SHEET PILE g. Number of square feet of fill to be placed below water level. Bulkhead backfill 500 Riprap_ Breakwater/Sill Other i. Source of fill material. OFF -SITE PROVIDER Q. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? NYes ❑No [J NA If yes, (ii) Amount of material to be placed in the water 0 / NONE (iii) Dimensions of fill area 75'X 200' (APPROXIMATELY) (iv) Purpose of fill 15. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? FILL MATERIAL TRANSPORTED TO THE SITE WILL BE INSTALLED WHERE PROPOSED UPON ARRIVAL. C. (i) Will navigational aids be required as a result of the project? []Yes NNo ❑NA (ii) If yes, explain what type and how they will be implemented. El This section not applicable b. Length: 207' Width: N/A d. Maximum distance waterward of NHW or NWL: 2' f. (i) Has there been shoreline erosion during preceding 12 months? [-]Yes NNo ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. SOIL ❑This section not applicable b. (i) Will fill material be placed in coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑m ❑SAV ❑SB _ OWL NNone (it) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? BACKHOE, DUMP TRUCK, COMPACTOR, PILE DRIVER d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes NNo ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 252 -808 -2808 :: 'i- 8884RCOaST :: www.nccoestalmanactement.ri revised: 92125106 F©Fnq r r'NU7 u�fli s =c'. (ENCava_JOn MCI -, yH, tPa8ly 3 01 3) Date BRIDGETON BOATWORKS Project Name BRIDGETON MARINE, LLC Applicant Name Applicant. Signature /T r <<. y _1 G�.r.— 252 - 808 -2808 :: 1- 888- 4iRCOAST :: www.nccoastaimanaaemen8.ne1 revised; 92/26/06 For(m 0CM RN P-2 g EXCAVATNONand 'Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization) Length N/A N/A N/A N/A N/A N/A N/A Width N/A NIA N/A Avg. Existing N/A N/A NIA Depth Final Project N/A N/A N/A Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. C. (i) Does the area to be excavated include coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (VdL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. C. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ ❑WL ❑None (ii) Describe the purpose of disposal in these areas: N/A I NIA I N/A N/A N/A NA - NA N/A N/A NA NA NIA ® This section not applicable b. Type of material to be excavated. d. High - ground excavation in cubic yards. ®This section not applicable b. Dimensions of disposal area. d. (1) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (1) Does the disposal include any area in the water? ❑Yes ❑No ❑NA - (ii) If yes, how much water area is affected? 252 -808 -2808 :: 1- 8884RCOAST :: wurnr .nccoas4atmsaoaarnerauenE.ne4 revised: 12 125/06 l'"O V�,n 1c:)CH� Pf'] r =21 (E,— =va21ivn and UHII, *rave 2 v, S) 3, SHORELINE STABILIZATION (If development is a wood groin, use MP -4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑ Riprap ❑Breakwater /Sill ❑Other: _ c. Average distance waterward of NHW or NWL: V TO 2'. e. Type of stabilization material: VINYL SHEET PILE g. Number of square feet of fill to be placed below water level. Bulkhead backfill 500 Riprap Breakwater /S i I I Other i. Source of fill material. OFF -SITE PROVIDER 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ❑No DNA If yes, (ii) Amount of material to be placed in the water 0/ NONE (iii) Dimensions of fill area 75'X 200' (APPROXIMATELY) (iv) Purpose of fill 15. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? FILL MATERIAL TRANSPORTED TO THE SITE WILL BE INSTALLED WHERE PROPOSED UPON ARRIVAL. C. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. ❑This section not applicable b. Length: 207' Width: N/A d. Maximum distance waterward of NHW or NWL: 2' f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No DNA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. SOIL ❑This section not applicable b. (i) Will fill material be placed in coastal wetiands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. DOW ❑SAV ❑SB _ OWL ®None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? BACKHOE, DUMP TRUCK, COMPACTOR, PILE DRIVER d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No DNA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 252 - 808 -2808 :: revised: 12/26/06 r,'O7� FTDC5TJ NJIF-2 (Excava' acn and F1111t, Yalga 3 0'e 3) Date BRIDGETON BOATWORKS Project Name BRIDGETON MARINE, LLC Applicant Name Applicant- Signature 252-803-2808 12/26/06 FFo®®rm pDC//Mpq MP -3 C�PLAINI® DEVELOPMENT (Construction and /or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. EXISTING / N/A c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land- disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes NNo ❑NA (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and /or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 49,500 SO FT AEC AREA. 71.6 % EXISTING IMPERVIOUS. 80.3% PROPOSED IMPERVIOUS I. Give the percentage of the entire tract to be covered by impervious and /or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. EXISTING: 61.8 %. PROPOSED: 68.0% j. Describe proposed method of sewage disposal. NO CHANGE FROM EXISTING. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). NO CHANGE FROM EXISTING. b. Number of lots or parcels. N/A d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. < 1/2 ACRE FOR BULKHEAD, BACKFILL & TRAVEL LIFT PAVED APRON. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. COMPACTED GRAVEL AND PAVEMENT (ASPHALT OR CEMENT CONCRETE) h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ®Yes ❑No ❑NA (ii) If yes, list the date submitted: CONCURRENT k. Have the facilities described in Item (i) received state or local approval? ❑Yes ❑No NNA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes NNo RNA If yes, attach appropriate documentation. 252. 808 -28082 :: 1. 888- 4RCOASY :: www.nccoastalmanagement.net revised: 12/26/06 FF07N,,`7 ®CZN hV o3 (Upland IDevelopnas ent, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) SAME AS EXISTING o. When was the lot(s) platted and recorded? ORIGINAL: PRIOR TO 1950. COMBINATION / RECOMBINATION PLAN 101 & 203 A STREET RECORDED MAY 6, 2015, PLAT CAB I, SLIDE 59 -H, (DB 3353, PG 826) 7 1a--7 / S Date If r BRIDGETON BOATWORKS Project Name BRIDGETON MARINE, LLC Applicant Name Applicant Signature rnxlf%A$, Gn a"-w n. (i) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA 252 -808 -2808 :: 1. 888- 41RCCASg' :: vvvvvv.nccoasta0marravamen2aiet revesect: 122/26106 Form DCM MP -4 (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY /MARINA CHARACTERISTICS ❑This section not applicable a. (i) Is the docking facility /marina: b. (i) Will the facility be open to the general public? ®Commercial ❑Public /Government ❑Private /Community ❑Yes NNo c. (i) Dock(s) and /or piers) (i) Proposed Travel Lift Rails d. (i) Are Finger Piers included? ®Yes ❑No (ii) Number (it) Number 2 If yes: (iii) Length (iii) Length 170' (ii) Number 2 (iv) Width (iv) Width 4'& 7' (iii) Length EXTEND 40 FT. (v) Floating ❑Yes ❑No (v) Floating NO (iv) Width MATCH EXISTING (v) Floating ❑Yes ENo e. (i) Are Platforms included? EYes ❑No f. (1) Are Boatlifts included? ❑Yes ENo If yes: If yes: (ii) Number 1 (ii) Number (iii) Length 12 (iii) Length (iv) Width 12 (iv) Width (v) Floating ❑Yes ENo Note: Rooted areas are calculated from dripline dimensions. I (i) Number of slips proposed h. Check all the types of services to be provided. UNCHANGED E Full service, including travel lift and /or rail, repair or (ii) Number of slips existing maintenance service 4 ❑ Dockage, fuel, and marine supplies ❑ Dockage ( "wet slips') only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and /or channel EOpen water; no dredging required ❑Other; please describe: k. Typical boat length: 42 FT +/- m. (i) Will the facility have tie pilings? EYes ❑No (ii) If yes number of tie pilings? 5 j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). MIXED TYPES I. (i) Will the facility be open to the general public? ❑Yes ENo 252 -808-2808 :: 1- 888- 4RCOAST :: www.ncr,;3 asta imanaciamant. net revised: 12127106 FOYM U�iSM MP-4 (Skraac9:utres, Pace a u4 ) 2. DOCKING FACILITY /MARINA OPERATIONS a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. 1 � � { [9 This section not applicable f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live- aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina /docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 252- 808 -2808 :: 1- 888-= 3RCOAS7 :: ovv +nri.ncooasfalrnananern2n!.n e: revised: 12/27106 i- i FQii-i!Yd DCP,a '311143 ='4, {'Sfinr eLr.ia�es, &aye S of A) n. Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina /docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina /docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) a. (i) Is the boathouse structure(s): ❑Commercial ❑PubliGGovernment ❑Private /Community (ii) Number _ (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) a. (i) Number (ii) Length _ (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) a. Length _ c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑PubliGGovernment ❑Private /Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing _ ®This section not applicable ®This section not applicable ®This section not applicable I b. Average distance from NHW, NWL, or wetlands ®This section not applicable b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252 - 808.2808 :: 1- 888- 41RCOAS f :: vran v.accoasealmanauem an ?.na; revised: 12/27/08 IrPorm., l POP -4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines NEW TRAVEL LIFT - APPROXIMATELY 95 FT, AND EXTENDED FINGER PIERS - 20 FT + / - TO NEAREST ADJACENT RIPARIAN PROPERTY LINES. Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body 5.000 TO 5.500 FT WIDE. (APPROXIMATE WIDTH OF NEUSE RIVER AT THIS POINT). e. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No ®NA (ii) If yes, explain what type and how they will be implemented. rl a. Give complete description: l/� / `7 / Date ✓ ✓✓ Y BRIDGETON BOATWORKS Project Name BRIDGETON MARINE, LLC Applicant Name Applicant Signature b. Proximity of structure(s) to adjacent docking facilities. 250 FEET FROM NEAREST DOCK ON AN UPSTREAM PROPERTY. d. Water depth at waterward end of structure at NLW or NWL 7 FT ®This section not applicable 252.802 -2308 :: 9. 888- 4RCOAST .: www.n_rcoastalmanageneni_neY revised: 92127106