Loading...
HomeMy WebLinkAboutSW6240202_Supplement-EZ Form_20240219 SUPPLEMENT-EZ COVER PAGE LOAD SUPDL EMENT FORMS I IPROJE INFORMATIONT - - - - il 1 Project jectectName Cotton Farms Phase 2 and 3 2 Project Area(aC) -_ _ -___ 105.84 - 3 Coastal Wetland Area(ac)___ - - i 4 Surface Water Area(et) - — - - -- - 5 Is this project High or Low Density? _- Low 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) , 7 Width of vegetated setbacks provided(feet) - 8 'Will the vegetated setback remain vegetated? - _ N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? _ N/A - 10 i Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System _ — - — -- —- - - - 12 Bioretention Cell _ -- — -- - 13 'Wet Pond - -14 Stormwater Wetland15 Permeable Pavement 16 Sand Filter17 Rainwater Harvestinqg(RV{IH)18_Green Roof19 Level Spreader-Filter Strip(LS-FS) - 20 Disconnected Impervious Surface(DIS) - 21 Treatment Swale 22 Dry Pond - - - — — -- -23 StormFilter - - - -- 24 Silva Cell25 Bs - 26 Filterra -- ILDaO SUPPLEMENT FORMS I DESIGNER CERTIFICATION 27 Name and Title: ,___ Kirby r Bell,Jr.Senior Project Engineer 28 Organization• —_ __ - Bass,Nixon and Kennedy,Inc 29 Street address: -_ ______- __6310 Chapel Hill Road _30 City,State.Zip: Raleigh,NC MO?----- --------- - 919-851-4422 31 Phone number�s): - -__ t. 32 Email: _ robbie.bell@bnkinc.com Certification Statement I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,,,n,tnnr r:q,r , , O CAPO ',, °,7.. .••.ESS/p'•' .<i SEALSi Lire o signer ziQ 14023 .••:A/GiNFe ,?•: r, R. gE� '''�.�4nuu rrpr..'�`````e Feb 13,2024 Sea] Date v1 DRAINAGE AREAS 1 1 Is this a high density project? No 2 If so,number of drainage areas/SCMs 0 3 Does this project have low density areas? _._ _ Yes 4 If so,number of low density drainage areas __ _1 Is all/part of this project subject to previous rule 5 I versions? —_ No • DRAINAGE AREA INFORMATION Entire Site LD 1 4 !Type of SCM — _ _ _ N/A 5 'Total drainage area(sq ft) 4,610,390 6 iOnsite drainage area(sq ft) _ 4,610,390 7 l,Offsite drainage area(sqft) 8 :Total BUA in project(sq ft) 548202 sf 'New BUA on subdivided lots(subject to permitting) 9 �(sq ft) 408800 sf I New BUA not on subdivided lots(subject to 10 .permitting)(st) ___ 139402 sf 11 j0ffsite BUA(sq ff1 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft)-Sidewalk(sq ft) -Roof(sq ft) 139402 sf -Roadway ft)-Future(sq ft) -Other,please specify in the comment box 'below(sq ft) New infiltrating permeable pavement on 13 ;subdivided lots(sq ft);New infiltrating permeable pavement not on 14 (subdivided lots(sq ft) _ I Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 I Existing BUA that is already permitted(sq ft) -- 17 Existing BUA that will be removed(sq ft) 18 Percent BUA _ 12% 19 Design storm(inches) 20 Design volume of SCM(cu ft) 21 Calculation method for design volume ;ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 !drainage area(s): _ Actual BUA%is 11.89.This form rounds up to 12%