Loading...
HomeMy WebLinkAboutSW5240201_Stormwater Narrative_20240219 • • f • 5410 Trinity Road P 919.866.4951 T I M M O N S GROUP Suite 102 F 919.859.5663 YOUR VISION ACHIEVED THROUGH OURS. Raleigh, NC 27607 www.timmons.com November 27, 2023 NC Dept of Enviro. Quality Raleigh Regional Office Attn: Jim Farkas 512 N. Salisbury Street Office 640 E Raleigh, NC 27604 Subject: CONSTRUCTION SEQUENCE/ NARRATIVE Project Name: Wrenn Farms County: Franklin City: Youngsville Dear Mr. Farkas, The proposed 183 lot Townhome subdivision, Wrenn Farms, will be constructed as one project with (1) one proposed Wet Pond SCM. The proposed SCM will also treat the future Wrenn Apartments site. SCM #1 will be constructed, as part of the subdivision improvements, to reduce the pre-to post- development peak flows conditions for the 10-, 25-year, 24-hour storm event of the proposed development. Additionally, this project will propose an 85% Total Suspend Solids removal and will treat the required Water Quality Volume per NCDEQ requirements. A pre-development and post-development hydrologic analysis was completed for the site using the NRCS (SCS) method. A hydraulic analysis was completed using Hydraflow modeling software to route these storm events through the proposed detention and outlet structures. The runoff from our project site discharges Richland Creek and is part of the Neuse River Basin — Phase II ETJ Area. The Town of Youngsville is not named Nutrient Sensitive Water Town however the site is in a Tipped County and requires post-construction stormwater permitting through NCDEQ to confirm Neuse Basin Rules, 15A NCAC 02H .1017, compliance. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES