Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5240201_Stormwater Report_20240219
WRENN FARMS •••••• STORMWATER IMPACT ANALYSIS TOWN OF YOUNGSVILLE, FRANKLIN COUNTY, NC T I M M O N S GROUP YOUR VISION ACHIEVED THROUGH OURS. i ' ¢y � �� • ' / fit' � Iix • .w k. FQ t. 4 r� r,x 4,4' s 47. ' le \II rr77_ hti�:� Iy si —r I' tif v r g „4-t„- o �.' I(:^ ti �' Mnsswood,84vd �.. j' ,, 9 I "*"4111 l77J77l *a.* 7/1 7 . I N•..., FEBRUARY 7, 2024 PREPARED FOR: PREPARED BY: ARS Wrenn Farms, LLC Timmons Group, NC License No. C-1652 1524 Canterbury Road 5410 Trinity Road, Suite 102 Raleigh, NC 27608 Raleigh, North Carolina 27607 Hampton Smith Mike Zaccardo, P.E. 919.866.5640 919.532.3281 phone 919.833.8124 fax hampton@canterburyconstruction.com mike.zaccardo@timmons.com www.tmmons.corn Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 Table of Contents SECTION A — PROJECT SUMMARY 3 Introduction 3 Stormwater Methodology 3 Stormwater Treatment and Detention 4 SECTION B— SITE MAPS 5 FIRMETTE FEMA Map 5 USDA Soils Map 5 SECTION C— DRAINAGE AREA MAPS 6 Pre-Development Peak Flow Exhibit 6 Post-Development Peak Flow Exhibit 6 Post-Development Culvert 3000 Peak Flow Exhibit 6 SECTION D— SCM DESIGN 7 SCM (Wet Pond) Design Calculations 7 Culvert 3000 Design 10 & 100 Year Events 7 SECTION E— RAINFALL DATA 8 SECTION F— STORM ANALYSIS— 100 SERIES 9 Storm Sewer Summary Report 9 Velocity Report— 2 YR 9 Inlet Gutter Spread Report—4" / HR 9 Hydraulic Grade Line Computation — 10 YR 9 SECTION G — STORM ANALYSIS— 200 SERIES 10 Storm Sewer Summary Report 10 Velocity Report— 2 YR 10 Inlet Gutter Spread Report—4" / HR 10 Hydraulic Grade Line Computation — 10 YR 10 SECTION J— HYDRAFLOW REPORT 11 Delineation Drainage Area Calculations 11 Culvert 3000 C Value Calculation 11 Hydraflow Report 11 Culvert HydraFlow Report 11 SECTION K— NITROGEN LOADING 12 Nitrogen Loading Calculations — SNAP Tool 12 .•••. • • fe www.timmons.com TIMMONS GROUP Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 Nitrogen Loading Exhibit 12 .•••••• • • TIMMONS GROUP I www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION A - PROJECT SUMMARY Introduction Wrenn Farms is a proposed townhome community comprising of 183 lots on 30.86 acres located at the intersection of NC-Highway 96 and US-Highway 1 in Youngsville, NC. The site is zoned MU-2 and will be served by Youngsville water and sewer. Richland Creek is located on site along the southern property boundary. The property is located within a FEMA Flood Zone X on Map 3720184300K. The property lies within the Neuse River Basin — Phase II ETJ Area that discharges to Richland Creek (Stream Index 21-21-(0.5), Classification C; NSW). Three (3) Points of Interest (P01) are identified on-site for the purpose of studying the pre- to post- development impacts on stormwater peak flows to offsite properties. POls are located along the northern, eastern, and southeastern boundaries of the site, as shown on the Pre- and Post-Development Drainage Area Maps in the appendices. In existing conditions, runoff generally flows from west to east, then into Richland Creek where it discharges off-site at POI 1 through Richland Creek. Stormwater measures are proposed on- site to control and treat the difference between the pre- and post-development peak runoff rates for the 10-, and 25-year, 24-hour storm event at each POI per Town of Youngsville and NCDEQ MDC requirements. The methodology, results, and supporting calculations of the analysis are provided within this report. Stormwater Methodology Stormwater conveyances are provided to meet the Town of Youngsville's requirements per NCDEQ to control gutter spread and minimum pipe sizes to control the required storm events. The SCS method and Hydraflow Storm Sewers Extension for Autodesk Civil 3D were used to model gutter spread and HGL calculations for each storm drain network. The results are provided in the appendices. The NRCS Method and Hydraflow Hydrographs Extension for Autodesk Civil 3D were used to model the pre- and post-development peak flows as well as proposed pond routing to POI 1. Time of Concentration (Tc) calculations were performed using TR-55 methodology for each POI and are provided within the Hydraflow Reports in the appendix. Curve Number (CN) calculations were performed using TR-55 methodology and are provided within the appendix. The results of the Hydraflow routings are provided in the section below. Reinforced Concrete Pipe (RCP) is specified for all proposed storm drainage pipe with a Manning's N-value of 0.013. The inlet types are show on the details sheet. .•.��.• • � • TIMMONS GROUP I www.timmons.com YOUN VISION A<HIl VLU iHRODUH OU R3. Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 Stormwater Treatment and Detention A pre-development and post-development hydrologic analysis was completed for the site using the NRCS (SCS) method. A hydraulic analysis was completed using Hydraflow modeling software to route these storm events through the proposed detention and outlet structures. The runoff from our project site discharges Richland Creek and is part of the Neuse River Basin — Phase II ETJ Area. The Town of Youngsville is not named Nutrient Sensitive Water Town however the site is in a Tipped County and requires post-construction stormwater permitting through NCDEQ to confirm Neuse Basin Rules, 15A NCAC 02H .1017, compliance One (1) wet pond is proposed to reduce the pre- to post-development peak flows conditions for the 10-, 25-year, 24-hour storm event of the proposed development. Additionally, this project will propose an 85% Total Suspend Solids removal and will treat the required Water Quality Volume per NCDEQ requirements. The results of the Hydraflow routing are provided below and supporting calculations are included in the appendices. For pond sizing and outlet elevation calculations for the SCM's, reference the "Pond Reports" provided within the Hydraflow section of the appendix. Pre & Post-Development Runoff Summary Point of Interest 1 Q10(cfs) Q25(cfs) Pre-Development 80.11 125.91 Post-Development with Detention 74.57 115.70 Reduction (%) -6.92% -8.11% Point of Interest 2 Q10(cfs) Q25(cfs) Pre-Development 24.64 35.76 Post-Development 4.32 5.95 Reduction (%) -82.47% -83.36% Point of Interest 3 Q10(cfs) Q25(cfs) Pre-Development 12.81 18.09 Post-Development 6.77 10.85 Reduction (%) -47.15% -40.02% ••••.. • • • TIMMONS GROUP I www.timmons.com YOUN VISION A<HIl VLU iHRODUH OU R3. Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION B - SITE MAPS FIRMETTE FEMA Map USDA Soils Map • 4 �s www.timmons.com TIMMONS GROUP National Flood Hazard Layer FIRMette - FEMA Legend 78°29'47"W 36°2'33"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT_ I it r J / . F- Without Base Flood Elevation(BFE) ` LL11J �� Zone A,V,A99 II '' . lll .J_, SPECIAL FLOOD With BFE or Depth Zone AE,AO,AH,VE,AR • Zone �+ 7 ch Ci;' HAZARD AREAS Regulatory Floodway II / '' '•.� re) IA • ' �' + '' �� I 0.2%Annual Chance Flood Hazard,Areas S -.� of 1%annual chance flood with average • '. ♦. '' .. depth less than one foot or with drainage areas of less than one square mile zonex INI '� 4 '' ,^ _ Future Conditions 1%Annual l M Chance Flood Hazard zonex 1 ' ♦. �.4 • ,' �" Area with Reduced Flood Risk due to J , OTHER AREAS OF Levee.See Notes.zone x .' ♦ .' . FLOOD HAZARD �� Area with Flood Risk due to Leveezone D *414444 N t ' �' ♦ . .' .• , NO SCREEN Area of Minimal Flood Hazard zonex • . ' . • Effective LOMRs • 1 OTHER AREAS Area of Undetermined Flood Hazard Zone • 1. �� GENERAL ----- Channel,Culvert,or Storm Sewer 4044 STRUCTURES I I 1 1 1 1 1 Levee,Dike,or Floodwall ' ` 0 20.2 Cross Sections with 1%Annual Chance ��� t�s Water Surface Elevation TOWN OF YOUNGS�'ILLE— AREA OF MIPJIM FLOOD HAZARD #► ii4 8— - - Coastal Transect 370404-94 r -^^^•513^— Base Flood Elevation Line(BFE) a e x �` lib I . • 1 Limit of Study Jurisdiction Boundary j --- Coastal Transect Baseline OTHER _ — Profile Baseline 3720184300K 3720185300K / r . FEATURES Hydrographic Feature eff.4/16/2013 eff.4/16/2013 i , Digital Data Available• N r No Digital Data Available 1 II 44* MAP PANELS Unmapped i �. D. • The pin displayed on the map is an approximate 9 point selected by the user and does not represent an authoritative property location. • This map complies with FEMA's standards for the use of t 4' digital flood maps if it is not void as described below. p' • �„y The basemap shown complies with FEMA's basemap accuracy standards ../: •r•. The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA.This map w exported on 1Oda/7/ 22 a 8: Asnot • • reflect changes or mendments20 subsequent to doe this date and r time.as The xport NFHL an effective informationt M may and chan nge or become superseded by new data over time. /14 \� This map image is void if the one or more of the following map WI elements do not appear:basemap imagery,flood zone labels, i A' s ; - legend,scale bar,map creation date,community identifiers, C 78°29'10"W 36°2'4"N FIRM panel number,and FIRM effective date.Map images for Feet 1.V 00o unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap:USGS National Map:Orthoimagery:Data refreshed October,2020 Hydrologic Soil Group—Franklin County,North Carolina (Wrenn Farms Soil Boundary) Psi ol n 725600 r2b7W 725800 725900 726000 726100 36°2'23"N 36°2'23"N 9s \ - '.*N 401 . i,. Az ilk .„ 4 0,-, i' ". --N. . , * .,, .'• . , \ /1 ‘i i .;do. 14 8 96yk � y litie Nip.", . • CaB Q i /.. F, i"' }Cj1$2 f �Nti 6. . 7 - , AN C ,,A , �A. 5 ' - duo, . - ; �`" ',OOjO lap Eruay T© ISc-dE0od Eft¶UJ -cale. , 36°1'57'N 36°1'57'N 725603 725700 725803 725900 726000 726100 3 3 Map Scale:1:4,000 if printed on A portrait(8.5"x 11")sheet. Meters p N 0 50 100 200 300 Feet 0 150 300 600 900 Map projection:Web Mercator Corner coordinates:WGSR4 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 9/22/2022 101. Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Franklin County,North Carolina (Wrenn Farms Soil Boundary) MAP LEGEND MAP INFORMATION Area of Interest(AOI) a C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. C/D Soils D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed 0 B scale. Transportation BID +-+-+ Rails Please rely on the bar scale on each map sheet for map n C measurements. ▪ Interstate Highways n CID US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) 1—I Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines projection,which preserves direction and shape but distorts Background • • A distance and area.A projection that preserves area,such as the III Aerial Photography Albers equal-area conic projection,should be used if more • • AiD accurate calculations of distance or area are required. . B This product is generated from the USDA-NRCS certified data as �. B/D of the version date(s)listed below. • C Soil Survey Area: Franklin County, North Carolina • Survey Area Data: Version 25,Jan 21,2022 • • C/D Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • • Not rated or not available Date(s)aerial images were photographed: Apr 25,2022—May Soil Rating Points 20,2022 O A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background p A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • BID USDA Natural Resources Web Soil Survey 9/22/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Franklin County,North Carolina Wrenn Farms Soil Boundary Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaB Cecil sandy loam,2 to 6 A 25.0 81.1% percent slopes CaC Cecil sandy loam,6 to A 5.8 18.9% 10 percent slopes Totals for Area of Interest 30.9 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition USDA Natural Resources Web Soil Survey 9/22/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Franklin County,North Carolina Wrenn Farms Soil Boundary Component Percent Cutoff. None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 9/22/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION C - DRAINAGE AREA MAPS Pre-Development Peak Flow Exhibit Post-Development Peak Flow Exhibit Post-Development Culvert 3000 Peak Flow Exhibit • I �s www.timmons.com TIMMONS GROUP % -�--� 1. \ --ice ,, \ r,o r % % <0 / - f w --re ! r � � � � 1 aE _______L___________________ ________ ,j _&AN7J �\ �=� '.....;in, 1 d I 1 UW 3 SCALE 1"=250' _ Q„ . ,� \ `^o.OM ?F ti r ,... •-- - '_ I I �'"M,0 lk �3 0 250' 500' +► 1•N'^ _ i -- \ `14 ` -. -e„ ^^ 1PH \ \ SEET FLOW _� __ , ,�-�' r455 •�°"' _ ,�. L__-----I \JP \ I 100LF - - •• •• %1 ., a-: .<•.w✓.f.4r N • >,f y ilkAr. \ 1 - POI3 vc %�'`-1 2%SLOPE , _ 1 ../ - ".ts :...:_.... _ . o LEGEND �,_ % - - �1 \/ �k` - "` '� � � " ;r ^^ DRAINAGE AREA: 6.91 AC m 0. o 4. •�^ /\ TIME OF CONCENTRATION: 18 MIN �� - ..-• ,. ...s\•\ \\\\� •. , x t.. (1 1:\;1, 455 1I I POI 1 -PRE-DEVELOPMENT AREA / h -i ^C/!\�\�\\\\ A y>> Y i+ e I t ' 1I�, r 1 / 1 //\ (�` 1 �I CN: 65 < - y \\,l\\ \\ r .1 , �JI I /_�" I e / /\ \ 7 1 .t.-a 1 + I I POI 2-PRE-DEVELOPMENT AREA i j} / ! \`\\�\\\, �y ►y Y i / \ I / \ \ r ( �\ v I I POI 3-PRE-DEVELOPMENT AREA - �/ \ I'\ \ \ II - ,+vN 455 • /- f J - 1 f 1 ' \ \ i . I �\ ) .. t I I r?'" T�• fi /Jr r 1 , c / / -/= ;;•i1 •- �� FLOW LINE 1 a / \ ! gr /\4�` \\\\ \\\�+� f` ` ( I -- y ( -*}�--- 1�• *. C / r/ +z 111t( 11 III ,� ` C >z�,� I / > \ __ - I `� J t/ .Ii w�V 1�) -��/ts\l�l�ll ��� car' ` �' 455 �� '_ 445 __.�f 1 /� � .. 0 � I r y J (\, t \"\ ��__////\\II \ cr • -r,..--_-_-: ' _ -/ \ \ ` \ 4f -F raor r 44/[k/ ; ar J•'` -- J\Z \ \ ^+ L.y, ,/ / / /r \ l �,1, u,(t I 1 /t r' + t J� - \ l\ \)S bbi�/ _ -mac �50/ / / /� ) i \�\ \vije1 1 (� �i J� - /, 1II > +11 I I I( ( ) C �•? / c._ .1 \\ _ %- - 7"S•O�1's j !.1. / / / / / // > \ r "., r " i 1 DATE 1 III I v 1 �, _ - �� •,. / / / ) J / / 1 1 l v _ ... k / 1 ' o DATE 111III 11•yoe � tw �, ,` \ Ic.,�✓�. ��`� i. \\ 11��\ � \ 1 / / /�/ // // f ! 0 1// / �% !J/ IL 1 \\ � 445 /, _ I DRAWN BY \\*. \ '� \ \� /r _ + SHALLOW CONCENTRATED FLOW n�/ / / / S / i / % _ i1 45 -11---11:::".-^S� 1 1 •\ �' ( ‘il%� � \\.• y y/ // (,. / / // " '" .rJ -. ... �'- _ 7_- N' r' .� l{ 1331 1 ~ •,, li‘1 • - , IJ / 1631 LF 445 / / / //' e e 1)a \ A - J I \ \1 DESIGNED BY tf / / / / _ - - - \. J.. w ! ! ! // aA� \� 1.44%SLOPE ) 4j 1 1 l ! f�� ��/ !// ' � - - 5- --455^ C c I l l .1 /! ' '§` .:r 1 1, t r'l // f'\ (\J -�y i l '� '-- iJ-- - SHALLOW CONCENTRATED FLOW T--�-- •� aat /. a\! 71r1 /if + l_; f.:..„, _ { \\ \ y ! r c / / / 455 1�\ e / s" //( _ ) ) 1\)S/i t I \ O rr 5f / / /� - _ _- I HECKEDBY S ! e \1 / / �� \\\ \ s 1 / ,! �/t 1/ // / % _ !!t 944LF/ r• 1 !// / ! / 1. �►. ) /1 / r // ,//�r J /// r /// ` 1 _wd1,• 1( ! 1 /) // I 1 / / 1 1I(/ 'll/ A 11(/ r 11 ( A 1 // ' _ _ - - - \ �.-. / -• o nnvz o 1r �� / f 5 .. I ( / S / / / / / 2.43°/ SLOPEL / J . ii/ ' ( 4 L 1r youfiS/ r ( ( rr \ // /!/ •,r rrJ f1 / tr ///�// / �� �. r\� -� 11 � • SCALE �� - !' ./ /��ii i / :9 / 11 �i'rT�„�r=°/!r 1 r rl1 ( t !' / r/ t 0j� t(1 pH, 4 fr/ r / < - - J\ I � Z.-^ \ / it / // II ;Pear. Ida' 1( S f l t (/ // ' ! JI 1 r I r' ." �� 4� \ I„=25o' eo //, . / .gu'L!r'/ss\ ?,/J ` /*,- %( � r J 18 r/I f Ili / , r -�, . NA% i #. ,7i,///. pc / �Iiin ;� j (f)r��l / L 1 ( 1 s /% // 1j (1 //11! � lr` f Jr 1� z r ! / � � j\� t \ 1 w \� \4 \ \t l /// ee' \ ` 1 £ '/l ,;i:::wir" 11 (( \Cr1t ! 1 ) ` .,, ..4L5. Jr// J )( (\ 11e.r T \ ( { e J T i % ;� I\\ \ \ . \! \ � / \ \ k .,are, i.4h \) ( 1 I r(I(// "-s,,- - // /- \ r (�1 i\\\ / - ^ ti %-. \ .:• ( ► !� • \ �Cri/f// �~ y J ,� \ \ S t''9��nv1 Il� .S -_'r f/ °. a I!� t ` l \tip 1 \ t l t � /- \• 1 ` s1 \\ \ \�\ J '' ) a. �\ 1 1f I /// / / ( ti \1 �`S 3z\ 1 \ r l r ./ : J \ w 1 / r \ x" \ 1.1\ i t,t14 1, 1 / I 1 hi J1\ ` \' I� 0 \ \ ! �--'- •.- - SHEET FLOW' r l l \ / c1 1 \ lli I r �a.aa: \ �l\ )I it l / r/ r� t( /tl 1S(�� l` M\ \\1\ • (i t ' \ \ \ �/ i6J�t }(l. d 1 4 \ r' s.,r \ \ s ! ( S 1 \ \" �amT:, \\\ (` i. ,\f• .a /•r ) / / /// l rhS \ \\� t ( \- ''' ''-' \ \ i I� ��r 100LF \<T1.k ti 11 \J T. rl ( \ via ! S1 l S J / J \ t\ \\ \ e 1 t \ \ - / ( 1 c 1 :"�y \1`I , \ n t r I r l c� . ` \ \\ \ I 1 1 CTt \ \ �\ tit ( o \ \ \ wr„ 2 \ r // ) \ `� / r 1.02/oSLOPE v\ '1 ��\ \\ r \ ) ,\\ w \ ? I %w.%viera'\ 0.0\\ \ \••- b t rj / \c1. 1\ t r) �,9C? S \ ��� `\ 'C ��\ ../iai4;1 '`v - \S\ . IU III -14 m \ _ ) \1 .. \,\1 t,. 4 (II l is rn. rt. )( - / - / / sJ /tom f t.;' 1. r! 7l- r \ i \ " i s/ • a �' t1 t )t x e \ J �) IIIII I 4r, °,,1�() )(\v ��7 /. //i t //c}I if \` 1 � �( 1 \ \ \ >`'� \'` / L\s. ` ! I N. \ tf1lt i \ y s ?�) \ .. D 1 .1 t. eun- ..li\\\ \� „,--' -�./ / /f l /t • \) ;coM I (a. t \ \ Y - \ �� / rr SHEET FLOW j\\ 11\ \Ilr ' �\ I ` ( 1 t 4 !\ ( 1�� / rivwti„I4p��\ss \ _ r / / // /d r rJ f�1' S/ l \ \ \ � A I \ �Y _ \ 'r \ 1 \ \ I� . � A t e..�.. ; \\ \\\� \ . ` -,f /ii/ ��f^ c t, t O l\ \\ \\r< 1 j (t� I c5 -� ! I \ '< �` \ \ F ' r 100 LF 1 I 1 (II r (1 1\ / / / / r \�� \ 1.28/ SLOPE // (l( \-- >. �' \a r -� `` Q _ \(( >��.�rer.., 1/ .^•11 I 4\ �\ i / \ o ) I✓) 1 S ) Q ` tNi . �/ Yf ' A ' Al ' �' I llj\ e J r a w.a \ ��•\\\``- �� /// / r �11) I11 \I1\ ` „� \\ %-C/ �" \\1 � • ){ 1 �' 2 +�� rr 1 \ ��/� �1I k �►'w.i-J...\I O i/ - A. I < _ �� � \ fp - .- J t1i or ,- ,( m , - / ..1, \\ 1,, \\ i .'t 1 \\ $ / I' _3,.'.'r 'h' O,•\ C ew /i,///// -..,_ ' (I1ll ) 1) \ `� i\'C\ 3 ) t { Ill IN: J (k l i -'s.0 )/ Ilt •fti�(lci ///, O`r' Q s co / / r .i ". l \ I j1! \ l 1 `'ai 1 / _._ '�, l N \ / /i i:1 r'3 / l( )1 S� \\ r r G \a I l \ ( _J. _ I\ 1 Y T. / / f' Ia �1\ ,) ) 1kr / �° iJfr '' 116 . ) iy Il ., l \ 1\ \�rv� /i // ✓'Jr 'h\ ( .. ..--" \ 1 l \\ 1 1 � r .' / -,(.._' 1 1 /l U a o / / -�G� „r7;" `_:�. \1 l \ : ///r .J 1 I /a /\ \ /-;J• J( 1 \ \ �1 S 1. (1 l CC (J') Q a / / ! \ 14 -�(�,.., I ., J.... .. �1 • \ -> // /,, •- / f J � ��/F. ( f \ _ ` J r: t y�) \t r' 1� l 1 / O F. W / / \ 1( �-�/- ..J Li 1>_ L r t• /- D l � r' r Y A( r ! - J h r/ /i P Q 1 » vs N.- t \` \ \ // <//i z / / �i ' i / 1 0 c ( t / //� QQ >ti �' rh 11 S 11\\� / / 1 /� / J -'- f/ / //r L ••a r. \ \ k. .1 1 �/, / 1 / lOLD Cea . \ 't j/mil :trp\' rt \'s 1 ( ( /ir// 1 /� • /\ / I Jc / - 1 I /v O / i / i / r ! SHALLOW CONCENTRATED FLOW R• �. + a Q \ \ � ✓ \ i f ;!\\( // •• .1.;Or?\, l//1 \\I \ ?) r ) 1 S!1 \*er//I( J(f �J1 l� ��j��/ r11 1375LF . Ir I J _ � (tJ f = z = o \ \ \ ? II�� \�\ \ \1 / t!) i �)11 - / r / 1 Y ! 1 1 0 \ 2.09%SLOPE L=� J r U_ a \ \ \\ / \ r •f r If / \ \�\ S\\\\) ;I1 t \� ��//t ?. > T{ '>� ) 1 DI�`(I( (( ( ( z t � -� z �1 1 , �t- o o,\ \ ^ \ •' �,r / // cr.,. " / ! // , I W ljl lr t \Alt t\ I.). i,\ -�� /-� )r S t ( 1 \ 1 ( -1- ! - ' ''` r \ 1 ~ �" I?--' .., z Li, 0 3 \ e\ / \\r ,, /l /,( ((/� 1 / / 1 / r oVV��n ! Rti 1 r r I°t ii i' t/r ( �� 0 1 0 1( r ( t Y\t �0 It\) 11 I �..21: i / n ass ��..- t L 4• Q \ ter 1 -." // \\ 1 / \ � ,r� A. h /� \ C1 / \ ` \-,_ _ _ Z_ z � w� , \ \ " r / \\ �/ }� Q,p J r t'r �c )d� ti ) JI ( ( //1 � C \ I ( r, 1 CC ( a� c - a ` ` _ %i/ / / / / i /�" •iYs CO^I �/\\/� /r J!'4,4 +f'!l) 10� \ 11 1S1/l? 1r //J r// ;/11 IC!'/e r 1 < ( - . ` 1 t 1 C . . . y � ••` t �� ^Il --•///- �J W W � � {* _ ~`f \ / \� /�Y�Y/AI\\`ice( 1 /1< /� �i 1//` `; "1 L M i/ r (// / 1 $ I 1 \/ 1(( j � !�1 ( ' ! /// - \ ( `� . .1 , 1 \ \ 1 1 =// / ''\ 1 Q o 2 ' , /1�\/ r / / 1 L r/_ / ` / 1 \ ^ I \ ( i\1 ((jr f('p� r // > s / / \ t 1 +Z{ ) ti k.. ,,. - 1 > 1 > _� a '\ti.. f, 1i.rt✓ ,// r`-` / ( 2 ! t( ,-F,r //, ,e: ! �( \ _. �.- l r ; 1 + l r r / / 1 / / U r� n / . / r �1 /! 1`� / I / , ,/ I/, f a( )1 r \ l ( T/ \ y° e1 ''/ / _ / ( ( w� ,, ! Z= J Es ci ��� • � s'�-- / / _ J• lr r ( / �^/%�„ � / r,,%, -� � t, ,.,, CHANNEL FLOW %•, l�! / i 1 � � _ %-�• r \I / �( \ , qa ' / v / / ►' �. , !/ \ ten:.// GJ./ ! \ \ -/ // \ c 1! r t w ! / \ �L / a. M y• \ 'r -`r-•1,,---- // �.\` ,, t /I Y s / /r ;. r. (/f \ -r % - 1 / I � W M -r. f ///i<11 \ ��/ (j \ /// J� /%i C,r �- '� , ���/ f j'r / . 1498LF r`J / / / 1 l� � \ - _ = /ems • \\ �,\ a \, �� F J ) ( ( 1?` / ((r O � p� \ - w !r /i//i �� /rl , / , .= i,, .;! // o / / / \.� - �/ _ - _ 1 ) -- W v = '-iG_ J ! yl / \\ V %/( // I•- C.i--. �- - s- / // / // 2.54/DSLOPE Jf /tt J C \ - / -- J I 1 ��. <v I .. 'c1 OZ "i •:r - K J'r/ r / �, _',_,. I% i ..! / r to- //( /J .. 1 - _ i5) 1 1 r ) . I', s• I a •. .1 .` /.' , I ! � .�1\\\ ` r, rd / //•'_r i:.i"`�/ r ry -.!/' ^ // r.//,r r ./( J 1 J / ` - - 1 i i yi - ,� r J c 1 gi // / i (/ ��� �( / (�,Cf� J,1f j'/ j• f.... /•• � � - - � - 1 l A1l t.� � i'� �' r,. / W ' t • itr //) II / r� r Pr I \ 1p�/ ! r(I // t r (N r !^/ / tJ _ _ 1 \1 l •-- -� i.r _ (� r / I < I / ! l / /r . - o _ 11 J•r'a , l Il! JL It f O, �/ I r r �, _ = - r- - L - J 1 o ,Alk,r s14 (r / '''(11) / / / fJ / / / � /A J \ .. 445- \ 51 ilsi 1, 1, �• �, EL .0 !'J 11 /yl *ny l !t // / l / / 'r / = Gl Q •i• ( �Yf I t < r N POI � / / 2 '.YJ� 1 \ (( // / /� �If / / 1 / C/��.� ` - �j � .f�. � � .n ^C '� p (( �' 6 V E� E 2-.` E �r i�-�'z./ / F I /lll l r/ / -- ��2/i / / / > �� _ r. \ / i ^� i �S •jr �hI i \ S e Y•�1$h DRAINAGE AREA: 71.70 AC r�' a l` / / �' / r f t '' ' i L� a / \ I Jr I C)r //,i/ Q'3 'l/ / r ,t < -s r - ?R; N. -o J )11 C \ 1 It r 1_. r % > �= r r J „,, / / / // �'/ O // r l ( ,, F! o J ,.- r ..^ ti r J .... -, I 3 TIME OF CONCENTRATION: 20 MIN " �; 1 y(r t/�/! ( \ II(�//// rri// %. Fj r. r / f p J ! r� ) r / - ;440; \` 1 �a11 \ r � 1 jo /. ,�� `''�� t �r s `^trJ CN: 57 / �`. 1 t/r r•s \ �( I jl //t(r� A3J� J / /SI \ ( - 3(( + r y I tt I /r r ' J - .Q��Q 1 4 Q -•. �. ,\ ,+ 1 ( I y� .,•`n''+7 a 3 E =c E i' , ( I / �� r /// �; ) > It 1 ) \ �"".�'' - V Q.e �� �4b C ( // '\ ' _ �` w 11�\ \' s \� \ f' ,'1 • yl xE l d ��th ��.\\`I ��\mil JI \ \l1\\\\\, \ I \ 1\\ 111 �=�\\\�� • \ \ - - \ \ '•. ~ r/idt J/ �� , /l \ r/ - " �- 1 - - - POI J 1 ` ) j \ I \` / ' u1• \ \I I t l i : I(\ \ \ - - osNo. 5 \� �, z, ` 1 1 1 I I \\ \;`\��\�(� � \y' •: 1���i'� ''� �' \ i ! 1\1 1 t i(I \ 11) )I Ii \ \ Y 1 XJ• DRAINAGE AREA: 11.54 AC > . -1 -- S I \1 I \ \ f \ 1�.�,. :" ►_' ! 1 > Its ! 1 I I t\ \ __ « w 1 \ ! ,r 54949 1 1�\ 1�1 \\ �q„,,. ,,,..„..,_ _ / /,,,ir , tc° \t !'�Ali// (r// I! / �+\\\\\\\I c 1�\\ `�-, = y(1 H1ry� \ - / /!t\ f ; TIME OF CONCENTRATION: 21 MIN 1( -- / SHEET NO. 5! 71 '� ))JIlI1t1�11111 \1 ell,' s� � \ \ // r1. %1 11 j /��� l/(�I• �\"`�='r N• �/7111�� \- - _ -1 111` CN: 61 �. 1. 1 �/ DA1.0 €m - 1�I , I /ry ..� I / III -- .-- — ►_ — -- ~ \ \ _ _n'''''---- — e,t ---------\7-_--.:- ...-.-i...r.,,-_.".,.1- (-- / c o ..` - 1 w e SAN-� \ C _ I 1 1 -1 �w. „►a ..rr 1 1 g';—c SCALE 1"=250' t ��� >—.�,�• 'r� �L / �I 1 1 ��`o V I \ i \ 11 I� v 'j 1 Pt!: _ 0 250' 500' `� SHEET FLOW _ ,-( �P \ \ I �� 100LF - " `yI I ,.•.�••- ry `� I [r. iE ao 1 / /► 2%SLOPE - 'I .r ' ,--*-+' :.r..,..,,. - 1 0 o LEGEND ) i -r _ _ _ if _ ' a, ; i 1 � \ ll SCM 1 DRAINAGE AREA A % ' - r \ \\\\ \ +, / 1 I ! 1 /\ \ <`+ 1 POI 1 BYPASS AREA 1 \ \ \\ �• 1 �I \ / POI 2 BYPASS AREA I✓ \0 \ \ e: i ►1 I ` _ _ �-,sir ,1 - /f r^ t V�1 S ! / Jp.;�III l'''....T POI 3 BYPASS AREA / -I \ \1\ \\ \ 4� III I ' ,' ��,.- r 1 / --*� ' / I/ I 1 I \ ' \. sY I III / s •\� - \�``'r, / - ?J� �r� � i ; r I 9 — — — DRAINAGE AREA LINE \ / 1/ \ 1 \ I \ ' . /�//_ _— ' � �� FLOW LINE \r 1~ _ f\ 1 \ .. \ / `D1/\= � -�' \ 1-- % 0 I II.1\\g! s, I_ Li 111111 I ; - ll\ '\\ V / / j \� \t `G , ilk 1 r POI 3 TOTALDATE '1 I I\ \ ^/- \ v /` / / // ` ) _ r DRAINAGE AREA:6.07 ACo01/09/2024 II \Iti+od { /\41 \ / / / f / / J `t _ _ I \ TIME OF CONCENTRATION: 18 MIN ..\ \ \1\ 111 ` J r c i >\ t\.\� / / / / / J \ 1 - - - ' .L. CCC CN:56oaawN B\j t‘ �v SHALLOW CONCENTRATED FLOW / / // J _ ^ 1 ___ ..._ ,,.. , ! , �- 331 \ \ ~, .. i. r J\I v( ' >� i� / (4 , ,•' 1.5%SLOPE / \ 1J �r ` i/ / j /r// _ _ — rep:�'' ( _-..{�__� • DESIGNED BY 1 r 1\ "� ) �. T CHECKED BY ^ ? , / / 1 \ � , r f , .11 SHALLOW CONCENTRATED FLOW / " \ \ r / mvz J/r // \II \ +: Wiz, I 1 ! e I ` / 1 / / // 944 LF • ' I (ti ti 1 •�' / %�//� /, 1 4 hr r ( 1 , / ` ( / // �.; r 1 1 I 4/ -`-^ scare o. \ / 1' II J( 7u 1. /1 ) ( J / / 1 4 s l 2.43%SLOPE .J.--1 \ ( • • ..� )v ' — t' -- �ii II I :% ' 1, S 1 J r/ J ( 1 I / �III�� � v :li • „_250% , � / jiIll a=":' _�^E{ ( I/ ? J it i1 1/ y1 i ( 1 YSHEET FLOW �' I��lll �� , \t •\ // J ✓ \ l 1 •�., t9\ \ I ( / //f/ /rl I I , \ 1 e ? 100LF -- � i9.\� \ �, l l •• % \ �� �. 1 f / ' \ r \ ( fIt Ir�� .'._\11 if1r "/.// // 1 11 ��, \� ° .' \ t t 1.02 J SLOPE V tt k'tt a'r a \ ,t / VA1a \ ?�I ae 1 4 \ pa \ ( \ t au. �iSi \ ( 1 \ �v ! 1 / / / '. \ 1 v �, >��, „ � �1 v f / v v ��` ti � , wi ?vw .t \t \\ \ A� J r// / � ' ` \\1 \ ) 1 ! 1 I 1 \\ �� /ill I uI I \R • 1, • - CO \ _ > !1 \ ( 4 Ih r.ratI ( I \ .- / / 1 / ! 1 \ \\ �� �� y I V r 1 \� 1 1 _w 7►1►'. \ 'a�.r r J \ \ \\ \ 1 I �I �•a., f \ l J r 1 J I ! ! / \ tN 1x 1 ti� ry }'�li.> .I \ / / J / \` 41 I ! \ \\ �a!� Ia > 1 1 1ti a + 1 C \ o an ter► 1 \\ \ /" / t. \ i I \ ID , - r l(I Ill //\\ 1.., .,^ , \ \ , // i 11 t 1 ) I ( ( \ \ N .1 I ( � \t J` 0_ a fa \ 11 \ \ �n 11 �o�'ar� �\ 1 - s , /jam .M1 f 1 \ ( ( , 1 y� r p 1 �J 1 { ) Y 1 1 Q \/ , 1 \� Qv_/1�J �/ `�'r \\\, \\ \ / // J 0 1 I I l 4 ���\ ��� / a / J a \ . t \ 1 1 N. // � '�' � \ 1 \ t /, �/ t 1 ` % �� I Ir — 1 I ' QM c ss \ II ` i ( rim,pia \ \ \ 1 . `/ /// ^Zi 11 t ' ` % I 1 J / / Oinin <Ct a � �/ �J / ' I' /// F' s /i ✓•✓ J J f f j I% — . 41 ~J f / 1 3. 4 \ t ,! v 1 �i_ esz? i J J h �, � 1 O LLJ 1 i \ ) 60 LF * / / " ‘ 0,,,'-u 12 g Z I � /// \11 ���(S j ='s`i \� \ \ \\ %/r / / /���e 1f� % —iiil)kji till r SHEET FLOW II z 1/ / / z o Q \ \ t \ 1 / I r 1 ! /( i i i /�\`���� �'y/ , jl 1.00%SLOPE J ! f z Q . Q a \ 9 I CHANNEL FLOW / 2 \ i f� f1 ` � J- J o�1 LL !Z' `� r / \\ r r ' J Je I1 • 0 1408 LF I f 1 (• r Jam'' � _ � 11S �� , � )� J r-, o \\r �/ / N/ (!rs 2.54/DSLOPE I. 1 \ I �. r � .ti� � I t �, ,. a z 3 - �.r- / vv vvI ''•• ' ' - 1�111 �I' v ��' Si % j%mil C%�ti"►�� ' t! R ti ` —�-�• t_ z Z ; z II o i / \ / i /R Jllf �` der/ �� ■ J' WRENN APARTMENTS SITE W m w =� o r %= 1 1 o' ►1 1 ) �Itt _ > it �1 \ITNITAr t 1 .1 TOTAL IMPERVIOUS:2.66 AC } //�,�- y J 2 ///J_�/j// ( /,. l l� WRENN FARMS 111,1vit 1 , s J 1 Q ° O oi \. f f r tit�� 1 I1 - v a r / ; t ! /// i \ SUBDIVISION �� / E= V ./IV •• • l / i� ��� � ���i -T- 1 111191111� of I( \ / ,, ♦ POI 1 TOTAL / / �1 �. i/�� ;: � ,,;�� r— 1 l �I O W DRAINAGE AREA:82.49 AC .1 ^" TIME OF CONCENTRATION: 19 MIN G 1 /� ` ��- ,� - a �� 1 1 O (9 ,. CN:61 F diff•110/,/ , - -)i/ - • 1 ,driNil ilk *-•-• ,,, Ai I) *.V.--1 0 '.7e- A N 1"611\111111, P '[.. POI 1 BYPASS ///�/ �' . IAMII ,Ii 7011111"—Ar 1 L /11-111V- r'N I > :1 :;-r 'e s..urla,. .:3, r i 1 E 3 �� e DRAINAGE AREA:57.29 ACi ��� d � ��III � t�- _ 1� �.1;* `� TIME OF CONCENTRATION: 19 MIN //r O e �r - I .may, — _ F. ' CHANNEL FLOW FLOW _., e'. i • -, wE E ci /�i f / r -/ - Jm. \ L %/� �' , 1" \ \ \ \'" ti 1.00%SLOPE �tz i44T\i( y� fa! �/� SCM 1 ! ( I l \\ 1 ,I ! - -I ---�_e— \ /\ r----- '' _ — � � \\ l\\ \ / �':�' DRAINAGE AREA:25.20 AC 1 ` 1 1 I \ \ POI 2 TOTAL SHALLOW CONCENTRATED FLOW \1 r fJoB Naa a \ \ \ \ \ r ate— J I I t\ \ L Ir( / 54949L /�� ' 1\\ i 1\\\\ \1Ar+�.TIME OF CONCENTRATION: 15.8 MIN / / r\\ \ I ( \ \ DRAINAGE AREA: 1.67 AC 633 LF �♦ • Ili' \ 1 \ \ ,�. 1 \ \ 1 \ I / •- , SHEET NO. M .�/ S I I\1 1 \ 1j� 6 CN:66 J / \, A/ I \ I ` -. ` TIME OF CONCENTRATION: 10 MIN 2.16%SLOPE 1 1\ \ \ \ L /� DA9.9 d ui �� 111\ 1)./, �\ q ,-_, / 1 /. /. l / 7 -,� 1 (NR7 5 1 h \ \I ( i ,E \ / / / / / / / ) \ 1 1 1 ) / 1 f e I w �Y \ / �� / I'/ / ' 11 1 I i / l I 1 s / < < 1 / , si - _ _ _ l / 31 / / / l / ( / + + l l -, J _ o.a SCALE 1"=100' / / / i ( / / ` \ / / I// // / I J -, + l l f r I \ \ 1 SHEET FLOW \ (/ z o g ��� 10�' 20�' - -�— ti — Y / // � // f /< I/�� �\ i ; L +_ ~( \ , \ 100LF \I ` + �I_ � .� QVo 0 LEGEND w CULVERT 3000 DRAINAGE AREA r / ) / r.. • \ \ \ \ 1 \ \ y\ �11,4\;.g) `• / , DRAINAGE AREA LINE !�� / / /I / \ \, \( \ / ) I \ 0�\ z � ,� \ ��►1����Al r / l f I ( � � �� �� ���--�� FLOW LINE / > �i i/ / I r / DA - CULVERT 3000 I ( 1 ` � ��' �Q, fir.='yI / , / , / • S, • 4.74 AC / ,/ 1 + 1 �� ` � `� •?` c� ;/ P b/ / 1 / / o ) ( \ I � �i. ;:�iP�'�� !:�per// ! :::: `-, % #7. tri gAk 0 r_._------ 1‘ 5' S' L,' • \ / / 1 , 1 (+ , _ DATE ‘ ; �. ty'.01.. 1 I I 11) ''' 01/09/2024 �` �[`� 1 \.\\ 1\ o� \\ rvSHALLOW CONCENTRATED FLOW } / I 1 1 , \\ - \ \ /y /� %'%, I !���111IIMR DRAWN BY ,1- � ( � E \ I 1 \ \ \ \ ` / I I 1 ( �0 Z /\ /� / �a �1 a��0 331 _ 909 LF I DESIGNED BY ! -4Air • 1 ) ; e 1\ / 4.36/001 I + / // -- -. ,i4 -- II / 331 P'� oNP /�' ��1 i'� \ �I�11 I • / alio • CHECKED BY -- ? e. i�01, 11 \ \ \ \ \\ l i .✓ / / / / 1- J J ( ( ) I I / ///1 ..--/` ,/ - / ' \ \1 ,� I�� 1 " ;11.L___Itti • • SCALE :,We•\. _ .., ifig It* .I \ \, , \ \ \ 1\ ' -.: / / / // o J 7 ( ,vim J %/ \ 1 / � /, `/ , 1 I�� OF 1 I 1 ,III • Y }— �S 1+ l \ t \\ s \ \\` 'rI / /f/ / / ) j '• . 'tea A� / �'/^ / J /�/ / °N, T' '�j , r 1\ at Villh i / cn \ \ \ \ \ v J J / / ,r �� I. / /��/ / ( (-AR(' ' - .�,2r lf IC __— 11 1 4It�,l�.. W elm o _ J • lig v , / 1 0 / / _ 4:1*-7:.r-bror-V01:Livat°11171rr IliIllDW \ ) I 1 ) 1 - f �� - /� / , > - \ t l a .. ,� n 11�I�Iii��1a �{\ ) 1 1 �..;.,.� ( — ` / .• P I Y�'-,/iii'd / /��/��►`- IL 11 I -I�!i—n--=,-T.E.---"erairdi ILTEZI yijif - J ) I 1 1 i i / / / `�\ _ � tea.- �` --! `O I ,,,---'', - \ N \ / / /,� (/ /009 �' , ,lA -,=r iz :;,. rrimsoc!arxres�r.....2.,, ..,.„70.-00_,_.-.„-=-------4.--4401K _—�/" -w��5 a0_ i ( / l. / ' �,� � .ONP ? '��II�,I,� f�• =������ �/I`�P•- CC 6• (nag< .- 1 •1 ( \ 1 // r / i° / let. 104`���, v 10,4014 �� 1 '��,� wraa ti:,_re� o�� FE a'7 e;+ev....c i-* -1- w Q W 1 1 I 1 CULVERT 3000 [ j�;``tt"� A \ WI j�4 Qj��%� �r�/ /�� �� �I j� 1 'i:4,.. ` l5'at'��ii-4 tw < 6, a a ( \ i/_, r � /y 1 i ` ` y . tit � % 1 �— �1s^ — J z Z Q o/ 1• / h , 0 � / .�� i. _ �` %=�"► �r 1�, ���� J1��111, tilll��i/,ll z z z a I \ L �� / rJO& . r ,. �`=mac4111111111111 > II1I1 B§ x 1 / I//�� \ i //e/' 0R /. 02 0 l'ery VI �,��4 OW � m'/.- WRENN FARMS - �', ' i■�il■�i� l �II1i �II�/ ZU ° H T9� / Pi� - / � �� . I � � I / �� . rig �'.-1 oN /` ,-Y` - ,r// ��1 � . �, /E+i SUBDIVISION �'�� �� �' 1,� = z E° M � �� /// / i�� � ram-�J �� r/ ''�/04 °'eA°1* % \ �■►�� %. � 1�������I�111111 II MIMI 0� w to; CD9 ':,.•''..... 807 1-'1" ,A,'' I/ /c.------ 4 ':.& ItInittitiOrdifig0.414,011)Aillf0 Ilk 01.40' ' '\ II irW;1111ill • I :10111116b 0 ‘g ( '-` IIIIIIIIINIISI TN x w E- 1 ,,,,,- -,,z*-.. - ,,,-,,P,j, I ,,,,,-10,40 _ iiiiima imax'Aiii-e-otir--.,40_,,,,„„,„,-40----:„.„.0„ft-00,,..7--- ____,,,,. ..... „- is- .01:417",,-, A(- t_ , > ;, _ , _______ .__ ,,, _,,,,.,,. . \ . a.;, , , i _ :„...._,,,,,,- ridi_„-- Igtw.,,,,,,,,,,it ,,,,,, , ,_ _ _______________„-:---------,_-. 4.00011111/..41.. I No, 0 ,. „,, , _,,,,.,_ ter_ w .,,,, 11111404111MINIA, to.w ,.. ,-...-t.,.!-‘,„ 4 , ,,,, � / '• / � a11I� I �� `a � �, /� 1E111 ' Ill E E 11111111 ��� ',i� Q,I ]OB NO. o a rn ////��� sp■ 000400.3 ,/ � '�I — —�� p• �� �� ���� ���� 54949 ^-- �J ( .1 IL14.*-714"N'iP""'"'MC'414' �� ������ �_ _ .,r" ���= /ate I L�, M \\ I�, �IIIIIIR�1�� I� '(���� r ,_ dBfV:JS� � �,"111_ ISHEE NO. a�l �� �����Illti�ll��� a��l ! �..�II his �Q� �- ��_�,r2ralia' �'—.�� �.e,i...ok DA 9.2 13 Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION D - SCM DESIGN SCM (Wet Pond) Design Calculations Culvert 3000 Design 10 & 100 Year Events .•'•'•• • • • TIMMONS GROUP I www.timmons.com YOUN VISION A<HIl VLU iHRODUH OU R3. �...S. • 0 • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Wrenn Farms Project No.: 54949 Calculated By: Colie Crosby Date: 1/11/2024 Wet Pond Design Calculations SCM 1 Pollutant/Nutrient Removal Total Suspended Solids(TSS) 85% Nitrogen 30% Phosphorus 40% Basin Characteristics Post-Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Qty(#of Lots) Imp/Lot(SF) Total Imp Area Impervious Lots 7.28 Townhome Lot A 183 1100 4.62 Impervious R/W 3.14 Future Apartment(80%imperv) 2.66 2.66 Managed Pervious 14.57 0.00 Impervious Other 0.20 0.00 0.00 0.00 Subtotal 183 - 7.28 Streets and SW Description Length(LF) Imp(SF)/LF Total Imp Area 60' ROW 3702 27 2.29 10'Sidewalk 3702 10 0.85 0.00 0.00 0.00 Subtotal 3.14 Other Mil 0 Kio Total to Pond (AC) 25.20 Parking sk/Amentities I I 5698 I 0.113 Pond Basin C 0.60 Grand Total Impervious Area(AC): 10.63 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Impervious Area Acres Required Surface Area of Permanent Pool Offsite Impervious Area 0.00 Onsite Impervious Area 10.63 Average Depth(ft)= 4.0 Total Impervious Area 10.63 SA/DA Ratio= 1.35 Required SA(ft2)= 14,819 Total Drainage Area To SCM 25.20 SA as Shown(ft2)= 18,533 Percent Impervious Area 42% SA/DA Ratio from latest NCDENR BMP Manual SA/ DA Pond Volumes and Areas (Below Permanent/ Normal Pool) Elevation Main Forebay Depth Main Forebay Total (ft) Area(sf) Area(sf) (ft) Inc.Vol (cf) Inc.Vol(cf) Vol(cf) 401.0 Bottom of Sediment Storage 402.0 13,395 1,846 0.0 Top of Sediment Storage 403.0 14,375 2,199 1.0 13,885 2,023 15,908 404.0 15,378 2,575 2.0 14,877 2,387 33,171 405.0 16,406 2,974 3.0 15,892 2,775 51,838 406.0 17,458 3,396 4.0 16,932 3,185 71,955 407.0 18,533 3,841 5.0 17,996 3,619 93,569 408.0 0 0 409.0 0 0 410.0 0 0 411.0 0 0 Total 5.0 79,581 13,9E Verify the Forebay Volume Is Approximately(15%-20%)of the Permanent Pool Volume. Water Quality and Quantity Volumes (Above Permanent/ Normal Pool) Elevation Main Forebay Depth Inc Total Accum'Total (ft) Area(sf) Area(sf) (ft) Vol (cf) Vol(cf) 407.0 18,533 3,841 0.00 Permanent Pool Elevation Notes 408.0 26,613 - 1.00 22,573 22,573 408.6 27,836 - 1.61 16,715 39,288 WQE/TPE 409.0 28,605 - 2.00 10,894 50,182 410.0 30,653 - 3.00 29,629 79,811 411.0 32,756 - 4.00 31,705 111,516 412.0 34,914 - 5.00 33,835 145,351 413.0 37,127 - 6.00 36,021 181,372 414.0 39,396 - 7.00 38,262 219,634 415.0 41,720 - 8.00 40,558 260,192 Verify the Average Depth of Pool (Dag) -Equation 3. davg=[Vperm pool-[0.5 x Depth max over shelf X Perimeter perm pool X Width submerged part of shelf]/Abottom of shelf Vperm= 79,581 C.F. (Main Pond) Abottom shelf= 18,533 S.F. (Main Pond) Depth of Water over shelf= 0.00 FT Perimeter perm pool= 468 L.F. (Main Pond) Width submerged part of shelf= 0.0 FT Davg= 4.29 FT Depth for SA/DA= 4.00 FT(Round Dav down to nearest 0.5 ft) 1.0"Water Quality Runoff Volume Calculation Using the runoff volume calculations in the"Simple Method"as described by Schueler(1987) Where: Rv= Runoff Coefficient, in/in I=Percent Impervious 1= 42.2% Rv=0.05+0.009(1) Rv= 0.429 1.0 inch runoff volume(Required) Runoff volume,S=(Design rainfall)(Rv)(Drainage Area) Design Rainfall= 1.0 inch Drainage Area= 25.20 acres Storage Required= 39,288 cu.ft. Volume Storage For 1.0" Runoff Above Permanent Pool (Provided) Depth PPE SA(SF) Top Temp Pool SA(SF) Volume(CF) Elevation 1.61 18,533 27,836 39,288 408.61 Size Water Quality Orifice for(2-5) Day Drawdown for 1" Runoff Volume Q1.,=CdA(2gh)1 2 (Orifice Equation;Cd=0.60;h=Ho/3) 3.00 Orifice Diameter(inches) 1.49 Ho(Driving Head to Centroid of Orifice)(ft) 0.50 Ho/3(Per orifice equation recommendation in NCDEQ SWM Design Manual, Part B) 0.17 Q1.0"Drawdown Rate(cfs) 39,288 Water Quality Volume(VWQ) VWQ/(Q1"x 86,400) Drawdown Time(days) 2.7 Drawdown Time da s 2-5 da s Pond/Riser Data & Elevations Pond Type Wet Pond TSS Removal 85% Top of Pond/Berm 415.00 ft Secondary Spillway Width 20.00 ft Bottom of Secondary Spillway 414.00 ft Top of Riser 413.00 ft (at least 1'Above TPE) Riser Type/Size 4x4 ft Top of Water Quality/Temp Pool Elev 408.61 ft (1"Runoff) Top of Veg.Shelf 408.00 ft Permanent Pool Elevation(Normal Pool) 407.00 ft Water Quality Orifice Elevation&Size 407.00 ft 3.00 in Secondary Orifice Elevation&Size(Rise&Span) 409.00 ft 6.00 inch 24.00 inch Bottom of Veg.Shelf 407.00 ft ^Rise ^Span Top of Sediment Storage/Pond Bottom 402.00 ft Bottom of Sediment Storage 401.00 ft (Min 1 ft) Invert Out of Riser 403.81 ft Outlet Pipe Size 24.00 in Diameter RCP Outlet Pipe Length&Slope 78.00 ft 0.51 % Downstream Outlet Elevation 403.41 ft 1 Yr Water Surface Elev/Peak Flow(CFS) 408.31 ft 0.25 CFS 2 Yr Water Surface Elev Peak Flow(CFS) 409.08 ft 0.49 CFS 10 Yr Water Surface Elev Peak Flow(CFS) 409.86 ft 4.14 CFS 25 Yr Water Surface Elev Peak Flow(CFS) 410.77 ft 6.38 CFS 100 Yr Water Surface Elev Peak Flow CFS 412.45 ft 9.16 CFS Pond Detail Top of Riser: 413.00 3 in WQ Orifice Elev Top of WQ Pool: 408.61 407.00 10'Berm 415.00 100 Yr 412.45 Spillway 414.00 25 Yr 410.77 _ 10 Yr 409.86 2 Yr 409.08 A Pond Bottom 1 Yr 408.31 402.00 See Plan for accurate outlet design Inv Out: IL403.41 Diss Pad Perm Pool - Sediment Bottom Invert Out: 403.81 78 LF of 24"RCP @ 407.00 401.00 Base: 401.00 0.51 Anti-Bouyancy Calculations for the Riser Structure Riser Dimensions Weight of Structure Displaced Volume Outside Width 5.00 ft Walls= 16,200 LBS V=LxWx(HT)=C.F. Inside Width 4.00 ft Base= 6,075 LBS Outside Length 5.00 ft FILL= 5,544 lbs Displaced Water= Inside Length 4.00 ft C.F.*62.4 PCF=LBS Height 12.00 ft Outlet Pipe= 236 LBS Base Thick'(ft) 0.50 ft WQ Orifice= 4 LBS Add 15%Factor of Safety Wall Thick'(ft) 0.50 ft Ext Base(ft) 2.00 ft Weir#1 = 75 LBS V= 313 C.F. Areas removed from Riser Weir#2= 0 LBS Disp.Water= 19,500 LBS Outlet Pipe 3.14 ft Weir#3= 0 LBS 15%F.S.= 2,925 LBS WQ Orifice 0.05 ft Weir#4= 0 LBS Orifice#1 1.00 ft Other#1 = 0 LBS Safety Factor 1.23 Orifice#2 0.00 ft Orifice#3 0.00 ft Weight= 27,505 LBS Weight= 22,425 LBS Orifice#4 0.00 ft Precast Concrete Riser Structure to be 4 ft x 4 ft x 12 ft Tall,With a 0.5 ft Thick Precast Extended Other 0.00 ft Base Planting Summary Requirements Dam/Berm Non-Clumping Turf Grass 6'Shelf Length 468 Area of Shelf= 2808 SF (50 Plants per 200 SF of Area) Quantity Type Root Common Name Scientific Name Planting Size Notes 234 Herbaceous Container Quill Sedge Cerex Tenera 4"Pot 24"-36"OC _ 234 Herbaceous Container Virginia Sweetspire Itea Virginica 4"Pot 24"-36"OC _ 234 Herbaceous Container Joe Pye Weed Eupat'Fistulosus 4"Pot 24"-36"OC Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jan 10 2024 10 - Year Event Invert Elev Dn (ft) = 410.28 Calculations Pipe Length (ft) = 96.00 Qmin (cfs) = 8.34 Slope (%) = 0.55 Qmax (cfs) = 8.34 Invert Elev Up (ft) = 410.81 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 8.34 No. Barrels = 1 Qpipe (cfs) = 8.34 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 3.27 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 5.09 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 411.79 HGL Up (ft) = 411.84 Embankment Hw Elev (ft) = 412.31 Top Elevation (ft) = 415.10 Hw/D (ft) = 0.75 Top Width (ft) = 66.33 Flow Regime = Inlet Control Crest Width (ft) = 92.00 EIe .ttl 10-Year Event Hw Depth(0) 4I E CG 5.19 415.00 4.19 414.00 3.19 413.00 2.19 _Inge:coflh 412.00 1.19 1 411.00 Alb 11 .10.19 410.00 - - -0.81 409.00 - I -1.81 0 10 20 30 40 50 60 7D 00 9D 1DC 110 120 130 140 CirculerCulven HGL Embank Reach(0) Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jan 10 2024 100. - Year Event Invert Elev Dn (ft) = 410.28 Calculations Pipe Length (ft) = 96.00 Qmin (cfs) = 10.66 Slope (%) = 0.55 Qmax (cfs) = 10.66 Invert Elev Up (ft) = 410.81 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 10.66 No. Barrels = 1 Qpipe (cfs) = 10.66 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 3.99 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 5.56 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 411.86 HGL Up (ft) = 411.98 Embankment Hw Elev (ft) = 412.57 Top Elevation (ft) = 415.10 Hw/D (ft) = 0.88 Top Width (ft) = 66.33 Flow Regime = Inlet Control Crest Width (ft) = 92.00 EIe .el 100._Year Event Hw Depth(0) 4I E:C 5.19 415.00 1111///11- - 4.19 414.00 3.19 413.00 2.19 InIEt COiltf� 412.00 1.19 AL-1M11 411.00 III 0.19 410.00 - - -0.81 409.00 - -1.81 0 10 20 30 40 50 60 7D 80 9D 1D:, 110 120 130 140 CircularCulvert HGL Embank Reach(0) Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION E - RAINFALL DATA •.••••• • TIMMONS GROUP I www.timmons.com YOUR VISION ACM .THROUGH OURS. NOAA Atlas 14,Volume 2,Version 3 Location name:Youngsville,North Carolina,USA* nailhh„one , Latitude:36.0369°,Longitude:-78.4945° eA. Elevation:441.54 ft** i %� *source:ESRI Maps •"* ,a **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.85 5.65 6.47 7.22 8.02 8.62 9.16 9.62 10.1 I 10.6 (4.48-5.28) (5.21-6.16) (5.94-7.02) (6.64-7.85) (7.32-8.70) (7.82-9.35) (8.27-9.94) (8.64-10.5) (9.04-11.0) (9.36-11.5) 10-min 3.88 4.52 5.18 5.78 6.38 6.86 7.27 7.63 8.02 8.33 (3.58-4.21) (4.16-4.92) (4.76-5.62) (5.30-6.28) (5.83-6.93) (6.23-7.45) (6.57-7.89) (6.85-8.30) (7.15-8.73) (7.37-9.08) 15-min 3.23 3.79 4.36 4.87 5.40 5.79 6.13 6.41 6.73 6.98 (2.98-3.51) (3.49-4.12) (4.02-4.74) (4.47-5.29) (4.93-5.86) (5.26-6.28) (5.54-6.65) (5.76-6.98) (6.00-7.33) (6.16-7.60) 30-min 2.21 1 2.62 3.10 3.53 4.00 4.36 4.69 4.99 5.36 5.65 (2.04-2.41) (2.41-2.85) (2.85-3.37) (3.24-3.83) (3.65-4.34) (3.96-4.73) (4.24-5.09) (4.48-5.43) (4.77-5.83) (4.99-6.16) 60-min 1.38 1.64 1.99 2.30 2.66 2.95 3.23 3.50 3.84 4.12 (1.27-1.50) I (1.51-1.79) (1.83-2.16) (2.11-2.50) I (2.43-2.89) (2.68-3.21) (2.92-3.51) I (3.14-3.81) (3.42-4.18) I (3.64-4.49) 2-hr 0.810 0.966 1.18 1.38 1.62 1.82 2.02 2.22 1 2.48 I 2.70 (0.740-0.888) (0.886-1.06) (1.08-1.29) (1.26-1.51) (1.46-1.76) (1.64-1.98) (1.81-2.20) (1.97-2.41) (2.18-2.69) (2.35-2.94) 3-hr 0.573 0.684 0.839 0.987 1.17 1.33 1.49 1.65 1.87 2.06 (0.522-0.632) (0.625-0.754) (0.765-0.925) (0.896-1.08) (1.06-1.28) (1.19-1.46) (1.32-1.63) (1.46-1.80) (1.63-2.04) (1.78-2.26) 6-hr 0.344 il 0.411 0.505 1 0.595 0.708 1 0.808 0.907 1.01 1.15 1.28 (0.314-0.380) (0.376-0.453) (0.460-0.556)1(0.541-0.654)1(0.639-0.776)1(0.724-0.884) (0.807-0.993) (0.891-1.10) 1 (1.00-1.26) (1.10-1.40) 12-hr 0.202 0.241 0.298 0.352 0.422 0.485 0.548 0.616 0.710 0.794 (0.185-0.222) (0.222-0.264) (0.273-0.327) (0.322-0.386) (0.384-0.462) (0.437-0.528) (0.489-0.596) (0.543-0.669) (0.616-0.771) (0.679-0.863) 24-hr 0.120 0.145 0.181 0.209 0.248 0.279 0.310 0.342 0.386 0.421 (0.112-0.129) (0.135-0.155) (0.169-0.194) (0.195-0.225) (0.231-0.266) (0.258-0.299) (0.286-0.333) (0.315-0.368) (0.354-0.415) (0.384-0.453) 2-day 0.070 0.084 0.104 0.120 0.141 0.158 0.175 0.192 0.216 0.234 (0.065-0.075) (0.078-0.090) (0.097-0.111) (0.112-0.128) (0.131-0.151) (0.146-0.169) (0.161-0.187) (0.177-0.206) (0.198-0.232) (0.214-0.253) 3-day 0.049 0.059 0.073 0.084 0.099 0.110 0.122 0.134 0.151 0.164 (0.046-0.053) (0.055-0.063) (0.068-0.078) (0.078-0.090) (0.092-0.106) (0.102-0.118) (0.113-0.131) (0.124-0.144) (0.138-0.162) (0.150-0.177) 4-day 0.039 0.047 0.057 0.066 0.077 0.087 0.096 0.105 0.118 0.129 (0.036-0.042) (0.044-0.050) (0.054-0.061) (0.062-0.070) (0.072-0.083) (0.080-0.093) (0.089-0.103) (0.097-0.113) (0.109-0.127) (0.118-0.139) 7-day 0.026 0.031 0.037 0.043 0.050 0.055 0.061 0.067 0.075 0.082 (0.024-0.028) (0.029-0.033) (0.035-0.040) (0.040-0.045) (0.046-0.053) (0.052-0.059) (0.057-0.066) (0.062-0.072) (0.069-0.081) (0.075-0.088) 10-day 0.020 0.024 0.029 0.033 0.038 0.042 0.047 0.051 i 0.056 0.061 (0.019-0.022) (0.023-0.026) (0.027-0.031) (0.031-0.035) (0.036-0.041) (0.040-0.045) (0.043-0.050) (0.047-0.054) (0.052-0.060) (0.056-0.065) 20-day 0.014 0.016 0.019 0.021 0.025 0.027 0.030 0.032 I 0.036 0.038 (0.013-0.015) (0.015-0.017) (0.018-0.020) (0.020-0.023) (0.023-0.026) (0.025-0.029) (0.028-0.032) (0.030-0.034) (0.033-0.038) (0.035-0.041) 30-day 0.011 0.013 0.016 0.017 0.019 0.021 0.023 0.025 0.027 0.029 (0.011-0.012) (0.013-0.014) (0.015-0.016) (0.016-0.018) (0.018-0.021) (0.020-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.029) (0.026-0.030) 45-day 0.010 0.011 0.013 0.014 0.016 0.017 0.018 0.019 0.021 0.022 (0.009-0.010) (0.011-0.012) (0.012-0.014) (0.013-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.020-0.022) (0.021-0.024) 60-day 0.009 0.010 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.019 (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.017)1(0.017-0.019) (0.018-0.020) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based intensity-duration-frequency (IDF) curves Latitude: 36.0369°, Longitude: -78.4945° 100.000 Average recurrence interval L 10.000 - (years) 1 41.000 -•-•-- - d �- - 5 c \ — 25 0.100 -... em,=, - co — 50 a` 0.010 --- - - -= 500 — 1000 0.001 c c c c c i- I I- >, >,>. >. >, >, >, >,>. .F .- . L L . L L r0 r0 40 N Z0 2 2 r0 40 Vl - - rn r-I N N AI� O ID r-I N rn .7 VZ Duration 100.000 , I I I 10.000 •- c • Duration 7/1 1.000 - - — 5-min — 2-day ai — 10-min — 3-day c 15-min — 4-day o ::: : : - 10 day - - 3-hr — 30-day — 6fir — 45-day — 12-hr — 60-day 0.001 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Tue Aug 23 12:12:55 2022 Back to Top Maps & aerials Small scale terrain Young sville '+ 3km 2mi Large scale terrain • 'Lyfctlburg sburg s Roanoke N orfol -Sal ern O • • Durham ■� RockyMount Raleigh • • Greene H CARCLINA + harl^rro Amami , p 100km 60mi Jacksonville • Large scale map 3lackshurg ,ttoanoke Norte ston-6alem Greensboro U Rocky Mount R�leigh Green vi II- North Carolina tarlotte F ayettevi lle 100km 60mi Jacksonville Large scale aerial lack_tiir N orf of ston-Salem • Durham , Rocky Mount Greensboro Raleigh • Greenville North Carolina. arlotte • Fayetteville 100km 60mi Jacksonville Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@ noaa.gov Disclaimer Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION F - STORM ANALYSIS - 100 SERIES Storm Sewer Summary Report Velocity Report - 2 YR Inlet Gutter Spread Report - 4" / HR Hydraulic Grade Line Computation - 10 YR • 4 �s www.timmons.com TIMMONS GROUP Pipes Page 1 Line Junct Inlet DnStm Drng Tc i Runoff Incr Total Capac Line Line n-val Line Invert Invert Gnd/Rim Gnd/Rim HGL HGL No. Type ID Ln No Area Sys Coeff Q Runoff Full Length Size Pipe Slope Up Dn El Up El Dn Up Dn (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (ft) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 Grate 01101 Outfall 0.07 14.6 5.07 0.70 0.35 24.42 30.47 164.891 30 0.013 0.55 407.91 407.00 413.31 409.79 410.92 409.86 2 Comb. CB 103 1 0.30 14.4 5.10 0.70 1.51 24.32 30.31 87.877 30 0.013 0.55 408.49 408.01 414.10 413.31 411.91 411.35 3 Comb. CB 104 2 0.19 14.3 5.11 0.70 0.96 23.29 30.57 27.000 30 0.013 0.56 408.74 408.59 414.10 414.10 412.58 412.42 4 Comb. CB 105 3 0.05 14.1 5.15 0.70 0.25 19.90 32.84 88.916 30 0.013 0.64 409.41 408.84 416.01 414.10 414.07 413.65 5 Comb. CB 106 4 0.22 13.9 5.17 0.70 1.11 19.81 76.48 55.781 30 0.013 3.48 411.45 409.51 417.83 416.01 415.11 414.84 6 Comb. CB 107 5 0.26 12.4 5.43 0.70 1.31 16.36 82.85 134.536 30 0.013 4.08 417.33 411.84 424.71 417.83 419.02 j 415.87 7 Comb. CB 108 6 0.23 12.0 5.49 0.70 1.16 14.69 51.81 157.031 24 0.013 5.25 425.68 417.44 433.29 424.71 427.39 419.02 8 Comb. CB 109 7 0.21 11.7 5.55 0.70 1.06 13.10 48.29 141.705 24 0.013 4.56 432.25 425.79 441.04 433.29 433.91 427.39 9 Comb. CB 110 8 0.32 11.4 5.61 0.70 1.62 11.51 40.17 130.628 24 0.013 3.15 436.37 432.25 447.82 441.04 437.97 j 433.91 10 Comb. CB 111 9 0.10 10.8 5.73 0.70 0.50 8.94 39.81 207.515 24 0.013 3.10 442.80 436.37 452.59 447.82 444.30 j 437.97 11 Comb. CB 112 10 0.06 10.6 5.76 0.70 0.30 8.15 41.05 66.493 24 0.013 3.29 444.99 442.80 453.62 452.59 446.46 j 444.30 12 Comb. CB 113 11 0.16 10.5 5.79 0.70 0.81 7.86 36.75 42.431 24 0.013 2.64 446.11 444.99 455.44 453.62 447.56 j 446.46 13 Comb. CB 126 12 0.17 9.4 6.02 0.70 0.86 2.36 16.60 100.065 18 0.013 2.50 449.11 446.61 457.50 455.44 449.69 j 447.56 14 Comb. CB 127 13 0.09 6.3 6.81 0.70 0.45 0.86 11.38 136.165 15 0.013 3.11 453.59 449.36 460.56 457.50 453.95 449.69 15 Comb. CB 128 14 0.09 5.0 7.21 0.70 0.45 0.45 10.55 28.842 15 0.013 2.67 454.36 453.59 460.81 460.56 454.62 j 453.95 16 Comb. CB 126A 13 0.21 5.0 7.21 0.70 1.06 1.06 6.49 43.587 15 0.013 1.01 449.80 449.36 458.35 457.50 450.20 449.70 17 Comb. CB 114 12 0.21 6.9 6.62 0.70 1.06 5.66 17.95 27.000 24 0.013 0.63 446.38 446.21 455.44 455.44 447.73 447.56 18 Comb. CB 115 17 0.12 6.7 6.68 0.70 0.61 4.72 17.43 48.841 24 0.013 0.59 446.77 446.48 453.60 455.44 448.07 447.78 19 Comb. CB 116 18 0.09 6.5 6.75 0.70 0.45 3.78 20.63 57.701 24 0.013 0.83 447.35 446.87 454.14 453.60 448.60 448.07 20 Comb. CB 117 19 0.22 6.0 6.90 0.70 1.11 1.98 26.10 103.666 24 0.013 1.33 448.73 447.35 455.31 454.14 449.88 j 448.60 21 Comb. CB 117A 20 0.16 5.0 7.21 0.70 0.81 0.81 13.84 27.042 18 0.013 1.74 449.70 449.23 455.33 455.31 450.03 j 449.88 22 Grate DI 118 20 0.03 5.0 7.21 0.70 8.58 0.15 28.85 33.196 24 0.013 1.63 449.27 448.73 455.27 455.31 450.31 j 449.88 23 Dp-Curb TI 116A 19 0.30 5.0 7.21 0.70 1.51 1.51 9.15 42.789 15 0.013 2.01 448.96 448.10 455.51 454.14 449.45 j 448.60 Project File: New.stm Number of lines. 38 Date: 1/11/2024 NOTES: Intensity=70.39/(Inlet time+ 12 30)A 0.80--Return period= 10 Yrs. ; "Critical depth Storm Sewers Pipes Page 2 Line Junct Inlet DnStm Drng Tc i Runoff Incr Total Capac Line Line n-val Line Invert Invert Gnd/Rim Gnd/Rim HGL HGL No. Type ID Ln No Area Sys Coeff Q Runoff Full Length Size Pipe Slope Up Dn El Up El Dn Up Dn (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (ft) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 24 Comb. CB 115A 18 0.09 5.0 7.21 0.70 0.45 0.45 6.46 27.000 15 0.013 1.00 447.79 447.52 453.73 453.60 448.05 j 448.07 25 Comb. CB 112A 11 0.02 5.0 7.21 0.70 0.10 0.10 6.46 27.000 15 0.013 1.00 446.01 445.74 453.63 453.62 446.13 446.46 26 Grate DI 111A 10 0.11 5.0 7.21 0.70 0.56 0.56 12.28 96.432 15 0.013 3.62 447.04 443.55 457.46 452.59 447.33j 444.30 27 Comb. CB 124 9 0.38 5.0 7.21 0.70 1.92 1.92 6.47 40.782 15 0.013 1.01 439.59 439.18 449.22 447.82 440.14 439.65 28 Grate 01134 3 0.27 12.4 5.43 0.70 1.36 3.04 19.54 57.768 18 0.013 3.46 410.97 408.97 420.93 414.10 413.70 413.65 29 Grate DI 135 28 0.13 9.0 6.11 0.70 0.66 2.27 24.22 283.843 18 0.013 5.32 426.17 411.07 433.33 420.93 426.74 j 413.72 30 Grate DI 136 29 0.16 7.5 6.48 0.70 0.81 1.81 14.37 145.724 15 0.013 4.95 433.64 426.42 440.33 433.33 434.18 426.74 31 Grate DI 137 30 0.24 5.0 7.21 0.70 1.21 1.21 11.59 146.533 15 0.013 3.22 438.36 433.64 447.19 440.33 438.79 j 434.18 32 Comb. CB 109A 8 0.23 5.0 7.21 0.70 1.16 1.16 6.52 28.491 15 0.013 1.02 433.78 433.49 441.60 441.04 434.20 433.91 33 Comb. CB 120 5 0.26 13.7 5.20 0.70 1.31 3.46 6.08 26.855 18 0.013 0.34 412.87 412.78 417.82 417.83 415.90 415.87 34 Grate DI 121 33 0.30 12.8 5.36 0.70 1.51 2.59 9.78 99.054 18 0.013 0.87 413.83 412.97 418.38 417.82 415.99 415.93 35 Grate DI 123 34 0.13 8.1 6.33 0.70 0.66 1.73 22.70 305.328 18 0.013 4.67 428.20 413.93 434.02 418.38 428.69 j 416.04 36 Grate DI 125 35 0.26 5.0 7.21 0.70 1.31 1.31 22.43 136.996 18 0.013 4.56 434.55 428.30 441.51 434.02 434.98 428.69 37 Comb. CB 122 7 0.22 5.0 7.21 0.70 1.11 1.11 14.69 29.125 18 0.013 1.96 428.09 427.52 433.92 433.29 428.48 427.80 38 Comb. CB 107A 6 0.22 5.0 7.21 0.70 1.11 1.11 7.24 38.206 15 0.013 1.26 420.58 420.10 426.19 424.71 420.99 420.43 Project File: New.stm Number of lines:38 Date: 1/11/2024 NOTES: Intensity=70.39/(Inlet time+ 12.30)^0.80--Return period=10 Yrs. ; **Critical depth Storm Sewers Velocity Page 1 Line Junct Inlet DnStm Total Tc i Total Vel Line Line n-val Line No. Type ID Ln No Area Sys Runoff Ave Length Size Pipe Slope (ac) (min) (in/hr) (cfs) (ft/s) (ft) (in) (%) 1 Grate 01101 Outfall 6.88 17.2 3.58 17.23 5.23 164.891 30 0.013 0.55 2 Comb. CB 103 1 6.81 17.0 3.60 17.18 5.22 87.877 30 0.013 0.55 3 Comb. CB 104 2 6.51 16.9 3.61 16.46 5.07 27.000 30 0.013 0.56 4 Comb. CB 105 3 5.52 16.6 3.64 14.08 4.59 88.916 30 0.013 0.64 5 Comb. CB 106 4 5.47 16.4 3.66 14.03 5.65 55.781 30 0.013 3.48 6 Comb. CB 107 5 4.30 14.2 3.93 11.83 7.48 134.536 30 0.013 4.08 7 Comb. CB 108 6 3.82 13.8 3.98 10.65 7.61 157.031 24 0.013 5.25 8 Comb. CB 109 7 3.37 13.4 4.03 9.51 7.14 141.705 24 0.013 4.56 9 Comb. CB 110 8 2.93 13.0 4.08 8.37 6.65 130.628 24 0.013 3.15 10 Comb. CB 111 9 2.23 12.4 4.18 6.52 6.21 207.515 24 0.013 3.10 11 Comb. CB 112 10 2.02 12.1 4.21 5.95 6.23 66.493 24 0.013 3.29 12 Comb. CB 113 11 1.94 12.0 4.23 5.74 6.23 42.431 24 0.013 2.64 13 Comb. CB 126 12 0.56 10.6 4.45 1.74 2.55 100.065 18 0.013 2.50 14 Comb. CB 127 13 0.18 6.7 5.23 0.66 3.27 136.165 15 0.013 3.11 15 Comb. CB 128 14 0.09 5.0 5.65 0.36 1.87 28.842 15 0.013 2.67 16 Comb. CB 126A 13 0.21 5.0 5.65 0.83 3.25 43.587 15 0.013 1.01 17 Comb. CB 114 12 1.22 7.3 5.09 4.34 6.07 27.000 24 0.013 0.63 18 Comb. CB 115 17 1.01 7.1 5.13 3.63 5.92 48.841 24 0.013 0.59 19 Comb. CB 116 18 0.80 6.8 5.19 2.91 5.90 57.701 24 0.013 0.83 20 Comb. CB 117 19 0.41 6.3 5.32 1.53 5.24 103.666 24 0.013 1.33 21 Comb. CB 117A 20 0.16 5.0 5.65 0.63 1.74 27.042 18 0.013 1.74 22 Grate 01118 20 0.03 5.0 5.65 0.12 4.93 33.196 24 0.013 1.63 23 Dp-Curb TI 116A 19 0.30 5.0 5.65 1.19 3.05 42.789 15 0.013 2.01 Project File: New.stm Number of lines:38 Date: 1/11/2024 NOTES: Intensity=74.33/(Inlet time+ 13.20)A 0.89--Return period=2 Yrs. ; **Critical depth Storm Sewers Velocity Page 2 Line Junct Inlet DnStm Total Tc i Total Vel Line Line n-val Line No. Type ID Ln No Area Sys Runoff Ave Length Size Pipe Slope (ac) (min) (in/hr) (cfs) (ft/s) (ft) (in) (%) 24 Comb. CB 115A 18 0.09 5.0 5.65 0.36 1.53 27.000 15 0.013 1.00 25 Comb. CB 112A 11 0.02 5.0 5.65 0.08 0.83 27.000 15 0.013 1.00 26 Grate DI 111A 10 0.11 5.0 5.65 0.43 1.54 96.432 15 0.013 3.62 27 Comb. CB 124 9 0.38 5.0 5.65 1.50 3.85 40.782 15 0.013 1.01 28 Grate 01134 3 0.80 14.4 3.90 2.18 1.32 57.768 18 0.013 3.46 29 Grate 01135 28 0.53 10.1 4.53 1.68 2.27 283.843 18 0.013 5.32 30 Grate DI 136 29 0.40 8.2 4.90 1.37 5.35 145.724 15 0.013 4.95 31 Grate 01137 30 0.24 5.0 5.65 0.95 2.64 146.533 15 0.013 3.22 32 Comb. CB 109A 8 0.23 5.0 5.65 0.91 3.34 28.491 15 0.013 1.02 33 Comb. CB 120 5 0.95 16.2 3.69 2.45 3.26 26.855 18 0.013 0.34 34 Grate DI 121 33 0.69 15.0 3.83 1.85 3.01 99.054 18 0.013 0.87 35 Grate 01123 34 0.39 8.9 4.75 1.30 3.21 305.328 18 0.013 4.67 36 Grate DI 125 35 0.26 5.0 5.65 1.03 3.29 136.996 18 0.013 4.56 37 Comb. CB 122 7 0.22 5.0 5.65 0.87 3.68 29.125 18 0.013 1.96 38 Comb. CB 107A 6 0.22 5.0 5.65 0.87 3.44 38.206 15 0.013 1.26 Project File: New.stm Number of lines:38 Date: 1/11/2024 NOTES: Intensity=74.33/(Inlet time+ 13.20)A 0.89--Return period=2 Yrs. ; **Critical depth Storm Sewers Spread Page 1 Line Inlet Junct Byp Drng Inlet i Runoff Incr Q Q Q Gutter Gutter No. ID Type Ln No Area Time Inlet Coeff Q Carry Capt Byp Slope Spread (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (cfs) (ft/ft) (ft) 1 D1101 Grate Offsite 0.07 5.0 4.00 0.70 0.20 0.00 0.20 0.00 0.047 0.68 2 CB 103 Comb. Sag 0.30 5.0 4.00 0.70 0.84 0.00 0.84 0.00 Sag 2.60 3 CB 104 Comb. Sag 0.19 5.0 4.00 0.70 0.53 0.00 0.53 0.00 Sag 2.00 4 CB 105 Comb. Offsite 0.05 5.0 4.00 0.70 0.14 0.04 0.18 0.00 0.029 1.81 5 CB 106 Comb. 4 0.22 5.0 4.00 0.70 0.62 0.06 0.63 0.04 0.036 3.69 6 CB 107 Comb. Offsite 0.26 5.0 4.00 0.70 0.73 0.00 0.69 0.03 0.054 3.44 7 CB 108 Comb. Offsite 0.23 5.0 4.00 0.70 0.64 0.00 0.62 0.02 0.055 3.19 8 CB 109 Comb. Offsite 0.21 5.0 4.00 0.70 0.59 0.00 0.58 0.01 0.057 2.99 9 CB 110 Comb. Offsite 0.32 5.0 4.00 0.70 0.90 0.00 0.82 0.08 0.046 4.03 10 CB 111 Comb. Offsite 0.10 5.0 4.00 0.70 0.28 0.00 0.28 0.00 0.015 2.85 11 CB 112 Comb. Offsite 0.06 5.0 4.00 0.70 0.17 0.00 0.17 0.00 0.028 1.77 12 CB 113 Comb. Offsite 0.16 5.0 4.00 0.70 0.45 0.00 0.43 0.01 0.025 3.25 13 CB 126 Comb. Offsite 0.17 5.0 4.00 0.70 0.48 0.00 0.46 0.02 0.023 3.45 14 CB 127 Comb. Sag 0.09 5.0 4.00 0.70 0.25 0.00 0.25 0.00 Sag 1.18 15 CB 128 Comb. Sag 0.09 5.0 4.00 0.70 0.25 0.00 0.25 0.00 Sag 1.18 16 CB 126A Comb. Offsite 0.21 5.0 4.00 0.70 0.59 0.00 0.55 0.04 0.023 3.87 17 CB 114 Comb. Offsite 0.21 5.0 4.00 0.70 0.59 0.00 0.55 0.04 0.023 3.87 18 CB 115 Comb. Sag 0.12 5.0 4.00 0.70 0.34 0.00 0.34 0.00 Sag 1.39 19 CB 116 Comb. Offsite 0.09 5.0 4.00 0.70 0.25 0.00 0.25 0.00 0.014 2.72 20 CB 117 Comb. Offsite 0.22 5.0 4.00 0.70 0.62 0.00 0.55 0.06 0.014 4.51 21 CB 117A Comb. Offsite 0.16 5.0 4.00 0.70 0.45 0.00 0.42 0.03 0.014 3.82 22 01118 Grate Offsite 0.03 5.0 4.00 0.70 8.51 0.00 8.33 0.19 0.044 2.84 23 TI 116A Dp-Curb Sag 0.30 5.0 4.00 0.70 0.84 0.00 0.84 0.00 Sag 0.57 Project File: New.stm Number of lines. 38 Date: 1/11/2024 NOTES: Intensity=380299500.00/(Inlet time+ 120.10)A 3.80--Return period=3 Yrs. ; "Critical depth Storm Sewers Spread Page 2 Line Inlet Junct Byp Drng Inlet i Runoff Incr Q Q Q Gutter Gutter No. ID Type Ln No Area Time Inlet Coeff Q Carry Capt Byp Slope Spread (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (cfs) (ft/ft) (ft) 24 CB 115A Comb. Sag 0.09 5.0 4.00 0.70 0.25 0.00 0.25 0.00 Sag 1.18 25 CB 112A Comb. Offsite 0.02 5.0 4.00 0.70 0.06 0.00 0.06 0.00 0.011 1.40 26 DI 111A Grate Offsite 0.11 5.0 4.00 0.70 0.31 0.00 0.31 0.00 0.018 0.97 27 CB 124 Comb. Offsite 0.38 5.0 4.00 0.70 1.06 0.00 0.92 0.14 0.037 4.64 28 01134 Grate Offsite 0.27 5.0 4.00 0.70 0.76 0.00 0.76 0.00 0.127 0.94 29 01135 Grate Offsite 0.13 5.0 4.00 0.70 0.36 0.00 0.36 0.00 0.044 0.87 30 DI 136 Grate Offsite 0.16 5.0 4.00 0.70 0.45 0.00 0.45 0.00 0.091 0.82 31 D1137 Grate Sag 0.24 5.0 4.00 0.70 0.67 0.00 0.67 0.00 Sag 0.67 32 CB 109A Comb. Offsite 0.23 5.0 4.00 0.70 0.64 0.00 0.62 0.02 0.056 3.17 33 CB 120 Comb. 5 0.26 5.0 4.00 0.70 0.73 0.00 0.67 0.06 0.034 3.91 34 DI 121 Grate Sag 0.30 5.0 4.00 0.70 0.84 0.00 0.84 0.00 Sag 0.78 35 01123 Grate Offsite 0.13 5.0 4.00 0.70 0.36 0.00 0.36 0.00 0.029 0.94 36 DI 125 Grate Offsite 0.26 5.0 4.00 0.70 0.73 0.00 0.73 0.00 0.042 1.14 37 CB 122 Comb. Offsite 0.22 5.0 4.00 0.70 0.62 0.00 0.60 0.02 0.054 3.12 38 CB 107A Comb. Offsite 0.22 5.0 4.00 0.70 0.62 0.00 0.60 0.02 0.054 3.12 Project File: New.stm Number of lines:38 Date: 1/11/2024 NOTES: Intensity=380299500.00/(Inlet time+120.10)^3.80--Return period=3 Yrs. ; "Critical depth Storm Sewers Storm Sewer Profile Proj. file: New.stm _ o f4 N CO �' Ct) CO t` CO O x- C m C 7 C 7 C= 7 C j C 5 C 7 C 5 C 7 C 7 m 0 C J O.C J O C J Q C J O C J Oc J C J C J C J C J0 O O ' MOO 00cs, O4Lo co' Or-oo co �Vx> co .vcq ' NC N N CON. CNN �MM CO CO['1CO O ti Co co N co Co cO V Co W CO CA O) 4 r.-, O N N-N- O M IC)Cn d.N N C, 4-CO C0 CO U N Elev. ft P. 00 00 00 0o NN MM MM V O V 4 Vd'7 N :Tr O �V7 ca V�V Ti ;V� O y�V Cfl 4VV yVV Co V'cp� O V'� ( ) O W C0 f� c0 N • Ct7 Cf) • CO • } • p -6 W WWW N WWW N WWW co WWW V WWW i.r) WWW n WWW W WWW rn WWW W W co E >• t° E » :o E> > m E » cz E > > :o E 5> c E » as E » as E » co E » as E to O S CO E.c co E c E co D! E cn i2EE co D: = Co E to RE.E Co Ir E co E E c to E2 c 485.00 - —485.00 467.00 — • 467.00 449.00 / 449.00 431.00 — - 431.00 11. 111 _ / 207.515Lf-24"@3.10% �_ / — 130.E 28Lf-24"@ 3.15% 413.00 �I__ IIIIP— — 141.705Lf-24"@ 4.56% 413.00 ----- 1 — 157031If_24 n525% i_ 07.877_f-30•'iQ 0. 5%55.781 Lf-aft" - .48% — 164.891 Lt-30•'CO,0.55"/o — 513.976Lt-30•'L U.64% 395.00 395.00 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm N h 00 0) O N N 7 C 7 C j C 7 C 7 J O C 7 J C C 7 O C J O.C —IC C C C J C J O J O O_ _O_ 0 W o o ' N O)Q) ' cr. 4co co ' Ohh ' 't(AL[) c.,co • MO B co coM (0M0 V �,N 't '.CM4 (0hco M MM N MNN C'' N. CDLoNV Tr ui may.rY 0) Lo CO CO 7CO W 0d.V' 2�� V �V7 CO COm �Voi U LoR Elev. (ft) o v v co �. o . M ?vv �vv • N . v d. co d'v oW W W O WWW WWW WWW WWW N WWW M WWW M WW as E > > }a E » to E > > co E » co E » as E > > cc o' > > cosE co E co 'ELSE coE c c tc 5E to Ecc u) Ecc *IEEE cocoE c to Ec 464.00 464.00 459.00 — 459.00 K 454.00 ' \` I 454.00 I 449.00 ---__-_ - ____ 449.00 y — 666Lf 2 Y 444.00 — ,7.701 Lf-24"A 0.83% — 2 .042Lf-18"@ 1.74% 444.00 — 48R411f-24"n056% 27.0001f 21"@ 9.63% — 42.431L1-24"@2.647o - - b6.493Lt-24"L 3.29 h 439.00 439.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm co C O C J O E C O E J 0 Tr • J _ -CO Lo o_co � in co•M O0 �cr)�• co 0cMM O co o • V Elev. (ft) o v v NI- o 71- co°i �_co m y oWWW WWW N WWW N El mE > > co E > > cc3 E» m E > co c c cn 12== co iEcE co 02c 472.00 — —472.00 466.00 — —466.00 460.00 460.00 454.00 — 454.00 11°0 6.16 448.00 _ -- - 5R467% • 100.066Lf-18' @ 442.00 — L 442.00 0 25 50 75 100 125 150 175 200 225 250 275 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm CD o o= -J 0 Elev. (ft) o v v v v4 o III ww o L.T. mE > > m E> cnE c c in E5 466.00 466.00 462.00 462.00 458.00 —458.00 454.00 454.00 450.00 --- -_ _-JM —450.00 446.00 446.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm N N 7 C 7 o. -J 0 M co n CO N N g2W LC)� Elev. (ft) g v CO,v M y o W W w o ww mE > > co E > coEcc (I) ii.E 461.00 461.00 458.00 - . 458.00 / • 455.00 455.00 452.00 452.00 449.00 449.00 - 33-196Lf-24"@ 1.63% 446.00 446.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm () N 3 . 0 E - _0 O co O0 ho0 I"- LoM Elev. (ft) o CV K*� oWww o El w coE > > co E> coFc c c EE 465.00 465.00 461.00 - 461.00 457.00 457.00 , —I I 453.00 453.00 449.00 —449.00 _ 12.789Lf-15 - 2.-1% . 445.00 445.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm .. 7 7 OE = 0 J ° nto o-or <oti o ,Mr- • Elev. (ft) o N , � oWww o ww m E > > ;g E> NE c c cn Fec 460.00 460.00 457.00 - • 457.00 454.00 / 454.00 451.00 451.00 448.00 \ --- 448.00 27.00JLf-15 g 1.00% 445.00 445.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm Lo 7 N7 OE E 0 Na)- M� GO a)ti co.O O R L O co O Elev. (ft) o N 0Www o ww co c c u) D c 463.00 — - —463.00 459.00 459.00 455.00 455.00 451.00 451.00 447.00 ' - • - • - —447.00 • 27.000Lf 15"@ 1.00% • 443.00 443.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm co CV 7 . 0 E J o its co Lo N 0 O" NM �I� Elev. (ft) o v a �� oWww o ww co co E 5 469.00 as E 469.00 463.00 - • 463.00 457.00 — —457.00 451.00 1 —451.00 -------------------------- 445.00 -- — — — 96.432Lf-i o"@ 3.G2% 445.00 • 439.00 439.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm N ' 7 OE -j 0 — n coN NLo el co a M coCD V c.,Elev. (ft) o v. v v 6 oWww o ww co > > co E > cnR c c cn Ec 456.00 456.00 452.00 - 452.00 • • • • 448.00 —448.00 444.00 444.00 • • 440.00 • • 440.00 mli ----- —=------ 40.7©2Lf 16"@ 1.01 436.00 436.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm co' 7 E 5 OE -J 0 V p" ' OM O N — CO O- N M I. Elev. (ft) o' y r N v v oWww o Ww co ii. c c co E 5 450.00 450.00 446.00 - 446.00 442.00 / 442.00 438.00 438.00 434.00 8.4 L - 434.00 291Lf-15" 112% 430.00 430.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm M a C 7 o C J 0 N co CN/ ") p Elev. (ft) $ N v� oWww o ww cn ii" c c u) Fe 440.00 440.00 437.00 . 437.00 434.00 / 434.00 431.00 431.00 428.00 - — --T - @ 428.00 1.9b% 29.125Lf-18" • 425.00 425.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm c) d' co co co co co co j C 5 C 5 C 7 C 5 O C J Q C J Q C J O E J 0 0 co 2 co.co o) cD 0) M qNM M U7in Q n N 0p rNN o) coMM N MNN N• '-M Elev. (ft) o v v N �vv N 7rvv M TvvCO ,ZI•v owww C) www www v Www Ln El as E > > as E > > }a E > ; :° E> > m E > c c c u) ri c c c c E c c u) iE c 460.00 460.00 449.00 • 449.00 438.00 438.00 456%.......i......,.........................................„„_ • • 13690 427.00 427.00 3p5 '1B 416.00 ---r�'s- -- --- • 416.00 • • [a — 99.054LF-18"@ 0.87% 26.855Lt-18"L 0.34% 405.00 405.00 0 50 100 150 200 250 300 350 400 450 500 550 600 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: New.stm co ci O N (+) N C�) 7 C 7 C 7 7 pc J pc J pc J OE J 0 O n W • C) c' Mr-•c M�� Corn OO GOOD O NO� W MCOCO U)• �MM —O NCO Elev. (ft) $ v v in .4rry �vv ?vv M ?v el WWW O WWW M WWW WWW C+O L.T. coE > > co E » m E » co E 5 5 Qs E> coE2 c c co E25c co E2 E E co .C2cc to Fe 473.00 473.00 458.00 458.00 443.00 .I 443.00 _-� 3. 2/ _ — 33y5C i" 146.G 428.00 — @ —428.00� /•_ A45. / / 2$315 413.00 _ • 413.00 — 55.000Lt-18"L 3.45% 398.00 I 398.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 HGL EGL Reach (ft) Storm Sewers Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION G - STORM ANALYSIS - 200 SERIES Storm Sewer Summary Report Velocity Report - 2 YR Inlet Gutter Spread Report - 4" / HR Hydraulic Grade Line Computation - 10 YR • 4 �s www.timmons.com TIMMONS GROUP Pipes Page 1 Line Junct Inlet DnStm Drng Tc i Runoff Incr Total Capac Line Line n-val Line Invert Invert Gnd/Rim Gnd/Rim HGL HGL No. Type ID Ln No Area Sys Coeff Q Runoff Full Length Size Pipe Slope Up Dn El Up El Dn Up Dn (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (ft) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 Grate DI 201 Outfall 0.02 19.8 4.40 0.65 0.09 19.43 66.12 36.628 36 0.013 0.98 407.39 407.03 413.72 410.36 409.11 409.86 2 Comb. CB 203 1 0.16 19.3 4.46 0.65 0.75 19.62 66.70 133.972 36 0.013 1.00 408.63 407.29 419.79 413.72 410.36 j 409.11 3 Comb. CB 204 2 0.16 19.0 4.49 0.65 0.75 17.97 68.82 101.575 30 0.013 2.82 412.00 409.14 425.85 419.79 413.77 410.36 4 Comb. CB 205 3 0.02 18.7 4.53 0.65 0.09 17.65 101.89 114.702 30 0.013 6.17 419.18 412.10 432.76 425.85 420.93 413.77 5 Comb. CB 206 4 0.11 18.6 4.53 0.65 0.52 17.62 82.80 26.496 30 0.013 4.08 420.36 419.28 432.68 432.76 422.11 420.93 6 Grate DI 207 5 0.44 18.4 4.56 0.65 2.06 17.41 31.80 94.802 30 0.013 0.60 421.03 420.46 435.64 432.68 422.78 422.19 7 Grate DI 208 6 0.16 17.8 4.63 0.65 0.75 15.48 63.79 193.007 30 0.013 2.42 425.80 421.13 434.86 435.64 427.48 422.78 8 Grate DI 209 7 0.15 17.5 4.67 0.65 0.70 15.10 31.88 90.998 30 0.013 0.60 426.55 426.00 432.96 434.86 428.22 427.62 9 Comb. CB 210 8 0.53 14.8 5.04 0.65 2.48 14.86 31.74 96.807 30 0.013 0.60 427.33 426.75 433.33 432.96 428.99 428.36 10 Comb. CB 211 9 0.30 11.1 5.67 0.65 1.41 11.35 33.37 138.994 30 0.013 0.66 428.45 427.53 435.66 433.33 429.98 428.99 11 Comb. CB 212 10 0.11 10.0 5.90 0.65 0.52 9.16 54.48 260.155 30 0.013 1.76 433.24 428.65 440.76 435.66 434.68 429.98 12 Comb. CB 213 11 0.18 9.4 6.01 0.65 0.84 8.20 31.54 115.005 30 0.013 0.59 433.92 433.24 443.17 440.76 435.32 j 434.68 13 Comb. CB 214 12 0.06 9.3 6.03 0.65 0.28 4.71 7.56 27.000 15 0.013 1.37 435.54 435.17 443.16 443.17 436.42 435.88 14 Comb. CB 216 13 0.23 8.9 6.12 0.65 1.08 2.75 12.44 57.974 15 0.013 3.71 437.79 435.64 444.65 443.16 438.45 j 436.42 15 Comb. CB 217 14 0.30 7.6 6.46 0.65 1.41 1.93 10.21 142.807 15 0.013 2.50 441.46 437.89 450.01 444.65 442.01 j 438.45 16 Grate DI 218 15 0.16 5.0 7.21 0.65 0.75 0.75 7.19 93.683 15 0.013 1.24 442.82 441.66 449.60 450.01 443.16 j 442.01 17 Comb. CB 229 13 0.20 7.4 6.51 0.65 0.94 1.90 10.53 42.878 15 0.013 2.66 436.68 435.54 445.91 443.16 437.23 j 436.42 18 Comb. CB 230 17 0.25 5.0 7.21 0.65 1.17 1.17 14.62 135.825 15 0.013 5.12 443.64 436.68 450.46 445.91 444.07 j 437.23 19 Comb. CB 226 12 0.04 6.4 6.79 0.65 0.19 3.18 40.24 44.675 30 0.013 0.96 434.35 433.92 442.14 443.17 435.51 j 435.32 20 Comb. CB 227 19 0.03 5.7 6.99 0.65 0.14 3.09 28.81 97.280 30 0.013 0.49 434.83 434.35 440.37 442.14 435.99 435.51 21 Comb. CB 228 20 0.25 5.5 7.05 0.65 1.17 2.98 29.47 27.112 30 0.013 0.52 434.97 434.83 440.34 440.37 436.12 j 435.99 22 Comb. CB 228A 21 0.13 5.0 7.21 0.65 0.61 0.61 9.01 7.194 15 0.013 1.95 436.41 436.27 440.42 440.34 436.71 436.49 23 Grate TI 229 21 0.27 5.0 7.21 0.65 10.14 1.27 15.98 98.200 24 0.013 0.50 435.96 435.47 440.24 440.34 437.12 436.63 Project File: STRM 200.stm Number of lines:35 Date: 1/11/2024 NOTES: Intensity=70.39/(Inlet time+ 12.30)^0.80--Return period=10 Yrs. ; **Critical depth Storm Sewers Pipes Page 2 Line Junct Inlet DnStm Drng Tc i Runoff Incr Total Capac Line Line n-val Line Invert Invert Gnd/Rim Gnd/Rim HGL HGL No. Type ID Ln No Area Sys Coeff Q Runoff Full Length Size Pipe Slope Up Dn El Up El Dn Up Dn (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (ft) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 24 Comb. CB 224 11 0.18 5.0 7.21 0.65 0.84 0.84 7.86 34.402 15 0.013 1.48 435.00 434.49 441.29 440.76 435.36 434.77 25 Comb. CB 221 9 0.39 14.7 5.06 0.65 1.83 3.06 7.04 27.743 15 0.013 1.19 429.65 429.32 433.44 433.33 430.35 429.90 26 Grate DI 222 25 0.16 13.7 5.21 0.65 0.75 1.83 5.30 111.400 15 0.013 0.67 430.50 429.75 434.17 433.44 431.04 j 430.35 27 Grate DI 223 26 0.23 12.3 5.44 0.65 1.08 1.34 7.51 110.105 15 0.013 1.35 432.09 430.60 435.83 434.17 432.55 431.04 28 Grate DI 225 27 0.15 5.0 7.21 0.65 0.70 0.70 8.98 252.527 15 0.013 1.93 437.07 432.19 441.48 435.83 437.40 j 432.55 29 Grate DI 211B 8 0.18 15.3 4.96 0.65 0.84 0.94 9.31 138.995 15 0.013 2.08 430.69 427.80 435.65 432.96 431.07 j 428.22 30 Grate DI 212A 29 0.11 5.0 7.21 0.65 0.52 0.52 9.80 260.006 15 0.013 2.30 436.68 430.69 440.63 435.65 436.96 j 431.07 31 Comb. CB 211A 10 0.39 5.0 7.21 0.65 1.83 1.83 6.89 40.377 15 0.013 1.14 430.88 430.42 436.15 435.66 431.42 430.86 32 Grate DI 207A 6 0.29 5.0 7.21 0.65 1.36 1.36 4.76 121.259 15 0.013 0.54 422.98 422.32 426.25 435.64 423.44 422.78 33 Comb. CB 219 2 0.40 14.8 5.04 0.65 1.88 1.47 11.42 49.915 15 0.013 3.13 411.94 410.38 417.56 419.79 412.42 410.68 34 Comb. CB 219A 33 0.03 14.2 5.13 0.65 0.14 0.17 4.87 7.018 15 0.013 0.57 412.08 412.04 417.24 417.56 412.42 412.42 35 Comb. CB 220 34 0.02 5.0 7.21 0.65 0.09 0.09 5.07 42.152 15 0.013 0.62 412.44 412.18 416.01 417.24 412.56 412.43 Project File: STRM 200.stm Number of lines:35 Date: 1/11/2024 NOTES: Intensity=70.39/(Inlet time+ 12.30)^0.80--Return period=10 Yrs. ; **Critical depth Storm Sewers Velocity Page 1 Line Junct Inlet DnStm Total Tc i Total Vel Line Line n-val Line No. Type ID Ln No Area Sys Runoff Ave Length Size Pipe Slope (ac) (min) (in/hr) (cfs) (ft/s) (ft) (in) (%) 1 Grate DI 201 Outfall 6.79 23.7 3.01 13.30 4.71 36.628 36 0.013 0.98 2 Comb. CB 203 1 6.77 23.1 3.06 13.45 5.99 133.972 36 0.013 1.00 3 Comb. CB 204 2 6.16 22.8 3.08 12.34 9.00 101.575 30 0.013 2.82 4 Comb. CB 205 3 6.00 22.4 3.11 12.13 6.79 114.702 30 0.013 6.17 5 Comb. CB 206 4 5.98 22.3 3.12 12.12 6.81 26.496 30 0.013 4.08 6 Grate DI 207 5 5.87 22.0 3.14 11.99 6.72 94.802 30 0.013 0.60 7 Grate DI 208 6 5.14 21.3 3.20 10.68 6.49 193.007 30 0.013 2.42 8 Grate DI 209 7 4.98 21.0 3.22 10.43 6.57 90.998 30 0.013 0.60 9 Comb. CB 210 8 4.54 17.6 3.54 10.46 6.56 96.807 30 0.013 0.60 10 Comb. CB 211 9 3.08 12.5 4.15 8.31 6.40 138.994 30 0.013 0.66 11 Comb. CB 212 10 2.39 11.3 4.34 6.75 6.28 260.155 30 0.013 1.76 12 Comb. CB 213 11 2.10 10.7 4.44 6.06 5.69 115.005 30 0.013 0.59 13 Comb. CB 214 12 1.20 10.5 4.46 3.48 5.27 27.000 15 0.013 1.37 14 Comb. CB 216 13 0.69 10.0 4.55 2.04 3.45 57.974 15 0.013 3.71 15 Comb. CB 217 14 0.46 8.3 4.88 1.46 3.43 142.807 15 0.013 2.50 16 Grate DI 218 15 0.16 5.0 5.65 0.59 2.75 93.683 15 0.013 1.24 17 Comb. CB 229 13 0.45 8.0 4.93 1.44 2.62 42.878 15 0.013 2.66 18 Comb. CB 230 17 0.25 5.0 5.65 0.92 2.55 135.825 15 0.013 5.12 19 Comb. CB 226 12 0.72 6.4 5.28 2.47 4.84 44.675 30 0.013 0.96 20 Comb. CB 227 19 0.68 5.7 5.46 2.41 5.26 97.280 30 0.013 0.49 21 Comb. CB 228 20 0.65 5.5 5.51 2.33 5.24 27.112 30 0.013 0.52 22 Comb. CB 228A 21 0.13 5.0 5.65 0.48 3.18 7.194 15 0.013 1.95 23 Grate TI 229 21 0.27 5.0 5.65 0.99 5.35 98.200 24 0.013 0.50 Project File: STRM 200.stm Number of lines:35 Date: 1/11/2024 NOTES: Intensity=74.33/(Inlet time+ 13.20)A 0.89--Return period=2 Yrs. ; **Critical depth Storm Sewers Velocity Page 2 Line Junct Inlet DnStm Total Tc i Total Vel Line Line n-val Line No. Type ID Ln No Area Sys Runoff Ave Length Size Pipe Slope (ac) (min) (in/hr) (cfs) (ft/s) (ft) (in) (%) 24 Comb. CB 224 11 0.18 5.0 5.65 0.66 3.29 34.402 15 0.013 1.48 25 Comb. CB 221 9 0.93 17.4 3.56 2.15 4.43 27.743 15 0.013 1.19 26 Grate DI 222 25 0.54 16.1 3.70 1.30 3.11 111.400 15 0.013 0.67 27 Grate DI 223 26 0.38 14.4 3.90 0.96 3.22 110.105 15 0.013 1.35 28 Grate DI 225 27 0.15 5.0 5.65 0.55 2.59 252.527 15 0.013 1.93 29 Grate DI 211B 8 0.29 18.2 3.48 0.66 3.35 138.995 15 0.013 2.08 30 Grate DI 212A 29 0.11 5.0 5.65 0.40 2.01 260.006 15 0.013 2.30 31 Comb. CB 211A 10 0.39 5.0 5.65 1.43 3.90 40.377 15 0.013 1.14 32 Grate DI 207A 6 0.29 5.0 5.65 1.06 3.11 121.259 15 0.013 0.54 33 Comb. CB 219 2 0.45 17.5 3.55 1.04 4.42 49.915 15 0.013 3.13 34 Comb. CB 219A 33 0.05 16.7 3.63 0.12 0.58 7.018 15 0.013 0.57 35 Comb. CB 220 34 0.02 5.0 5.65 0.07 1.13 42.152 15 0.013 0.62 Project File: STRM 200.stm Number of lines:35 Date: 1/11/2024 NOTES: Intensity=74.33/(Inlet time+ 13.20)A 0.89--Return period=2 Yrs. ; **Critical depth Storm Sewers Spread Page 1 Line Inlet Junct Byp Drng Inlet i Runoff Incr Q Q Q Gutter Gutter No. ID Type Ln No Area Time Inlet Coeff Q Carry Capt Byp Slope Spread (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (cfs) (ft/ft) (ft) 1 DI 201 Grate Sag 0.02 5.0 4.00 0.65 0.05 0.00 0.05 0.00 Sag 0.12 2 CB 203 Comb. Offsite 0.16 5.0 4.00 0.65 0.42 0.00 0.40 0.02 0.019 3.37 3 CB 204 Comb. Offsite 0.16 5.0 4.00 0.65 0.42 0.00 0.40 0.02 0.019 3.37 4 CB 205 Comb. Offsite 0.02 5.0 4.00 0.65 0.05 0.00 0.05 0.00 0.019 1.23 5 CB 206 Comb. Offsite 0.11 5.0 4.00 0.65 0.29 0.00 0.28 0.00 0.019 2.68 6 DI 207 Grate Sag 0.44 5.0 4.00 0.65 1.14 0.00 1.14 0.00 Sag 0.96 7 DI 208 Grate Sag 0.16 5.0 4.00 0.65 0.42 0.00 0.42 0.00 Sag 0.49 8 DI 209 Grate Sag 0.15 5.0 4.00 0.65 0.39 0.00 0.39 0.00 Sag 0.47 9 CB 210 Comb. Sag 0.53 5.0 4.00 0.65 1.38 0.00 1.38 0.00 Sag 3.87 10 CB 211 Comb. Offsite 0.30 5.0 4.00 0.65 0.78 0.00 0.69 0.09 0.024 4.43 11 CB 212 Comb. Offsite 0.11 5.0 4.00 0.65 0.29 0.00 0.28 0.01 0.012 3.10 12 CB 213 Comb. Offsite 0.18 5.0 4.00 0.65 0.47 0.00 0.43 0.04 0.009 4.39 13 CB 214 Comb. Offsite 0.06 5.0 4.00 0.65 0.16 0.00 0.16 0.00 0.010 2.19 14 CB 216 Comb. Offsite 0.23 5.0 4.00 0.65 0.60 0.00 0.57 0.03 0.031 3.60 15 CB 217 Comb. Offsite 0.30 5.0 4.00 0.65 0.78 0.00 0.69 0.09 0.024 4.43 16 DI 218 Grate Offsite 0.16 5.0 4.00 0.65 0.42 0.00 0.42 0.00 0.060 0.63 17 CB 229 Comb. Offsite 0.20 5.0 4.00 0.65 0.52 0.00 0.50 0.02 0.033 3.27 18 CB 230 Comb. Offsite 0.25 5.0 4.00 0.65 0.65 0.00 0.60 0.05 0.023 4.08 19 CB 226 Comb. Offsite 0.04 5.0 4.00 0.65 0.10 0.00 0.10 0.00 0.029 1.47 20 CB 227 Comb. Offsite 0.03 5.0 4.00 0.65 0.08 0.00 0.08 0.00 0.004 1.91 21 CB 228 Comb. Offsite 0.25 5.0 4.00 0.65 0.65 0.00 0.55 0.10 0.004 6.19 22 CB 228A Comb. Offsite 0.13 5.0 4.00 0.65 0.34 0.00 0.31 0.02 0.004 4.56 23 TI 229 Grate Offsite 0.27 5.0 4.00 0.65 9.57 0.00 8.53 1.04 0.017 3.33 Project File: STRM 200.stm Number of lines. 35 Date: 1/11/2024 NOTES: Intensity=380299500.00/(Inlet time+ 120.10)A 3.80--Return period=3 Yrs. ; "Critical depth Storm Sewers Spread Page 2 Line Inlet Junct Byp Drng Inlet i Runoff Incr Q Q Q Gutter Gutter No. ID Type Ln No Area Time Inlet Coeff Q Carry Capt Byp Slope Spread (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (cfs) (ft/ft) (ft) 24 CB 224 Comb. Offsite 0.18 5.0 4.00 0.65 0.47 0.00 0.44 0.03 0.013 3.99 25 CB 221 Comb. Sag 0.39 5.0 4.00 0.65 1.01 0.00 1.01 0.00 Sag 2.36 26 DI 222 Grate Sag 0.16 5.0 4.00 0.65 0.42 0.00 0.42 0.00 Sag 0.49 27 DI 223 Grate Offsite 0.23 5.0 4.00 0.65 0.60 0.00 0.60 0.00 0.128 0.86 28 DI 225 Grate Sag 0.15 5.0 4.00 0.65 0.39 0.00 0.39 0.00 Sag 0.47 29 DI 211B Grate Sag 0.18 5.0 4.00 0.65 0.47 0.00 0.47 0.00 Sag 0.53 30 DI 212A Grate Sag 0.11 5.0 4.00 0.65 0.29 0.00 0.29 0.00 Sag 0.38 31 CB 211A Comb. Offsite 0.39 5.0 4.00 0.65 1.01 0.00 0.86 0.15 0.026 4.94 32 DI 207A Grate Offsite 0.29 5.0 4.00 0.65 0.75 0.00 0.75 0.00 0.020 1.33 33 CB 219 Comb. Offsite 0.40 5.0 4.00 0.65 1.04 0.00 0.86 0.18 0.021 5.26 34 CB 219A Comb. Offsite 0.03 5.0 4.00 0.65 0.08 0.00 0.08 0.00 0.021 1.40 35 CB 220 Comb. Offsite 0.02 5.0 4.00 0.65 0.05 0.00 0.05 0.00 0.019 1.23 Project File: STRM 200.stm Number of lines:35 Date: 1/11/2024 NOTES: Intensity=380299500.00/(Inlet time+120.10)^3.80--Return period=3 Yrs. ; "Critical depth Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm 0 = — M C to CO N. o) N .. Co C C C .. 7 C ' C 7 C S. C 7 C ' .. 7 C 7 J 7 J O0 C J Q C C O C J Q C J O C J Q C J Q C J O C C O.C J 0 C O c i M M ' N co o J OCO - ' �00 ' OCO Co ' CO CO CO ' CMM ' 000 J co to u) ' M C+)M CO LOU) O OO 0 0 Co NMN NCo— to CO _ N. n.—N M 0MC 'n (0 • • N 0 CO•O• O)c‘jto•N.• N. co CoCO coC'•Cp CO C•CO• _M ~N 00 • CO MOO CO• O0C) ems- N�� Co CN'00) . Co)O ci N ,— MNN CO MNN CO co OW O MNN• � M co co NN Co C co M Elev. ft o d. co d vC ci �vv N vCv m ACC M_ �4C 00 v-4v �4C c.i �C4 °o ACC N ACC °o �v ( ) O �yJ co • r Co _ O O _ 0 O + • + • + + W_- + W + W + W • + W + W + W_ + W T. W O W r W 0 -6 W O WW WW N WW M WW et WW to WW n WW ti WW co WW WW W :° E > coE » ;a E > > w E » :o E » :o E» coE » :o E » :° E > > asE» coE» E > ti62 (o R. = In o'cE co Ecc co Ecc co E5E co E . = u) Ea= co Ec5 co FicE co REE rn Q5 463.00 - —463.00 • 450.00 — • Z Z —450.00 Z / 437.00 — 437.00 —"will 0111111.- 4 . _ ________,_____iiiiiwiii;;::--- A' ... 260, )J �� 424.00 — ice'— 90.D07Lf-30"@ O.GO% 424.00 — 90.99SLT-30"a)U.6U% ...Z.- — 193.00 Lf-30"@ 2.42% 34.802Lf-30"@ 0.60% 411.00 .� _________-- � — 26.496Lf-30"(Ca 4.08% 411.00 mai — 101.575Lf 30"@ 2.82% 133.972Lf-30"@ 1.00% - - 36.626Lt-36"L 0.9S% — 135.994Lt-30"L 0.66% 398.00 398.00 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm N M to Co 7 C 5 C 5 E 5 E 5 C 5 0 C J O E J O E J O C J 0 C J 0 0 Tr Tr �NI� �rl'V �6)O) CO CO ' ON n N N I 01 7 IC)CO (A CO r-co OTr,CO CO CO W 't M M (• �MM ( �M co 0) 'tMM ( =Tr� CO �V Elev. (ft) g? v v In v• . v ... 0) nt v �v v co Tr v p W W W W W W W E. E. W LT-Et c.) W LULU W W m E > > m E » co E » m E » co E > > co E > coD: c c cu EFc co EE.5 co E c c co iEcc co RE 463.00 - 463.00 • 456.00 • 456.00 • • 449.00 0 449.00 NN 442.00 / - s— 442.00 93 683Lf ' 435.00 - —435.00 • 1 I5.005Lf-30"@ 0.50%,_r — 57.974Lf-15"a 3.71% 428.00 — 2/•000Lf-1b"CD1.6/% 428.00 0 50 100 150 200 250 300 350 400 450 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm N. co S 0 C J OE J 0 CO in u co 0) C.00 C) 1 co p 6CO W• RICO N• �M Elev. (ft) o? v v v d. ti �� o W w w o www L.T. c}oE > > :°IE > j o E> cow � c5 co Cc 461.00 — —461.00 455.00 - 455.00 449.00 449.00 443.00 __ 443.00 Li- b.47), 5 19% 437.00 437.00 1i R78Lf-15(W 2.66% 431.00 431.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm ,- N N N S. C 7 C 3 C 7 N7 O E J OE J OE J OE C O J - 0)0) Lo 7 cnco LO MCO Co I'' MAN 'I:.1- C)� MM �MM • TrMM • �MM N• Vco Elev. (ft) o, vv �vvi. �.4v 7vv fe 7v o W ww o w LT]w www Www ww coE > > coo E > > co E» m E » co E > fn E. c c Cn E=E co R c c co E E E co 451.00 451.00 447.00 447.00 / 443.00 — 443.00 439.00 439.00 — - - -- - 435.00 . — —435.00 dd 675Lt-3U"(CD 0.96% 97 2A0Lf-30"Ca)U.49% - 7.101Lf 16"@ 1 95% — 27.112Lf-30"©0.52% 431.00 431.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm 0, 7 N 7 0 E .c O J M co ' N O 0 Lo ON Elev. (ft) o v v v oo owWW o ww coE > > m E > coE c c cn 0 448.00 448.00 445.00 445.00 442.00 442.00 439.00 439.00 436.00 I. 436.00 98.200Lf-24"@ 0.50% 433.00 433.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm ct 5 C 5 0E -J 0 N. cc' N N O O° MR V Mtn Elev. (ft) o M ?4 oWww o Ww mE > > m E> u)E c c co Fc 447.00 447.00 444.00 . 444.00 441.00 - 441.00 438.00 438.00 435.00 '._----- -- 435.00 34.402Lf-15"@ 1.48% 432.00 432.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm in co N. co N N N N 7 C 5 E 5 E 5 c Q E J Q E J 0 E J Q E J 0 coti toCOM M co v. co 7 CO aD0N- to V'0 � COnMW • •NC,- 00 NN hOhO vO vEIeV. (ft) v v Nd o Mv CO v v o v oWWW o W Ti W W W W N W W W I- to W W ca E > > m E » m E» as E » m E > uoik" 55 co E255 co iicc to icc co E5 455.00 — 455.00 449.00 - 449.00 443.00 —443.00 437.00 — / 437.00 — = 52 431.00 —— — o0431.00 — — 110.105 111.400Lf-15"Cw u.b7% 27.743Lf-1 J' ue 1.19% 425.00 425.00 0 50 100 150 200 250 300 350 400 450 500 550 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm O_ O N M 7 C 7 C 7 OE -J o. -J 0 (O (f)O ' in OO ' M O O) u)O (r) f0(fl CO (O • gN (O(� 0 )00 0 0(O Elev. (ft) g7 v v g ?vv o) Try 0WWW .t LWLU M wW mE > > m E » ccs E > co c c co E c c co RE 453.00 — —453.00 447.00 447.00 441.00 — 441.00 435.00 — 435.00 260 429.00 95Lf u 429.00 423.00 423.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm M 7 C 3 0E -J 0 CO LoN ' �co OM cot c2 MO Elev. (ft) o Tr. 414 v v., oWww o L.T. mE > > m E> coi2 c c co RE 443.00 443.00 440.00 - - . 440.00 437.00 437.00 434.00 434.00 431.00 ""—_— - 431.00 40.377Lt- 15"a 1.14% • 428.00 428.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm N co 7 7 0 J O CO MOM o, N0, • p M N Tr. v N N N co Elev. (ft) o N 0Www ww m E > > co E co i2 c co R E 448.00 448.00 442.00 442.00 436.00 —/ —436.00 430.00 —430.00 424.00 — — —424.00 121.259Lf-15"@ 0.51% 418.00 I I 418.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm c In c) co M 0 = J 0= J 0E J 0 � co co co ••�0 M NOD O co � 00000 O n,-N 01 nNN O ON Elev. (ft) o a v d v v v v rn Tr v o W w w o www o www o L.T. co E > > m E» m E» m E> to E c c co ii 5= u) E c c (o RE 427.00 427.00 • 423.00 • 423.00 • • 419.00 419.00 415.00 415.00 - - r -- -- 42.1:f2Lf-13"@ 0.C2% • ---------- 411.00 — - q Lf_ 5 3 13°/ 411.00 — /.0 I tSLT-10"(W U.5/7o 407.00 407.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION J - HYDRAFLOW REPORT Delineation Drainage Area Calculations Culvert 3000 C Value Calculation Hydraflow Report Culvert HydraFlow Report • 4 �s www.timmons.com TIMMONS GROUP TIMMONS GROUP Project:WRENN FARMS Project No.: 54949 Calculated By: COLIE CROSBY 2/6/2024 PRE-DEVELOPMENT PRE POI 1 Pre-development Drainage Area Impervious Existing Impervious Lots Description CN Acres Description Qty Inc Area Total Area Existing Impervious-Lots 98 15.04 Ex. Commerical 15.04 Existing Impervious-Streets 98 0.00 0.00 Existing Impervious-Misc 98 0.00 0.00 Total to DA 98 15.04 0.00 Existing Pervious Sub Total 0 15.04 Description CN Acres Streets Wooded-Soil A 45 35.62 Total Area Wooded-Soil B 66 0.00 Ex. Streets 0.00 Wooded-Soil C 77 0.00 0.00 Wooded-Soil D 83 0.00 0.00 Pasture-Soil A 49 21.05 0.00 Pasture-Soil B 69 0.00 0.00 Pasture-Soil C 79 0.00 Sub Total 0 0.00 Pasture-Soil D 84 0.00 Misc Total to DA 69 56.66 0.00 _Total to DA 71.70 0.00 Basin CN 57 Sub Total 0.00 TIMMONS GROUP Project:WRENN FARMS Project No.: 54949 Calculated By: COLIE CROSBY 2/6/2024 PRE-DEVELOPMENT PRE POI 2 Pre-development Drainage Area Impervious Existing Impervious Lots Description CN Acres Description Qty Inc Area Total Area Existing Impervious-Lots 98 0.00 Ex. Commerical 0.00 Existing Impervious-Streets 98 0.11 0.00 Existing Impervious-Misc 98 0.00 0.00 Total to DA 98 0.11 0.00 Existing Pervious Sub Total 0 0.00 Description CN Acres Streets Wooded-Soil A 45 3.75 Total Area Wooded-Soil B 66 0.00 Ex. Streets 435 11 0.11 Wooded-Soil C 77 0.00 0.00 Wooded-Soil D 83 0.00 0.00 Pasture-Soil A 68 7.68 0.00 Pasture-Soil B 79 0.00 0.00 Pasture-Soil C 86 0.00 Sub Total 435 0.11 Pasture-Soil D 89 0.00 Misc Total to DA 74 11.43 0.00 Total to DA 11.54 0.00 Basin CN 61 Sub Total 0.00 TIMMONS GROUP Project:WRENN FARMS Project No.: 54949 Calculated By: COLIE CROSBY 2/6/2024 PRE-DEVELOPMENT PRE POI 3 Pre-development Drainage Area Impervious Existing Impervious Lots Description CN Acres Description Qty Inc Area Total Area Existing Impervious-Lots 98 0.00 Ex. Commerical 0.00 Existing Impervious-Streets 98 0.29 0.00 Existing Impervious-Misc 98 0.00 0.00 Total to DA 98 0.29 0.00 Existing Pervious Sub Total 0 0.00 Description CN Acres Streets Wooded-Soil A 45 1.39 Total Area Wooded-Soil B 66 0.00 Existing Streets 1152 11 0.29 Wooded-Soil C 77 0.00 0.00 Wooded-Soil D 83 0.00 0.00 Pasture-Soil A 68 5.23 0.00 Pasture-Soil B 79 0.00 0.00 Pasture-Soil C 86 0.00 Sub Total 1152 0.29 Pasture-Soil D 89 0.00 Misc Total to DA 74 6.62 0.00 Total to DA 6.91 0.00 Basin CN 65 Sub Total 0.00 TIMMONS GROUP Project:WRENN FARMS Project No.:54949 Calculated By:COLIE CROSBY 2/6/2024 I POST-DEVELOPMENT DA POST POI 1 TOTAL Post-development Drainage Area Impervious Proposed Impervious Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 22.32 Townhome Lot A 183 1100 4.62 Impervious Streets 98 3.14 Ex. Commerical 15.04 Impervious Misc 98 0.20 Future Apartments(80%Imperv.) 2.66 2.66 Total to DA 98 25.66 0.00 Proposed Pervious 0.00 Description Acres Sub Total 0 22.32 Lawn 39 4.62 Streets Wooded-Soil A 45 22.02 Description Length Imp/Ft Total Area Pasture-Soil A I 49 30.19 60'ROW 3,702.00 37 3.14 Ex.Streets 0.00 Sub Total 3.14 Total to DA 44 56.83 Misc Parking 5,698 0.13 Total to DA 82.49 Mail Kiosk/Amenities 3010 0.07 Basin CN 61 Sub Total 0.20 TIMMONS GROUP Project:WRENN FARMS Project No.:54949 Calculated By:COLIE CROSBY 2/6/2024 I POST-DEVELOPMENT DA POST 1A-SCM 1 Post-development Drainage Area Impervious Impervious to SCM A Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 7.28 Townhome Lot A 183 1100 4.62 Impervious Streets 98 3.14 Ex. Commerical 0.00 Impervious Misc 98 0.20 Future Apartments(80% Imperv.) 2.66 2.66 Total to DA 98 10.63 0.00 Pervious to SCM A 0.00 Description Acres Sub Total 183 7.28 Lawn 39 4.62 Streets Wooded-Soil A 45 0.00 Description Length Imp/Ft Total Area Pasture-Soil A 49 9.95 60'ROW 3.14 Ex.Streets 0.00 0.00 Sub Total 3.14 Total to DA 44 14.57 Misc Parking 5,698 0.13 Total to DA 25.20 Mail Kiosk/Amenities 3010 0.07 Basin CN 67 Sub Total 0.20 TIMMONS GROUP Project:WRENN FARMS Project No.:54949 Calculated By:COLIE CROSBY 2/6/2024 I POST-DEVELOPMENT DA POST 1 B-BYPASS Post-development Drainage Area Impervious Impervious bypassing SCM A Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 15.04 Townhome Lot A 0 1100 0.00 Impervious Streets 98 0.00 Ex. Commerical 15.04 Impervious Misc 98 0.00 Future Apartments(80% Imperv.) 0 0.00 Total to DA 98 15.04 0.00 Pervious bypassing SCM A 0.00 Description Acres Sub Total 0 15.04 Lawn 39 0.00 Streets Wooded-Soil A 45 22.02 Description Length Imp/Ft Total Area Pasture-Soil A 49 20.24 60'ROW 0.00 Ex.Streets 0.00 0.00 Sub Total 0.00 Total to DA 44 42.26 Misc Parking 0 0.00 Total to DA 57.29 Mail Kiosk/Amenities 0 0.00 Basin CN 58 Sub Total 0.00 TIMMONS GROUP Project:WRENN FARMS Project No.: 54949 Calculated By: COLIE CROSBY 2/6/2024 I POST-DEVELOPMENT DA POST 2A TOTAL Post-development Drainage Area Impervious Proposed Impervious Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 0.00 Townhome Lot A 0 1100 0.00 Impervious Streets 98 0.59 Ex. Commerical 0 0 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 0.59 0.00 Proposed Pervious 0.00 Description Acres Sub Total 0 0.00 Lawn 39 0.00 Streets Wooded-Soil A 45 0.00 Description Length Imp/Ft Total Area Pasture-Soil A 68 1.08 60' R/W 0 37 0.00 Ex. Streets '" 33 0.59 0.00 Sub Total 0.59 Total to DA 51 1.08 Misc Parking 0 0 0.00 Total to DA 1.67 Mail Kiosk/Amenities 0.00 Basin CN 67 Sub Total 0.00 TIMMONS GROUP Project:WRENN FARMS Project No.:54949 Calculated By:COLIE CROSBY 2/6/2024 I POST-DEVELOPMENT DA POST POI 3 TOTAL Post-development Drainage Area Impervious Proposed Impervious Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 0.00 Townhome Lot A 0 1100 0.00 Impervious Streets 98 0.63 Ex. Commerical Impervious Misc 98 0.00 Future Apartments(80% Imperv.) 0.00 Total to DA 98 0.63 0.00 Proposed Pervious 0.00 Description Acres Sub Total 0 0.00 Lawn 39 0.00 Streets Wooded-Soil A 45 0.00 Description Length Imp/Ft Total Area Pasture-Soil A I 68 5.44 60'ROW 37 0.00 Existing Streets 836 33 0.63 Sub Total 0.63 Total to DA 51 5.44 Misc Parking 0.00 Total to DA 6.07 Mail Kiosk/Amenities 0.00 Basin CN 56 Sub Total 0.00 Project: `` _ Calculated By: Wrenn Farms Gibson B. Project Number: T I M M O N S GROUP Date: 54949 YOUR VISION ACHIEVED THROUGH OURS. 01/11/24 Runoff Coefficient Worksheet Culvert 3000 Category C, A, C;x A; Roof& Pavement 0.95 0.22 0.21 Bare Earth 0.50 0.00 _ Unimproved Area 0.35 1.90 0.67 Wooded Area 0.25 2.61 0.65 Open Water 1.00 0.00 4.74 1.53 C Value 0.32 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 1 POST DA TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 11.94 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 43,174 cuft Drainage area = 25.200 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.80 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA TO SCM 1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 - - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 2 SCM 1 Hydrograph type = Reservoir Peak discharge = 0.257 cfs Storm frequency = 1 yrs Time to peak = 1448 min Time interval = 2 min Hyd. volume = 41,107 cuft Inflow hyd. No. = 1 - POST DA TO SCM 1 Max. Elevation = 408.31 ft Reservoir name = SCM 1 Max. Storage = 32,977 cuft Storage Indication method used. SCM 1 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 8.00 6.00 - 6.00 4.00 4.00 2.00Illikillill1111111- 2.00 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Hyd No. 1 111111111 Total storage used = 32,977 cuft 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 3 POST BYPASS - POI 1 Hydrograph type = SCS Runoff Peak discharge = 7.696 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 53,996 cuft Drainage area = 57.290 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 1 Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 8.00 - 8.00 I 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 4 POST POI 1 TOTAL Hydrograph type = Combine Peak discharge = 7.814 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 95,103 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 57.290 ac POST POI 1 TOTAL Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 8.00 - 8.00 6.00 - 6.00 4.00 - 4.00 2.00 - 2.00 0.00 �_ L 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 5 PRE - POI 1 Hydrograph type = SCS Runoff Peak discharge = 5.831 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 54,122 cuft Drainage area = 71.700 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.30 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 1 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 L0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 7 PRE - POI 2 Hydrograph type = SCS Runoff Peak discharge = 3.681 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 13,273 cuft Drainage area = 11.540 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.10 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 2 Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 • 2.00 - 2.00 1.00 1.00 0.00 — L - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 8 POST DA POI 2 Hydrograph type = SCS Runoff Peak discharge = 1.041 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 3,261 cuft Drainage area = 1.670 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA POI 2 Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 2.00 - 2.00 1.00 1.00 0.00 - P ` 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 10 PRE - POI 3 Hydrograph type = SCS Runoff Peak discharge = 2.564 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 11,236 cuft Drainage area = 6.910 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.70 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 3 Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 3.00 - 3.00 I 2.00 2.00 1.00 1.00 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 11 POST BYPASS - POI 3 Hydrograph type = SCS Runoff Peak discharge = 0.392 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 4,386 cuft Drainage area = 6.576 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 3 Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 • 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 13 PRE - TOTAL Hydrograph type = Combine Peak discharge = 10.17 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 78,631 cuft Inflow hyds. = 5, 7, 10 Contrib. drain. area = 90.150 ac PRE - TOTAL Q (cfs) Hyd. No. 13 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 I 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 - 2.00 0.00 - 41 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 5 Hyd No. 7 Hyd No. 10 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 14 POST - TOTALW/ SCMs Hydrograph type = Combine Peak discharge = 8.917 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 102,750 cuft Inflow hyds. = 4, 8, 11 Contrib. drain. area = 8.246 ac POST - TOTAL W/ SCMs Q (cfs) Hyd. No. 14 -- 1 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 14 Hyd No. 4 Hyd No. 8 Hyd No. 11 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 15 POST - TOTAL NO SCMs Hydrograph type = Combine Peak discharge = 20.12 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 104,817 cuft Inflow hyds. = 1, 3, 8, 11 Contrib. drain. area = 90.736 ac POST - TOTAL NO SCMs Q (cfs) Hyd. No. 15-- 1 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 - 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 1 Hyd No. 3 Hyd No. 8 Hyd No. 11 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 1 POST DA TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 22.03 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 69,931 cuft Drainage area = 25.200 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.80 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA TO SCM 1 Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 T ____ 8.00 8.00 4.00 4.00 .....T......... 0.00 - • �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 2 SCM 1 Hydrograph type = Reservoir Peak discharge = 0.494 cfs Storm frequency = 2 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 65,821 cuft Inflow hyd. No. = 1 - POST DA TO SCM 1 Max. Elevation = 409.08 ft Reservoir name = SCM 1 Max. Storage = 54,345 cuft Storage Indication method used. SCM 1 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 - 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Hyd No. 1 111111111 Total storage used = 54,345 cuft 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 3 POST BYPASS - POI 1 Hydrograph type = SCS Runoff Peak discharge = 21.02 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 99,661 cuft Drainage area = 57.290 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.00 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 1 Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 4 POST POI 1 TOTAL Hydrograph type = Combine Peak discharge = 21.20 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 165,482 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 57.290 ac POST POI 1 TOTAL Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - L 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 5 PRE - POI 1 Hydrograph type = SCS Runoff Peak discharge = 19.47 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 105,317 cuft Drainage area = 71.700 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.30 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 1 Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 7 PRE - POI 2 Hydrograph type = SCS Runoff Peak discharge = 8.472 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 23,427 cuft Drainage area = 11.540 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.10 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 2 Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - k 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 8 POST DA POI 2 Hydrograph type = SCS Runoff Peak discharge = 1.840 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 5,209 cuft Drainage area = 1.670 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA POI 2 Q (cfs) Hyd. No. 8 -- 2 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 - • - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 10 PRE - POI 3 Hydrograph type = SCS Runoff Peak discharge = 4.974 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 18,468 cuft Drainage area = 6.910 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.70 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 3 Q (cfs) Hyd. No. 10 --2 Year Q (cfs) 5.00 5.00 1 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 11 POST BYPASS - POI 3 Hydrograph type = SCS Runoff Peak discharge = 1.495 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 8,810 cuft Drainage area = 6.576 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 3.47 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 3 Q (cfs) Hyd. No. 11 --2 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 13 PRE - TOTAL Hydrograph type = Combine Peak discharge = 28.83 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 147,213 cuft Inflow hyds. = 5, 7, 10 Contrib. drain. area = 90.150 ac PRE - TOTAL Q (cfs) Hyd. No. 13 --2 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 _ I _ 0.00 - - - 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 5 Hyd No. 7 Hyd No. 10 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 14 POST - TOTALW/ SCMs Hydrograph type = Combine Peak discharge = 23.96 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 179,502 cuft Inflow hyds. = 4, 8, 11 Contrib. drain. area = 8.246 ac POST - TOTAL W/ SCMs Q (cfs) Hyd. No. 14 --2 Year Q (cfs) 24.00 24.00 • • 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) Hyd No. 14 Hyd No. 4 Hyd No. 8 Hyd No. 11 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 15 POST - TOTAL NO SCMs Hydrograph type = Combine Peak discharge = 44.75 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 183,612 cuft Inflow hyds. = 1, 3, 8, 11 Contrib. drain. area = 90.736 ac POST - TOTAL NO SCMs Q (cfs) Hyd. No. 15--2 Year Q (cfs) 50.00 50.00 • 40.00 40.00 30.00 30.00 7 20.00 20.00 LTh................._ — 10.00 10.00 0.00 - k 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 1 Hyd No. 3 Hyd No. 8 Hyd No. 11 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 1 POST DA TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 53.73 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 155,915 cuft Drainage area = 25.200 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.80 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA TO SCM 1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 60.00 60.00 • 50.00 50.00 _ 1 • 40.00 40.00 30.00 30.00 • 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 2 SCM 1 Hydrograph type = Reservoir Peak discharge = 4.143 cfs Storm frequency = 10 yrs Time to peak = 802 min Time interval = 2 min Hyd. volume = 151,499 cuft Inflow hyd. No. = 1 - POST DA TO SCM 1 Max. Elevation = 409.86 ft Reservoir name = SCM 1 Max. Storage = 77,525 cuft Storage Indication method used. SCM 1 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 LI 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Hyd No. 1 111111111 Total storage used = 77,525 cuft 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 3 POST BYPASS - POI 1 Hydrograph type = SCS Runoff Peak discharge = 74.28 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 260,231 cuft Drainage area = 57.290 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.00 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 1 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 — 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 —' I \- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 4 POST POI 1 TOTAL Hydrograph type = Combine Peak discharge = 74.58 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 411,730 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 57.290 ac POST POI 1 TOTAL Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 80.00 80.00 • 70.00 _ I 70.00 • 60.00 60.00 50.00 — 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 5 PRE - POI 1 Hydrograph type = SCS Runoff Peak discharge = 80.11 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 291,636 cuft Drainage area = 71.700 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.30 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 1 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 90.00 — 90.00 — 80.00 80.00 1 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 1 30.00 30.00 20.00 20.00 10.00 — - 10.00 i0.00 \— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 7 PRE - POI 2 Hydrograph type = SCS Runoff Peak discharge = 24.64 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 58,108 cuft Drainage area = 11.540 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.10 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 2 Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 - 12.00 8.00 8.00 4.00 4.00 0.00 ` 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 8 POST DA POI 2 Hydrograph type = SCS Runoff Peak discharge = 4.317 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 11,403 cuft Drainage area = 1.670 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA POI 2 Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 10 PRE - POI 3 Hydrograph type = SCS Runoff Peak discharge = 12.81 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 41,977 cuft Drainage area = 6.910 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.70 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 3 Q (cfs) Hyd. No. 10-- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 11 POST BYPASS - POI 3 Hydrograph type = SCS Runoff Peak discharge = 6.767 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 25,231 cuft Drainage area = 6.576 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 5.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 3 Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 7.00 7.00 I 6.00 6.00 5.00 5.00 • 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 13 PRE - TOTAL Hydrograph type = Combine Peak discharge = 107.54 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 391,722 cuft Inflow hyds. = 5, 7, 10 Contrib. drain. area = 90.150 ac PRE - TOTAL Q (cfs) Hyd. No. 13-- 10 Year Q (cfs) 120.00 120.00 • 100.00 100.00 • 80.00 80.00 • 60.00 60.00 40.00 40.00 20.00 20.00 0.00 _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 5 Hyd No. 7 Hyd No. 10 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 14 POST - TOTALW/ SCMs Hydrograph type = Combine Peak discharge = 84.77 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 448,363 cuft Inflow hyds. = 4, 8, 11 Contrib. drain. area = 8.246 ac POST - TOTAL W/ SCMs Q (cfs) Hyd. No. 14 -- 10 Year Q (cfs) 90.00 — 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 4 Hyd No. 8 Hyd No. 11 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 15 POST - TOTAL NO SCMs Hydrograph type = Combine Peak discharge = 136.49 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 452,780 cuft Inflow hyds. = 1, 3, 8, 11 Contrib. drain. area = 90.736 ac POST - TOTAL NO SCMs Q (cfs) Hyd. No. 15-- 10 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 / 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 1 Hyd No. 3 Hyd No. 8 Hyd No. 11 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 1 POST DA TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 75.21 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 214,342 cuft Drainage area = 25.200 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.80 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA TO SCM 1 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 80.00 80.00 70.00i _ 70.00 60.00 60.00 50.00 — 50.00 40.00 • 40.00 30.00 30.00 — 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 2 SCM 1 Hydrograph type = Reservoir Peak discharge = 6.380 cfs Storm frequency = 25 yrs Time to peak = 784 min Time interval = 2 min Hyd. volume = 209,846 cuft Inflow hyd. No. = 1 - POST DA TO SCM 1 Max. Elevation = 410.77 ft Reservoir name = SCM 1 Max. Storage = 106,028 cuft Storage Indication method used. SCM 1 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Hyd No. 1 I I Total storage used = 106,028 cuft 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 3 POST BYPASS - POI 1 Hydrograph type = SCS Runoff Peak discharge = 112.78 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 375,748 cuft Drainage area = 57.290 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.00 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 1 Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 120.00 120.00 • 100.00 1 100.00 80.00 80.00 60.00 I 60.00 I 40.00 40.00 20.00 20.00 --) 0.00 \- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 4 POST POI 1 TOTAL Hydrograph type = Combine Peak discharge = 115.70 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 585,594 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 57.290 ac POST POI 1 TOTAL Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 120.00 120.00 100.00 1 100.00 80.00 80.00 60.00 1 60.00 I 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 5 PRE - POI 1 Hydrograph type = SCS Runoff Peak discharge = 125.91 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 428,341 cuft Drainage area = 71.700 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.30 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 1 Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) 140.00 140.00 120.001 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 r 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 7 PRE - POI 2 Hydrograph type = SCS Runoff Peak discharge = 35.76 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 82,613 cuft Drainage area = 11.540 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.10 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 2 Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 , 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 8 POST DA POI 2 Hydrograph type = SCS Runoff Peak discharge = 5.951 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 15,581 cuft Drainage area = 1.670 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA POI 2 Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 6.00 6.00 • 5.00 - 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 ) _ _ _ 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 10 PRE - POI 3 Hydrograph type = SCS Runoff Peak discharge = 18.09 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 58,069 cuft Drainage area = 6.910 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.70 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 3 Q (cfs) Hyd. No. 10--25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 11 POST BYPASS - POI 3 Hydrograph type = SCS Runoff Peak discharge = 10.85 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 37,403 cuft Drainage area = 6.576 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 5.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 3 Q (cfs) Hyd. No. 11 --25 Year Q (cfs) 12.00 - 12.00 10.00 - I 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.001 . 2.00 0.00 - \-- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 13 PRE - TOTAL Hydrograph type = Combine Peak discharge = 166.52 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 569,023 cuft Inflow hyds. = 5, 7, 10 Contrib. drain. area = 90.150 ac PRE - TOTAL Q (cfs) Hyd. No. 13--25 Year Q (cfs) 180.00 - 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 - 80.00 60.00 - 60.00 40.00 40.00 20.00 20.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 5 Hyd No. 7 Hyd No. 10 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 14 POST - TOTALW/ SCMs Hydrograph type = Combine Peak discharge = 131.21 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 638,578 cuft Inflow hyds. = 4, 8, 11 Contrib. drain. area = 8.246 ac POST - TOTAL W/ SCMs Q (cfs) Hyd. No. 14--25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 i 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 4 Hyd No. 8 Hyd No. 11 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 15 POST - TOTAL NO SCMs Hydrograph type = Combine Peak discharge = 202.11 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 643,074 cuft Inflow hyds. = 1, 3, 8, 11 Contrib. drain. area = 90.736 ac POST - TOTAL NO SCMs Q (cfs) Hyd. No. 15--25 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 I11\ 0.00 ALmmiz 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 1 Hyd No. 3 Hyd No. 8 Hyd No. 11 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 1 POST DA TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 112.73 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 316,945 cuft Drainage area = 25.200 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.80 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA TO SCM 1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 120.00 120.00 • 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 2 SCM 1 Hydrograph type = Reservoir Peak discharge = 9.164 cfs Storm frequency = 100 yrs Time to peak = 782 min Time interval = 2 min Hyd. volume = 312,338 cuft Inflow hyd. No. = 1 - POST DA TO SCM 1 Max. Elevation = 412.45 ft Reservoir name = SCM 1 Max. Storage = 163,615 cuft Storage Indication method used. SCM 1 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 2 Hyd No. 1 II I II Total storage used = 163,615 cuft 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 3 POST BYPASS - POI 1 Hydrograph type = SCS Runoff Peak discharge = 181.85 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 585,598 cuft Drainage area = 57.290 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.00 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 1 Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 , L 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 4 POST POI 1 TOTAL Hydrograph type = Combine Peak discharge = 188.47 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 897,936 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 57.290 ac POST POI 1 TOTAL Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 5 PRE - POI 1 Hydrograph type = SCS Runoff Peak discharge = 209.02 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 679,490 cuft Drainage area = 71.700 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.30 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 1 Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 7 PRE - POI 2 Hydrograph type = SCS Runoff Peak discharge = 55.33 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 126,663 cuft Drainage area = 11.540 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.10 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 2 Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 60.00 60.00 • 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 ` 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 8 POST DA POI 2 Hydrograph type = SCS Runoff Peak discharge = 8.817 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 22,888 cuft Drainage area = 1.670 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA POI 2 Q (cfs) Hyd. No. 8-- 100 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 10 PRE - POI 3 Hydrograph type = SCS Runoff Peak discharge = 27.43 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 86,450 cuft Drainage area = 6.910 ac Curve number = 65 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.70 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - POI 3 Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 � 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 11 POST BYPASS - POI 3 Hydrograph type = SCS Runoff Peak discharge = 18.32 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 59,896 cuft Drainage area = 6.576 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.00 min Total precip. = 7.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS - POI 3 Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 r I 6.00 • 6.00 3.00 3.00 0.00 \- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 13 PRE - TOTAL Hydrograph type = Combine Peak discharge = 273.06 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 892,604 cuft Inflow hyds. = 5, 7, 10 Contrib. drain. area = 90.150 ac PRE - TOTAL Q (cfs) Hyd. No. 13 -- 100 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 I 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 5 Hyd No. 7 Hyd No. 10 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 14 POST - TOTALW/ SCMs Hydrograph type = Combine Peak discharge = 213.57 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 980,721 cuft Inflow hyds. = 4, 8, 11 Contrib. drain. area = 8.246 ac POST - TOTAL W/ SCMs Q (cfs) Hyd. No. 14 -- 100 Year Q (cfs) 240.00 240.00 • • 210.00 210.00 180.00 180.00 150.00 — 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 �/� 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 4 Hyd No. 8 Hyd No. 11 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Thursday,01 /11 /2024 Hyd. No. 15 POST - TOTAL NO SCMs Hydrograph type = Combine Peak discharge = 318.77 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 985,328 cuft Inflow hyds. = 1, 3, 8, 11 Contrib. drain. area = 90.736 ac POST - TOTAL NO SCMs Q (cfs) Hyd. No. 15-- 100 Year Q (cfs) 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 Hyd No. 1 Hyd No. 3 Hyd No. 8 Hyd No. 11 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,01 /15/2024 Hyd. No. 1 Culvert 3000 DA Hydrograph type = Rational Peak discharge = 8.339 cfs Storm frequency = 10 yrs Time to peak = 12 min Time interval = 1 min Hyd. volume = 6,004 cuft Drainage area = 4.740 ac Runoff coeff. = 0.32 Intensity = 5.497 in/hr Tc by User = 12.00 min IDF Curve = Wrenn IDF.IDF Asc/Rec limb fact = 1/1 Culvert 3000 DA Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,01 /15/2024 Hyd. No. 1 Culvert 3000 DA Hydrograph type = Rational Peak discharge = 9.305 cfs Storm frequency = 25 yrs Time to peak = 12 min Time interval = 1 min Hyd. volume = 6,700 cuft Drainage area = 4.740 ac Runoff coeff. = 0.32 Intensity = 6.135 in/hr Tc by User = 12.00 min IDF Curve = Wrenn IDF.IDF Asc/Rec limb fact = 1/1 Culvert 3000 DA Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,01 /15/2024 Hyd. No. 1 Culvert 3000 DA Hydrograph type = Rational Peak discharge = 10.66 cfs Storm frequency = 100 yrs Time to peak = 12 min Time interval = 1 min Hyd. volume = 7,672 cuft Drainage area = 4.740 ac Runoff coeff. = 0.32 Intensity = 7.025 in/hr Tc by User = 12.00 min IDF Curve = Wrenn IDF.IDF Asc/Rec limb fact = 1/1 Culvert 3000 DA Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (min) Wrenn Farms Town of Youngsville, Franklin County, NC Project Number: 54949 SECTION K - NITROGEN LOADING Nitrogen Loading Calculations — SNAP Tool Nitrogen Loading Exhibit .•'•'•• • • • TIMMONS GROUP I www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. Project Information Complete this sheet if required by your reviewing authority. Contact them for any questions. Grey boxes/text are optional. SNAPv4.2.0 LOCATION Project Name(optional): WRENN FARMS Parcel ID(optional): Submission Date(optional): date Nutrient Management Watershed: Neuse menu Local Jurisdiction/Reviewing Agency: State/Federal menu Subwatershed: Neuse-Upper menu Project Latitude Coordinates(optional): 36.036750 N Phosphorus Delivery Zone: Neuse- Upper 03020201 menu Project Longitude Coordinates(optional): -78.494430 W Nitrogen Delivery Zone: Neuse- Upper 03020201 menu PROJECT DETAILS Development Land Use Type: Single Family Residential menu Disturbed Area: 1,306,800 ft2 Part of Common Development Plan? no y/n Project Activity: New Development menu Designated Downtown Area? no yin Project Drains to SA Waters? no y/n Public Linear Road/Sidewalk Project? .no y/n Pre-Project Land Use: pasture menu Project Owner Type: Private menu Project Description(optional): STORMWATER DETAILS (Falls ONLY)Onsite Reduction%Req. % Project Uses LID/Runoff Volume Match? no yin Existing BUA/Development Onsite? no yin Local Gov't nutrient req's same as State? N/A y/n Local Gov't cutoff date for Existing BUA: 05/01/2001 date Project Drains to Regional SCM? no y/n Nitrogen Export Rate Target: 3.60 Ib/ac/yr Total Nitrogen Offset Credits Needed: lb/yr Phosphorus Export Rate Target: 1000.00 Ib/ac/yr Total Phosphorus Offset Credits Needed: lb/yr SNAP v4.2.0 Project Area and Offsite Land Cover Characteristics Precipitation Neuse Station: Copy ' Paste VALUES ONLY for Best Results Click here to scroll down to error messages on this sheet. — PROJECT AREA LAND COVERS TN EMC (mg/L) TP EMC (mg/L) Pre-Project Area (ft2) Post-Project Area (ft2) Change pre-to-post(ft2) 1 Roof 1.18 0.11 317,170 317,170 Roadway 1.64 0.34 99,954 99,954 Parking/Driveway/Sidewalk 1.42 0.18 65,688 65,688 Protected Forest 0.97 0.03 0 0 Managed Pervious/Landscaping 2.48 1.07 1,306,800 771,461 -535,339 Offsite or Existing Roof 1.18 0.11 0 Offsite or Existing Roadway 1.64 0.34 0 Offsite or Existing Parking/Driveway/Sidevin 1.42 0.18 0 Offsite Protected Forest 0.97 0.03 0 Offsite Managed Pervious I 2.48 1.07 0 CUSTOM LAND COVER 1 0 CUSTOM LAND COVER 2 0 CUSTOM LAND COVER 3 0 LAND TAKEN UP BY SCM 1.18 0.11 52,527 52,527 Total (Regulated & UnReg)Area 1,306,800.00 1,306,800.00 Project (Regulated)Area 1,306,800.00 1,306,800.00 SCM Characteristics Stormwater Control Measure (SCM) Characteristics Copy ft Paste VALUES ONLY for SNAP v4.2.0 Best Results L Catchment ID 1 1 Drains to Dra INN SCM ID 101 102 Type of SCM Wet Pond IHydrologic soil group at SCM location A 16 SCM Description scv #i [ Design Storm Size (inches/24hrs) 1.00 III Percent of Full Size 100% I Annual Effluent 63% 0% [ %Annual Overflow 16% 0% Annual ET/Infiltrated 21% 0% I. Custom %Annual Effluent ■ Custom %Annual Overflow rCustom %Annual ET/Infiltrated L SCM Effluent TP EMC (mg/L) iF 0.13 0.00 I— SCM Effluent TN EMC (mg/L) 0.86 0.00 L Custom Effluent TP EMC d ■ Custom Effluent TN EMC SCM Land Cover TP EMC (mg/L) 0.11 0.00 Pm SCM Land Cover TN EMC (mg/L) 1.18 0.00 This SCM Drains to Numbered SCM _0 0_ I- Catchment Routing Catchments Draining to Catchments Draining to SCM 101 SCM 102 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 SCM Characteristics Error Check- Missing SCM Area: Error Check-Min/Max Size: Error Check-Hydrology: illError Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: LError Checks-SCM Type: Ellim SCM ID: 101 102 rArea Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 101 (ft2) SCM 102 (ft2) Roof I 317,170 Roadway 99,954 Parking/Driveway/Sidewalk 42,718 Protected Forest Managed Pervious/Landscaping 585,343 Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Side alk Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM 52,527 TOTAL AREA DRAINING TO SCM (ft2): 1,097,712 0 ICATCHMENT AREA(ft2): 1,097,712 Nutrient Export Summary SNAP v4.2.0 Landcover Et SCM Data Review Errors/Advisories Errors/Advisories Avg Annual precip(in)= 45.76 SCM Area(ft2) = 52,527 Total(Regulated+ 1,306,800 SCM Treated Area(ft2)= 1,097,712 Unregulated)Area(ft2)= Project(Regulated) 1,306,800 Catchment Routing: No errors Area(ft2)= Net BUA(Project Area Treating Runoff from 482,812 I Net BUA indicates new development or expansion. no BUA only ft2)= Existing BUA or Offsite: Custom Landcovers are present: no Disturbed Area(ft2)= 1,306,800 Total Nitrogen Export Target Total Phosphorus Export Target 108.00 30000.00 Scaled to Project Area(lb/yr): Scaled to Project Area(Ib/yr): Total Area Total Area Project Area Total Area Project Area Total Area Project Area Project Area Total Area Project Area (Onsite+ Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project Nutrient Export Summary Offsite) (OnsiteOnly) before before Post-Project Post-Project SCM-Treated SCM-Treated Untreated Untreated Pre-Project after Treatment after Treatment Pre-Project Treatment Treatment Area Only Area Only Areas Areas Area(All Landcover Types)(acres) 30.0000 30.0000 30.0000 30.0000 30.0000 30.0000 25.2000 25.2000 4.8000 4.8000 Percent Built-Upon Area(BUA)(%) 0% 0% 37% 37% 37% I 37% 42% 42% 11% 11% Built-Upon Area(BUA)(sqft) 0 0 482,812 482,812 482,812 482,812 459,842 459,842 22,970 22,970 Annual Runoff Volume(ft3/yr) 224,247 224,247 1,886,816 1,886,816 1,511,149 1,511,149 1,404,320 1,404,320 106,829 106,829 Annual Runoff%Change 741% 741% 574% 574% Total Runoff Change(cuft/yr) 1,662,569 1,662,569 1,286,903 1,286,903 Total Nitrogen EMC(mg/0_ 2.48 2.48 1.38 _ 1.38 1.01 1.01 0.96 0.96 1.74 1.74 Total Nitrogen Load Leaving Site(Ib/yr) 34.73 34.73 162.34 162.34 95.40 _I 95.40 83.81 83.81 11.59 11.59 Total Nitrogen Loading Rate(Ib/ac/yr) 1.16 1.16 5.41 5.41 3.18 3.18 3.33 3.33 2.41 2.41 Total Nitrogen%Change Pre-to-Post 367% 367% 175% 175% Total Nitrogen Change(Ib/yr)Pre-to-Post I 127.62 127.62 60.67 , 60.67 Total Phosphorus EMC(mg/L) 1.07 1.07 0.23 0.23 0.17 0.17 0.15 0.15 0.45 0.45 Total Phosphorus Load Leaving Site(Ib/yr) 14.98 14.98 26.51 26.51 15.76 I 15.76 12.79 12.79 2.98 2.98 Total Phosphorus Loading Rate(Ib/ac/yr) 0.50 0.50 0.88 0.88 0.53 0.53 0.51 0.51 0.62 0.62 Total Phosphorus%Change Pre-to-Post 77% 77% 5% 5% Total Phosphorus Change(Ib/yr)Pre-to-Post 11.53 11.53 0.78 0.78 1 SCM/Catchment Summary Volume TN Reduction TP Reduction TN Out TP Out SCM ID and Type Reduction(% ° Falls Lake ONLY: Onsite Reduction Compliance Check (%) (%) (Ibs/ac/yr) (Ibs/ac/yr) Catchment 1 21.11% 44.41% 45.68% 3.33 0.51 Nitrogen Phosphorus 101:Wet Pond 21.11% 44.41% 45.68% 3.33 0.51 Onsite%Reduction Requirement 102:NA 0.00% 0.00% 0.00% 0.00 0.00 Export Target Scaled to Area(lb/yr) 108.00 30,000.00 103:NA 0.00% _ 0.00% _ 0.00% 0.00 _ 0.00 Export Load Post-Project Before Treatment 162.34 26.51 Catchment 2 0.00% 0.00% 0.00% 0.00 0.00 Total Reduction Need(Ib/yr) 201:NA 0.00% 0.00% 0.00% 0.00 0.00 Onsite Reduction Need(Ib/yr) 202:NA 0.00% 0.00% 0.00% 0.00 0.00 Onsite Export Target(Ib/yr) 203:NA 0.00% 0.00% 0.00% 0.00 0.00 Project Area Post-Project After Treatment 95.40 15.76 Catchment 3 0.00% 0.00% 0.00% 0.00 0.00 301:NA 0.00% 0.00% 0.00% 0.00 0.00 302:NA 0.00% 0.00% 0.00% 0.00 0.00 303:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 4 0.00% 0.00% 0.00% 0.00 0.00 401:NA 0.00% 0.00% 0.00% 0.00 0.00 402:NA 0.00% 0.00% 0.00% 0.00 0.00 403:NA 0.00% 0.00% 0.00% 0.00 0.00 _ Catchment 5 0.00% 0.00% 0.00% 0.00 0.00 501:NA 0.00% 0.00% 0.00% 0.00 0.00 502:NA 0.00% 0.00% 0.00% 0.00 0.00 503:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 6 0.00% 0.00% 0.00% 0.00 0.00 601:NA 0.00% 0.00% 0.00% 0.00 0.00 602:NA 0.00% 0.00% 0.00% 0.00 0.00 603:NA 0.00% 0.00% 0.00% 0.00 0.00 1 Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form SNAP v4.2.0 Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: http://deq.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset-information PROJECT INFORMATION Applicant Name: Project Name: WRENN FARMS Project Address: Date: (mm/dd/yyyy) Development Land Use Type: Single Family Residential County: FRANKLIN Project Activity Type: New Development Project Area(sqft): 1,306,800 Project Latitude: 36.036750 Post-Project Built-Upon Area%: 36.95% I Project Longitude: -78.494430 WATERSHED INFORMATION Nutrient Management Watershed: Neusc N Target Export Rate(Ib/ac/yr): 3.60 Subwatershed: Neuse-Upper P Target Export Rate(Ib/ac/yr): 1000.00 Nitrogen Delivery Zone: Neuse-Upper 03020201 Nitrogen Delivery Factor: 100% Phosphorus Delivery Zone: Neuse-Upper 03020201 Phosphorus Delivery Factor: 100% PERMANENT NUTRIENT OFFSET REQUEST Post-Project Nitrogen Calculations -Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TN Export TN Remaining TN Permanent Additional I Total TN TN Untreated TN Treated TN Delivery Offsets Permanent Load(Ib/yr) Target Load Load(lb/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 162.3 108.0 95.4 0.0 1 100.0% 0.0 0.0 I Post-Project Phosphorus Calculations -Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TP Export TP Remaining TP Permanent Additional I Total TP TP Untreated TP Treated TP Delivery Offsets Permanent Load(Ib/yr) Target Load Load(Ib/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) r #VALUE! I LOCAL GOVERNMENT AUTHORIZATION Local Government Name:I Staff Name: Phone: Staff Email: Date: Local Government Authorizing Signature: ice- / valluiVe fairdiair ( `=� LEGEND PROPOSED BOUNDARY a�t� ROADWAY PARKING/SIDEWALK I '=�:rl ���' F ROOF BUA (TOWNHOME 19') II ��.• _ MANAGED PERVIOUS / LANDSCAPING :C�•: /', U LAND TAKEN UP BY SCM ►= rI Ir C ' i i�� /�� T, NOTE: 20' X 10' DRIVEWAYS . �� �� C:� ° ACCOUNTED FOR BY NOT SHOWN • �-�`/ /// Fa, /i ":era / s/ o j i \/I 1:01 ' 1:1,Atio*,1101"i?-4:isivt'''',-,,,-----,11,, _- - - - f_____ // / .lla 'Is,�,o• ,i-• 2.•` ,.. . •woo ° ° ° ,,, ��1 .ore,,&, . ,,;.;, ,itti �0000�,���� ° . ° y 1 0: ..,77 -00"-ISti o o9 r //'/ •jj... ° Epp■ ,,, • pOp° p0° O°° °°°° ° ° ° i IOO ��= n o — �' o - -�- • ifillit : /;�� SCM #1 ° E ti! 11, R - t 0'� : // (WET POND)/ = 1/• f p1.11 • \ I 1 e e e I I I I ,HI W RE N N FARMS YOUNGSVILLE NORTH CAROLINA JANUARY, 2024 .•••. SCALE 1"=200' • ! !• TIMMONS GROUP 0 200' 400' 5410 Trinity Road,Suite 102 I Raleigh,NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com