Loading...
HomeMy WebLinkAbout20040179 Ver 2_401 Application_20151020(S� 0()q() / -)(� State of North Carolina Department of Environment and Natural Resources Division of Water Resources ~ -- 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10 -2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1617 I. Applicant Information j15A NCAC 02H .0502(a)j 1. Owner Information Name: (n i Chnp ] clod 1,I i I« _0lA0e, Mailing Address: Ps K(>>X \I wu-) (line, rn�c�cesv�ll �0' any I = /!� V L5 U V ISM ��� II II OCT 2 0 2015 U DENR • WATER RESOURCES 401 & BUFFER PERMITTING Telephone Number: F=RF5A Number: ,V)_%' -� E -mail Address: ('fed 0 c�nfli`Ct��IS �)!` �tttik� tNc I6OC>e @ me., "mm 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http: / /www.saw.usace.armv. mil / Portals /59 /docs /reizuIatory /reedocs /Permits /SAMPLE AGENT AUTH ORIZATION FORM.odf) must be attached if the Agent has signed this application form. Name: !?hl I "'1 o de a Company Affiliation: LaKewsion DX'_Jdopme(1-� �i•(e� Mailing Address: , l (1(l e—we 6+ he,� ;cos q091--> Nc agiD -1 Telephone Number: N4,15010 09(�l Fax Number: E -mail Address:hl)R Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10 -2013 Page 1 of 4 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this / application form. °3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: I fe_(ieI t Nearest Town: mm�Sv111E Subdivision name or site address (include phase /lot number): Anr <, LnM i hC 1q5 i�n�X�1�vJ \c��ne tYioc�ces�►Ile �C8)I� J L(�-# �.J Directions to site - please include road names and numbers, landmarks, etc.: rnooresdMe - -Fay_t --n soo�� PX i b Arep . Kovp IP 1, 6( Y)e fts) on -Mo le + Latitude (in decimal degreesj3 31 W01-14 Longitude (decimal degrees) _DV + 5ari 12 8 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): C- 6en l o,( 6. Property size (acres): o 3,3 7. Lake/ river/ ocean adjacent to property: LaKe_ Norma() 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): YRI :4 0 n�CP _. WaP God N4e_d- "Y' }� �nreve�t- - �.rr� -►t�� , 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amoun`t'of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 3(30 S -K_C_, ' 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): :;3 +(ees and 9 hoS hes Owner /Agent's Signature* [15A NCAC 02H .0502(f)), Date Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10 -2013 Page 2 of 3 R-oUS JACKSON LOVE CERTIFY THAT THIS MAP WAS DRAWN FROM ANA6AA& SURVEY UNDER MY DIRECT SUPERVISION, 'HAY THE RATIO OF PRECISION IS 1.10.00Op.EEF AWM ENTS; AND THAT { THE ANGULAR ERROR WAS < 7.5 SECONDS PER TURN ./,,� ••� % g WITNESS MY *IAND AND OmCUU°k•'EI —,�.. FSAY OF 1 L!/!J v ,. �1,f1..:�••y V 4 � SE No CAI 1 51 No CIE Rc aR 4 BI4's "E_ - - 100.78' ._..�3s'v,4':'iS,,,r.' •�' VICINITY mAP PIPE NO SCALE BaSEp ' Ma o s ��... "� 19aT s • I m A ` LOT 4 0.82 ACRES LOT 5 JOSEPH F. NEMECHEK Ill & wf. ANDREA OB 1078 -1626 PIN 4644 -08 --3861 PS 24 -149 of N r� 3 O :) Y ±'{S� GGNVV X50 CONTOI�R ,L � F'£I D LOCATED \ 5/09/07 i LAKE NORMAN 1 1 I 1 L UR N 0 • 15.sa' u1 CONCRETE `� N DRIVEWAY Cp �z �•e� 15.81' 2 STORY 7� BRICK ^ LAKE NORMAN . LOT 3 LEONARD J. WOOD & wf. SELMA DB 1071 -995 PIN 4644 -09 -3073 PB 24• -149 f�Y�sj yNl y 3T'!ON I, m B 0 "."C' ICA NOTES: FOR MICHAEL DANE & wf. PAULA I. MSS P � A ;PUTAT,ON. PROPERTY OF JOSEPH F. NEMECHEK III & wf. ANDREA C M07E5 cWPUTEO PaNT. No YONUTffNT FOUND OR SET 195 KNOXVIEW LANE 5. No GRID ua UVEWIMS WITAN �Tm As aF THIS DATE LOT 4 OF KINGS LANDING, PB 24 -149 DEED BOOK 965 -1879, PIN 4644 -08 -3983 DAVIDSON TOWNSHIP, IREDELL COUNTY NORTH CAROLINA MAY 23, 2007 Rl£ NAULDANE RAPHIC SCALE - LEGEND: :rTY LINE UNWRVEYEO IJW ------------------- BACK OF CUR9tUW OF PWT. -- - - - - - - - -•. SE4 AM LDIE CP COMPUIW POW PP POWER POLE 50 100 150 iu,bJy, ,Wllur"ILbML.NIW+Tj PrRAMD LAM � mk vA11A/itr PA P.O. X" 11 DAYA 1DN, NOR= Cd11111SM FEET (704)@U -4S" RUM FAC=UN ,LOVN Z,,W 4 La ke (At Full Pond/ Normal Water Level) dLY7 Full Pond/ -'4 C n'a`\ Normal Water Level �p' Shoreline 3i0c►c wCW Flo C�eGC�n9 �e,CeSS0.�� Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10 -2013 Page 3 of 3 OIL. KPI At Goo 4g e