HomeMy WebLinkAboutNCG020274 DMR SW (2)Stoemwater Discharge Outfall (SDO)
nualitntive Monitoring_ Renort
ij
Certificate of Coverage No.: NCG020274
Facility Name: Pine Mountain Mine & Processing Plant
THE QUARTZ "
County: Mitchell
Phone No.: 828-765-8956
CORP
Operator: The Quartz Corp, USA
Frequency: Semi -Annual
Receiving Stream: North Toe River
Watershed: Nolichucky; NC, TN
Representative Outfall Status?: No
Basin: French Broad River Basin
TMDL 303(d)
Listed?: Yes, turbidity 2008
Vehicle Maintenance Monitoring?: Yes (as of 2012)
Sub -basin: 04-03-06
Stream Class: C:Tr
Water Priority Chemical Storage: Yes
IIIAMs Used?: No
NC Mine Permit ID: 61-06
Date of Inspection: la 2- 9-01 �
Time of Inspection: :3 Sk PM DOZi! Inspector:
a
p�cAl
�� .,
Total Event Precipitation (inches): 1,0
� : 3g �, Pn• o 03
Is this a Representative Storm Event? 19Tes
F No
& s-7 PM oo 1,4
CI.
s
..
by •�
c
o O
Structure
4-
s a
�,
oA
5
O
v'
a
E
�
°o
y
Outfall No.
Description
Ln EColor
p
Industrial Activities
Odor
U
u°,
V)
c�
p
a
p
Otlier Indicators
PM -001A
pipe
road, shipping, bulk loading
73ro wd
P Oh L
�-
aO
W
tl0
/V 4e/ F w
PM -002A
pipe (skimmer)
bulk loading, wastewater
r/ W M
R On e-
No
tj0
AJ 0
�,, Flo w
PM -003
pipe
bulk loading
g1 -o wA ZIW4; j
Rohe
a
�-
Afo
NO
NO
a t✓ A6 *&--
riPM-005A
PM-005A
pipe
tailings dump area
PM -006A
pipe
mining, haul roads
PM -006E
pipe
mine waste dump, stockpile
Scale: I to 5 where I is clear/no solids and 5 is very cloudy/extremely/covered
Comments:
Colors: red, brown, blue, etc. Tint: light, medium,
dark
JAN 16 2015
Odors: use words like "strong, weak, slightly, oil, chemical, etc.
CENTRAL FILES
DWR SECTION
By this signature, I certify that this report is accurate and complete
to the best of my knowledge. 9
/2[2�y
31FAM
Paae of
• Stormwater Semiannual Analytical 2014.xlsx
Pine 2014
NPDES Permit No.: NCG020274
(') Sampling upstream and downstream for SDOs 01, 02, 03 is done in the N. Toe River
(Z) Sampling upstream and downstream for outfall 06E is done in Little Bear Creek
'6
I6 C
0
N
�
U
O
O
~CO
°Ln
m
c o
c(o 0
ca
m
o.
No
v _ �.
o
Z
cam
U
Ew
mo
o�
LL
Via?
M
� a
Q °
Weather Station:
N 2
N o
N
w a-
Site Rain
Gauge
<50.0
50
0.1
15.0
Event Preci itation
Flow Estimated at 20 min intervals
Total
Total
Event
Flow
Flow
Total
Date of
Time of
Sample Point
Date of
Turbidity
TSS
SS
TPH
Rainfall
Duration
Rate
Flow
(gph *
Flow
Sample
Sample
(Outfall ID)
Analyst
Analysis
(NTU)
(mg/1)
(ml/1)
(mg/1)
(inches)
(Hrs)
(gpm)
(gph)
hrs)
(MG)
6/18/14
16:00
PM -01
P. Dortch
6/18/14
x
40
0.1
na
1.36
2.00
8
480
1 960
0.001
6/18/14
16:05
PM -02
P. Dortch
6/18/14
x
33
<0.1
na
1.36
2.00
5
300
600
0.0006
6/18/14
16:10
PM -03
P. Dortch
6/18/14
x
20
<0.1
na
1.36
2.00
5
300
600
0.0006
6/18/14
16:20
PM -05
P. Dortch
6/18/14
33
45
0.1
na
1.36
2.00
30
1,800
3,600
0.0036
6/18/14
16:30
PM -06A
P. Dortch
6/18/14
28
30
<0.1
na
1.36
2.00
35
2,100
4,200
10.0042,
6/18/14
16:55
PM -06E
P. Dortch
6/18/14
17
22
<0.1
na
1.36
2.00
5
300
600
0.0006
6/18/14
17:15
KT -NT -UP
P. Dortch
6/18/14
91
6/18/14
17:20
KT-NT-DWN
P. Dortch
6/18/14
85
PM -01
0
0
0
12/24/14
6:35 AM
PM -02
C.S arks
12/24/14
330
319
0.1
na
1.00
10.50
5.4
324
3,402
0.0034
PM -03
0
0
0
PM -05
0
0
0
PM -06A
0
0
0
PM -06E
0
0
0
12/24/14
6:40 AM
KT -NT -UP
C.S arks
12/24/14
28
12/24/14
6:45 AM
KT-NT-DWN
C.S arks
12/24/14
33
NPDES Permit No.: NCG020274
(') Sampling upstream and downstream for SDOs 01, 02, 03 is done in the N. Toe River
(Z) Sampling upstream and downstream for outfall 06E is done in Little Bear Creek