Loading...
HomeMy WebLinkAboutNCG030277 DMR SWSemi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 7-1;.4-/s CERTIFICATE OF COVERAGE NO. NCG03 O � Z _2 FACILITY NAME CA si mwl CalaiTy D%rgj,.jG- MAe.11C.c. COUNTY C!rAg Te .AJ PERSON COLLECTING SAMPLES LABORATORY PA R Lab Cert. # 20 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR S P R I J'J G- ;2a LS' SAMPLE PERIOD RJan-June ❑ July -Dec _ or ❑ Monthly'_ (month) 1�►RGING TO CLASS ❑ORW E]HQW OTrout ❑PNA JUL 17 2015 Zero -flow [:]Watersupply []SA CENT ©Other TAXAa CRgrj!g WS -IV DWR SECTION es PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?2 - . OutfeilNo. , ;Da#e52unple" Collected 44-houtralnfall amount, � � � • • Total Suspended solids . •� PH,; .:" Standird units � � •�:� Copper _ .�. , . . - Lead Zinc 'Non-Polat O&G /�' >fiotal�Taxic Total Petroleum . , (rfiio/dd/yr), 4nches3 - !. ^ Hydrocarbons : ilrganics5. Benchmarks =_=> _ - 100 mg/L or 50 L / - 6A 9.0 0 007 mgjL, / , 0.033 mg/L, , 0.067 mg/L, •15 thg/L '� ', (a '�f;I'IS�lf ` ,� S• �o. .ao3 , o Ga � S" "� 2A, -IS 3/44 •c S b.r�' .ao1. .00 .00 <5 A 4 G•�G•1S 3 < S G•1 .00 .003 •012, « NIA L./A ZMonthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive,receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture,semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample°(for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." .3-1M MC Dt.IA/ Name (Print name) Q. C- Map'. Title (Print title) 7 -IJ -f -IS' (Signat ) (Date) Note.: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "tM me/L" where XX isthe numerical value 'of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No &,,har a this d 22 NIN - - _ -- - - _ - -a- _ �t. - dike P_ - Collected. , - :v,i - :�w, a: i°'rS'y '-C. ��ii;% ''�:' -��amou" nt;°;�,� qtr , nche5 - -';; •. --,�;-'i s."� • `i _ _ _ - Non- olar'O&G TPH-ttV �PA:1664�{sGT=HEIVI �;d: r_'<% = i' ;•1 �L. _ - .ro:� Y,�:�'�C'x,-.-?,Yx 'S"' - '.�f%+ ria \.•- 1. �..�- ended-rSAlids _ - �.�.,�,s:��;w�-� «, 100'm LorSO;m' 1. - .�% _ f- .4`.R,.9:-_-^>. .�'•-. pi - _ - ���r' L' - Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 3, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: jq`A • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES [] NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES [] NO M REGIONAL OFFICE CONTACT NAME: in the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering Vie information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) 7^ /4i — /-q- (Date) Note: Our area of Gaston County has been in an extended dry spell. Rains have had ,not generated sufficient flow. However, we did get a storm with good flow at 9 PM on Friday June 26th, 2015. We got our samples to Par Lab on Monday June 29th, 2015. - talked with Samar Bou-Ghazle at the Mooresville Office on June 30th 2015 regarding my report would be late. Per Samar, I would be OK if I sent in as soon as I got my lab reports. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3